Strengthening management and oversight of Global Fund grants ...

49
Strengthening management and oversight of Global Fund grants: Lessons learned from the OGAC pilot experiences with executive dashboards in Nicaragua, Zanzibar, Tanzania and Nigeria The Leadership, Management and Sustainability Program Management Sciences for Health December 2007 Prepared by: Wayne Stinson Cary Perry Eduardo Samayoa Catherine Severo Marc Pechevis, HCI Saeed Osmani

Transcript of Strengthening management and oversight of Global Fund grants ...

Strengthening management and oversight of Global Fund grants:

Lessons learned from the OGAC pilot

experiences with executive

dashboards in Nicaragua, Zanzibar,

Tanzania and Nigeria

The Leadership, Management and Sustainability Program Management Sciences for Health

December 2007

Prepared by:

Wayne Stinson Cary Perry

Eduardo Samayoa Catherine Severo

Marc Pechevis, HCI

Saeed Osmani

Management Sciences for Health Tel: 617.250.9500

784 Memorial Drive Web site: www.msh.org

Cambridge, MA 02139 USA

For more information please contact Catherine Severo ([email protected])

This report was made possible through support provided by the US Agency for International

Development, under the terms of Cooperative Agreement Number GPO-A-00-05-00024-00.

The opinions expressed herein are those of the author(s) and do not necessarily reflect the

views of the US Agency for International Development.

Lessons learned on strengthening oversight and management of GF grants with dashboards

3

Table of Contents

Acronyms ............................................................................................................ 4

Executive Summary ................................................................................................. 5

Part 1: Identifying lessons from pilot year efforts to strengthen GF grant oversight and

management .......................................................................................................... 8

Introduction and purpose....................................................................................... 8 Methodology for reviewing the pilot experience ........................................................ 9 Background ......................................................................................................... 9

Part 2: Strengthening CCM oversight: diagnostic and capacity issues ........................... 12

Targeting technical support for oversight ............................................................... 12 CCM oversight capacity assessment ...................................................................... 13

Part 3: Strengthening CCM oversight through better information: Executive Dashboards 16

Overview ........................................................................................................... 16 Grant dashboards in the context of the Three One’s ................................................ 16 Design considerations for information tools ............................................................ 17 The design phase for information tools .................................................................. 25

Part 4: Conclusions and Recommendations .............................................................. 37

Annex 1: Rapid Assessment of CCM Oversight Capacity .......................................... 41 Annex 2: Menu of recommended indicators ............................................................ 47

Lessons learned on strengthening oversight and management of GF grants with dashboards

4

Acronyms

AIDS Acquired Immuno-Deficiency Syndrome

CBOs Community Based Organizations

CCM Country Coordinating Mechanism

CLWD Communities living with one of the 3 Diseases

CSOs Civil Society Organizations

FBOs Faith Based Organizations

FPM Fund Portfolio Manager

GA Grant Agreement

GF Global Fund

GMS Grant Management Solutions

HIV Human Immuno-Deficiency Virus

INGO International NGO

LFA Local Fund Agent

LOE Level of Effort

MDGs Millennium Development Goals

NGO Non-Governmental Organization

OGAC Office of the Global AIDS Coordinator

PEPFAR President’s Emergency Plan for AIDS Relief

PLWA People Living With HIV/AIDS

PLWD People Living With Diseases

PMI President’s Malaria Initiative

PR Principal Recipient

PSMP Procurement and Supply Management Plan

RBM Roll Back Malaria

SOW Scope of Work

SR Sub Recipient

SSR Sub-Sub-Recipient

TA Technical Assistance

TB Tuberculosis

TL Team Leader

TSAP Technical Support Advisory Panel

TSF Technical Support Facility

UNAIDS United Nations AIDS Program

UNICEF United Nations Children’s Fund

USAID United States Agency for International Development

WHO World Health Organization

Lessons learned on strengthening oversight and management of GF grants with dashboards

5

Executive Summary

From June 2006 through December 2007, the Office of the Global AIDS Coordinator (OGAC)

provided funds for Management Sciences for Health’s Leadership, Management and

Sustainability program (LMS) to undertake a pilot program of technical support to Country

Coordinating Mechanisms (CCMs) and Principal Recipients (PRs) receiving grants from the

Global Fund to fight AIDS, TB and Malaria (Global Fund). As part of its efforts to identify

lessons from the pilot phase, OGAC asked LMS to prepare a report analyzing the dashboard

experiment. LMS was instructed to identify the conditions needed for replication of the

dashboard as a standard tool and to draw conclusions on its potential for improving

oversight and management.

To fulfill this charge, LMS convened a working group which conducted a series of face-to-

face and virtual discussions from June through September 2007. Participants in the working

group concluded that broad aspects of governance and grant management had more impact

on conditions for replication than did software selection and dashboard design. Hence, this

report situates the executive dashboard option within the context of strengthening CCM

oversight and PR management, rather than as a stand-alone tool.

Strengthening CCM oversight: diagnostic and capacity issues

Two crucial questions for this pilot evaluation were ―How can we identify CCMs and PRs that

are ready for a dashboard approach?‖ and ―In countries which are not ready for a

dashboard, what should be done to strengthen grant oversight and monitoring?‖ The

working group used the image of a ―three-legged stool‖ required for effective management

and oversight of grants:

Reporting systems, from sub-recipients to PRs and from the latter to the Global Fund

Dashboard tools, used primarily to present existing information more effectively

Action steps, based on information, particularly actions to remedy implementation

problems.

The working group summarized the experiences from the pilot year in targeting technical

support in a table (see Chart 1: Simple mapping tool for identifying TA priorities on page 13

of this report). This table may be used to determine if a country (CCM and PR tandem) is

ready for a dashboard, or if more basic structural or information strengthening work needs

to be done first.

The LMS working group also developed a CCM rapid assessment tool to guide diagnosis of

CCM oversight capacity. (See Annex 1) The tool looks at three major areas: the strength of

data reporting, the quality and effectiveness of grant management and CCM oversight, and

the potential capacity for developing and using information tools.

Using Executive Dashboards to Strengthen CCM oversight

The executive dashboard tool responds to the need of managers and decision makers for

highly graphic presentations of key management and performance indicators for each grant.

LMS has promoted the use of dashboards for:

Overall CCM governance and communication with constituencies and leaders

CCM oversight of grant implementation

PR management of individual grants and sub-recipients.

Lessons learned on strengthening oversight and management of GF grants with dashboards

6

The dashboards provide different amounts of detail (and number of screens or pages) for

each of these levels, from information on individual SRs to succinct summaries of all grants

for higher political levels. The amount of detail provided balances the time the users can

devote to the function and the distance of the user from the level of implementation. The

African dashboards have been developed in Microsoft Excel (see the example on pages 18-

22 for the Round 4 Malaria grant in Tanzania), while Latin American dashboards use Excel

and Crystal Xcelsius (see Attachment A for the Honduras CCM Dashboard).

Dashboards intended for strengthening overall CCM governance and communication can

include additional indicators pertaining to CCM internal management and Secretariat

performance. Dashboards for management may show Sub Recipient information.

The working group spent substantial time debating the relative merits of alternative

software packages, with general agreement that design should start with Excel. PRs/CCMs

which can access capable IT support should move quickly to Xcelsius once basic capability

and user interest have been confirmed. The process for developing new information tools

includes the following steps: deciding what tools to develop; determining appropriate

software; outlining essential presentations; developing dashboard ―architecture,‖ based on a

hierarchy of information needs; developing a flagging system for items requiring attention;

determining data requirements; developing data entry sheets; and developing Follow-up

and Actions pages.

One clear lesson from early oversight work is that international support groups cannot

simply hand over responsibility for dashboards to the GF Secretariat, PRs and resource

centers without also offering continued technical support and facilitation. Dashboards are

not rigid tools but resources for organizational change - and external facilitation (i.e., from a

local or international support group) will usually make the evolution more effective. Two

case studies, one from Nicaragua and the other from Tanzania illustrate the process of

institutionalizing a dashboard within a PR and how longer term support can enable a CCM

and its PRs to use the dashboard to improve oversight.

Conclusions and Recommendations

The working group developed the following conclusions about how technical support to CCM

oversight and PR management should be delivered effectively:

1. In general, technical support should focus on basic structures and processes of good

governance before working on oversight (unless good governance is already in place).

2. Information tools developed for CCM oversight should highlight overall progress and flag

specific problems, but not go the level of detail required for routine management.

3. Information tools should focus on areas likely to require action, including programmatic

blockages and work plan implementation, and should encourage users to make

judgments and plan follow up.

4. TS providers should generally start by encouraging more effective use of existing

sources (especially PR reports, GF and AIDSPAN ratings) before moving to more

sophisticated (and demanding) tools.

Lessons learned on strengthening oversight and management of GF grants with dashboards

7

5. New information tools, especially dashboards, should start from existing demand (the

needs, interests and resources of our host country clients) rather than from what TS

providers think the CCM should want and use.

6. To the extent possible, TS providers should build on existing reporting schedules,

formats and definitions rather than attempting to introduce parallel systems.

7. In countries committed to the Three One’s, the decision to use a dashboard tool should

take into account Three One’s partners, so that the dashboard is not seen as a

duplicative or rival system.

8. Every dashboard for CCM oversight should be able to answer five questions:

a. Where is the money?

b. Where are the drugs?

c. Are activities rolling out as planned?

d. Have performance targets been achieved?

e. Are conditions precedent and other requirements being met?

9. Full CCM meetings should generally review only summary sheets, focusing on overall

program status and follow up actions required.

10. More effort must be placed upon establishing and documenting long term support

arrangements with locally resident technical support partners or contractors.

Experience in implementing recommended changes has been mixed, with successful

introduction of dashboards in Latin America and a greater number of obstacles to their

introduction in Africa. Additional work will be needed in a future project to develop a

dashboard prototype and take forward the standardization of instruction manuals and other

complementary tools and documents.

Lessons learned on strengthening oversight and management of GF grants with dashboards

8

Part 1: Identifying lessons from pilot year efforts to strengthen GF grant oversight and management

Introduction and purpose

From June 2006 through December 2007, the Office of the Global AIDS Coordinator (OGAC)

financed a pilot phase of technical support to Country Coordinating Mechanisms (CCMs) and

Principal Recipients (PRs) receiving grants from the Global Fund to fight AIDS, TB and

Malaria (Global Fund). Funding from the President’s Emergency Plan for AIDS Relief

(PEPFAR) was attributed to existing public health technical support cooperative agreements

and contractors of the United States Aid for International Development (USAID) for

individual short term assignments in 38 target countries. Management Sciences for Health’s

Leadership, Management and Sustainability program (LMS) carried out seven such

assignments focusing on CCM governance and PR grants management.1

Four of those assignments involved strengthening the CCM to provide oversight for GF

grants and/or strengthening the PR’s monitoring and management of the grant and grant

Sub-Recipients (SRs). In parallel, similar work was engaged in a fifth country (Honduras)

financed through the USAID/Honduras buy-in to the LMS project. During the first of these

assignments (Nicaragua), and drawing on several previous years experience with the PR

Nicasalud (a large national NGO), the LMS team developed a computerized summary

reporting tool, the Executive Dashboard. (This tool was inspired by the executive dashboard

developed for the Global Fund itself in 2005.2) Following review of this work in October 2006

by LMS, a decision was made to attempt adaptation of the Nicaragua executive dashboard

to countries in Africa as a tool for strengthening CCM oversight. Adaptation and replication

was attempted in Zanzibar, Tanzania and Nigeria.

In May 2007, as part of its efforts to identify lessons from the pilot phase, OGAC asked LMS

to prepare this report analyzing the four dashboard experiments. LMS was instructed to

identify the conditions needed for replication of the dashboard as a standard tool and to

draw conclusions on its potential for improving oversight and management.

To fulfill this charge, LMS convened a working group which conducted a series of face-to-

face and virtual discussions from June through September 2007. Participants in the working

group concluded early on that broad aspects of governance and grant management had

more impact on conditions for replication than did software selection and dashboard design.

Hence, this report situates the executive dashboard option within the context of

strengthening governance and management, rather than as a stand-alone tool. This report

makes recommendations for dashboard design, including software selection, and defines the

steps required to produce a dashboard and introduce it to the PR and CCM. Brief case

studies illustrate the successful use of a dashboard by the Honduras CCM and the ongoing

struggles of Zanzibar, Tanzania and Nigeria to use theirs. Conclusions are drawn about the

human, IT, and data quality conditions needed for dashboards, and strengthening efforts

needed before dashboards become appropriate. Finally we make recommendations for

1 In Nicaragua, Zanzibar, Tanzania, Pakistan, Nigeria, Cote d’Ivoire, Guinea. This support was financed through

USAID Cooperative Agreement number GPO-A-00-05-00024-00, as part of the USG technical assistance effort for the Global Fund to fight AIDS, TB, and Malaria. 2 See http://www.theglobalfund.org/en/files/about/replenishment/The%20Global%20Fund%20Mid-

Year%20Progress%202005%20%20-%20June%202005.pdf

Lessons learned on strengthening oversight and management of GF grants with dashboards

9

planning and implementing technical support for strengthened management and oversight

of Global Fund Grants.

Methodology for reviewing the pilot experience

With an eye to synthesizing experience and improving future LMS products and services,

three MSH staff and one consultant met for three days in June 2007 to review the Executive

Dashboards created in Nicaragua and replicated in three African countries and to define:

Conditions for replication

Recommendations on use of Excel versus Xcelcius for a generic version of the

dashboard

Process for replication.

Members of the working group were:

Eduardo Samayoa, Senior Program Associate, LMS (oversight work in Nicaragua and

Honduras and inventor of the Executive Dashboard)

Cary Perry, Monitoring and Evaluation Specialist, LMS (oversight work in Nicaragua

and Honduras)

Wayne Stinson, consultant (oversight work in Tanzania, Zanzibar, and Nigeria)

Saeed Osmani, MSH Manager of IT Support (dashboard work in Zanzibar).

Also participating via distance communications was Marc Pechevis, HCI, France (oversight

work in Tanzania) and Catherine Severo, Global Fund Support Manager, LMS (oversight

work in Zanzibar, Tanzania, Nigeria, Cote d’Ivoire, Guinea Conakry).

This group drew lessons from MSH/LMS technical assistance to the following countries to

strengthen oversight:

Nicaragua (July to September 2006)

Tanzania Mainland (September 2006 to January 2007; some follow up support)

Zanzibar (September 2006 to January 2007; some follow up support)

Nigeria (December 2006 through March 2007).

Honduras (January 2007 to present)

Three drafts of the report were produced from June to September 2007. Further information

was drawn from a detailed analysis of the Honduran experience and from follow-up in

Tanzania and Nigeria six months after the first sets of visits and integrated into this final

report. This additional observation has provided much sobering information on the need for

long term follow-up to strengthen CCM oversight and use of the dashboards in general.

Background

Country Coordinating Mechanisms, established to guide Global Fund activities at country

level, have five major responsibilities:

Governance

Harmonization

Proposal development

Lessons learned on strengthening oversight and management of GF grants with dashboards

10

Oversight

Communication.

Oversight is fundamentally a CCM responsibility and differs from management because it

looks across grants and programs to identify cross-cutting policy and implementation

issues. It is strategic, in the sense of setting and following up on broad objectives and

service delivery approaches rather than individual agencies or activities, sometimes even

beyond the scope of individual funding sources. (Tanzanian oversight, for example, is

intended to cover all relevant national programs, not simply those funded by GFATM.)

Oversight is a cyclic activity, following the grant reporting cycle. Typically, the oversight

process starts with reporting by implementing groups, followed by data-based reviews by

objective analysts (i.e., not representing implementing groups), and finally action to

diagnose and resolve implementation bottlenecks. These three stages in the oversight

process are equally critical, especially since information without action may be largely

wasted.

Grant management is primarily a full-time responsibility of individual PRs and SRs, not of

the CCM. Principal Recipients, as signatories of the Grant Agreements, have legal

responsibility for grant performance. The PR may manage the grant directly or delegate

some of the management functions to an SR. In all cases, GF grant management includes

maintenance of key operational systems: partnership coordination, financial management,

human resources mobilization and deployment, procurement and distribution, supervision,

technical coordination, annual planning, technical reporting, among others. CCMs neither

can nor should become involved in grant management functions, except to the extent that

they involve higher level policy issues or systemic problems requiring intervention by higher

authorities.

Many programs also require grant coordination, a process that lies between management

of individual organizations and oversight by the CCM. The need for coordination arises in

grants with multiple PRs, as in Tanzania’s Round 4 HIV grant. The Global Fund Portfolio

Manager has indicated that all four recipients must work together and will be judged

together, hence the need for information sharing, peer review, and joint efforts to solve

problems. The need for coordination also arises where a country has more than one grant

for the same disease or where a single PR manages more than one grant.

Strong reporting systems and data-driven decision making and actions are essential for all

five of the CCM functions, but especially for oversight. The reporting systems currently

available in recipient countries are often weakest in the very countries where they are most

essential. Many CCMs, moreover, continue to see the proposal development function as the

most critical one for continued donor funding. Yet GF’s performance-based funding approach

emphasizes effective and efficient implementation; continuity of funding is conditional upon

good management and high performance. GF Board decisions on additional grants are

increasingly informed by evidence that the CCM and PRs have learned from past

performance and resolved systemic problems. Good PR management and timely problem-

solving CCM oversight both require timely, high quality information and analytical skills.

Work with CCMs and PRs since 2002 has identified a number of frequent problems with

governance and management, many of which have consequent effects on oversight.

Common problems include:

Superficial or limited efforts by CCM to understand and follow the GF grants and their

implementation, increasing as the number of grants per country increases

Lack of clear processes and designated responsibilities for oversight

Lessons learned on strengthening oversight and management of GF grants with dashboards

11

Uncertain and sometimes contested relationships between the CCM and Principal

Recipients

Conflicts of interest when CCM members, Chairs or Vice Chairs are representatives of

PR or SR institutions

Weak national reporting systems leading to parallel reporting for GF requirements

Poor data quality, poor or tardy compliance with reporting deadlines

Excessively voluminous, non quantified, and tardy reporting to the CCM

Failure of the CCM to acquire the technical expertise needed for oversight

Ignorance of significant problems in grant implementation

Reluctance by the CCM to take action even when problems are recognized or failure

to mobilize CCM members to assist the PR to resolve problems beyond its authority.

There is a strong demand for summary reports and tools on the part of more sophisticated

information users, such as CCM donor members and high level decision makers. All CCMs

complain that the volume of information coming from the PRs is late and either too

voluminous or vague and unverifiable. High level decision makers on the CCM (ministers,

permanent secretaries to ministries, donors) ask for succinct summaries with colored or

graphic guides to identify problems or warning symptoms easily.

LMS chose to work on these problems of oversight and information in parallel, linking efforts

to restructure and reinforce oversight with efforts to improve the timeliness and quality of

reporting. Particular emphasis has been placed on development of simplified information

tools and mobilizing technical expertise to help the CCM in the long term.

Lessons learned on strengthening oversight and management of GF grants with dashboards

12

Part 2: Strengthening CCM oversight: diagnostic and capacity issues

Dashboards have been widely praised because of their potential contribution to reducing

Global Fund oversight problems; however, their actual contribution and use have been

mixed because of weak reporting by Principal Recipients and ineffective information use by

CCMs and oversight committees. This is because information tools, no matter how well

presented, provide only raw material for strengthening management, coordination and

oversight. People, and the way in which they work together, are more important than

information tools and are often slower to change.

The working group used the image of a ―three-legged stool‖ required for effective

management and oversight of grants:

Reporting systems, from sub-recipients to PRs and from the latter to the Global Fund

Dashboard tools, used primarily to present existing information more effectively

Action steps, based on information, particularly actions to remedy implementation

problems.

Therefore, two crucial questions to this pilot evaluation are ―How can we identify CCMs and

PRs which are ready for a dashboard approach?‖ and ―In countries which are not ready for a

dashboard, what should be done to strengthen grant oversight and monitoring?‖

Targeting technical support for oversight

Technical support for CCM oversight or M&E strengthening usually begins with a diagnostic

phase, whether an M&E Self Assessment or a shorter diagnosis conducted by the LMS or

GMS team. The results of this phase will be used to select interventions appropriate to the

capacity gaps of the PR or CCM and to select consultants with the skills needed to deliver

the interventions.

The working group summarized the experiences from the pilot year in targeting technical

support in the following table (See Chart 1). This table may be used to determine if a

country (CCM and PR tandem) is ready for a dashboard, or if more basic structural or

information strengthening work needs to be done first. If the latter is the case, the

dashboard should NOT be proposed. It might, however, be proposed in a second phase of

support if preliminary strengthening has been completed successfully.

Information for this analysis should come from an oversight or M&E diagnostic but also from

review of the CCM structure and procedures and the relations between the CCM and the

PR(s) in the recent past. Information should also be drawn from the Grant Progress

Reports, Phase 2 Score Cards and other documents on the GF website.

As noted in this table, the types of consultants needed for these different functions will vary,

depending on the strength of reporting systems and the readiness of CCMs and PRs to use

available information for effective oversight and management. Consultants to support data-

based oversight and management range from governance specialists (for basic structure

and process), to HMIS or M&E experts, to program management or public health people

with intermediate Excel and/or Xcelsius skills. In some cases, the appropriate consultant

Lessons learned on strengthening oversight and management of GF grants with dashboards

13

may be a specialist in financial management or procurement, rather than a measurement

specialist.

Chart 1: Simple mapping tool for identifying TA priorities

Context Responses Comments

Data supply Information use Technical support options

Appropriate types of

consultant

Financial or

programmatic data are unavailable or very unreliable

Statistical

presentations are ignored because they are unreliable

HMIS and M&E

support for selected PRs

HMIS and M&E

specialists

PR reporting

systems are

basically OK, but . . .

The CCM

oversight function

is not defined; committee and procedures are not established.

Create oversight

committee and

procedures within broader governance structure; strengthen secretariat

Governance

specialists

PR systems should

be in place before

developing information tools

PR reporting systems are basically OK, but . . .

CCM doesn’t know how to use information, especially links between financial,

procurement and performance data

Train CCM and/or oversight committee to use existing GF reports

M&E specialist with strong programmatic understanding

Dashboards may be easier to understand than available reports, but they may not

be worth the extra effort when already available information t is not used

Information is

available and problems are recognized, but . . .

No one does

anything; the CCM ignores even known problems.

Strengthen CCM

motivation and capacity to act on available information

Financial

management, procurement, other

Dashboards will

generally not resolve problems of CCM inaction

PR reporting

systems are basically OK, and

The CCM has

moderately good capacity to analyze and act on data.

Excel-based

dashboard (perhaps simple at first)

Program specialist

with intermediate Excel skills (and access to home office technical support)

Pairing of program

and Excel specialists, as in Africa, generally not necessary.

PR and SR

reporting systems are basically OK, and

CCM has high

capacity to analyze and act on data

Xcelsius-based

dashboard

Consultant should

have basic Xcelsius skills but with immediate access to home

office technical support

Xcelsius should be

considered experimental in many countries (especially Africa).

CCM oversight capacity assessment

The Global Fund has focused considerable attention upon preparation of diagnostic tools to

be used by the Local Fund Agent to assess capacity of the PR. With WHO and other

partners, the Global Fund has also developed the M&E Self Assessment Tool for review of

Lessons learned on strengthening oversight and management of GF grants with dashboards

14

national M&E systems for diseases. However, little attention has been focused upon

diagnosis of the oversight capacity of the CCM.

The LMS working group developed a CCM rapid assessment tool to guide diagnosis of CCM

oversight capacity. (See the CCM oversight rapid assessment tool in Annex 1.) The tool

looks at three major areas: the strength of data reporting, the quality and effectiveness of

grant management and CCM oversight, and the potential capacity for developing and using

information tools.

The CCM oversight rapid assessment tool may be used either informally or in a workshop

setting. Specific steps for its use are as follows:

1. Gather further information on USAID and GFATM concerns and issues

a. Meet with USAID

b. Review documents, interview key informants regarding GFATM concerns

2. Assess interests and capacity of information users, especially CCM and program

managers

a. Meet with CCM

b. Meet with oversight group if available; otherwise with key individuals

interested in oversight

c. Assess the use and usefulness of available information tools, including

PU/DRs, direct PR reports, site visits

d. Assess the adequacy and appropriateness of current oversight procedures (as

officially planned and as actually conducted)

e. Assess the adequacy and appropriateness of CCM responses to known

problems

3. Assess interests and capacity of data providers, especially PRs and LSRs

a. Meet with program managers, M&E managers, and those responsible for

financial reporting and procurement

b. Rapidly assess SR reporting to PRs

c. Review reports to LFA and GF (PU/DRs) for completeness and timeliness

d. Determine how existing information tools are used for program management

4. Assess available information tools for content, utility

a. Verbal PR presentations

b. Progress Updates/Disbursement Requests

5. Assess capacity and processes of CCM Secretariat

a. M&E capacity

b. Ability to obtain local expert assistance when needed

6. Identify and assess potential local support institutions and consultants (universities,

computing centers, donors).

a. Assess ability to develop and update information tools

b. Identify at least two individuals able to take responsibility for GF support

c. Assess ability to contract with (1) MSH; (2) CCM Secretariat

Results of this rapid assessment will be used to select the support interventions and to

explain to the CCM what kinds of strengthening it needs to undertake. (It will also allow the

consultants to categorize the CCM in the simple mapping chart – Chart 1 - if they were not

able to do so using existing documents.)

Lessons learned on strengthening oversight and management of GF grants with dashboards

15

Response strategies may begin during the second week of the first field visit and will require

two additional visits with longer term follow up by local consultants or other local partners.

The steps below are condensed but form the heart of country implementation.

1. Work with key members of CCM and others to outline oversight process:

a. What kinds of information PRs will provide to oversight group and on what

schedule

b. How the oversight group will be constituted and what it will do

c. How the oversight group will report to full CCM

d. What follow up actions will occur when problems are identified

2. Work with PRs and others to strengthen use of information for grant management

a. Outline process for coordinated review of SR reports

b. Develop coordination process for multiple implementing groups (PRs/LSRs)

c. Encourage involvement of non GFTS partners to strengthen routine reporting

systems

3. Decide if new information tools are necessary, feasible

a. Specify the information needs of various users (e.g., oversight group,

Secretariat, PR coordinating group, individual PRs)

b. Decide if first step should be to support better use of available reports (e.g.

PU/DR)

c. Do not develop new information tools if basic reporting and oversight

processes are not already in place. Fix that problem first.

d. If new tools are necessary and information users are ready, decide for whom

(per above) and how much information each group will be able to absorb.

e. Identify who will maintain tools after external assistance ends; adjust tool

strategy to sustainability requirements.

4. Plan for long term involvement of local partner

a. Develop contracting arrangement between local partner and GFTS

b. Also identify potential technical support arrangement between local group and

CCM or Secretariat

5. Identify next steps:

a. Stakeholders to confirm membership of oversight group

b. Local TA partner to gather additional information

c. External consultant to begin drafting information tools.

Thus the decision to undertake a dashboard approach takes into account each of the three

―legs‖ of the oversight ―stool‖: reporting systems, quality of existing information, and

capacity to take action.

Lessons learned on strengthening oversight and management of GF grants with dashboards

16

Part 3: Strengthening CCM oversight through better information: Executive Dashboards

Overview

The executive dashboard tool responds to the need of managers and decision makers for

highly graphic presentations of key management and performance indicators for each grant.

LMS has promoted the use of dashboards for:

Overall CCM governance and communication with constituencies and leaders

CCM oversight of grant implementation

PR management of individual grants and sub-recipients.

The dashboards provide different amounts of detail (and number of screens or pages) for

each of these levels, from information on individual SRs to succinct summaries of all grants

for higher political levels. The amount of detail provided balances the time the users can

devote to the function and the distance of the user from the level of implementation. The

African dashboards have been developed in Microsoft Excel3, while Latin American

dashboards use Excel and Crystal Xcelsius.4

As an example, the following pages show dashboards for the Round 4 Malaria grant in

Tanzania. (Please see also Attachment A: the Honduras Dashboard for a full presentation

about a CCM level dashboard.)

Grant dashboards in the context of the Three One’s

The Nicaragua dashboard was created in an environment free of PEPFAR or Three One’s

considerations. In the process of transferring the dashboard to Zanzibar, Tanzania and

Nigeria, the LMS consultants were required to justify this approach within the context the

Three One’s philosophy of consolidated M&E systems and national indicators. In all three

countries, the World Bank was assisting the National AIDS Commissions and Ministries of

Health to develop national HIV/AIDS MIS systems. In Nigeria, furthermore, the federalist

style of government means that health reporting channels information through state

systems, on the way to national level. There was considerable debate in each country about

the appropriateness of a dashboard when all other efforts were directed at consolidation;

World Bank consultants can object strenuously to the introduction of a dashboard.

Four arguments have been used successfully to justify the dashboard as an additional but

not duplicative tool:

1. The dashboard uses existing information from the PRs and SRs, it does not require

collection of additional information. Dashboards reformat information in a user-

friendly way for decision makers. Therefore it is a presentation mechanism for busy

decision makers and managers, not a reporting mechanism.

3 MS Office Excel 2003 4 Business Objects Crystal Xcelsius v4.5

Lessons learned on strengthening oversight and management of GF grants with dashboards

17

2. The World Bank efforts focus on HIV/AIDS but do not concern TB and malaria. The

need for summary reports for these grants cannot be solved by the World Bank

work.

3. Furthermore, the new HIV/AIDS MIS will not be operational for some time (6 to 18

months at the time of these consultancies), while the CCM needs information about

HIV/AIDS grants immediately. CCM work cannot be delayed to coincide with start-

up of the MIS. If at some future time, the MIS can produce dashboard information,

then the grant dashboard for AIDS grants could be stopped.

4. Dashboards include management information, not just health indicators. Therefore,

dashboards overlap only partially with the HIV/AIDS MIS outputs, focusing

specifically on the Global Fund grants.

Design considerations for information tools

The following discussion distinguishes three sub-topics:

Dashboard contents

Dashboard ―architecture‖

Software

Dashboard contents

Regardless of intended use, every dashboard should answer at least the following

questions:

Where is the money?

Where are the drugs?

Are activities rolling out as planned?

Have performance targets been achieved? Are conditions precedent and other requirements being met?

Dashboards intended for strengthening overall CCM governance and communication can

include additional indicators pertaining to CCM internal management and Secretariat

performance.

Lessons learned on strengthening oversight and management of GF grants with dashboards

18

30 September 2007

S1 Comment S2 Comment S3 Comment

Expected Actual Due Date

No. Expected

Reports

No. On-Time

Reports

LFA to GF 7 14 15-Apr-07 6 6

GF to PR 14 14 15-Jul-07 6 6

PR to MoHSW 7 60 15-Oct-07 6 6

MoHSW to SSRs 14 22 (Median) 15-Jan-08 6

MoHSW to SSRs 14 28(Longest)

S4 Comment

BudgetedCommitted/

PaidProcurements

48,891,733 46,938,713 Drugs (ACT)

S5 Comment

Indicators

Target AchievedAchievement

Rate

# of severe malaria cases correctly treated 338,000 393,587 116%

# of uncomplicated malaria cases correctly treated 8,560,000 4,495,268 53%

# of health facilities with no drug stock-outs 2,334 4,111 176%

# of sentinel sites for resistance 20 19 95%

# of NGO/CBO staff trained on BCC 2,541 3,010 118%

# of Radio/TV spots produced and aired 2,000 1,563 78%

# of deliverers trained on epidemic containment 9,710 8,710 90%

# of districts connected to NMCP by internet 24 0 0%

Preparation date: 20-Nov-07 Printing Date

Prepared by: UCC

GFATM, Round 4, MALARIA

Grant has now been fully disbursed. Implementing groups have adequate resources for

near future.

Lengthy delays between MoF and MoH.

S2: Last Fund Disbursement Pipeline (days)

Cumulative Performance

31-Jan-08

Summary of Indicators

01-Aug-05Grant Start Date:

31-Jul-08

$76,086,764

S3: Financial Reporting by LSRs

Data Updated to:

27-Dec-07

Phase 2

MoF

12-Jul-07

Next Shipment DueLast Shipment Received

Grant Finish Date:

Total Value:

Current Status:

Principal Recipient:

Cumulative Performance

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

S1: Program Budget (cumulative,USD)

-

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

US

D

ALL (temp) 54,201,787 54,201,787 54,201,787 54,201,787

Approved Budget Disbursed to PR Disbursed from PR Spent or Obligated

Lessons learned on strengthening oversight and management of GF grants with dashboards

19

Lessons learned on strengthening oversight and management of GF grants with dashboards

20

01-Aug-05

31-Jul-08

30 September 2007

Are technical targets being achieved?

P1 Comment

Indicators Target Achieved

Achievement

Rate

# of severe malaria cases correctly treated 338,000 393,587 116%

# of uncomplicated malaria cases correctly treated 8,560,000 4,495,268 53%

# of health facilities with no drug stock-outs 2,334 4,111 176%

# of sentinel sites for resistance 20 19 95%

# of NGO/CBO staff trained on BCC 2,541 3,010 118%

# of Radio/TV spots produced and aired 2,000 1,563 78%

# of deliverers trained on epidemic containment 9,710 8,710 90%

# of districts connected to NMCP by internet 24 0 0%

P2 Comment P3 Comment

P4 Comment

Preparation Date: 20-Nov-07

Prepared by: UCC Printing Date 27-Dec-07

P1: Cumulative Performance

Yes, very well (except for internet connectivity).

Internet connections delayed by procurement requirements for more than 2 years! Equipment is now in country; installation expected to begin shortly. Need to update treatment target and results; also radio indicator. Drug stock-out

indicator should be verified.

GFATM, Round 4, MALARIA

Performance IndicatorsGrant Start Date:

Grant Finish Date:

Data Updated to:

Cumulative Performance

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

P4: No of Health facilities with no Drug stockouts

0

1,000

2,000

3,000

4,000

5,000

6,000

0 (baseline) Quarter 2 Quarter 4 Quarter 6 Quarter 8

Target

Achievement

P2: No of severe cases correctly treated

0

100,000

200,000

300,000

400,000

500,000

600,000

0 (baseline) Quarter 2 Quarter 4 Quarter 6 Quarter 8

Target

Achievement

P3: No of uncomplicated cases correctly treated using ACT

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

0 (baseline) Quarter 2 Quarter 4 Quarter 6 Quarter 8

Target

Achievement

Lessons learned on strengthening oversight and management of GF grants with dashboards

21

Lessons learned on strengthening oversight and management of GF grants with dashboards

22

Lessons learned on strengthening oversight and management of GF grants with dashboards

23

As noted, the degree of detail used to answer these questions will vary by program phase,

data availability, and user sophistication. (Annex 2 presents a menu of suggested indicators,

with notes regarding their appropriateness for different levels.)

Volume of information

It is essential to avoid information overload for users, especially when there are multiple

grants, PRs, and SRs. In general, it is better to start simply and gain ―buy-in‖ from data

producers and users before moving to more sophisticated information tools. The following

matrix in Chart 2 correlates dashboard users, with objectives, and types of presentations.

Note that the Oversight Committee and Secretariat are likely to require multiple

dashboards, perhaps totaling up to 50 pages for a complex program (e.g. Tanzania)

although some may be studied through hyperlinks and printed only when detailed questions

must be analyzed.

Chart 2: Information users and inter-linked dashboards

User Contents Presentations Comments

Political leaders,

donors,

constituencies,

public

Overall grant

performance, CCM

information

Generally one summary

dashboard (1 page) for all

grants

Identify level of

detail which each of

these user groups

require

CCM as a whole Grant

performance, plus

summary report

from Oversight

committee

One summary dashboard

(1-2 pages) for each

grant, plus analysis of

oversight findings, actions

taken & recommendations

Full CCM should

generally not review

detailed dashboards

Oversight

Committee (all

grants)

Implementation

details (financial,

procurement, HR)

in Phase I, and

technical

performance in

Phase II

Summary dashboard for

each grant (2-3 pages)

including highlights and

actions

Avoid data overload;

ensure that

committee answers

the five questions

above and can easily

access PR detail

when needed

Grant or disease

coordination

committee

Information on

each PRs and

selected SRs

implementing a

single grant

As above plus detailed

dashboards (3-4 pages)

for each PR (if there is a

multi PR grant) and/or

objective

Dashboards facilitate

information

exchange among PRs

with shared

objectives and

responsibilities

Individual PRs Same as above but

with details for

individual SRs

Summary dashboard for

grant, with detailed

dashboards for each SR

and/or objective, this may

include a map of SR

distribution

Develop in

conjunction with

Oversight Committee

dashboards

Software selection

The working group spent substantial time debating the relative merits of alternative

software packages, with general agreement that design should start with Excel. PRs/CCMs

which can access capable IT support should move quickly to Xcelsius once basic capability

and user interest have been confirmed. Excel is simpler than Xcelsius and more widely

Lessons learned on strengthening oversight and management of GF grants with dashboards

24

known, but a well-designed Xcelsius presentation shows greater detail and has greater

potential for exciting users. Chart 3 summarizes the two packages.

Chart 3: Comparison of Excel and Xcelsius for Dashboard Development

Software Advantages Disadvantages

Excel Widely known and many more

people trained in its use than

for Xcelsius; rows and columns

can be easily added to facilitate

maintenance; TA consultants

likely to know it well

Time to create engaging graphs

for presentation is long; Pages

hold a limited number of graphs

(4-5); Many printouts needed

requiring a lot of paper and color

capability

Xcelsius Engaging graphs and pictorial

representations; Graphs can be

quickly created from Excel

spreadsheets; Someone with

good computing skills can be

taught to use it; Interactive

slides can hold more graphs

that Excel

Known by few people; Capacity to

maintain dashboard and make

changes is less available locally

Must be printed by exporting to

Power Point slides which can be

manipulated to show graphs

under a drop down box, but

information contained in the slides

can only be changed in the

original Excel document;

Additional cost of software license

The following may be considered prerequisites for moving from Excel to Xcelsius:

Strong and sustainable software capability within the CCM Secretariat or a support

organization with an established relationship (i.e., contract, grant, or MoU) with the

CCM. (Generally, at least three individuals should have strong software presentation

skills and commitment to learn Xcelsius.)

A rich and generally reliable data set. (Xcelsius is often the most appropriate

presentation package for a program with multiple sub-recipients and service

providers reporting on the same indicators.)

A long term (minimum six to nine months) partnership with MSH or other Global

Fund M&E/IT support group.

Regardless of software selection, the working group agreed that attractiveness of dashboard

presentation has a major bearing on use. While Xcelsius lends itself to greater artistry than

Excel, much can be done within Excel as well. The success of Eduardo Samoyoa’s Excel

forms for data collection for the Nicaragua PR and his dashboards in Xcelsius for the

Nicaragua PR and the Honduras CCM demonstrate the utility of good data presentation. An

example of a prototype CCM dashboard with basic indicators that has been exported to

Power Point from Xcelsius can be found in Attachment A. It displays indicators for

monitoring of the Honduras Global Fund Project performance and management of the

Honduras CCM and CCM secretariat.

Lessons learned on strengthening oversight and management of GF grants with dashboards

25

Technical support consultants’ qualifications

All dashboard consultants should be competent in Excel (i.e., with intermediate skills, able

to develop dashboards with only minimal technical support from an Excel specialist).5 All

dashboard consultants, moreover, should know enough about Xcelsius to determine its

feasibility and appropriateness for a specific program. They should be able to discuss

technical feasibility with local partners and determine if sustainable capability exists. They

should also be able to present a previously prepared Xcelsius dashboard to information

users. Technical support for Xcelsius dashboards may come ―virtually,‖ through an expert

pool in the home office, provided that field consultants are able to prepare preliminary

information in Excel.

The design phase for information tools

Initial design

The following summarizes the process for developing new information tools. (These steps

must be modified where new tools are either not needed or may be introduced after more

basic oversight and management processes have been established.)

1. Decide what tools to develop; these may include:

a. CCM oversight tools

b. Higher (―presidential‖) level dashboard

c. Grant management/coordination dashboards

d. Secretariat dashboard

2. Determine appropriate software (See Chart 3: Comparison of Excel and Xcelsius)

a. Interest/ability of users to use complex information

b. Sustainability with local support resources

c. Use Excel unless prerequisites for Xcelsius have been met.

3. Outline essential presentations

a. Where is the money?

b. Where are the drugs?

c. Are activities rolling out as planned?

d. Have performance targets been achieved?

e. Are conditions precedent and other requirements being met?

f. Are the CCM and Secretariat meeting their own performance objectives?

4. Develop dashboard ―architecture,‖ based on a hierarchy of information needs (see

Chart 1: Information users and inter-linked dashboards)

a. Detailed dashboards for program management and grant coordination (charts

for individual implementing groups and program objectives)

b. Summary dashboards for oversight (charts for individual rounds and

programs, e.g., R4 HIV)

c. Highlight and action pages for full CCM (one for each round and program)

d. Higher (―presidential‖) dashboard for political leaders and others (one

dashboard for all GF-supported activities)

5 Essential Excel skills, defined here as ―intermediate,‖ include: (1) ability to develop and

format graphic presentations, with linkages to data sheets; (2) facility with conditional

formatting; (3) ability to develop simple formulas. Competence in developing macros may

be useful but is not essential.

Lessons learned on strengthening oversight and management of GF grants with dashboards

26

5. Develop flagging system for items requiring attention

a. Red for action needed

b. Orange for early warnings

6. Determine data requirements

a. Build as much as possible on existing reporting systems, especially PU/DRs

b. Options for financial reporting

c. Tracking commodity procurement and availability

d. Identifying critical actions, e.g. conditions precedent and application deadlines

e. Develop definition sheet

7. Develop data entry sheets

a. Lock cells which should not be changed

b. Use color codes for cells which data providers must update

8. Develop Highlights and Actions page

Output: Prototype tools, including contents, architecture, and software selection.

Facilitate local capacity to support oversight

One clear lesson from early oversight work is that international support groups cannot

simply hand over responsibility for dashboards to the GF Secretariat, PRs and resource

centers without also offering continued technical support and facilitation. Most ―hand over‖

arrangements - usually designed as manuals, a training session, and a local resource center

– have led to only weak oversight, with dashboards updated but not adjusted to changing

needs, and oversight committees either not meeting or working ineffectively. It is clear that

more proactive facilitation from outside the GF implementing group makes a big difference

in oversight and eventually grant performance.

It is necessary to keep the full oversight cycle in mind and recognize that even good

dashboards do not guarantee a functioning process. Key elements generally include the

following:

CCM leadership, including insistence that PRs provide timely and accurate data and

cooperate with the oversight process and any follow up

A Secretariat able to obtain and digest PR reports, follow up on missing information,

and monitor PR compliance with oversight recommendations

PRs able to provide timely financial, procurement and performance data

A technical support group, able both to input dashboard data and update

presentations AND to make necessary changes for new grants, Round 2 approvals,

and evolving needs.

A strong and well-facilitated oversight committee or committees, able to ask

perceptive questions, interpret dashboard and other data, and provide appropriate

recommendations to the full CCM

A CCM able to interpret digested program information and to make appropriate

decisions to resolve problems.

Experience in Tanzania and elsewhere shows that good tools and motivated reviewers, while

necessary, do not ensure success; rather, tools, reviewers and processes must evolve

synergistically, with likely adjustments over time in all three. Dashboards must adapt to

changing needs; reviewers must learn to ask perceptive questions and share sensitive

Lessons learned on strengthening oversight and management of GF grants with dashboards

27

information; and processes need to be adjusted for institutional constraints and individual

resources. Dashboards are not rigid tools but resources for organizational change - and

external facilitation (i.e., from a local or international support group) will usually make the

evolution more effective.

Nicaragua aside, most countries have had difficulty ensuring that all oversight elements

were in place together, resulting in poor reporting, inadequate technical review, and failure

to identify and implement necessary improvements. Chart 4 below illustrates:

Chart 4: Status of oversight components six to nine months after OGAC assistance

Country CCM

leadership Secretariat capacity

PR reporting Dashboard production

Review process

Actions to

resolve problems

Nicaragua Complete

change in CCM membership

due to national elections

Weak. CCM

without an Executive Secretary for

over a year.

Good at PR

level, weak from sub-recipients due

to SR turnover and lack of training.

Used by PR to

integrate information and send

reports to CCM

Internal to

PR

Internal

to PR

Tanzania

Mainland

Strong Weak, no

M&E capacity

Until recently,

inadequate for effective review, good for a few PRs

Good,

through University Computing Centre (UCC)

Now in

place for third review cycle

Often

delayed, will need ongoing support

Zanzibar New and intermittent

Weak, no M&E capacity

Good for some grants,

deficient for

others

Good, as above

Two excellent

review

meetings

Will need ongoing

support

Nigeria Strong No functioning Secretariat

Adequate for oversight review

WHO support did not occur due to personal

transfer; US-based consultant has updated dashboards

CCM oversight committee just getting

started one year later, few experts mobilized

Will need ongoing support

Each oversight step requires organizational will and capacity, as well as individual skills; and

it is rare that all come into place simultaneously. In Tanzania, for example, poor PR

reporting made dashboards difficult to compile or misleading; the absence of review

committees led to submission of undigested data to the TNCM Executive Committee. Data

quality is now improving, and well-facilitated review meetings are producing carefully

formulated recommendations. In Zanzibar, CCM leadership has been weak and has failed to

support an otherwise well-planned review process. Nigeria, somewhat surprisingly, has

continued to generate review data, but the departure of a key WHO support person and

slow start-up of the new Oversight Committee, as well as absence of an effective

Secretariat, has crippled other elements in the process.

It is recommended that technical support groups maintain facilitation and fill critical gaps

until the cycle becomes a self-reinforcing virtuous circle. This support can be funded

through local consultants, perhaps mentored by the Grant Management Solutions (GMS)

Lessons learned on strengthening oversight and management of GF grants with dashboards

28

Project, technical support from other international donors, or USAID mission field support

(as currently in Tanzania and Nigeria). Facilitated support should generally last at least six

months. In some cases, a support group (local or international) may have to temporarily fill

M&E functions normally assigned to the Secretariat. External consultants may need to help

resolve implementation blocks or fine-tune dashboard components. Oversight tools and

processes are works in progress; external facilitation and continued technical support should

be available for at least the first two review cycles to ensure sustainability.

From the beginning, moreover, external support groups should develop ties with local

resource groups, such as WHO in Nigeria and University Computing Centre in Tanzania.

These groups should be mandated to technical assistance and facilitation to all key actors in

the oversight cycle, including:

PRs, to provide high quality and timely data

Secretariats, to strengthen M&E capacity, follow up on recommendations, and ensure

that reporting obligations are met

Oversight review groups, to orient members to use of dashboards and to facilitate

meetings

CCM members, to provide appropriate data and recommendations.

All those involved in dashboard production, to ensure that tools evolve with changing

needs.

Output: Sustainable grant management and program oversight processes, including

dashboards

The case study from Nicaragua on the next three pages shows how the dashboard was

introduced in one country.

Lessons learned on strengthening oversight and management of GF grants with dashboards

29

Conditions for success:

The design of the processes needs to be carried out in a participatory way. This

guarantees the success of their implementation.

1. Designing the Pathway

One of the objectives of the technical assistance offered by MSH to the Nicaragua CCM and PR

was:

To design a system for programmatic and financial monitoring and evaluation by the

Principal Recipient (PR)

The first stage of technical assistance to the Principal Recipient consisted of scanning different

country experiences in monitoring and evaluation of Global Fund projects jointly with the PR’s

Global Fund team, with priority given to Latin American countries with a similar language and

culture. The experiences of Peru, Colombia, Cuba, Argentina and Honduras permitted the PR

Global Fund team to have a broader vision of the processes of monitoring and evaluation, to

learn about successful experiences, and to have parameters for comparison with the

Nicaraguan experience.

The next stage consisted of designing the pathway to develop effective oversight of the

implementation of the project through the three processes of monitoring, supervision and

evaluation. For each process, the PR team developed detailed descriptions of the procedures,

activities, persons responsible for undertaking the activities, and the regulations that should

govern the system. Designing these processes in a joint and participatory fashion guarantees the

success of their implementation

Finally a process of validation of these processes was carried out. It was important to share with

all of the staff in the PR the processes that were being designed with the goal of having them

know and approve the procedures, activities, persons responsible, and the regulations. In this

way greater buy-in was created.

In the case of Nicaragua the Principal Recipient is a network of NGOs called NICASALUD. Its

structure allows it to encompass more than 26 NGOs of which the majority are Sub Recipients

During this processs, days were spent working on validation and approval jointly with the

Executive Management, Deputy Technical Management, Coordinators of the Family Health and

Global Fund Projects, and the technical team for programmatic and financial monitoring.

NICARAGUA CASE STUDY AT MSH 2007

Monitoring and Evaluation of the

Global Fund Program in

Nicaragua

08 /2007

BY EDUARDO SAMAYOA

Lessons learned on strengthening oversight and management of GF grants with dashboards

30

Conditions for Success:

Having personnel with intermediate knowledge in the use of Excel responsible

for updating the information system.

Conditions for Success

Train technical personnel in the use of Xcelcius and be able to count on personnel who can

update the system

2. Setting up the Pathway

In order to operationalize the processes of monitoring, supervision, and evaluation, the next

stage consisted of designing the information system. The purpose of this system is to provide

periodic and systematic information to the PR, Sub Recipients, and LFA about the progress of

indicators of coverage and the targets proposed for each quarter during the year.

With this end in mind, a simple and flexible system was designed - one that required the

minimum use of software packages (Excel spreadsheets). The information permits feedback to

be provided efficiently, not only to Sub Recipients but also to the CCM in order to optimize the

project’s planning and implementation processes. The system was designed to have three

levels: Level 1 collects all the information about activities implemented in the action plans of Sub

Recipients. Level 2 consolidates the information at the national level, and Level 3 consolidates

information to be sent to the CCM and LFA.

Monitoring, supervision and evaluation of the entire Project is carried out through indicators of

coverage, quarterly targets, and operational plans from the PR and each Sub Recipient. It is

important to emphasize that in NicaSalud each person responsible technically for the Project

components is the same person responsible for entering the information generated by the Sub

Recipients.

3. Observing the results

The third stage of this technical assistance consisted of designing a system that would permit the

results to be reviewed by the PR Global Fund team and action to be taken when results

demonstrated problems in implementation. In order to provide oversight of progress in

programmatic, financial and managerial performance of Sub Recipients, an early warning

system (dashboard) was created for the Principal Recipient. The goal of the early warning

system is to identify in a timely fashion, the level of financial, programmatic and managerial

progress by Sub Recipients in order to make supervisory visits, if necessary, to help correct

bottlenecks in implementation.

This early warning system was designed using the software Xcelcius, which displays indicators of

process, results, and impact of the project in 4 slides. These results are transmitted monthly to the

CCM and communicated to the Sub Recipients and to the LFA. A training workshop was held for

all of the technical personnel in the projects in how to use and operate Xcelsius (for a total of 12

people).

Lessons learned on strengthening oversight and management of GF grants with dashboards

31

4. Basic Conditions for Replicating the Process

The basic conditions for replicating the process can be summarized as:

1. Clearly define the pathway: use a participatory consensus building process to define the

processes, procedures, activities, persons responsible and regulations for the processes of grant

monitoring, supervision of sub recipients, and evaluation

2. Design a process by which the senior management of the PR can validate the processes

described above in order to gain institutional commitment

3. Define an information system (with programmatic and financial indicators) that permits the

collection of data from sub-recipients and its consolidation

4. Design an early warning system or dashboard to display quarterly results graphically in an

attractive and easily understood way and train staff in the use of the system

5. Have dedicated staff from the PR, with intermediate skills in Excel, specifically for the

development of monitoring and evaluation activities.

Lessons learned on strengthening oversight and management of GF grants with dashboards

32

Facilitate first and second review cycles

Experience in Tanzania and elsewhere shows that success with introduction of the

dashboard was more likely when MSH had the resources to facilitate at least the first cycle

of oversight processes, including all three stages of data reporting, dashboard production,

and review/action. The following are key steps.

1. Ensure CCM leadership support for oversight process and data requirements

2. Secretariat or other dashboard ―owner‖ to request most recent PU/DRs; enter

available information into data sheet

3. Dashboard ―owner‖ to request additional information and updates from implementing

groups

4. Dashboard ―owner‖ to input data, update and possibly adjust presentation pages

5. Plan to use on-screen presentations for details, reserve printouts for summary pages

6. Orient information users to existing and/or new tools; facilitate first review and

development of recommendations

7. Review group to highlight issues and recommend actions to CCM

8. Specific technical assistance for certain follow up actions (especially financial and

procurement supply management)

9. Prepare report

10. Repeat process for second cycle (but with less TA).

Develop follow up plan with local TA group

Sustainability and continuation are key concerns. Continuing support should be facilitated

through local technical organizations. Although LMS made concerted efforts to identify and

hand over the dashboard to local TA providers, these efforts were not always successful.

The following table summarizes these experiences:

Where Hand over to: Result:

Nicaragua Nicasalud with some follow up by LMS

residential team

Internalized process

Zanzibar MOH & University Computing Centre Ltd, a

Dar es Salaam based partner

CCM did not follow up effectively

with UCC to ensure support

Tanzania PRs and University Computing Centre Ltd, a

sub-recipient under 2 grants

Additional TS needed from LMS

and UCC for start up

Nigeria WHO Nigeria, TB Advisor with commitment

from WHO Resident Representative

Failed transfer, TB Advisor was

transferred to another country.

When dashboards have been institutionalized and the information begins to be used by the

CCM, they should evolve, from simple presentations to more complex tools as data flow

improves and users become more sophisticated in their diagnoses and responses. Medium

term TA providers would facilitate this process by:

1. Continue to build capacity within PRs to provide high quality information

2. Continue to build capacity among CCM members to use information to identify issues

and target problem solving

3. Facilitate evolution of information tools as reporting process improves and users

become more sophisticated

4. Include dashboard process in annual work plans and budgets.

Lessons learned on strengthening oversight and management of GF grants with dashboards

33

Output: Sustainable grant management and program oversight processes, including

dashboards

The following case study of dashboard introduction in Tanzania illustrates how longer term

support can enable a CCM and its PRs to use the dashboard to improve oversight.

Lessons learned on strengthening oversight and management of GF grants with dashboards

34

Lessons learned on strengthening oversight and management of GF grants with dashboards

35

By Wayne Stinson6

Country Coordinating Mechanisms for Global Fund programs sometimes put greater energy

into development of new proposals than they do into routine oversight and the smooth flow

of approved funds from GFATM to implementing groups and beneficiaries. The Global Fund

has insisted all along that grants are to be performance-based, contingent on demonstrated

progress, with significant funding hurdles at the transition from Phase 1 to Phase 2 (24

months). Yet CCMs have been slow to set up effective oversight procedures to ensure timely

resolution of the many system constraints facing program expansion—in hiring and

procurement, financial and service reporting, public-private partnerships, and even public to

public relationships (as in decentralization). Potential resources have been ―lost‖ as a result,

as GFATM delays disbursement requests and/or reduces grants.

One of the chief obstacles to oversight and effective decision making has been the lack of

effectively presented information. In some cases, CCM members may be overwhelmed by

voluminous reports or poorly digested statistics with limited bearing on program operations.

In other instances, Principal Recipients submit tardy, incomplete reports. National leaders

and beneficiary representatives on the CCM may have the seniority and authority to address

policy constraints and systemic blockages but lack the time to analyze poorly presented

data or master the management intricacies of implementation. Available reports typically

lack information on the common system constraints mentioned above, moreover, making it

difficult to determine exactly where delays are occurring. Effective oversight requires

appropriate and well-presented information, as well as strong motivation to take action

when problems arise.

Management Sciences for Health (MSH), with funding from USAID, has strengthened

oversight in several countries, including Tanzania, using an information tool known as the

Executive Dashboard. Linked with timely and accurate reporting (already mandated), the

dashboard attempts to answer five basic questions for every grant:

Where is the money?

Where are the people, drugs, commodities, equipment?

Are activities on schedule? Are operational deadlines being met?

Are performance targets being achieved?

Have requirements for time-bound actions and conditions precedent been met?

The data that dashboards present are essentially those already collected and reported (no

new reporting systems); but dashboards summarize them succinctly and provide

automated red flags when actions are needed. Executive Dashboards, in effect, work like

those in cars: minimizing complexity for non-mechanics, reassuring drivers about routine

situations but alerting them to problems, and using summary indicators to identify issues

6 This document was originally prepared with assistance from Ken Heise, Resident Advisor in Tanzania, in December 2007 for the USAID/Tanzania Mission Director, Pamela White, who is a CCM Tanzania representative of the donor constituency.

Case study from Tanzania: Executive dashboards as a tool for management of Global Fund grants

Lessons learned on strengthening oversight and management of GF grants with dashboards

36

for investigation. Dashboards do not replace looking through the windshield or even

occasionally under the hood, but they do provide vital guidance for those prepared to act.

Dashboards are only tools, however, not independent agents; and they only work if applied

appropriately. A fundamental requirement is that dashboards be used as part of a regular

managerial and technical review process and be linked directly to actions. In Tanzania, a

country with more than half a billion dollars in approved grants, oversight was long

enfeebled by the absence of an effective oversight process, starting with timely reporting,

appropriate review by technical specialists, and responsive decision making and follow up by

the CCM (known in Tanzania as the TNCM). Dashboards have become the center point for

that process – now largely in place – providing a vehicle for Technical Working Groups in

Malaria, HIV and TB to summarize findings. TWG reviewers study each chart, enter their

findings in spaces provided, and make explicit recommendations to the Global Fund

Secretariat and Executive Committee. These recommendations, in turn, link automatically to

a TNCM action page, where decisions can be recorded and responsibilities assigned.

The dashboard is a tool for determined actors, not an end in its own right. The dashboard,

and the oversight process it supports, is now coming into its own in Tanzania and appears

likely to improve grant performance. MSH and its local partner, University Computing

Centre, are now adapting the dashboard to a recently signed TB grant to ensure that

potential problems are identified well in advance and do not delay grant performance.

Lessons learned on strengthening oversight and management of GF grants with dashboards

37

Part 4: Conclusions and Recommendations Depending on the level of oversight capacity and information quality of a CCM or PR,

external consultants may support CCM grant oversight and PR grants management and

monitoring in a variety of ways:

1. By providing direct TA to PRs to improve data collection and reporting, including

indicator selection, data quality, and HMIS.

2. Through governance reform, specifically to establish oversight structures and

processes, and to strengthen secretariat M&E capacity.

3. Through strengthening of the CCM’s capacity to diagnose and act on readily available

information, such as GF reports, AIDSPAN ratings, and feedback from direct contact

with PRs.

4. Through development of new oversight tools, ranging from simple PowerPoint

summaries, to Excel-based dashboards (light to complex), to full Xcelsius

presentations.

5. By extending CCM dashboards to the PR level and adapting them for grant

coordination and routine management.

The working group developed the following conclusions about how technical support to CCM

oversight and PR management should be delivered effectively:

11. Oversight of grant implementation is fundamentally an issue of governance and is likely

to be problematic (explicitly or implicitly) in almost every country with weak governance.

Resolution of oversight problems generally requires prior resolution of issues regarding

CCM membership, committee structure, and work procedures, as well as creation of an

effective secretariat. It also benefits from collaborative relationships between the CCM

and principal recipients. In general, technical support should focus on basic structures

and processes of good governance before working on oversight (unless good governance

is already in place).

12. Oversight differs significantly from management and from traditional M&E. The CCM’s

scope looks beyond individual grants and PRs and focuses on national progress and

obstacles in tackling the three target diseases. It contributes to resolving specific

problems, especially when they cut across individual organizations, but it does not

become involved in routine program or organizational management. Information tools

developed for CCM oversight should highlight overall progress and flag specific

problems, but not go the level of detail required for routine management.

13. Oversight also differs from traditional M&E in that it emphasizes action even more than

information. Information tools should focus on areas likely to require action, including

programmatic blockages and work plan implementation, and should encourage users to

make judgments and plan follow up. As such, information tools need to evolve over

time, with perhaps greater managerial detail during startup quarters and more emphasis

on technical performance once basic systems are in place. Technical support for

oversight, in addition to improving governance, should encompass problem analysis and

solution development at appropriate levels and in specific technical areas (especially

financial management and procurement).

14. On the information side of oversight, TS providers should generally start by encouraging

more effective use of existing sources (especially PR reports, GF and AIDSPAN ratings)

before moving to more sophisticated (and demanding) tools. As CCM oversight capacity

increases, however – especially the capacity for analysis and action – TS providers and

Lessons learned on strengthening oversight and management of GF grants with dashboards

38

local TS partners should move to more elaborate methods, including both Excel and

Xcelsius dashboards.

15. New information tools, especially dashboards, should start from existing demand (the

needs, interests and resources of our host country clients) rather than from what TS

providers think the CCM should want and use. TS providers need to educate the CCM to

stimulate demand but should not assume that demand will increase just because they

have introduced a pretty tool.

16. Tools, moreover, should follow existing processes rather than require major changes,

especially in data reporting. To the extent possible, TS providers should build on existing

reporting schedules, formats and definitions rather than attempting to introduce parallel

systems. Depending on our scope of work, TS providers may support development of

PR reporting systems, but this is generally a longer term task than development of a

dashboard.

17. In countries committed to the Three One’s, the decision to use a dashboard tool should

take into account Three One’s partners, so that the dashboard is not seen as a

duplicative or rival system.

18. Every dashboard for CCM oversight needs to address certain basic questions, but with

varying levels of detail depending on grant complexity and CCM oversight capacity.

These questions include:

a. Where is the money?

b. Where are the drugs?

c. Are activities rolling out as planned?

d. Have performance targets been achieved?

e. Are conditions precedent and other requirements being met?

19. Above all, information tools are intended to simplify oversight and management, not to

add significantly to reporting and analytical burdens. Few oversight committees can

review more than 10-15 pages for all current grants. Additional detail should be readily

accessible, however, through spreadsheet linkages (Excel) or interactive displays

(Xcelsius). Full CCM meetings should generally review only summary sheets, focusing on

overall program status and follow up actions required.

20. The first priority of TS providers working with CCMs and PRs is to people (especially

those involved in oversight and management), rather than to products (manuals and

dashboards). The ability of short-term TS providers to facilitate long term organizational

change has been constrained due to the rapid nature of the technical support prescribed

by the scope of work in this pilot phase. Although LMS teams developed innovative and

high quality products, teams had limited capacity (varying from country to country) to

support implementation. More effort must be placed upon establishing and documenting

long term support arrangements with locally resident technical support partners or

contractors, to whom short term TS providers can hand over.

Experience in implementing recommended changes has been mixed, with successful

introduction of dashboards in Latin America and a greater number of obstacles to their

introduction in Africa. Greater care must be exercised in evaluating readiness for a

dashboard approach: the diagnostic tools provided in this report will enable future teams to

target the dashboard intervention to countries with suitable skills and conditions, or to

Lessons learned on strengthening oversight and management of GF grants with dashboards

39

select other strengthening interventions more appropriate to the capacity and information

gaps of the specific CCM or PR.

CCMs and PRs that complete their initial phases of strengthening successfully, have local IT

providers and TS partners to provide long term support, may become suitable in subsequent

years for introduction of grant dashboards.

Additional work will be needed in a future project to develop a dashboard prototype and

take forward the standardization of instruction manuals and other complementary tools and

documents, as well as to translate them into various languages. Additional efforts might

also be directed towards:

Development of the mapping function for PR management of SRs;

Improvement of the summary dashboards for leaders and decision makers;

Development of summary presentation techniques for complex situations including

multiple PRs, multiple grants for the same diseases, and presentation of final results

of grants that have closed.

Finally, given the level of interest expressed by the Global Fund itself, a technical

presentation or technical discussion session of the dashboard with Global Fund and USG

representatives might be worthwhile. If, after additional replication efforts, a prototype

could be finalized and the conditions for replication laid out clearly, the Global Fund itself

might wish to take replication forward as part of its M&E and CCM oversight strengthening

interventions.

Lessons learned on strengthening oversight and management of GF grants with dashboards

40

Lessons learned on strengthening oversight and management of GF grants with dashboards

41

Annex 1: Rapid Assessment of CCM Oversight Capacity

Dimension Indicators Beginning

1

Intermediate

2

Advanced

3

Score Evidence

1. Oversight

Oversight

structure,

processes, and

procedures for

information

collection and use

1.1 Does

the CCM have a

defined

committee, group,

office or specified

individuals whose

role is to assist the

CCM with

oversight?

No defined

oversight

committee, office

or individuals

responsible for

assisting the CCM

with oversight

CCM has

secretariat and /or

oversight

committee but they

are not functional

CCM has secretariat

and/or oversight

committee that are

fully functional in

overseeing GF grants

1.2 Does the CCM

have a defined

process for

oversight?

No defined

oversight

processes

CCM has some

processes but they

are not complete

or well defined

CCM has defined

processes and or/

operations manual

1.3 Does the CCM

or an internal

oversight group

review quarterly

reports and use

data for decision

making?

CCM or internal

oversight group

does not review

quarterly reports

or provide

feedback

CCM or internal

oversight group

reviews quarterly

reports but does

not know how to

interpret statistics

CCM or internal

oversight group

regularly reviews

quarterly reports

and/or dashboards

1.4 Does the CCM

investigate

problems?

CCM does not

recognize

problems or does

not investigate in

an appropriate,

timely or

substantive way.‖

CCM knows about

problems and can

diagnose but does

not respond

effectively

CCM diagnoses

problems and

responds effectively

Lessons learned on strengthening oversight and management of GF grants with dashboards

42

Dimension Indicators Beginning

1

Intermediate

2

Advanced

3

Score Evidence

1.5 Do they

validate data

independently

through site visits?

CCM does not

make site visits

CCM makes

occasional site

visits

CCM plans for regular

site visits and/or has a

system for validating

data

1.6 Does the CCM

use resource

persons or other

experts to

investigate

problems?

CCM never uses

resource persons

to investigate

problems

Asks a CCM

member or a staff

member of PR or

SR to explain

more, or to get

additional

information

May develop specific

terms of reference

and mobilize or

engage an expert or

resource person to

investigate a problem.

:

1.7 Does the CCM

receive regular

help with oversight

from technical

support agencies?

CCM receives no

help

CCM receives help

but it is insufficient

for needs or not

routinely available

CCM regularly receives

help from agencies

such as WHO,

UNAIDS, USAID, GTZ

Please list all

agencies:

Lessons learned on strengthening oversight and management of GF grants with dashboards

43

2. Data Capacity

Dimension Indicators Beginning

1

Intermediate

2

Advanced

3

Score Evidence

Equipment and

Tools

2.1 Does the CCM

Chairman or

Secretariat have

access to

computer

equipment,

projectors and a

printer?

CCM Chairman or

Secretariat does

not have

computer

equipment,

projector. or

printer

CCM Chairman or

Secretariat has or

has access to at

least one computer

but not sufficient

for needs. No color

printer or projector

CCM Chairman or

Secretariat has

sufficient computer,

projector, and color

printer equipment

2.2 Do the CCM

members have

access to the

Internet to send

and receive email?

Most CCM

members do not

have regular

access to the

Internet or may

only have access

through

cybercafés or

other people’s

offices

CCM President and

Secretariat have

internet access at

least daily, not all

CCM members

have internet

All CCM members and

Secretariat staff are

accessible by and

have access to high

speed internet

2.3 Does the CCM

have a reliable

source of

electricity?

CCM has

unreliable source

of electricity

CCM has

moderately reliable

electricity

CCM has a reliable

source of electricity

2.4 Does the CCM

have access to IT

support for

software and data

management

needs?

CCM has no

source of IT

support

CCM has access to

some IT support

but source needs

capacity building in

GF needs

CCM has access to

highly capable source

of IT support

Lessons learned on strengthening oversight and management of GF grants with dashboards

44

Dimension Indicators Beginning

1

Intermediate

2

Advanced

3

Score Evidence

Human resources 2.5 Does the CCM

Secretariat have

identified staff for

M&E?

No identified staff

or consultant with

confirmed TOR

and time

expectations for

M&E

Only one person

(staff or

consultant) for

M&E

More than one person

(staff or consultant)

dedicated to M&E

2.6 Does the CCM

have staff with

capacity in Excel to

maintain and

further develop

Excel-based

dashboards?

No capacity in

Excel. Would

depend on others

to maintain and

further develop

dashboard

Only one person

with intermediate

Excel skills to

maintain and

further develop

dashboard

Several staff with

intermediate Excel

skills

2.7 Does the CCM

have experts or

resource persons

who are co-opted

to support the

CCM oversight

process?

Occasional support

from MOH, PR or

SR

Resource persons

available

occasionally upon

request

Experts co-opted to

participate in

oversight committee

or activities on an

ongoing basis.

Lessons learned on strengthening oversight and management of GF grants with dashboards

45

Dimension Indicators Beginning

1

Intermediate

2

Advanced

3

Score Evidence

3. Information Use and Interpretation

Preparation and

capacity of the

M&E or Oversight

Committee

3.1 Do members

have statistical

understanding and

familiarity with

graphs?

No members with

statistical

understanding and

familiarity with

graphs

At least one

member with

statistical

understanding and

familiarity with

graphs

More than one

member with

statistical training

and/or familiarity with

graphs

3.2 Do members

have M&E

training?

No members

have M&E training

At least one

member with M&E

training

More than one

member with M&E

training

3.3 Do members

have

programmatic

public health

knowledge?

No members

have

programmatic

public health

knowledge

At least one

member with

programmatic

public health

knowledge

More than one

member with

programmatic public

health knowledge

3.4 Are members

action-oriented or

good at problem

solving?

Members are not

action-oriented or

good at problem

solving

At least one CCM

member is

reported by others

to be action

oriented and

problem solving

Evidence from

minutes or interviews

that the CCM has a

reputation for being

action oriented and

solving problems

4.Communi-

cation

Use of electronic

means of

communication

and

communication

strategies

4.1 How do

members of the

CCM and/or

secretariat

communicate with

each other and

with stakeholders?

Minimal use of

email, power point

presentations, or

other electronic

means. Most

communication by

mail or phone or

face to face

meetings

Moderate use of

email, power point

presentations, and

other electronic

means.

Over 50% of

communication takes

place electronically.

Members frequently

make use of power

point presentations

with stakeholders.

Lessons learned on strengthening oversight and management of GF grants with dashboards

46

Dimension Indicators Beginning

1

Intermediate

2

Advanced

3

Score Evidence

4.2 Does the CCM

produce an annual

report, maintain a

website or send

out other

communications?

No annual reports

or website. Few

bulletins or other

communications

with CCM

constituencies

Communications

materials and

moderate efforts to

communicate with

constituencies. May

have a website but

it is not kept up to

date

Website and/or annual

reports or other

communications

materials

5. External Demand for Information

Motivation to

collect and use

data

5.1 Is there

demand for

information on

grant progress

from political

leaders?

No demand from

political leaders

Some political

leaders have

requested

information

Senior political leaders

are requesting

information on a

regular basis

5.2 Is there

demand for

information from

the GF and other

donors or risk that

the country may

lose grant money?

CCM does not

sense pressure

from political

leaders to improve

performance. No

conditions

precedent

CCM senses some

pressure from

political leaders to

improve

performance.

Existence of some

conditions

precedent

CCM has several

conditions precedent

and/or has been

notified by the GF that

the grant is at risk of

being cancelled

5.3 Are CCM

members or the PR

demanding

information?

No demand from

other CCM

members or PR for

information

A few CCM

members voice

concern that they

are not able to

oversee grant due

to a lack of

information

CCM demonstrates

that there is a lot of

value placed on

monitoring of GF

grant. CCM has

repeatedly requested

information from the

PR

Lessons learned on strengthening oversight and management of GF grants with dashboards

47

Annex 2: Menu of recommended indicators Question

addressed Indicator Definition Data source Levels of

use Alerts

Where is the money? (Are

funds reaching implementation levels promptly?)

Total funding request Total requested from GFATM for all phases

GF website CCM, oversight, PR

Approved funding

(cumulative)

Cumulative total which GF has

approved to report date

GF website CCM,

oversight, PR

Total funds disbursed (cumulative)

Cumulative total which GF has disbursed to PRs

GF website CCM, oversight, PR

Funds disbursed to SRs (cumulative)

Total which PR has either disbursed to SRs OR reserved for its own costs

Special PR report (i.e., not reported to LFA)

CCM, oversight, PR

Have expenditures occurred in accordance with budget (by PR, by objective, by cost

category)?

Proportion of cumulative budget which PR reports as spent

Special PR report (i.e., not reported to LFA)

CCM, oversight, PR

Red flag for >20% discrepancies

Above indicators for current fiscal year

As above, but for current fiscal year only

Special PR report (i.e., not reported

to LFA)

CCM, oversight, PR

Red flag for >20%

discrepancies

Where are the drugs? (Are required commodities in

country and reaching beneficiaries?)

% of funds budgeted for pharmaceuticals which have been spent

Actual budget through period of Progress Update/Cumulative through period of progress update

Most recent PU/DR CCM, oversight, PR

Red flag for >20% discrepancies

% of funds budgeted for health products

which have been spent

Actual budget through period of Progress Update/Cumulative through

period of progress update

Most recent PU/DR CCM, oversight, PR

Red flag for >20%

discrepancies

Lessons learned on strengthening oversight and management of GF grants with dashboards

48

Question

addressed

Indicator Definition Data source Levels of

use

Alerts

Are activities rolling out as planned? (Have staff been hired

and trained?)

# of senior posts required vs. # filled

Program management positions Special PR report (i.e., not reported to LFA)

Oversight, PR

Red flag if any positions are unfilled

% of each training target met

cumulative # trained/cumulative # targeted for training

Most recent PU/DR Oversight, PR

Red flag for <80% of target; dark green if >150% of target

Has access increased?

Proportion of each target for facility development which has been achieved

Cumulative number of facilities strengthened/Cumulative target for each type of facility

Most recent PU/DR Oversight, PR

Red flag for <80% of target; dark green if >150% of target

Do GF and AIDSPAN rate this grant positively?

Most recent FPM rating Grant performance report on GF website

CCM, oversight

Red flag if B2 or C

AIDSPAN rating AIDSPAN website CCM,

oversight

Have

performance targets been achieved?

Proportion of target

achieved (cumulative)

Actual results to date

(cumulative)/Intended targets to date (cumulative)

Most recent PU/DR Oversight,

PR

Red flag for

<80% of target; dark green if >150% of target

Proportion of target achieved (trend line)

Above, as reported for each time period

Current and previous PU/DRs

Oversight, PR

Red shading between trend lines for target

and achievement (unless achievement exceeds target)

Proportion of target achieved (most recent

period)

Above, as reported for most recent period

Current and previous PU/DRs

PR Red flag for <80% of target;

dark green if >150% of target

Lessons learned on strengthening oversight and management of GF grants with dashboards

49

Question

addressed

Indicator Definition Data source Levels of

use

Alerts

Are conditions precedent and other requirements

being met?

Status of PR response to GF conditions precedent

Have any major conditions in the Grant Agreement been met?

Grant performance report on GF website

CCM, oversight, PR

Red flag if not met

Status of each condition precedent

Itemization of conditions precedent not yet met and the current status of PR response

Most recent PU/DR CCM, oversight, PR

Red flag if not met

Status of Phase II application

Date due; current status (if appropriate)

Information from PR

CCM, oversight, PR

Orange flag if due date in the

next three months; red flag if overdue

Reports due and

submitted to LFA/GF

Date due; current status (if

appropriate)

Due dates from

grant agreement; submission dates from PR

Oversight,

PR

Orange flag if

due date in the next three months; red flag if overdue

Status of significant work plan deadlines

Information from PR

PR

Are the CCM and Secretariat meeting their own performance objectives?

# of CCM meetings with quorum held in past 12 months

Secretariat reports CCM Red flag if below standard

# of oversight review

meetings held in past 12 months

Secretariat reports CCM Red flag if below

standard

% of Secretariat staff

positions filled

Secretariat reports CCM Red flag if any