Streamlining NPDES Permit Compliance with Asset Management...

21
Streamlining NPDES Permit Compliance with Asset Management Walter Yu Terrence Chen November 8, 2018

Transcript of Streamlining NPDES Permit Compliance with Asset Management...

Page 1: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Streamlining NPDES Permit Compliance with Asset 

Management

Walter YuTerrence Chen

November 8, 2018

Page 2: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Presentation Overview What and why Asset Management

Drivers (NPDES Permit) Innovative Information Technology or Tools 

Examples of Stormwater Asset Inventory

Usefulness for your Stormwater Program

11/9/2018 2

Page 3: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

The Need Stormwater Asset Tracking Needs are Increasing!

NPDES Permit – outfall mapping, BMP inventory, ICID TMDL/Watershed Mandates Reporting

Other Needs Life‐Cycle Cost tracking Dept Health Services (standing water and vector control)

Operation & Maintenance Prioritization of Capital Improvements

11/9/2018 3

Page 4: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Drivers for (NPDES Permit)Asset Management

Phase II MS4Order 2013‐0001‐DWQ

Phase I MS4SF Bay Order R2‐2015‐0049

CT Order 2012‐0011‐DWQ 

OC OrderR8‐2015‐0001

….many more.

11/9/2018 4

Page 5: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

What and why Asset Management

Comprehensive asset management programs for stormwater infrastructure

Capital and Operations and Maintenance Planning Use technology to support a sustainable stormwater program

All agency divisions could benefit  Capital Improvement Planning, Design, Development, Construction, Maintenance, Landscape/Parks, Stormwater Management 

11/9/2018 5

Page 6: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Innovative Information Technologyfor Asset Management (Tools)

Web‐based tracking inventory (maps)

Mobile tools – data collection, inspections, photo documentation

Drones for watershed‐scale and regional‐scale inventory

11/9/2018 6

Page 7: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Example of Stormwater Asset Inventory

ESRI Survey 123 ESRI Collector

11/9/2018 7

Page 8: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

ESRI Survey123 Demo – BMP Review

8

Page 9: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

ESRI Survey123 Demo – BMP Review

https://survey123.arcgis.com/share/43d635ac833c42d9a01e895717b3d4cb

Page 10: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

11/9/2018 10

Page 11: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Mobile LIDAR ‐ Cost effective way to collect engineering grade survey data

Other Solutions?????

Page 12: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

System Components ‐ Sensor Coverage

Sensor height and arrangement facilitates Complete Survey 

Coverage.

Page 13: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Municipal GIS / Asset Inventory

Manholes

Stormdrain Inlets

Page 14: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Asset Visualization – Viewer Access Imagery and GIS datasets are integrated with Mobile data to stream all available information to the desktop.

Page 15: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Asset Management Platforms

11/9/2018 15

Page 16: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Example of Stormwater Asset Inventory

16

Page 17: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Example of Stormwater Asset Inventory

Page 18: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

11/9/2018 18

http://RCstormwatertool.org

Usefulness for your Stormwater Program

Page 19: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

COTS (Commercial Off-the-Shelf) asset management software• Lower cost vs custom• Scalable building block-like options?• May not find one that fits all your organizational needs• Longevity

• IT support cost• Will vendor still support my platform version?

COTS

Page 20: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

Summary NPDES Permit and Watershed Plans/TMDLs require intensive tracking needs for stormwater systems (outfalls, BMPs, O&M)

Use of Innovative technology will improve data collection and management and use by design, maintenance, and construction of stormwater controls

Automated information technology is needed for managing a sustainable stormwater management program

11/9/2018 20

Page 21: Streamlining NPDES Permit Compliance with Asset Management ...northernca.apwa.net/Content/Chapters/northernca... · Summary NPDES Permit and Watershed Plans/TMDLs require intensive

THANK YOU Questions?

Walter [email protected]

Terrence Chen, [email protected]