STREAM PRIVATE DATA CENTER™€¦ · • Dual underground electric utility feeds power from two...
Transcript of STREAM PRIVATE DATA CENTER™€¦ · • Dual underground electric utility feeds power from two...
2001 Ross Avenue , Su i te 2800
Da l l a s , Texas 75201
www.s t reamdatacen te r s .com
866 .30 1 .0901
S T R E A M P R I V A T E D A T A C E N T E R ™
HOUSTON MARKET
T H E W O O D L A N D S
3
7 days of on-site fuel storage
Site is located outside of the 500 year �oodplain
K-Rated perimeter security fence alond each public artery
Each perimeter access point is controlled by on-site security
Biometric scanners and ballistic-rated guard stations and mantraps
Multiple internal and external digital security cameras
Concrete roof, sarna�l membrane, no roof penetrations
Purpose-built, single story concrete building designed to withstand 185 mph wind and uplift
PROJECT OVERVIEW• 74,901 SF stand-alone data center building, hardened to withstand 185 MPH winds and uplift
• Three (3) independent Private Data Center Suites, each with 10,000 SF of raised floor
• Dual underground electric utility feeds power from two substations
• Potential to scale to 6.75 MW of 2N critical load
• Tier III Design certified by Uptime Institute
• Concrete roof deck with a fully adhered Sarnafil waterproofing membrane
• 36” raised floor, fully commissioned data center space
• Secured, perimeter fencing, two K-4 rated, security controlled access points
• Seven days of on-site security and numerous internal and external security cameras monitored on-site
• 24x7 on-site security and numerous internal and external security cameras monitored on-site
• Multiple fiber providers with diverse entry points
• Each Private Data Center Suite will include Private Disaster Recovery office space, backed by 2N generators
TARGETING
LEED SILVERCERTIFICATION
SECURE
4 5
45
Technology Forest Technology Forest
Tech
nolo
gy F
ores
t Te
chno
logy
For
est
Research ForestResearch Forest
New Trail
New Trail
100% undergroundutility feed
100% undergroundutility feed
NorthNorthSouthSouth
Electric UtilitySubstation
Electric UtilitySubstation
Go
slin
g R
dG
osl
ing
Rd
Resea
rch
Fore
st
Resea
rch
Fore
st
6
105
HOUSTONHOUSTON
MagnoliaMagnolia
PinehurstPinehurst
StagecoachStagecoach
TomballTomball
TheWoodlands
TheWoodlands
ShenandoahShenandoahPorter
HeightsPorter
Heights
WoodlochWoodloch
ConroeConroe
Cut andShoot
Cut andShoot
ClevelandCleveland
TarkingtonPrairie
TarkingtonPrairie
AtascocitaAtascocitaHumbleHumble
CrosbyCrosby
BarrettBarrettSheldonSheldon
HighlandsHighlands
ChannelviewChannelviewCloverleafCloverleaf
Jacinto CityJacinto City
Deer ParkDeer ParkPasadenaPasadena
WestUniversity
Place
WestUniversity
Place
BellaireBellaire
Fifth StreetFifth Street
Sugar LandSugar Land Missouri CityMissouri City
MeadowsPlace
MeadowsPlace
MissionBend
MissionBend
FourCorners
FourCorners
PecanGrovePecanGrove
RichmondRichmond
GreatwoodGreatwood
NewTerritory
NewTerritory
SmithersSmithers
HuntersCreek Village
HuntersCreek Village
SpringValleySpringValley
JerseyVillageJerseyVillage
AldineAldine
SpringSpring
SouthHouston
SouthHouston La PorteLa Porte
Morgan’sPoint
Morgan’sPoint
BaytownBaytown
ShoreacresShoreacres
Taylor LakeVillage
Taylor LakeVillage
SeabrookSeabrook
KemahKemah
BacliffBacliffLeague CityLeague City
GalvestonGalveston
FriendswoodFriendswoodWebsterWebster
PearlandPearland
BrooksideVillage
BrooksideVillage
FresnoFresno
SiennaPlantation
SiennaPlantation ArcolaArcola
WoodbranchWoodbranch
PattonVillagePattonVillage
SplendoraSplendora
Plum GrovePlum Grove
RomanForestRomanForest
RidgeRidgeNorthNorth
LakeHouston
Lake HoustonState Park
Sheldon LakeState Park
George BushIntercontinental
Airport - Houston
10
610
45
45
10
45
10
105105
105
6
249
90
59
59
9090
7
Data Hall Side Finish(2) Layers of 5/8” gypsum board with staggered joints
6” Metal studs spaced 16” O.C.Metal Wall Studs
Wire security mesh on the corridor side of the metal studsSecurity Mesh
Corridor Side Finish(2) Layers of 5/8” gypsum board with staggered joints
6” Metal trackMetal Wall Stud Track
S T R E A M R I C H A R D S O N P R I VAT E DATA C E N T E R
Roofing Membrane80 mil Sarnafil G410 Fleece-backed Roof Membrane
R-Value: .10
Prefinished Metal CopingHeavy gauge prefinished metal coping and membrane
Termination BarExtruded aluminum termination bar
1/2” Gypsum roof boardR-Value: .56
Gypsum Roof Board
Two 2” layersR-Value: 22.00
Isocyanurate Foam Insulation
Vapor Retarder2-Ply Sarnavap Self-Adhered Vapor Barrier Membrane
R-Value: .12
Tilt Wall PanelStructurally reinforced concrete tilt wall panel
Reinforced concrete over structural metal deckR-Value: .40
Composite Roof Deck
R-Value: .00Structural Steel Framing
Total Roof AssemblyR-Value: 23.18
ROOF DETAIL• Concrete roof deck with a fully adhered Sarnafil water proofing membrane
• Roof and Structure designed to withstand 185 MPH winds and uplift
DATA HALL SIDE FINISH
(2) Layers of 5/8” gypsum board with staggered joints
METAL WALL STUDS
6” Metal studs spaced 16”
O.C.
SECURITY MESH
Wire security mesh on the corridor side of the metal studs
CORRIDOR SIDE FINISH
(2) Layers of 5/8” gypsum board with staggered joints
METAL WALL STUD TRACK
6” metal track
PREFINISHED METAL COPINGHeavy gauge prefinished metal coping and membrane
TERMINATION BARExtruded aluminum termination bar
ROOFING MEMBRANE80 mil Sarnafil G410 Fleece-backed Roof Membrane
R-Value: .10
GYPSUM ROOF BOARD1/2” Gypsum roof board
R-Value: 22.00
ISOCYANURATE FOAM INSULATIONTwo 2” layers
R-value: 22.00
VAPOR RETARDER2-Ply Sarnavap Self-Adhered Vapor Barrier Membrane
R-Value: .12
COMPOSITE ROOF DECKReinforced concrete over structural metal deck
R-Value: .40
STRUCTURAL STEEL FRAMINGR-Value: .00
TILT WALL PANELStructurally reinforced concrete tilt wall panel
TOTAL ROOF ASSEMBLER-Value: 23.18
IN-WALLSECURITY MESHDEMISES SUITES
8
Multiple carriers are built into the data center for speed of deployment. Multiple local and long haul carriers offer network diversity.
Independent A & B electrical rooms provide 2N redundancy to each Private Data Center Suite
No shared infrastructure, chilled water loop sized for expanded critical load
FIBERCONNECTIVITY
TW Telecom
Level 3
Consolidated
Comcast
AT&T
Phonoscope
ICTX
9
Each private data center suite is demisable. Flexible build out of data halls two and three. Scale to 7.2 MW across 30,000 SF of raised floor.
DAY ONEBUILD OUT
10
TECHNOLOGY FOREST
TECHNOLOGY FOREST
EACH PRIVATE DATA CENTER SUITE PROVIDES
Dedicated 2N electric, N+1 mechanical infrastructure Tenant controlled A & B Telco Rooms
No shared infrastructure or equipment Tenant controlled A & B Electric Rooms
Each suite will deliver 1,125 kW critical load, and is pre-engineered to expand to 2,250 kW
Tenant controlled private entrance and private security station with mantraps
Tenant controlled Private Disaster Recovery office spaceMantraps and biometric readers into each Private Data Center Suite
Tenant controlled Equipment Yard Tenant control of critical infrastructure
11
Private Data Hall 110,000 SF Raised Floor
1,125 KW(Expandable to 2,250 KW)
Private Data Hall 210,000 SF Raised Floor
1,125 KW(Expandable to 2,250 KW)
Private Data Hall 310,000 SF Raised Floor
1,125 KW(Expandable to 2,250 KW)
Generators GeneratorsExp.Gen.
Exp.Gen.
Exp.Gen.
Exp.Gen.
TransformersTransformers
Vista GearSwitch
Transformers
Vista GearSwitch
Exp. Chiller Exp.Chiller
Chiller
Chiller Chiller
Chiller
Equipment Yard 1
Disaster Recovery 1/Office
PrivateTelco Rooms
PrivateTelco Rooms
PrivateTelco Rooms
HouseGenerator B
HouseGenerator A
Disaster Recovery 2/Office
Disaster Recovery 3/Office
Equipment Yard 2
FutureEquipment Yard 3
A B A B A B
Private Data Center Suite
SITE PLAN