Stratobuoy III
description
Transcript of Stratobuoy III
![Page 1: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/1.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
Stratobuoy III
Montana State University
Matthew Handley
Riley Logan
Jordan Maxwell
Matt Voll
1
![Page 2: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/2.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
Mission Overview:
- Verify the data link between the payload and ground station in a highly dynamic envionment
-Test all interfaces remotely (LVDS, UART, SPI etc.) and store payload data and telemetry beacons on-board
- No RF communications yet
- Analyze data post-flight using GSE software
- Look for bugs in flight software or electrical interfaces that cause a system reset or missed beacons
2
![Page 3: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/3.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II / UN-7 Connection:
- Use SHOT balloon flight as test bed to confirm essential UN-7 mission interfaces
Payload CDH
CDH Data Storage
System Health Telemetry Beacon
- Current Spacebuoy flight software version used
- Current electrical interfaces and payload emulator
3
![Page 4: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/4.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II Design: System Diagram
4
QuickTime™ and a decompressor
are needed to see this picture.
![Page 5: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/5.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II Design: Mechanical
- Foam box construction used in previous SHOT and Borealis (MSGC) balloon flights
- Foil shielding for thermal regulation and EMI protection
- Total mass: 1.2 kg
5
![Page 6: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/6.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II Design: Electrical
- Two Microchip PIC24 development boards configured as “emulators”:
1) CDH emulator runs simplified flight software
2) Payload sends dummy science data packets
- Custom battery charger and flight switch circuit
- 2-cell Li-Ion battery (same model used for Spacebuoy EPS)
- Current Multi-Function Interface Board (MFIB) electronics used for payload interface
- Separate heater circuit next to Li-Ion batteries6
![Page 7: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/7.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II Design: Software
- Payload emulator demonstrates a science run, sends dummy data packet every 1 second
- CDH collects dummy science data and writes to on-board SD card for future downlink
- CDH reads system health data and “transmits” telemetry beacon every 10 seconds
- GSE software used to track system health (voltages, currents, temperatures) over duration of the flight
7
![Page 8: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/8.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II Test Details:
8
![Page 9: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/9.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
SHOT II Test Details:
- MFIB and PIC24 development boards already used in functional testing for Spacebuoy electronics
- Battery charge circuit tested to verify mission lifetime goals
- Mission simulation data loaded from SD card into GSE software to demonstrate data parsing and analysis
- Structure design tested with flight heritage
9
![Page 10: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/10.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
Expected Results:
- Confirm payload data and beacon timing with the system clock information stored in each packet
- Payload data increments with each packet sent, no packets missed
- Track battery voltage and current over flight:1) No large fluctuations in current
2) <20% battery depth-of-discharge
- Monitor 3.3V line regulation
- Produce time-series plots with GSE software
10
![Page 11: Stratobuoy III](https://reader035.fdocuments.in/reader035/viewer/2022062802/568145f5550346895db2fad7/html5/thumbnails/11.jpg)
Friday, June 29, 2012 SHOT II Workshop, Boulder, CO
Demonstration:
- Power switches
- GSE software
11