Strategy For Each Water Demand Centre
SSC Meeting on 30 April 2013,Bundu Lodge, Nelspruit
Crocodile River Catchment
Strategy For Each Water Demand Centre
Water Demand Centres In The Crocodile River Catchment
Strategy For Each Water Demand Centre
• Nelspruit• White River• Karino Plaston• Nsikazi South• Matsulu• Elandshoek,
Ngodwana and Kaapsehoop
Overall Water Balance – no intervention scenario
Strategy For Each Water Demand Centre
Overall Water Balance – with interventions
Strategy For Each Water Demand Centre
Overall Water Balance Crocodile - Conclusions
• Overall, it appears that a water balance can be achieved without a new dam,
but• Local deficits occur and water cannot always easily be
transferred between WDCs
• Most significant interventions that will make the biggest difference in terms of reconciliation:− Water use conversions (existing applications to convert
irrigation entitlements into licences for domestic use)
− Removing invasive alien vegetation from the Kwena and Primkop Dams’ catchments
− WC/WDM
Strategy For Each Water Demand Centre
Generic Actions For All WDCs In The Crocodile Catchment
Strategy For Each Water Demand Centre
Action Responsibility TimelineComplete the validation and verification exercise & eliminate illegal water use
DWA Regional Office: ICMA
Ongoing
Develop a policy for reallocation of water entitlements
DWA Policy and Regulation
Immediately (Urgently required)
Individual WDCs in Crocodile River Catchment
Strategy For Each Water Demand Centre
Nelspruit
Strategy For Each Water Demand Centre
Urgent Actions Needed For Nelspruit
Strategy For Each Water Demand Centre
Action Responsibility TimelineImplementation of a WC/WDM plan
MLM (Sembcorp?) Start immediately and plan fully implemented by 2019.
Approval of licence applications.
DWA As soon as possible.
Removal of Invasive Alien Plants in Catchment Area of Kwena Dam.
Working For Water Teams of Department of Environmental Affairs
Start 2014, remove and maintain for the rest of the planning period
Urgent Actions Needed For Nelspruit (Continued)
Strategy For Each Water Demand Centre
Action Responsibility TimelineGroundwater development for short term water shortages.
MLM (Sembcorp?) Start 2014 and abstract water in that same year.
Dam development study for Boschjeskop Dam
DWA in collaboration with MLM
Start immediately – dam should be commissioned by 2018.
Dam development studies for Mountain View and Strathmore Dams
DWA: OA Start immediately – dam should be commissioned by 2022 if it turns out to be preferred to Boschjeskop.
White River
Strategy For Each Water Demand Centre
Urgent Actions Needed For White River
Strategy For Each Water Demand Centre
Action Responsibility TimelineDevelopment and implementation of a WC/WDM plan
MLM Start beginning of 2014 and plan fully implemented by 2019.
Revise tariff structure.(The more water you use, the higher the tariff should become)
MLM Immediately.
Karino Plaston
Strategy For Each Water Demand Centre
Urgent Actions Needed For Karino Plaston
Strategy For Each Water Demand Centre
Action Responsibility Timeline
Licence applied for need to be issued.
DWA Immediately.
Nsikazi South
Strategy For Each Water Demand Centre
Urgent Actions Needed For Nsikazi South
Strategy For Each Water Demand Centre
Action Responsibility TimelineImplement WC/WDM. Draw up a WC/WDM plan as a matter of urgency.
MLM & BWB (Sembcorp?)
Start with plan immediately and implement from 2014.
Stabilise the continuous interrupted water supply.
Bushbuck Ridge Water Board
Immediately
Licence to be issued (irrigation entitlements to be converted)
DWA and ICMA Immediately
Groundwater borehole siting using modern techniques
MLM & BRWB (Sembcorp?)
Start beginning of 2014 and drill and equip borehole(s) within 1 year.
Matsulu
Strategy For Each Water Demand Centre
Urgent Actions Needed For Matsulu
Strategy For Each Water Demand Centre
Action Responsibility Timeline
Implementation of a WC/WDM plan for Matsulu.
MLM (Sembcorp) Start immediately and plan fully implemented by 2019.
Groundwater development for short term water shortages.
MLM (Sembcorp) Start 2014 and abstract water in that same year.
Developing improved Operating Rules for Primkop Dam
ICMA Must be implemented during 2014
Urgent Actions Needed For Matsulu (Continued)
Strategy For Each Water Demand Centre
Action Responsibility TimelineRemove IAPs from the Primkop Dam catchment
Department of Environmental Affairs – Working for Water Teams
Start in 2014, continue and maintain till end of planning period
Investigate the possibility of purchasing water entitlements from upstream water users
MLM (& Sembcorp?) in collaboration with ICMA and DWA.
Start investigating 2014. Water licences must be in place by 2020.
Elandshoek, Ngodwane and Kaapsehoop
Strategy For Each Water Demand Centre
• No water deficits at present
• However water supply need to be augmented in future
• The potential for augmenting water supplies through rainwater harvesting should be investigated
• An experiment on fog harvesting at Kaapsehoop can be conducted
• Additional boreholes can also be drilled to maintain a sustainable water supply to Elandshoek and Kaapsehoop
Sabie River Catchment
Strategy For Each Water Demand Centre
Water Demand Centres In The Sabie River Catchment
Strategy For Each Water Demand Centre
• Hazyview• Nsikazi North
Overall Water Balance – no intervention scenario
Strategy For Each Water Demand Centre
Overall Water Balance – with interventions
Strategy For Each Water Demand Centre
Overall Water Balance Sabie River - Conclusions
• No dam further development possibilities on Sabie River • Most significant interventions for reconciliation:
− WC/WDM
− Water reallocation
− Groundwater development
• Water resource classification of the river could also alleviate the current and future deficits but it has to go through the full process, including full stakeholder participation.
Strategy For Each Water Demand Centre
Generic Actions For All WDCs In The Sabie River Catchment
Strategy For Each Water Demand Centre
Action Responsibility TimelineComplete the validation and verification exercise & eliminate illegal water use
DWA Regional Office: ICMA
Ongoing
Develop a policy for reallocation of water entitlements
DWA Policy and Regulation
Immediately (Urgently required)
Individual WDCs in Sabie River Catchment
Strategy For Each Water Demand Centre
Hazyview
Strategy For Each Water Demand Centre
Urgent Actions Needed For Hazyview
Strategy For Each Water Demand Centre
Action Responsibility TimelineImplement WC/WDM. Draw up a WC/WDM plan as a matter of urgency.
MLM Start with plan immediately and implement from 2014.
Revise tariff structure.(The more water you use, the higher the tariff should become)
MLM Immediately.
Groundwater borehole siting using modern techniques
MLM Start beginning of 2014 and drill and equip borehole(s) within 1 year.
Nsikazi North
Strategy For Each Water Demand Centre
Urgent Actions Needed For Nsikazi North
Strategy For Each Water Demand Centre
Action Responsibility TimelineProgressively improve the integrity of the distribution system
MLM Start immediately – this should be a priority.
Gradually implement WC/WDM as the integrity of the distribution system improves
MLM Ongoing
Site new boreholes at places of water shortage
MLM 2014. Assumed operational within one year
Urgent Actions Needed For Nsikazi North (Continued)
Strategy For Each Water Demand Centre
Action Responsibility TimelinePurchase water entitlements from other water users.
MLM in collaboration with ICMA and DWA.
Start investigating immediately.
Questions and Discussion
Strategy For Each Water Demand Centre