Strategic Requirement for FW MPA

23

Transcript of Strategic Requirement for FW MPA

What is ASW?

What is the threat?

To the UK

To British interests overseas

Outline of ASW capabilities pre-SDSR

UK ASW Area of interest

Changes brought about through SDSR

Why change?

What next?

Warfare against enemy submarines

Combined operations consisting of:

Warships (Frigates)

Aircraft

Friendly Submarines

Other Assets (Space, Sea Bed)

Multi-Sensor

Locate, Track, Deter/Damage/Destroy

Cold-War – Soviet Russia

Modern Cold-War – China?

Mutually Assured Destruction – Nuclear Deterrent

Strategic Capability

11 SSBN (ICBM)

5 SSGN (Tactical Missile)

17 SSN (Sub vs Sub)

17 SS (Sub vs Sub)

3 SSBN in trials

Around 10 other specialist submarines

Possibly the same this number in reserve

Argentina – 3 Diesel Electrics

China – 51 Diesel Electric, 14 Nuclear

Korea – 20 Diesel Electric, 50+ Midget

Iran – 3 Diesel Electric, 25 Midget

Pakistan – 5 Diesel Electric

India – 20 Diesel Electric, 6 Nuclear

Terrorism

13 Type 23 Frigate

9 Nimrod MRA 4

Around 30 Merlin HM1

Multi-Role, primarily ASW

Max speed 30 kts

Flight deck for 1 Merlin

Towed array sonar

Short range surface radar

ESM

Multi-Role, primarily ASW

Max speed 500 kts

Endurance 15hrs unrefuelled (Air to air)

Very capable radar, sonar and ESM

Multi-Role, primarily ASW

Max speed 160 kts

Endurance 5hrs

Ship or landbased

Radar, sonar and

ESM

Non-introduction of Nimrod MRA4

Re-rolling of other assets to cover the capability gap

Option Annual Cost Cost per Unit Operating Cost £/Hr

Nimrod MRA4 £200 Million £400 Million* £30,000

Type 26 Frigate £340 Million £300 Million

Merlin HM1 (Estimated)

£15 Million £28,000

* Much higher than projected costs due to project overruns.

P8-A Poseidon

Casa CN-295M

There is a need for a Maritime Patrol Aircraft

Cost is an overriding factor

Replacing the Nimrod MRA4 would take 10+ years

Experience and skills will fade over time