Strategic Planning for Water Supply Schemes
Transcript of Strategic Planning for Water Supply Schemes
STRATEGIC PLANNING FOR WATER
SUPPLY SCHEMES
SEWERAGE DEVELOPMENT SERVICING PLAN
ITERIM UPDATE
PREPARED FOR
ORANGE CITY COUNCIL
NOVEMBER 2012
ST
SEW
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES
SEWERAGE DEVELOPMENT SERVICING PLAN
INTERIM UPDATE
PREPARED FOR:
ORANGE CITY COUNCIL
NOVEMBER 2012
POSTAL ADDRESS PO BOX 1963 ORANGE NSW 2800 LOCATION 154 PEISLEY STREET ORANGE NSW 2800 TELEPHONE 02 6393 5000 FACSIMILE 02 6393 5050 EMAIL [email protected] WEB SITE WWW.GEOLYSE.COM
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
212266_REP_001A.DOCX
Report Title: Strategic Planning for Water Supply Schemes
Project: Sewerage Development Servicing Plan
Client: Orange City Council
Report Ref.: 212266_REP_001A.docx
Status: Final
Issued: 6 November 2012
Geolyse Pty Ltd and the authors responsible for the preparation and compilation of this report declare that we do not have, nor expect to have a beneficial interest in the study area of this project and will not benefit from any of the recommendations outlined in this report.
The preparation of this report has been in accordance with the project brief provided by the client and has relied upon the information, data and results provided or collected from the sources and under the conditions outlined in the report.
All information contained within this report is prepared for the exclusive use of Orange City Council to accompany this report for the land described herein and are not to be used for any other purpose or by any other person or entity. No reliance should be placed on the information contained in this report for any purposes apart from those stated therein.
Geolyse Pty Ltd accepts no responsibility for any loss, damage suffered or inconveniences arising from, any person or entity using the plans or information in this study for purposes other than those stated above.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
212266_REP_001A.DOCX
TABLE OF CONTENTS EXECUTIVE SUMMARY.............................................................................................. I
ABBREVIATIONS ....................................................................................................... II
INTRODUCTION ........................................................................................................ 1
1.1 BACKGROUND .................................................................................................................. 1 1.2 SCOPE ............................................................................................................................... 1 1.3 REPORT STRUCTURE ...................................................................................................... 1
METHODOLOGY ....................................................................................................... 2
2.1 WHAT ARE DEVELOPER CHARGES? ............................................................................. 2
2.1.1 THE CAPITAL CHARGE ..................................................................................... 2 2.1.2 THE REDUCTION AMOUNT .............................................................................. 2
2.2 SEWERAGE SYSTEM ....................................................................................................... 3
2.2.1 DESCRIPTION .................................................................................................... 3 2.2.2 GROWTH PROJECTIONS ................................................................................. 3
2.3 LAND USE INFORMATION ................................................................................................ 5 2.4 LEVELS OF SERVICE........................................................................................................ 5 2.5 EXISTING AND FUTURE SEWERAGE COMPONENTS .................................................. 5
2.5.1 EXISTING ASSETS............................................................................................. 5 2.5.2 FUTURE CAPITAL WORKS EXPENDITURE .................................................... 5 2.5.3 SYSTEM CAPACITY ........................................................................................... 6
DEVELOPER CHARGES CALCULATIONS ............................................................. 7
3.1 CALCULATED DEVELOPER CHARGE ............................................................................. 7
3.1.1 CAPITAL CHARGE ............................................................................................. 7 3.1.2 REDUCTION AMOUNT ...................................................................................... 7 3.1.3 CALCULATED DEVELOPER CHARGE ............................................................. 7
3.2 REVIEW .............................................................................................................................. 8 3.3 RETICULATION WORKS ................................................................................................... 8 3.4 ADOPTED DEVELOPER CHARGES ................................................................................. 8 3.5 SUPPORTING DOCUMENTS ............................................................................................ 8
REFERENCES ............................................................................................................ 9
DRAWINGS Drawing 212266_FIG01 – Sewerage Development Servicing Plan
APPENDICES APPENDIX A Sewerage Level of Service
APPENDIX B Capital Charge Calculation
APPENDIX C Capital Works Program
APPENDIX D Reduction Amount Calculations
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
212266_REP_001A.DOCX
TABLES Table 2.1 – Orange sewerage major infrastructure................................................................................. 3 Table 2.2 – Orange sewerage DSP growth projections .......................................................................... 4 Table 2.3 – Sewerage system capacity .................................................................................................. 6
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE I 212266_REP_001A.DOCX
Executive Summary
This document presents an interim update to Orange City Council’s Sewerage Developer Servicing Plan (DSP). The interim update only covers the Orange DSP area and does not include the Lucknow/Spring Hill service area. A full revision of the Sewerage DSP will be undertaken later in 2012 or early 2013 when new guidelines are expected to be released by the NSW Government. The full update will include the Lucknow/Spring Hill DSP area.
The area covered by this DSP is shown on Drawing 212266_FIG01.
The sewerage developer charge for the DSP area covered by this document is $4,498 per ET (in $21012/2013).
Developer charges relating to this DSP will be reviewed every 5 years. In the period between reviews, developer charges will be adjusted annually on 1 July on the basis of the movements in the CPI for Sydney in the preceding 12 months.
The developer shall be responsible for the full cost of design and construction of sewerage reticulation works within developments including subdivisions.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE II 212266_REP_001A.DOCX
ABBREVIATIONS
BAU Business as usual
D/S Downstream
DEUS Department of Energy, Utilities and Sustainability
DoP Department of Planning
DPWS Department of Public Works and Services
EA Emergency Authorisation issued under Section 22A of the Water Act 1912
ERP Estimated Residential Population
EP Equivalent Person
ET Equivalent Tenement
GL Gigalitre (1,000 megalitres)
ha Hectares
IWCM Integrated Water Cycle Management
kL Kilolitre (1,000 litres)
kWhr Kilowatt hour
L Litre (1,000 millilitres)
LGA Local Government Area
L/s Litres per second
LEP Local Environmental Plan
LWU Local Water Utility
m3/hr Cubic metres per hour
mL Millilitre
ML Megalitre (1 million litres or 1,000 kilolitres)
ML/day Megalitres per day
m Metre
mm Millimetres
NOW NSW Office of Water
NPV Net Present Value
OCC Orange City Council
pa Per annum
REF Review of Environmental Factors
STP Sewage Treatment Plant (works)
TBL Triple bottom line (environmental, social and economic)
TRB Typical Residential Bill
µg/L Micrograms per litre
U/S Upstream
UV Ultraviolet
WFP Water Filtration Plant
WWTP Wastewater Treatment Plant (or STP)
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 1 212266_REP_001A.DOCX
Introduction
1.1 BACKGROUND Section 64 of the Local Government Act, 1993 enables local water utilities (LWUs) to levy developer charges for water, sewerage and stormwater. A Development Servicing Plan (DSP) is a document that details the sewerage development charges to be levied on development areas utilising a LWU’s infrastructure.
The last review of sewerage developer charges was undertaken in 2009 (Worley Parsons, 2009) and resulted in a sewerage developer charge for the Orange DSP area of $3,410 (in $2007/08) per Equivalent Tenement (ET).
This value has been indexed by inflation each year and is currently $3,955 per ET.
The need to review the Sewerage DSP has been triggered by:
• an adjustment to the Orange sewerage DSP area to include development areas in Ploughmans Valley and the southern suburbs; and
• identification of additional capital works required to meet future system loads.
1.2 SCOPE This report presents results of an interim update of the Sewerage DSP and includes the Orange DSP area only. A full revision of the Sewerage DSP will be undertaken later in 2012 or early 2013 when new guidelines are expected to be released by the NSW Government. The full update will include the Lucknow/Spring Hill DSP area.
This DSP document has been prepared in accordance with the Developer Charges Guidelines for Water Supply, Sewerage and Stormwater (Department of Land and Water Conservation, 2002).
This DSP document supersedes any other requirements related to sewerage developer charges for the areas covered by this DSP. This document takes precedence over any of Council’s codes or policies where there are inconsistencies relating to sewerage developer charges.
1.3 REPORT STRUCTURE The DSP is presented in three sections:
• Section 1 provides the DSP background and scope;
• Section 2 outlines the calculation methodology and provides relevant background data; and
• Section 3 summarises the calculated developer charges for the Orange sewerage DSP area.
Technical and supporting information is attached as Appendices.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 2 212266_REP_001A.DOCX
Methodology
2.1 WHAT ARE DEVELOPER CHARGES? Developer charges are up-front charges levied to recover part of the infrastructure costs incurred in servicing new developments or additional/changes to existing development. Developer charges provide a source of funding for infrastructure required for new urban development.
Developer charges are calculated as follows:
Developer charge = Capital Charge - Reduction Amount (cost of providing asset) (cost recovered through annual bills)
The 2009 DSP (Worley Parsons, 2009) used the following methodology to calculate the sewerage developer charge:
• Capital Charge: Return on Investment (ROI) Factor; and
• Reduction Amount: NPV of Annual Charges.
The same methodology was used for this interim update.
2.1.1 THE CAPITAL CHARGE
The capital cost includes the cost of providing, extending or augmenting assets required, or likely to be required, to provide services to development areas. The capital cost per equivalent tenement (ET) is the value of relevant assets divided by the capacity of these assets (In ETs).
Relevant assets include existing and future assets required to support growth. The capital charge is calculated as follows:
Capital charge = Capital Cost - Return on Investment (ROI) Factor
The capacity of an asset is not fully utilised until sometime after the asset has been commissioned. The Return on Investment (ROI) factor is based on the cost of early investment and recovery of that cost over time. The ROI factor is dependent on the period of take-up of the asset capacity and the rate of return required for the asset.
The capital charge is calculated for each development service area.
2.1.2 THE REDUCTION AMOUNT
Orange City Council (OCC) has adopted the Net Present Value (NPV) of annual bills method for calculation of the reduction amount.
Developer charges cover the capital charge for servicing a development are less the net present value of the net income from annual charges for the development area. The reduction amount represents the NPV of net income (income less recurrent expenditure) from the development.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 3 212266_REP_001A.DOCX
2.2 SEWERAGE SYSTEM
2.2.1 DESCRIPTION
Orange City Council provides reticulated sewerage services to about 14,640 assessments (2009/10). The area serviced is shown on Drawing 212266_FIG01. Sewage is collected from this area through approximately 400 km of sewer mains and 11 major pump stations.
Sewage is collected and delivered to the Orange Sewage Treatment Plant (STP) which is located to the north-east of the city. The plant processes approximately 3,000 to 4,000 ML annually and has a capacity to service up to 60,000 equivalent persons (EP) with capacity to provide full treatment up to approximately 43.2 ML/day (500 L/s). The treatment plant has been in operation since 1919 with major upgrades undertaken in 1933, 1963, 1987 and 1988, and a refurbishment of the digester taking place in 2004.
Water is tertiary treated and includes biological nutrient removal, chemical dosing for phosphorous removal, and chlorination for disinfection of effluent. The process units utilised include: 2 step screens; an aerated grit chamber and classifier; 4 primary tanks; 4 trickling filters; anoxic tank and aeration tank (with surface aerators), 7 secondary clarifiers, chlorine tank and cascade, 2 storage tanks, dissolved air flotation (DAF) plant and sludge digester. Some aspects of the plant have been designed to provide for the ultimate capacity of Orange (120,000 EP) including the inlet works, control building, chlorination facilities and the trunk mains (WorleyParsons, 2009).
The majority of the treated effluent from the Orange STP is reused under an existing water supply agreement by Cadia Holdings Pty Limited for mineral processing. The agreement commenced in 1997 and is set to continue for the life of the mine. Data for the period 2001 to 2011 shows an average of 72% of the effluent produced over this period was transferred to Cadia Holdings Pty Limited. The annual transfer ranged from 28% to 94% and averaged 8.2 ML/day over this period.
The balance of the treated effluent is discharged under licence to Blackmans Swamp Creek.
Major sewerage infrastructure is listed in Table 2.1.
Table 2.1 – Orange sewerage major infrastructure
Component Quantity
Treatment plant 1
Pump stations 25
Pipes (km) 404
Access chambers 7,503
1 Source: IPWEA (2011)
2.2.2 GROWTH PROJECTIONS
Assessment growth projections for the interim sewerage DSP update have been adopted from analysis carried out for OCC’s Integrated Water Cycle Management (IWCM) Evaluation Study (Geolyse, 2012). Base line assessments in 2012/2013 are:
• Residential 14,860; and
• Non-residential 1,837.
An average growth rate of 0.8% pa was applied. This is the medium growth rate adopted in the IWCM Evaluation Study.
OCC has adopted the assumption that one residential assessment represents one ET and one non-residential assessment represents three ETs. Assessment and ET projections are shown in Table 2.2.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 4 212266_REP_001A.DOCX
Table 2.2 – Orange sewerage DSP growth projections
Year Assessments1 ETs
Residential Non-residential
Total Residential2 Non-residential3
Total
2011/2012 14742 1822 16564 14742 5466 20208
2012/2013 14860 1837 16697 14860 5510 20370
2013/2014 14979 1851 16830 14979 5554 20533
2014/2015 15099 1866 16965 15099 5598 20697
2015/2016 15219 1881 17100 15219 5643 20862
2016/2017 15341 1896 17237 15341 5688 21029
2017/2018 15464 1911 17375 15464 5734 21198
2018/2019 15588 1927 17514 15588 5780 21367
2019/2020 15712 1942 17654 15712 5826 21538
2020/2021 15838 1957 17795 15838 5872 21710
2021/2022 15965 1973 17938 15965 5919 21884
2022/2023 16092 1989 18081 16092 5967 22059
2023/2024 16221 2005 18226 16221 6014 22236
2024/2025 16351 2021 18372 16351 6063 22414
2025/2026 16482 2037 18519 16482 6111 22593
2026/2027 16614 2053 18667 16614 6160 22774
2027/2028 16747 2070 18816 16747 6209 22956
2028/2029 16881 2086 18967 16881 6259 23139
2029/2030 17016 2103 19119 17016 6309 23325
2030/2031 17152 2120 19271 17152 6359 23511
2031/2032 17289 2137 19426 17289 6410 23699
2032/2033 17427 2154 19581 17427 6462 23889
2033/2034 17567 2171 19738 17567 6513 24080
2034/2035 17707 2188 19896 17707 6565 24273
2035/2036 17849 2206 20055 17849 6618 24467
2036/2037 17992 2224 20215 17992 6671 24662
2037/2038 18136 2241 20377 18136 6724 24860
2038/2039 18281 2259 20540 18281 6778 25059
2039/2040 18427 2277 20704 18427 6832 25259
2040/2041 18574 2296 20870 18574 6887 25461
2041/2042 18723 2314 21037 18723 6942 25665
1 average growth 0.8% pa 2 one residential assessment = one ET 3 one non-residential assessment = 3 ETs
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 5 212266_REP_001A.DOCX
2.3 LAND USE INFORMATION Land use information defining future development areas were adopted from the Orange Local Environmental Plan 2011.
Areas zoned for development over the next 30 years and the anticipated number of allotments are shown on Drawing 212266_FIG01. The total lots available are:
• Years 0 to 20 4,534; and
• Years 20 to 30 4,124.
This shows a total of 8,658 residential allotments are available in the land already zoned for development. This is more than sufficient to cater for the forecast growth of residential assessments over the 30 year planning period.
2.4 LEVELS OF SERVICE Orange City Council sewerage levels of service (LOS) and the proposed performance measures are summarised in Appendix A. The sewerage LOS are the targets that Council aims to achieve and do not represent a formal customer contract.
System design (including capital works) and operation are based on the LOS.
2.5 EXISTING AND FUTURE SEWERAGE COMPONENTS
2.5.1 EXISTING ASSETS
Data for existing assets were taken from the 2009 Sewerage DSP (WorleyParsons, 2009). The 2009 DSP obtained the existing asset information from OCC’s asset database. It includes all collection, transport, pumping and sewerage treatment works assets associated with the existing sewerage system. A list of the existing assets is provided in Appendix B.
2.5.2 FUTURE CAPITAL WORKS EXPENDITURE
OCC’s sewerage capital works program is included in Appendix C. These items are included in the capital charge calculation presented in Appendix B.
Capital works estimated at $85.87 million ($2012/2013) will be required over the next 30 years to provide sewerage services to the Orange DSP area comprising both new works and renewals as follows:
• Level of service works $20.041 million;
• New system assets $15.569 million; and
• Renewals $49.260 million.
The annual sewerage capital works expenditure is shown in Figure 1. The renewals expenditure is excluded from the capital charge calculation. Timing of works and expenditure will be reviewed in conjunction with the Management Plan.
A subsidised scheme refers to improved level of service to existing customers, regardless of whether a subsidy is available.
New system assets are those required to support growth.
Existing cash reserves were applied to some capital items as described in Section 3.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 6 212266_REP_001A.DOCX
Figure 1: Orange DSP capital works program
2.5.3 SYSTEM CAPACITY
The system capacity was adopted from the 2009 sewerage DSP (WorleyParsons, 2009) as shown in Table 2.3.
Table 2.3 – Sewerage system capacity
System component Overall capacity (ETs)
Sewage Treatment Plant (ultimate capacity 60,000 EP)1 24,000
Collection and transfer system 23,004
1 based on an EP/ET ratio of 2.5
0
1,000
2,000
3,000
4,000
5,000
6,000
2012
/201
3
2013
/201
4
2014
/201
5
2015
/201
6
2016
/201
7
2017
/201
8
2018
/201
9
2019
/202
0
2020
/202
1
2021
/202
2
2022
/202
3
2023
/202
4
2024
/202
5
2025
/202
6
2026
/202
7
2027
/202
8
2028
/202
9
2029
/203
0
2030
/203
1
2031
/203
2
2032
/203
3
2033
/203
4
2034
/203
5
2035
/203
6
2036
/203
7
2037
/203
8
2038
/203
9
2039
/204
0
Tota
l exp
endi
ture
(201
2/20
13 $
'000
)Total Subsidised scheme (ie. LOS) Total New System Assets Total Renewals
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 7 212266_REP_001A.DOCX
Developer Charges Calculations
3.1 CALCULATED DEVELOPER CHARGE
3.1.1 CAPITAL CHARGE
The capital charge was calculated based on the existing and future assets and the ultimate capacity of each sewerage system component as outlined in the 2009 DSP (WorleyParsons, 2009) and described in Section 2.
Council currently has cash reserves in the sewer fund of around $8 million. The capital charge assumed the following capital works would be funded from these reserves:
Sewage Treatment Works
STP3: DAF upgrade $1,200,000 in 2013/2014
STP5: carbon dosing $845,000 in 2014/2015
Sewage Pump Stations
PV1: Sieben Drive pump station $1,000,000 in 2015/2016
PV3: West Ploughmans Valley PS $420,000 in 2012/2013
Rising Mains
SS1: Sewer main upgrade (Autumn St) $1,500,000 in 2016/2017
PV2: Ploughmans Valley Augmentation $500,000 in 2015/2016
PV4: West Ploughmans Valley main $180,000 in 2012/2013
The capital charge calculated from these assumptions is $5,662 per ET (in $21012/2013).
3.1.2 REDUCTION AMOUNT
The NPV of Annual Bills methodology was used to calculate the reduction amount (refer to Appendix D).
The reduction amount for OCC developer charges was calculated as $1,164 per ET (in $21012/2013).
3.1.3 CALCULATED DEVELOPER CHARGE
The calculated sewerage developer charge for the Orange DSP area is $4,498 per ET (in $21012/2013).
This is an increase of around $540 per ET (13.7%) above the existing sewerage developer charge.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 8 212266_REP_001A.DOCX
3.2 REVIEW Typically developer charges would be reviewed after a period of no more than 5 years. However if it is considered that a new DSP is warranted, a new DSP shall be prepared, exhibited and registered. That is the case for this interim update.
A full revision of the Sewerage DSP (including Lucknow/Spring Hill) will be undertaken later in 2012 or early 2013 when new guidelines are expected to be released by the NSW Government.
In the period between reviews, developer charges will be adjusted annually on 1 July on the basis of the movements in the CPI for Sydney in the preceding 12 months.
3.3 RETICULATION WORKS The developer shall be responsible for the full cost of design and construction of sewerage reticulation works within developments including subdivisions. The design and construction of the works shall be in accordance with Council’s development specifications for sewerage.
3.4 ADOPTED DEVELOPER CHARGES The adopted sewerage developer charge for the Orange DSP area is $4,498 per ET (in $21012/2013).
3.5 SUPPORTING DOCUMENTS The following supporting documents are attached as Appendices:
• Appendix A – OCC sewerage levels of service;
• Appendix B – Capital charge calculation. This document contains details information on existing and future capital items for the sewerage system. It details the timing and uptake of these works and the ROI factor;
• Appendix C – Sewerage capital works program that shows the type and timing of all capital works; and
• Appendix D – calculation of the reduction amount using the NPV method.
STRATEGIC PLANNING FOR WATER SUPPLY SCHEMES SEWERAGE DEVELOPMENT SERVICING PLAN
ORANGE CITY COUNCIL
PAGE 9 212266_REP_001A.DOCX
References
Department of Land and Water Conservation (2002) Developer Charges Guidelines for Water Supply, Sewerage and Stormwater
Geolyse Pty Ltd (2012) Integrated Water Cycle Management Evaluation Study. Draft for NOW review. Orange City Council
The Institute of Public Works Engineering Australia (2011b) Sewer Asset Management Plan 2012-2022
Worley Parsons (2009) Orange City Council Development Servicing Plans for Sewerage, Sydney, 2000
Drawings
LEGEND:
CAPITAL WORK
NUMBER RESIDENTIAL LOTSAVAILABLE
EXISTING SEWAGE PUMP STATION
PROPOSED SEWAGE PUMP STATION
PROPOSED SEWER RISING MAIN
DSP BOUNDARY
AREA TO BE DEVELOPED 0-20YEARS
AREA TO BE DEVELOPED 20-30YEARS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
4124
323
34
240
540
532
184
337
181
135
425450
904
PS
PS
SEWERAGE DEVELOPMENTSERVICING PLANORANGE CITY COUNCIL
ISSUE DATE: 06/11/12 212266_01A_FIG01
182
37
7
30
PSSS8
SS9
PSSS2
SS3
SS5
SS6
SS1
PV5
PSPV3 PV4 STP1-5
532
PV5
Appendix A SEWERAGE LEVEL OF SERVICE
ORANGE SEWERAGE LEVELS OF SERVICE
212266_Appendix A.docx Page 1
Table 1 – Sewerage LOS
Service Standard
Availability of Connection • Connections for domestic sewage should be provided to all houses, units or businesses within the defined service area.
• Acceptance of commercial and industrial wastes (trade waste) should be in accordance with approval conditions for each discharger.
Average System Failures • Controlled, expected (overflow structure) related to rainfall and design: - < 2 times in 1 year on average.
• Controlled, unexpected (flow relief structure): - < once in 5 years.
• Uncontrolled, unexpected: - Private Property: < once per 200 allotments per year. - Public Property: (sensitive areas): < once per 5 years. - Public Property: (elsewhere): < once per 10 km of main per year.
Response Times to System Faults
Response time defined as time to have staff on site to commence rectification of problem after notification by public or own staff. • Priority 1 – defined as major failure to contain sewage within the sewer system or
any problem affecting a critical user at a critical time - 1 hour (working hours) or - 2 hours (after hours)
• Priority 2 – defined as ‘minor failure to contain sewage within the sewer system or any problem affecting a critical user at a non-critical time’. - Response time 3 hours (working hours) or 4 hours (after hours)
• Priority 3 – defined as minor failure to contain sewage affecting a single property or as bad odours - Response time – next working day
Response Times to Customer Complaints & Inquiries of a General Nature
• Defined as a ‘minor operational problem, complaint, or inquiry, which can be dealt with at a time convenient to the customer and the local authority’ (e.g., adjustment of an access chamber or other non-critical structures bill inquiry).
• Response time defined as time to advise customer of intended action. Respond to 95% of written complaints or inquiries within 10 working days.
Odours Not more than 2 incidents per year that result in complaints.
Impact of Sewage Treatment Works on Surrounding Residents
The impact of treatment works on surrounding residents is generally due to noise and odour, both of which are subject to certain minimum standards set by statutory requirements and regulations. • The maximum level of noise should not be more than 5 dB above the background
noise level. • Odour should not be detectable outside Council’s buffer zone around the treatment
works.
Effluent Discharge / Biosolids Management
The minimum performance standards for effluent discharge and sludge management are set by statutory requirements and regulations through licensing.
Source: IPWEA (2011) Table 3.5
ORANGE SEWERAGE LEVELS OF SERVICE
212266_Appendix A.docx Page 2
Table 2 – Sewerage LOS performance measures
Key Performance Measure
Level of Service Performance Measure Performance Target
Environmental standards
Odour: Compliance with minimum standards set by statutory requirements and regulations.
Odour testing and analysis
Not more than 2 incidents per year that result in complaints. Odour at STP should not be detectable outside Council’s buffer zone around the treatment works
Biosolids management: Compliance with minimum performance standards for sludge management are set by statutory requirements and regulations through licensing
Biosolids testing and analysis
100% compliance
Effluent discharge: Compliance with EPA licence conditions
Effluent water quality testing and analysis
100% compliance
Noise Compliance with minimum standards set by statutory requirements and regulations.
The maximum level of noise should not be more than 5 dB above the background noise level.
100% compliance
System capacity Incidence of service malfunction
Frequency of system blockages
Less than 20 blockages annually per 100km of sewer main
Frequency of overflows affecting a single property
No property affected more than twice in 5 years
Reliability and capacity of pump stations
Number of pump station overflows
No more than 2 overflows per year during dry weather
Availability/reliability Minimal disruption to service due to: • Maintenance • Renewal activities • Breakages • Chokes
Planned disruption outage time
Not to last more than 2 hours
Number of unplanned disruptions
No property disrupted more than twice in 5 years nor last longer than 4 hours
Responsiveness Priority 1
Time to have staff on site to commence rectification of problem after notification by public or own staff
1 hour (working hours) or 2 hours (after hours) All response times for overflows to be high priority due to risk of contamination of stormwater harvesting water supply scheme and requirement to stop harvesting immediately
Priority 2 3 hours (working hours) or 4 hours (after hours)
Priority 3 Next working day
Overall customer satisfaction
Customer satisfaction with sewerage services
Percentage of customers rate their satisfaction with the sewerage services as ‘satisfied’ or ‘very satisfied’
90%
Source: Source: IPWEA (2011) Table 3.4
Appendix B CAPITAL CHARGE CALCULATION
Orange City Council Sewerage DSP - Capital Charge Calculation
Discount rate pre 1996 3%
Discount rate post 1996 7%
Calculated total capital charge (12/13 $'000) 133,676$
Total capital charge per ET (12/13 $'000) 5,662$
Orange Development Servicing Plan Area
Asset
Capital
Cost
(06/07 $'000)
Capital
Cost
(12/13 $'000)
Year
Dollars
Capital
Cost
(12/13 $'000)
Year
Commissioned
Effective Year
Commissioned
Present Value
(12/13 $'000)
Year of full
take-up
Years to full
take-up Discount Rate ROI Factor
Capital Charge +
ROI
(12/13 $'000)
Capacity
ETs
Capital Charge
(12/13 $'000)
SEWAGE TREATMENT WORKS
Existing (pre 1996)
STP I - preliminary, IDEA Tanks, sludge lagoons 14,132 16383 2012 16,383 1963 1996 16,383 2042 30 3% 1.49 24,345
STP II - preliminary, IDEA Tanks, sludge lagoons 17,206 19946 2012 19,946 1987 1996 19,946 2042 30 3% 1.49 29,640
Existing (post 1996)
STP III - nutrient removal 7,247 8401 2012 8,401 1997 1997 8,401 2042 30 7% 2.26 18,982
Future
STP3: DAF upgrade 0 2012 0 2013 2013 0 2042 30 7% 2.26 0
STP4: STP Optimisation 5,000 2012 5,000 2019 2019 5,000 2042 24 7% 1.96 9,778
STP5: Carbon dosing 0 2012 0 2014 2014 0 2042 29 7% 2.21 0
TOTAL SEWAGE TREATMENT WORKS 49,731 49,731 49,731 82,746 24,000 3.448
SEWAGE PUMP STATIONS
Existing (pre 1996)
Woodward Street 288 334 2012 334 1975 1975 334 2042 30 3% 1.49 496
March Road 412 478 2012 478 1992 1992 478 2042 30 3% 1.49 710
Mallee Place 288 334 2012 334 1995 1995 334 2042 30 3% 1.49 496
Tip 288 334 2012 334 1996 1996 334 2042 30 3% 1.49 496
Sophie Place 412 478 2012 478 1996 1996 478 2042 30 3% 1.49 710
Existing (post 1996)
Reece 137 159 2012 159 1997 1997 159 2042 30 7% 2.26 359
Phillip Street 343 398 2012 398 1998 1998 398 2042 30 7% 2.26 898
Careflight 137 159 2012 159 1999 1999 159 2042 30 7% 2.26 359
North Orange No 2 398 461 2012 461 1999 1999 461 2042 30 7% 2.26 1,042
North Orange No 1 439 509 2012 509 1999 1999 509 2042 30 7% 2.26 1,150
Airport 295 342 2012 342 2000 2000 342 2042 30 7% 2.26 773
Botanic Gardens 137 159 2012 159 2000 2000 159 2042 30 7% 2.26 359
Clinton Street 233 270 2012 270 2002 2002 270 2042 30 7% 2.26 610
Botanic Gardens café 233 270 2012 270 2003 2003 270 2042 30 7% 2.26 610
Gosling Creek House 137 159 2012 159 2003 2003 159 2042 30 7% 2.26 359
Gosling Creek Reserve 137 159 2012 159 2003 2003 159 2042 30 7% 2.26 359
Mitchell Hwy 137 159 2012 159 2004 2004 159 2042 30 7% 2.26 359
Wentworth 137 159 2012 159 2005 2005 159 2042 30 7% 2.26 359
Lake Canobolas 137 159 2012 159 2005 2005 159 2042 30 7% 2.26 359
Beer Rd 412 478 2012 478 2006 2006 478 2042 30 7% 2.26 1,079
Future
SS2: SPS (Land Unit 10) 1,150 2012 1,150 2017 2017 1,150 2042 26 7% 2.05 2,363
SS5: SPS (Land Unit 11) 575 2012 575 2025 2025 575 2043 19 7% 1.72 988
SS8: SPS 3 575 2012 575 2020 2020 575 2044 25 7% 2.00 1,153
PV1: Sieben Drive pump station 0 2012 0 2015 2015 0 2045 30 7% 2.26 0
PV3: West Ploughmans Valley area pump station 0 2012 0 2012 2012 0 2046 30 7% 2.26 0
TOTAL SEWAGE PUMP STATIONS 8,255 8,255 8,255 16,446 23,004 0.715
DSP_base-30 year.xlsx Capital Charge Page 1 of 3
Asset
Capital
Cost
(06/07 $'000)
Capital
Cost
(12/13 $'000)
Year
Dollars
Capital
Cost
(12/13 $'000)
Year
Commissioned
Effective Year
Commissioned
Present Value
(12/13 $'000)
Year of full
take-up
Years to full
take-up Discount Rate ROI Factor
Capital Charge +
ROI
(12/13 $'000)
Capacity
ETs
Capital Charge
(12/13 $'000)
SEWER MAINS
Existing (pre 1996)
Existing commissioned 1975 121 140 2012 140 1975 1975 140 2042 30 3% 1.49 208
Existing commissioned 1976 1,296 1,502 2012 1,502 1976 1976 1,502 2042 30 3% 1.49 2,233
Existing commissioned 1977 882 1,022 2012 1,022 1977 1977 1,022 2042 30 3% 1.49 1,519
Existing commissioned 1978 23 27 2012 27 1978 1978 27 2042 30 3% 1.49 40
Existing commissioned 1979 220 255 2012 255 1979 1979 255 2042 30 3% 1.49 379
Existing commissioned 1980 245 284 2012 284 1980 1980 284 2042 30 3% 1.49 422
Existing commissioned 1981 26 30 2012 30 1981 1981 30 2042 30 3% 1.49 45
Existing commissioned 1982 95 110 2012 110 1982 1982 110 2042 30 3% 1.49 164
Existing commissioned 1983 6,621 7,676 2012 7,676 1983 1983 7,676 2042 30 3% 1.49 11,406
Existing commissioned 1985 142 165 2012 165 1985 1985 165 2042 30 3% 1.49 245
Existing commissioned 1986 85 99 2012 99 1986 1986 99 2042 30 3% 1.49 146
Existing commissioned 1990 18 21 2012 21 1990 1990 21 2042 30 3% 1.49 31
Existing commissioned 1991 13 15 2012 15 1991 1991 15 2042 30 3% 1.49 22
Existing commissioned 1992 94 109 2012 109 1992 1992 109 2042 30 3% 1.49 162
Existing commissioned 1994 1,729 2,004 2012 2,004 1994 1994 2,004 2042 30 3% 1.49 2,979
Existing commissioned 1995 874 1,013 2012 1,013 1995 1995 1,013 2042 30 3% 1.49 1,506
Existing (post 1996)
Existing commissioned 1996 229 265 2012 265 1996 1996 265 2042 30 7% 2.26 600
Existing commissioned 1998 375 435 2012 435 1998 1998 435 2042 30 7% 2.26 982
Existing commissioned 2000 245 284 2012 284 2000 2000 284 2042 30 7% 2.26 642
Existing commissioned 2001 205 238 2012 238 2001 2001 238 2042 30 7% 2.26 537
Existing commissioned 2002 1,311 1,520 2012 1,520 2002 2002 1,520 2042 30 7% 2.26 3,434
Future
SS1: Sewer main upgrade (Autumn Street vicinity) 0 2012 0 2016 2016 0 2046 30 7% 2.26 0
SS3: Sewer Rising Main (Land Unit 10) 384.1 2012 384 2017 2017 384 2046 30 7% 2.26 868
SS6: Rising Main (Land Unit 11) 345 2012 345 2025 2025 345 2046 22 7% 1.86 641
SS9: Rising Main from SPS 3 345 2012 345 2020 2020 345 2046 27 7% 2.11 726
PV2: Ploughmans Valley Augmentation - Sewer mains upgrade 0 2012 0 2015 2015 0 2046 30 7% 2.26 0
PV4: West Ploughmans Valley area rising main 0 2012 0 2012 2012 0 2046 30 7% 2.26 0
Other minor new system assets 2012 85 2012 85 2012 2012 85 2046 30 7% 2.26 192
Other minor new system assets 2013 85 2012 85 2013 2013 85 2046 30 7% 2.26 192
Other minor new system assets 2014 85 2012 85 2014 2014 85 2046 30 7% 2.26 192
Other minor new system assets 2015 85 2012 85 2015 2015 85 2046 30 7% 2.26 192
Other minor new system assets 2016 85 2012 85 2016 2016 85 2046 30 7% 2.26 192
Other minor new system assets 2017 85 2012 85 2017 2017 85 2046 30 7% 2.26 192
Other minor new system assets 2018 85 2012 85 2018 2018 85 2046 29 7% 2.21 188
Other minor new system assets 2019 85 2012 85 2019 2019 85 2046 28 7% 2.16 183
Other minor new system assets 2020 85 2012 85 2020 2020 85 2046 27 7% 2.11 179
Other minor new system assets 2021 85 2012 85 2021 2021 85 2046 26 7% 2.05 175
Other minor new system assets 2022 85 2012 85 2022 2022 85 2046 25 7% 2.00 170
Other minor new system assets 2023 85 2012 85 2023 2023 85 2046 24 7% 1.96 166
Other minor new system assets 2024 85 2012 85 2024 2024 85 2046 23 7% 1.91 162
Other minor new system assets 2025 85 2012 85 2025 2025 85 2046 22 7% 1.86 158
Other minor new system assets 2026 85 2012 85 2026 2026 85 2046 21 7% 1.81 154
Other minor new system assets 2027 85 2012 85 2027 2027 85 2046 20 7% 1.76 150
Other minor new system assets 2028 85 2012 85 2028 2028 85 2046 19 7% 1.72 146
Other minor new system assets 2029 85 2012 85 2029 2029 85 2046 18 7% 1.67 142
Other minor new system assets 2030 85 2012 85 2030 2030 85 2046 17 7% 1.63 138
Other minor new system assets 2031 85 2012 85 2031 2031 85 2046 16 7% 1.58 135
Other minor new system assets 2032 85 2012 85 2032 2032 85 2046 15 7% 1.54 131
Other minor new system assets 2033 85 2012 85 2033 2033 85 2046 14 7% 1.50 127
DSP_base-30 year.xlsx Capital Charge Page 2 of 3
Asset
Capital
Cost
(06/07 $'000)
Capital
Cost
(12/13 $'000)
Year
Dollars
Capital
Cost
(12/13 $'000)
Year
Commissioned
Effective Year
Commissioned
Present Value
(12/13 $'000)
Year of full
take-up
Years to full
take-up Discount Rate ROI Factor
Capital Charge +
ROI
(12/13 $'000)
Capacity
ETs
Capital Charge
(12/13 $'000)
Other minor new system assets 2034 85 2012 85 2034 2034 85 2046 13 7% 1.45 124
Other minor new system assets 2035 85 2012 85 2035 2035 85 2046 12 7% 1.41 120
Other minor new system assets 2036 85 2012 85 2036 2036 85 2046 11 7% 1.37 117
Other minor new system assets 2037 85 2012 85 2037 2037 85 2046 10 7% 1.33 113
Other minor new system assets 2038 85 2012 85 2038 2038 85 2046 9 7% 1.29 110
Other minor new system assets 2039 85 2012 85 2039 2039 85 2046 8 7% 1.25 106
Other minor new system assets 2040 85 2012 85 2040 2040 85 2046 7 7% 1.21 103
Other minor new system assets 2041 85 2012 85 2041 2041 85 2046 6 7% 1.18 100
TOTAL SEWER MAINS 20,838 20,838 20,838 34,485 23,004 1.499
DSP_base-30 year.xlsx Capital Charge Page 3 of 3
Appendix C CAPITAL WORKS PROGRAM
Sewerage Capital Works
ORANGE CITY COUNCIL SEWERAGE CAPITAL WORKS PROGRAM
Updated 25/09/2012 Type Of Works PV (@ 7%) Total
(Values in 12/13 $'000) LOS Future Work Renewals 2010/2011 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030 2030/2031 2031/2032 2032/2033 2033/2034 2034/2035 2035/2036 2036/2037 2037/2038 2038/2039 2039/2040 2040/2041 2041/2042
Southern Suburb Augmentation
SS1: Sewer main upgrade (Autumn Street vicinity) 100 1,144 1,500 1,500
SS2: SPS (Land Unit 10) 100 713 1,000 1,000
SS3: Sewer Rising Main (Land Unit 10) 100 238 334 334
SS4: Contingency (Land Unit 10) 100 143 200 200
SS5: SPS (Land Unit 11) 100 207 500 500
SS6: Rising Main (Land Unit 11) 100 124 300 300
SS7: Contingency (Land Unit 11) 100 50 120 120
SS8: SPS 3 100 291 500 500
SS9: Rising Main from SPS 3 100 175 300 300
SS10: Contingency SPS 3 100 70 120 120
Ploughmans Valley Augmentation
PV1: Sieben Drive pump station 100 816 1,000 1,000
PV2: Ploughmans Valley Augmentation - Sewer mains upgrade 100 408 500 500
PV3: West Ploughmans Valley area pump station 100 420 420 420
PV4: West Ploughmans Valley rising main 100 180 180 180
PV5: Land purchase for buffer at North Orange PS 100 300 300 300
STP Augmentation
STP1: Land Purchase 100 3,000 3,000 3,000
STP2: STP stormflow diversion/retention 100 2,910 5,000 5,000
STP3: DAF upgrade 100 1,121 1,200 1,200
STP4: STP Optimisation 100 2,404 5,000 2,500 2,500
STP5: Carbon dosing 100 790 845 845
Other Work
O1: Minor works 100 1,129 2,550 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85
O2: Vent removals 100 539 1,241 32 35 40 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42
O3: Flow gauges/modelling 100 597 1,350 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45
O4: Environmental upgrades 100 2,656 6,000 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Renewals
R1: Sewer mains 100 9,294 21,000 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700
R2: Manholes 100 398 900 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
R3: Orange STP 100 7,435 16,800 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560
R4: Sewage Pump Stations 100 1,859 4,200 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140 140
R5: Spring Hill STP 100 2,217 5,010 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167 167
Feasibility Studies/Modelling
M1: Feasibility Studies 100 1,992 4,500 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150
Total Subsidised scheme (ie. LOS) 11,397 20,041 3,682 385 390 392 392 392 392 392 5,392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392 392
Total New System Assets 10,372 16,569 685 1,285 930 1,585 1,585 1,619 85 2,585 1,005 85 85 85 85 1,005 85 85 2,585 85 85 85 85 85 85 85 85 85 85 85 85 85
Total Renewals 21,802 49,260 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642 1,642
CWP TOTAL 43,570 85,870 6,009 3,312 2,962 3,619 3,619 3,653 2,119 4,619 8,039 2,119 2,119 2,119 2,119 3,039 2,119 2,119 4,619 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119
208103
Geolyse Pty Ltd
Page 1 of 1
DSP_base-30 year.xlsx
Appendix D REDUCTION AMOUNT CALCULATIONS
Orange City Council Sewerage DSP - Reduction Amount Calculation Annual Sewerage Bill 350 $ per ET
Annual growth rate 0.80% pa Annual Sewerage OMA 240 $ per ET
Net Income 110 $ per ET
Assessments ETs
Year Residential
Non-
residential Total Residential
Non-
residential Total
New ETs per
year PV (New ETs)
Cumulative
New ETs
Net Income
from New ETs
PV (Net
Income) from
new ETs
Reduction
Amount
($ per ET)
2011/2012 14742 1822 16564 14742 5466 20208
2012/2013 14860 1837 16697 14860 5510 20370 162 2172 162 18 2530 1164
2013/2014 14979 1851 16830 14979 5554 20533 163 325 36
2014/2015 15099 1866 16965 15099 5598 20697 164 489 54
2015/2016 15219 1881 17100 15219 5643 20862 166 654 72
2016/2017 15341 1896 17237 15341 5688 21029 167 821 90
2017/2018 15464 1911 17375 15464 5734 21198 168 990 109
2018/2019 15588 1927 17514 15588 5780 21367 170 1159 128
2019/2020 15712 1942 17654 15712 5826 21538 171 1330 146
2020/2021 15838 1957 17795 15838 5872 21710 172 1502 165
2021/2022 15965 1973 17938 15965 5919 21884 174 1676 185
2022/2023 16092 1989 18081 16092 5967 22059 175 1851 204
2023/2024 16221 2005 18226 16221 6014 22236 176 2028 223
2024/2025 16351 2021 18372 16351 6063 22414 178 2206 243
2025/2026 16482 2037 18519 16482 6111 22593 179 2385 263
2026/2027 16614 2053 18667 16614 6160 22774 181 2566 283
2027/2028 16747 2070 18816 16747 6209 22956 182 2748 303
2028/2029 16881 2086 18967 16881 6259 23139 184 2931 323
2029/2030 17016 2103 19119 17016 6309 23325 185 3117 343
2030/2031 17152 2120 19271 17152 6359 23511 187 3303 364
2031/2032 17289 2137 19426 17289 6410 23699 188 3491 385
2032/2033 17427 2154 19581 17427 6462 23889 190 3681 405
2033/2034 17567 2171 19738 17567 6513 24080 191 3872 426
2034/2035 17707 2188 19896 17707 6565 24273 193 4065 448
2035/2036 17849 2206 20055 17849 6618 24467 194 4259 469
2036/2037 17992 2224 20215 17992 6671 24662 196 4454 491
2037/2038 18136 2241 20377 18136 6724 24860 197 4652 512
2038/2039 18281 2259 20540 18281 6778 25059 199 4851 534
2039/2040 18427 2277 20704 18427 6832 25259 200 5051 556
2040/2041 18574 2296 20870 18574 6887 25461 202 5253 579
2041/2042 18723 2314 21037 18723 6942 25665 204 5457 601
DSP_base-30 year.xlsx Reduction Amount Page 1 of 1