STRATEGIC PLAN
FY 13-14
FOR PROGRAM
YEAR 14-15
Introduction
During the process of designing the strategic plan, goals were developed to
inspire and drive the program to achieve the success of implementing the overall
objectives of providing quality services to children, families and the community. The
following assemblages were involved:
Head Start Staff
o Director
o Teaching Staff
o Family/Community Partnership Specialist
o Health/Disability Specialist
Grantee
Governing Board
Policy Council
During a year long process, an extensive amount of effort has been implemented in
monitoring the program, collecting data and analyzing the results to design the goals
within the strategic plan utilizing the following systems:
Self Assessment
Community Assessment
ECERS
ELLCO
STARS
Outcome Analysis
T/TA Plan
NAEYC Standards
Parent Opinion Survey
Monitoring Tools
Staff Training Request Form
Tri-Annual Federal Review
Five Year Planning Process
A structured approach was implemented in collecting data from all instruments used in
monitoring the systems. Indicators are noted and analyzed to determine objectives that
will allow the goals to be assembled from organized, collaborative information. Through
the combination of the Governing Board, Grantee, Policy Council and the Head Start
Staff, a collective conclusion was reached in determining the overall goals prioritized to
enhance continuation of high quality services to children and families.
A Strategic Plan was designed to enable programs to develop and implement a
systematic, ongoing process consistent with Head Start philosophy and be reflective of
overall indicators.
To accomplish and maintain the strategic plan goals, a mission, vision and value
statement must be developed in order to allow all bodies concerned, a usable purpose to
set the ideology of the overall objectives of the program.
Vision Statement
To enhance positive transformation for our children, families, staff and
community through partnerships which allow for the entire group to benefit from
each other for a thriving society for future growth and generations to succeed.
Mission Statement
Foster individual development for children, families and staff to sustain positive
transitions into the future.
Value Statement
Impossible dreams; Hand in Hand, Together We Can.
This report is for the 2014-2015 school term. The 2014-2015 Strategic Plan will be
completed in the fall of 2015. As always, you can request and receive a copy of this
report or visit our website at: www.vanburenheadstart.com and locate under "Governing
Bodies".
We continually strive to improve our program and this is evident in our Strategic
Plan. Some items are things we can accomplish in the Short Term (many of which are
already implemented) and some which are considered Long Term. Some items, such as
Centralized Location, depend on additional funding before they can take place.
Due to the many systems we use to monitor our progress, the Strategic Plan is updated in
the fall of every year, as we gather information. The following updated information, on
plans we have implemented, is from the 2013-2014 school term Strategic Plan and has
been completed.
Short Term Goals
To ensure accountability and strong fiscal management.
Update the existing fiscal manual, Policies and Procedures
Continue to attend Head Start fiscal trainings
Continue to use fiscal checklist in Self Assessment process
Train HS Policy Council in fiscal roles and responsibilities
Train Grantee Board in fiscal roles and responsibilities
Maintain knowledgeable and professional staff.
Implement a practice based coaching program and training process
designed by NCQTL and design procedures
To promote safe and healthy environments
Promote hand washing by installing automated faucets
Ensure protective surfacing depths
Provide a learning environment and experiences to enhance child development
Promote social study opportunities
Add additional science related materials to gross motor areas
Expand on ELL skills through individualized opportunities
Embrace cultural diversity by involving families in classroom
activities
To promote community stability by ensuring comprehensive child/teen and
community health and safety awareness
Address obesity by the Walk across Tennessee program
Continue community outreach to ensure teen wellness, partnering with
local school system
Promote participation and awareness of the benefits of WIC and SNAP
program
Partner with Avalon to increase intensive training opportunities for
children and families related to domestic violence.
Promote basic education opportunities to increase financial stability
Identify the need for basic education, provide website resources,
training for using the website and partner with ABE/GED
To facilitate smooth transitions into future education placements.
Share records and attend meetings with school system to ensure
smooth transition into future placement.
Partner with school system to inform parents of approaching
kindergarten registration and requirements
Conduct alumni activities to promote parent awareness related to
higher
education
Long Term Goals
To provide a safe, healthy, environment for children, families and staff.
Remove and replace large slide on playground.
To meet the needs of families by providing accessibility to Head Start.
The need of incorporating a five day week as funds become accessible.
Incorporate Early Head Start when a location can be obtained.
Centralized location which will be more community accessible, reduce
transportation costs and ensure enrollment.
Seek resources for a centralized Head Start Center.
To increase parent, family, and community engagement in program activities
leading to improved family engagement outcomes and increased knowledge base
and logic.
Refine the alignment between the family partnership agreement process
and parent family community engagement framework
Restructure Community Assessment
Design parent knowledge interest survey
Focus emphasis on family well being
Focus emphasis on families as learners
Focus emphasis on families as lifelong educators
Focus emphasis on parent/child relations
Show systematic progress toward meeting established school readiness goals for
preschoolers
Establish systematic process in conjunction with parents, staff, and
community partners; developing a strong educational plan to ensure
stakeholders knowledge of school readiness
Ensure parents understand their role related to school readiness and being
an active participant in their child’s education
Focus on working with LEA and community partners to develop strategies
in understanding their role in school readiness
Focus on ensuring children’s success through proposed child outcome data
Focus on maintaining high CLASS scores to ensure positive interactions
Show systematic progress toward parent, family, community increased knowledge
base and logic related to correlation between healthy children and learning
Design parent knowledge survey and restructure trainings to meet the
needs identified by survey results
Focus emphasis to parents on health affects related to learning abilities
Focus on parent’s knowledge of correlation between child health and
development in relation to school readiness
Focus on parent’s knowledge of correlation between child mental health
and child discipline in relation to school readiness
Focus on parent’s knowledge of the correlation between child nutritional
health in relation to school readiness.
Goals Carried Forward
Continue growth in fiscal accountability.
Expand School Readiness Knowledge and Implementation
SHORT TERM
GOALS
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15 Date: 10-24-14
Improvement Area: Fiscal
Documents (used to determine area of improvement): Self Assessment, T/TA Plan, Federal Review
Desired Outcome: To ensure effective system of fiscal management.
Activities Staff Responsible
Due Date Documentation/Measurable Indicators
T&TA Required Resources
Update the existing
fiscal manual, Policies
and Procedures
Continue to attend
Head Start fiscal
trainings
Continue to use fiscal
checklist in Self
Assessment process
Train HS Policy
Council in fiscal roles
and responsibilities
Train Grantee Board in
fiscal roles and
responsibilities
Director of Finance,
Head Start Director
Grantee Fiscal Dept.,
Director
Director, F/CPS
Director
Divisional Director
Ongoing
As opportunities are
made available
Yearly
Ongoing
Ongoing
Fiscal manual
Training documentation
Self assessment
Training logs, minutes
Board minutes
Regional Office
Fiscal Specialist
Regional Finance
Meetings
Monitoring Protocol
Staff
Staff
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year 14-15___ Date: 10-24-14
Improvement Area: Professional Development
Documents (used to determine area of improvement): CLASS
Desired Outcome Maintain knowledgeable and professional staff.
Activities Staff Responsible
Due Date Documentation/Measurable Indicators
T&TA Required Resources
Implement a practice
based coaching
program and training
process design by
NCQTL and design
procedures.
Teaching Staff
January 2015
Procedures
OHS TA System and
NCQTL
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15 ___ Date: 10-24-14
Improvement Area: Education and Early Childhood Development
Documents (used to determine area of improvement): ECERS, STARS,
Desired Outcome: To promote a safe and healthy environment
Activities Staff Responsible
Due Date Documentation/Measurable Indicators
T&TA Required Resources
Promote hand
washing by installing
automated faucets
Ensure protective
surfacing depth
Teachers, H/DSS
H/DSS
November 2014
November 2014
Invoice
ECERS Results
Invoice
Allocated Dollars
Allocated Dollars
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15 Date: 10-24-14
Improvement Area: Education and Early Childhood Development (Continued)
Documents (used to determine area of improvement): Outcomes, School Readiness
Desired Outcome: To provide a learning environment and experiences to enhance child development
Activities Staff Responsible
Due Date Documentation/Measurable Indicators
T&TA Required Resources
Promote social study
opportunities
Add additional
science related
materials to gross
motor areas
Expand on ELL skills
through
individualized
learning
opportunities
Embrace cultural
diversity by involving
the family in
classroom activities
Education Staff
Education Specialist
Teaching staff
Teaching staff, FCPS
August 2014,
Ongoing
January 2015
August 2014 and
ongoing
Spring 2015
Lesson Plan
Invoice
Lesson Plan
Staff Training Sign Sheet
Daily Note
Lesson Plan
Allocated Dollars
Allocated Dollars
Training
Opportunities
Staff
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15 ___ Date: 10-24-14
Improvement Area: Health & Safety
Documents (used to determine area of improvement): Community Assessment
Desired Outcome: : To promote community stability by ensuring comprehensive child/teen and community health and safety
awareness.
Activities Staff Responsible Due Date Documentation/Measurable Indicators
T&TA Required Resources
Address obesity
through the Walk
Across Tennessee
program
FCPS
April 2015
Activity Logs
Allocated Dollars
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15 ___ Date: 10-24-14
Improvement Area: Health and Safety (continued)
Documents (used to determine area of improvement): Community Assessment, PIR
Desired Outcome: To promote community stability by ensuring comprehensive child/teen and community health and safety
awareness.
Activities Staff Responsible Due Date Documentation/Measurable Indicators
T&TA Required Resources
Continue community
outreach to ensure
teen wellness
partnering with the
local school system.
Promote participation
and awareness of the
benefits of WIC and
SNAP program.
Partner with Avalon
to increase intensive
training opportunities
for children and
families related to
domestic violence
H/DSS, FCPS
H/DSS, FCPS
H/DSS, FCPS
Fall/Spring
2014/2015
Phase In/Mid Year
3 Times a year
2014/2015
Sign In Sheet
Flyers
Sign In Sheet
Documentation will be noted in
Galileo phase in on a signature
form midyear.
Sign In Sheet
Daily Note
Partnership Agreement
Health Network
Local health
department
Avalon
Program Improvement Plan/Strategic Plan
Improvement Area: Family/Community Partnership Self Assessment Year: 14-15 Date: 10-24-14
Documents (used to determine area of improvement): Community Assessment
Desired Outcome: Promote basic education opportunities to increase financial stability.
Activities Staff Responsible Due Date Documentation/Measurable Indicators
T&TA Required Resources
Identify the need for
basic education,
provide web site
resource, training for
using the web site and
partner with
ABE/GED.
FCPS
Ongoing 2014/2015
Intake Process
Galileo
TN.gov website, local
school system
Program Improvement Plan/Strategic Plan
Improvement Area: Education Early Childhood Development Self-Assessment Year: 14-15__ Date: 10-24-14
Documents (used to determine area of improvement): T/TA
Desired Outcome: To facilitate smooth transitions into future education placements
Activities Staff Responsible Due Date Documentation/Measurable Indicators
T&TA Required Resources
Share records and
attend meetings with
school system to
ensure smooth
transition into future
placement
Partner with school
system to inform
parents of
approaching
kindergarten
registration and
requirements.
Conduct Alumni
activities to promote
parent awareness
related to higher
education
Teaching Staff
FCPS
Lead Teacher
May 2015
April 2015
April 2015
Meeting Minutes
Communication Sent Home,
Facebook, Call Out
Sign In Sheets
LONG TERM
GOALS
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15___ Date: 10-24-14
Improvement Area: Program Design: Facilities
Documents (used to determine area of improvement): Environmental Inspection
Desired Outcome: To provide a safe, healthy environment for children, families and staff.
Activities Staff Responsible Due Date Documentation/Measurable Indicators
T&TA Required Resources
Remove and replace
large slide on
playground
Director, H/DSS
7/1/2020
Procurement
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Program Design: Management Systems
Documents (used to determine area of improvement): Parent Input and Community Assessment
Desired Outcome: To meet the needs of families by providing accessibility to Head Start
Activities Staff Responsible
Due Date Documentation/Measurable Indicators
T&TA Required Resources
To increase Head
Start opportunities
by incorporating a
5 day week.
Consider addition
of Early Head
Start services.
Executive Director,
Agency, Governing
Bodies, Policy
Council, Director
Executive Director,
Agency, Governing
Bodies, Policy
Council, Director
7/1/2020
7/1/2020
Attendance, surveys, comments,
recruitment
Addition of classrooms
Access to funding
Access to funding
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Program Design: Management Systems (continued)
Documents (used to determine area of improvement): Parent Survey and Community Assessment
Desired Outcome: To have a centralized location
Activities Staff Responsible
Due Date Documentation/Measurable Indicators
T&TA Required Resources
Seek resources to
allow for a more
centralized,
community
accessible Head
Start Center
which will allow
for reduction of
transportation
costs, and
maintained
enrollment.
Executive Director,
Agency, Governing
Bodies, Policy
Council, Director
7/1/2020
Relocated Center, attendance,
budget reports
Access to funding
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Parent Family Community Engagement
Documents (used to determine area of improvement): Community Assessment, Five Year Planning Process
Desired Outcome: To increase parent, family and community engagement in program activities leading to improved family
engagement outcomes and increased knowledge base and logic.
Activities Staff
Responsible
Due Date Documentation/Measurable
Indicators
T&TA Required
Resources
Refine the alignment
between the family
partnership agreement
process and the parent
family community
engagement
framework.
Restructure
Community
Assessment
Design parent
knowledge interest
survey
FCPS
FCPS
FCPS
July 2015
July 2015
July 2015
Family Partnership Agreement
Community Assessment
Parent Surveys
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
OHS TA Network
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Parent Family Community Engagement (continued)
Documents (used to determine area of improvement): Community Assessment, Five Year Planning Process
Desired Outcome: To increase parent, family and community engagement in program activities leading to improved family
engagement outcomes and increased knowledge base and logic.
Activities Staff
Responsible
Due Date Documentation/Measurable
Indicators
T&TA Required
Resources
Focus emphasis on
family well being
Focus emphasis on
family as learners
Focus emphasis on
family as lifelong
educators
Focus emphasis on
parent/child relations
FCPS
FCPS
FCPS
FCPS
PY 2016/2017
PY 2017/2018
PY 2018/2019
PY 2019/2020
Tracking Forms, Surveys
Tracking Forms, Surveys
Tracking Forms, Surveys
Tracking Forms, Surveys
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
Same
Same
Same
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Education Early Childhood Development
Documents (used to determine area of improvement): Five Year Planning Process, Child Outcome Data
Desired Outcome: Show systematic progress toward meeting established school readiness goals for preschoolers
Activities Staff
Responsible
Due Date Documentation/Measurable
Indicators
T&TA Required
Resources Establish systematic
process in
conjunction with
parents, staff, and
community partners;
developing a strong
educational plan to
ensure stakeholders
knowledge of school
readiness.
Ensure parents
understand their role
related to school
readiness and being
an active participant
in their child’s
education
FCPS, Education
Staff
FCPS, Education
Staff
PY 2015/2016
PY 2016/2017
Policy and Procedure
Surveys
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
Same
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Education Early Childhood Development (continued)
Documents (used to determine area of improvement): Five Year Planning Process, Child Outcome Data
Desired Outcome: Show systematic progress toward meeting established school readiness goals for preschoolers
Activities Staff
Responsible
Due Date Documentation/Measurable
Indicators
T&TA Required
Resources
Focus on working
with local LEA, and
community partners
to develop strategies
in understanding
their role in school
readiness
Focus on ensuring
children’s success
through proposed
child outcome data
Focus on maintaining
high CLASS scores to
ensure positive
interactions
All Staff
Education Staff
Education Staff
PY 2017/2018
PY 2018/2019
PY 2019/2020
Documented Meetings, Surveys
Child Outcome Data
Class Scores
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
Same
Same
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Health & Safety
Documents (used to determine area of improvement): Five Year Planning Process, Mid Year Survey
Desired Outcome: Show systematic progress toward parent, family, and community increased knowledge base and logic related to
correlation between healthy children and learning.
Activities Staff
Responsible
Due Date Documentation/Measurable
Indicators
T&TA Required
Resources Design parent
knowledge survey
and restructure
trainings to meet the
needs identified by
the survey results
Focus emphasis on
parents knowledge of
health screenings
necessary related to
learning abilities.
Focus on parents
knowledge of the
correlation between
child health and
development in
relation to school
readiness
HDSS
HDSS
HDSS, FCPS
PY 2015/2016
PY 2016/2017
PY 2017/2018
Surveys
Surveys
Surveys
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
Same
Same
Program Improvement Plan/Strategic Plan
Program: UCHRA Van Buren Head Start Self Assessment Year: 14-15__ Date: 10-24-14
Improvement Area: Health & Safety (continued)
Documents (used to determine area of improvement): Five Year Planning Process, Mid Year Survey
Desired Outcome: Show systematic progress toward parent, family, and community increased knowledge base and logic related to
correlation between healthy children and learning.
Activities Staff
Responsible
Due Date Documentation/Measurable
Indicators
T&TA Required
Resources Focus on parents
knowledge of the
correlation between
child mental health
and child discipline
in relation to school
readiness
Focus on parents
knowledge of the
correlation between
child nutritional
health in relation to
school readiness
HDSS, FCPS
HDSS,FCPS
PY 2018/2019
PY 2019/2020
Surveys
Surveys
OHS TA Network,
Cluster Meetings,
State/Regional/National
Conferences
Same