Strategic Geographical Location - SembMarine - … Brochure.pdfFor Offshore Services, Shiprepair and...

2
For Offshore Services, Shiprepair and Shipbuilding SEPTEMBER 2013 Sembmarine Kakinada Ltd. 1st Floor OSV Complex, Kakinada Deepwater Port, Beach Road Kakinada 533007, A.P., India Tel: +91 884 3207444 Email: [email protected] www.sembkakinada.com SKL is strategically located between Visakhapatnam and Chennai Ports, a dynamic gateway in the East Coast of India Strategic Geographical Location YOUR STRATEGIC PARTNER IN INDIA

Transcript of Strategic Geographical Location - SembMarine - … Brochure.pdfFor Offshore Services, Shiprepair and...

For Offshore Services, Shiprepair and Shipbuilding

september 2013

Sembmarine Kakinada Ltd.1st Floor OSV Complex,Kakinada Deepwater Port, Beach RoadKakinada 533007, A.P., IndiaTel: +91 884 3207444Email: [email protected]

SKL is strategically located between Visakhapatnam and Chennai Ports, a dynamic gateway in the East Coast of India

StrategicGeographicalLocation

YourStrategicPartnerin india

One-StOp Integrated Marine FacilitySembmarine Kakinada Ltd (SKL)Sembmarine Kakinada, a joint venture between Sembawang Shipyard Pte Ltd and Kakinada Seaports Limited, is an integrated marine and offshore facility strategically located in the East Coast of India, catering to offshore drilling units and merchant vessels trading or operating in the waters off Indian Coast, one of the world’s key oil and gas exploration areas. SKL is operating within the vicinity of Kakinada Seaports and already commenced Operation Phase 1- Ship Repair works, conversion works and servicing of offshore vessels and ships for various clients including overseas clients. Operation Phase 2 comprising of New Buildings and Module Fabrication is slated to start from 2014.

Sembawang Shipyard pte LtdSembawang Shipyard, a wholly-owned subsidiary of Sembcorp Marine Ltd (Singapore), has one of the largest integrated ship repair and conversion facilities in Southeast Asia. With more than four decades of experience and proven track record in ship repair, offshore conversions and specialised new buildings, the shipyard’s world-class reputation is based on the company’s commitment to superior customer service, innovative solutions, quality and strict Health, Safety, Security and Environment standards.

Kakinada Seaports LimitedKakinada Seaports Limited, a dynamic gateway port on East Coast of India, is strategically situated between Visakhapatnam and Chennai Ports. With naturally sheltered waters and tranquil bay conditions, the Kakinada Deep Water Port is one of India’s busiest ports and plays an important role in the efficient turnaround of vessels requiring replenishment, bunkering and ancillary services.

Strong mangement team and skilled labour support from Sembawang Shipyard, Singapore

24 x 7 round-the-clock operations

Regular & hassle-free logistic support from Kakinada Seaports

Deep and sheltered water depth of 12 m

Well equipped and efficiently laid-out facilities throughout our yard, such as:

– 13,500 lifting capacity floating dock 200m (L) x 34.4m (W) with 2 x 15 ton travelling luffing cranes

– 635 x 25 meter repair pier with 2 x 50 ton travelling luffing cranes

– 200 x 80 meter building slipway with 1 x 70 ton travelling luffing cranes

– 2 x 250 ton crawler cranes

– 150 ton heavy transporter, 3-6 ton forklift, 14-21 meter cherry picker, 15-25 ton mobile cranes

– 106 x 21 meter mechanical and electrical workshop with 2 x 25 ton overhead cranes,

equipped with machining equipment and electrical equipment

– 106 x 21 meter riser workshop with 2 x 25 ton overhead cranes

– 50 x 50 meter steel outfitting and pipe workshop with 2 x 16 ton overhead cranes, CNC cutting

machine, plate rolling machine, plate forming machine, procile bending machine,

pipe bending machine

– 50 x 20 meter maintenance workshop with 1 x 10 ton overhead crane

– 50 x 20 meter multi-task workshop with 1 x 10 ton overhead crane

– 50 x 20 meter warehouse with 1 x 10 ton overhead crane

– 50 x 50 meter fabrication work-shelter with jibs and A frame supports

– 36 x 30 meter enclosed blasting chamber with dust containment system

– 42 x 30 meter sheltered painting chamber

– Up to 50,000 dwt newbuilding facilities

– 6 MW independent power generation & supply station

– Bollard Pull Test up to 120 T. Water Bag Testing up to 190 T

FLOATING DOCK13,500 ton lifting capacity200m (L) x 34.4m (W), 2 x 15 ton luffing cranes