Strategic Assessment of Worldwide Data Center Construction ... · PDF fileThe report considers...
Transcript of Strategic Assessment of Worldwide Data Center Construction ... · PDF fileThe report considers...
Strategic Assessment of Worldwide Data
Center Construction Market – Till 2021
The report considers the present scenario of worldwide data center
construction and strategic assessment of the market for the period 2015-
2021.The report also includes the market growth drivers, trends, and
restraints. It also includes the top 5 vendors in the market. To calculate
the market size:
The report considers the revenue generated from electrical,
mechanical, and general construction.
The report considers the revenue generated from Tier1, Tier2, Tier3,
and Tier4 data centers.
The report considers only new data center construction it doesn’t
consider the revenue generated from renovation or Tier up-gradation
projects
The report considers the revenue generated from North America,
Europe, APAC, Middle East and Africa, Latin America, and RoW.
The report doesn’t include the real-estate cost of the land.
It doesn’t include the site preparation cost for the Tier1 & Tier2 data
centers.
Scope of the study
The market research report also profiles the key vendors operating in the Worldwide Data
Center Construction market and also provides the detailed competitive landscape of key players.
There will be a gradual decrease in average cost of data center
construction per square feet from 2015-2021. This will be for both
Tier1&2 and Tier3&4.
For a data center construction spanning more than 1
year, the CAPEX is considered for the years the
construction started. For instance, if it takes 3 years to
construct a data center beginning 2015, then the report
includes the CAPEX in 2015 to calculate the market
size.
1Euro= US1.54
The average cost of data center construction per square feet for electrical
construction, mechanical construction, and general construction varies in different
geographies. However, overall it remains almost similar, with a variation of 2-3 % for
Tier1&2 construction, and 5-6% for Tier3&4 construction. However, it has been taken
constant throughout the world. The price of Tier1&2 has been taken as US$365 and
Tier3&4 has been taken as US$840.
1
2
3
4
Scope of the study
Market Segmentation
Electrical Construction
Mechanical Construction
General Construction
Tier 1&2
Tier 3&4
North America
Europe
MEAAPAC
ROW
Latin America
Segmentation by Geography
Segmentation by Tier Standards
Segmentation by Types of Construction
The report is presented in
the following segmentation
Market Size and Forecast is
done at all segmentation
levels
The fastest growing
segments have been
identified in the report
Market Sizing Methodology
Our market sizing
methodology includes an in-
depth bottom-up and top-
down approach to derive the
market numbers.
This is followed by a
forecasting model, which
factors the market drivers,
market restraints and market
trends to predict the market till
2021.
Market Landscape
The market for Worldwide Datacenter Construction market is estimated approximately at US$XX.XX million in 2015
Growth in the market
The major drivers impacting the market are being
identified and our analysts have explained in detail
in the report
75%
60%
Cloud
Computing
High Data Growth
Accommodation of High Data
Growth
There is a growing need to accommodate
high growth of data by data center facilities. It
is a challenging task for the enterprises to
process large volume of data generated.
Big Data BoomEra of
WebsitesEra of
Dotcom
Evolution of Data Center from 1998 to 2015 has also been discussed in the report
Geographical Landscape
N America X.XX%USA | Canada | Mexico
L America X.XX%Brazil | Argentina |
Mexico
Europe 4.03%Germany | France | UK
MEA X.XX%Africa | Nigeria |Iran
APAC X.XX%China | Japan |India
Europe and SEA are becoming the most considered destination for data center construction North America will witness a moderate growth and then a decline in market size
Data Center Design Construction and Future Changes
The report covers the Data Center design construction and the future changes that are expected in 2015-2021
Global factors for the growth of Data Centersare also being listed in the report
Vendor Landscape
• There is intense competition amongst construction vendors in the
global data center construction market. Many data centers are currently
being operated by enterprises, including CSPs, public and private
sectors organization worldwide.
• The count is expected to increase during the forecast period due to the
growth of data and data center emerging as a backbone of the
business.
• There will be a rapid growth in collocation facilities in the near future as
well. Several stakeholders of data center such as architecture
providers, engineering service providers, and construction firms are
involved in the race for attaining projects. Most of the vendors are
looking to construct data centers that can support varying computing
and storage demands for future.
• Few vendors have been in a long time partnership with a particular
enterprise, for its data center construction. Vendors with expertise in
building green data centers are likely to be preferred.
The leading players in this market are AECOM, DPR Construction, Holder Construction Engineering, Jacob Engineering, and
Turner Construction
Section 1 Report Coverage1.1 Report Assumption1.2 Market DerivationSection 2 Market landscape2.1 Data Growth2.2 Current Data Center Construction Market Scenario2.2.1 Data Center Design Considerations2.3 Future Changes in Data CenterSection 3 Key Market Trends3.1.1 Year-on-Year Impact of Market Trends3.1.2 Impact of Market Trends on Geographies In 2015Section 4 Key Market Growth Drivers4.1.1 Year-on-Year Impact of Drivers4.1.2 Impact of Market Drivers on Geographies in 2015Section 5 Key Market Restraints5.1.1 Year-on-Year Impact of Market Restraints5.1.2 Impact of Market Restraints on geographies in 2015Section 6 World Market Size and Forecast6.1 Major Upcoming Datacenter Projects by Cloud service providers and
Internet service providers6.2 Average cost of Construction per Square feetSection 7 Data Center Site selection criteria and Their ImportanceSection 8 North America Market Size and Forecast8.1 Market Segmentation by Tier Standardization8.2 Market Segmentation by Types of Construction
Table of Contents
8.3 Key Countries8.3.1 USSection 9 APAC Market Size and Forecast9.1 Market Segmentation by Tier Standardization9.2 Market Segmentation by Types of Construction9.3 Key Countries9.3.1 China9.3.2 India9.3.3 Southeast AsiaSection 10 Europe Market Size and Forecast10.1 Market Segmentation by Tier Standardization10.2 Market Segmentation by Types of Construction10.3 Key Countries10.3.1 Western Europe10.3.2 Nordic RegionSection 11 Latin America Market Size and Forecast11.1 Market Segmentation by Tier Standardization11.2 Market segmentation by Types of Construction11.3 Key Countries11.3.1 BrazilSection 12 Middle-East and Africa Market Size and Forecast12.1 Market Segmentation by Tier Standardization12.2 Market segmentation by Types of Construction12.3 Key Countries12.3.1 GCC
Table of Contents
16.2 Other Vendors16.2.1 Arup Group16.2.2 Corgan Associates16.2.3 Gensler16.2.4 HDR Architecture16.2.5 ISG16.2.6 Jones Engineering16.2.7 Nakano16.2.8 Schneider Electric16.2.9 Sweett16.2.10 Syska Hennessy16.2.11 SISKSection 17 Summary of Key FindingsSection 18 Appendix
Section 13 Data Center Market Segmentation by Tier Standardization13.1 Tier1&2 Data Centers13.2 Tier 3&4Section 14 Data Center Market Segmentation by Types of Construction14.1 Electrical Construction14.2 Mechanical Construction14.3 General ConstructionSection 15 Competitive Landscape15.1 Vendors by Segments15.2 Vendors by Geographies15.2.1 Competitive Scenario in Geographies15.2.2 North America15.2.3 Europe15.2.4 APAC15.2.5 MEA15.2.6 Latin AmericaSection 16 Company Profiles16.1 Major Vendors16.1.1 AECOM16.1.2 DPR Construction16.1.3 Holder Construction Group16.1.4 Jacobs Engineering16.1.5 Turner Construction
18 Sections in the report
List of Exhibits
Exhibit 1 Data Center Construction Market SegmentationExhibit 2 Market OverviewExhibit 3 Worldwide Internet Users Growth 1998-2015Exhibit 4 Global Factors for Growth of Data Centers:Exhibit 5 Evolution of Data Center from 1998-2015Exhibit 6 Expected Changes in Data Center Designing 2015-2021Exhibit 7 World Mobile Data Traffic Growth per Month (in EB)Exhibit 8 Social Media Usage in a MinuteExhibit 9 Containerized Data Center Market Worldwide 2015-2021Exhibit 10 Worldwide Data Center Construction Market 2015-2021 (US$ Billion)Exhibit 11 Cost of Construction per Square Feet 2015(in US$)Exhibit 12 Criteria for Data Center Site SelectionExhibit 13 Data Center Construction Market In North America 2015-2021 (In US$
Billion)Exhibit 14 Site Preference of Global Data Center owners in North AmericaExhibit 15 North America Market Segmentation by Tier Standardization (US$ billions)Exhibit 16 North America Market Segmentation by Types of Construction 2015Exhibit 17 Data Center Construction Market in US 2015-202(US$ Billion)Exhibit 18 Data Center Construction Market in APAC 2015-2021 (In US$ Billion)Exhibit 19 Site Preference of Global Data Center owners in APACExhibit 20 APAC Market Segmentation by Tier StandardizationExhibit 21 APAC Segmentation by Types of Construction 2015Exhibit 22 Data Center Construction Market in China 2015-2021 (US$ Billion)Exhibit 23 Data Center Construction Market in India 2015-202(US$ Billion)Exhibit 24 Data Center Construction Market in Southeast Asia 2015-202(US$ Billion)Exhibit 25 Data Center construction Market in Europe 2015-2021 (In US$ Billion)
Exhibit 26 Site Preference of Global Data Center Owners in EuropeExhibit 27 Europe Market Segmentation by Tier StandardizationExhibit 28 Europe Market Segmentation by Types of Construction 2015Exhibit 29 Data Center Construction Market in Western Europe 2015-2021 (US$
Billion)Exhibit 30 Data Center Construction Market in Nordic 2015-202(US$ billions)Exhibit 31 Data Center Construction Market in LA 2015-2021 (In US$ Billion)Exhibit 32 Site Preference of Global Data Center Owners in Latin AmericaExhibit 33 Latin America Market Segmentation by Tier StandardizationExhibit 34 Latin America Market Segmentation by Types of Construction 2015Exhibit 35 Data Center Construction Market in MEA 2015-2021 (In US$ Billion)Exhibit 36 Middle East and Africa Market Segmentation by Tier StandardizationExhibit 37 Middle East and Africa Market segmentation by Types of Construction 2015Exhibit 38 Data Center Construction Market in GCC 2015-2021(US$ Billion)Exhibit 39 Data Center Tier StandardizationExhibit 40 Worldwide Data Center Construction market by Tier Standard 2015-2019
(US$ billion)Exhibit 41 Worldwide Tier1 and Tier2 Data Center Construction Market (US$ Billion)Exhibit 42 Worldwide Tier 4 Data Center Construction Market 2015-2021Exhibit 43 Worldwide Data Center Construction Market by Types of Segments 2015-
2019 (US$ Billion)Exhibit 44 Worldwide Data Center Electrical Construction Market 2015-2021(US$
Billion)Exhibit 45 Worldwide Data Center Mechanical Construction Market 2015-2021(US$
Billion)Exhibit 46 Worldwide Data Center General Construction Market 2015-2021(US$
Billion)Exhibit 47 Presence of Major Vendors by Segment
List of Exhibits
Exhibit 48 Presence of Major Vendors By GeographiesExhibit 49 Presence of Major Vendors and Other Prominent Vendors in the MarketExhibit 50 Geographical Presence of AECOMExhibit 51 AECOM Revenue by SegmentsExhibit 52 Jacob Engineering Revenue by Segments
52 Exhibits in the report
THANK YOU
Contact
us
www.beigemarketintelligence.com
To view and purchase this report pls visithttp://www.beigemarketintelligence.com/reports/research-report-ict-market/data-center-construction-market-report/
Copyright Beige Market Intelligence LLP