STRATA DEPRECIATION REPORTS

for Bare-Land STRATAS

Russ Irish, P.Eng., Nanaimo Branch Manager(250) 716-3336, [email protected]

Darryl Tunnicliffe, P.Eng., Project Manager(250) 716-3336, [email protected]

Slide #1

10/29/2012 7:39:11 AM

Page 2: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

BASIC QUESTIONSQ1 – What’s a “Bare-Land Strata”?Q2 – What Infrastructure do we own?Q3 – What’s Infrastructure worth?Q4 - Why do I need a Depreciation

Report?Q5 - What does it look like?Q6 – What’s the scope of work?

Slide #2

10/29/2012 7:39:11 AM

Page 3: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q1 – What’s a Bare-Land Strata?

In it’s basic form, a Bare-Land Strata is similar to a subdivision

A standard “Fee Simple” subdivision has public roads

With a Bare-Land Strata Subdivision you own the roads

Slide #3

10/29/2012 7:39:11 AM

Page 4: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Typical Strata Subdivision Plan

A Bare-Land Strata subdivision has private roads held as common property

Slide #4

10/29/2012 7:39:11 AM

Page 5: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Typical Road Cross-section for a Bare-Land Strata SubdivisionInfrastructure within the road is also held as common property

Slide #5

10/29/2012 7:39:11 AM

Page 6: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Private Road is common property. Duplex buildings are on strata lotsRoadway and infrastructure behind the gate is common property

Slide #6

10/29/2012 7:39:11 AM

Page 7: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q2 –What Infrastructure do you own?

The Strata owns the same infrastructure that is typically owned by the municipality: Roads, Sidewalks and Boulevards Water works Sewer works Drainage works Streetlights

Slide #7

10/29/2012 7:39:11 AM

Page 8: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Maybe your road looks like thisOr………………………………………………

Slide #8

10/29/2012 7:39:11 AM

Page 9: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

………maybe it looks like this………Alligator cracking due to base failure

Slide #9

10/29/2012 7:39:11 AM

Page 10: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Roads, Sidewalks and BoulevardsRoads are more than just a bit of blacktop……………..

Slide #10

10/29/2012 7:39:11 AM

Page 11: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Excavation to subgradeRoad alignment is stripped and excavated to subgrade. Poor materials may need to be removed by over excavation to provide a suitable foundation

Slide #11

10/29/2012 7:39:11 AM

Page 12: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Sub base courseExcavation is followed by placement of coarse pit-run gravel

Slide #12

10/29/2012 7:39:11 AM

Page 13: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Base CourseCrushed gravel base course – this road design included cast-in-place concrete curbs

Slide #13

10/29/2012 7:39:11 AM

Page 14: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

As a final step we “paint it black”Hot mix asphalt placement. Compaction to get required density

Slide #14

10/29/2012 7:39:11 AM

Page 15: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Waterworks can include supply, treatment works, storage, distribution lines and fire hydrants

Does your waterworks system look like this?...............Or………………………….

Slide #15

10/29/2012 7:39:11 AM

Page 16: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

……or does it look like this……..I doubt the 45 gallon drum meets code……….

Slide #16

10/29/2012 7:39:11 AM

Page 17: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Mainline valves provide system controlValves need regular “exercise”

Slide #17

10/29/2012 7:39:11 AM

Page 18: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

And here is the hydrantNote that the hydrant is tied back to the main

Slide #18

10/29/2012 7:39:11 AM

Page 19: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Hydrants need annual maintenanceWorker flushing the system

Slide #19

10/29/2012 7:39:11 AM

Page 20: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Your sewer sollection system is a network of consists of pipes and manholes

Slide #20

10/29/2012 7:39:11 AM

Page 21: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Sewer worksSewer works can include a collection system, Lift stations, Forcemains, a treatment plant, and disposal fields

Slide #21

10/29/2012 7:39:11 AM

Page 22: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Drainage worksThe top end of your drainage works may be an innocuous little grate on the side of the road – but there’s way more to it……

Slide #22

10/29/2012 7:39:11 AM

Page 23: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Catchbasins connect to storm sewersThis large diameter storm sewer probably drains an area of several acres

Slide #23

10/29/2012 7:39:11 AM

Page 24: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Storm sewers collect runoff through a network of services and cb leads

Slide #24

10/29/2012 7:39:11 AM

Page 25: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Depending on the area, storm sewers can get quite largeI once lived in an apartment about this size…………..

Slide #25

10/29/2012 7:39:11 AM

Page 26: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Streetlights

Don’t be scared to change this bulb………..

Slide #26

10/29/2012 7:39:11 AM

Page 27: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

And, don’t forget about your landscaping too…………Kinda like kids, low capital cost , but can be high maintenance………

Slide #27

10/29/2012 7:39:11 AM

Page 28: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q3 – What is your infrastructure worth?

Typical Costs to build 100 metres of local road plus infrastructure: Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100 metres of road with infrastructure is

worth $122,000, or $1,220 per meter!Slide #28

10/29/2012 7:39:11 AM

Page 29: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q4 – Why do I need a Strata Depreciation Report?

A Strata Depreciation Report is an Infrastructure Management Tool

Slide #29

10/29/2012 7:39:11 AM

Page 30: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q4 – Why do I need one?

Reason 1 - They’re a good tool to manage you Common Property Assets Provides you with a comprehensive list of

Repair and Maintenance work Provides you a Budget for that work Provides you a Schedule for when that

work needs to be doneA well managed Depreciation Report should save you money!

Slide #30

10/29/2012 7:39:11 AM

Page 31: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q4 – Why do I need one?

Reason 2 – Consumer Protection Depreciation Reports are a concise and a

reliable source of information This information is useful for both strata

owners and prospective buyers (Form B)Depreciation Reports allow owners and purchasers to make informed decisions

Slide #31

10/29/2012 7:39:11 AM

Page 32: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q4 – Why do I need one?

Reason 3 – It’s THE LAW The Strata Property Act requires all Strata

Corporations to have a Depreciation Report by December 14, 2013

This requirement can be waived by the Strata Corporation based on a vote that passes with a 75% majority- yearly

BC has been late to adopt – This has been a requirement in Alberta and Ontario for several years Slide #32

10/29/2012 7:39:11 AM

Page 33: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q5 - What does it look like?

A Strata Depreciation Report has three main sections: A Physical Inventory of all common

property and assets Anticipated Maintenance, Repairs and

Replacement Costs over a 30-year program

At least 3 cash flow funding models for your Contingency Reserve Fund

Slide #33

10/29/2012 7:39:11 AM

Page 34: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q5 – What does it look like?

Section 1 - Physical Inventory First we need to compile a list of your

common property assets from strata documents and other records

These assets are inspected to assess current condition and identify any maintenance requirements

Information is documented in tables and with photos

Slide #34

10/29/2012 7:39:11 AM

Page 35: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q5 – What does it look like?

Section 2 – Maintenance, Repairs and Replacement Costs The cost to maintain and repair is based on

the age and condition of your assets The cost to replace should be based on

typical market conditions Reports are updated every 3 years to

reflect current condition and costs

Slide #35

10/29/2012 7:39:11 AM

Page 36: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q5 – What does it look like?

Section 3 - Contingency Reserve Fund Your CRF must have a minimum balance

of 25% of your operating fund for the year How do you want to fund maintenance,

repairs and replacement? Through savings, borrowing, or special levies?

Saving are generated through annual strata fees.

Slide #36

10/29/2012 7:39:11 AM

Page 37: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q6 – What’s the Scope of Work?

The Work program has 4 Main Components Data Acquisition Site Inspection Draft Report Client Review and Final Report

Slide #37

10/29/2012 7:39:11 AM

Page 38: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q6 – What work gets done?

Task 1 - Data Acquisition Strata records Strata plan and bylaws As-built drawings Maintenance records InterviewsCompile a comprehensive list of Common Property Assets

Slide #38

10/29/2012 7:39:11 AM

Page 39: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q6 – What work gets done?

Task 2 - Site Inspection Site reconnaissance to confirm recorded

common property assets Visual inspection to determine general

condition Compile a photographic record to

document current condition Talk to representatives and flag areas of

concernSlide #39

10/29/2012 7:39:11 AM

Page 40: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q6 – What work gets done?

Task 3 - Draft Report Summary of infrastructure Document condition assessment Map and photos Recommended maintenance, repair and

replacement program Cost estimates and cash flow models

Slide #40

10/29/2012 7:39:11 AM

Page 41: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Q6 – What work gets done?

Task 4 - Client Review and Final Report Present report to the strata corporation for

review Edit as warranted and issue a final report

Slide #41

10/29/2012 7:39:11 AM

Page 42: STRATA DEPRECIATION REPORTS for Bare-Land STRATAS€¦ · Pavement structure and curbs $40,000 Water lines $22,500 Sewer lines $18,500 Drainage works $34,000 Streetlights $7,000 100

Your Local Partner Since 1910

Engineering | Surveying | Planning | Mapping

Pres

erva

tion

Reha

bili

tati

onRe

cons

truc

tion

$1.00 invested herecan avoid $5.00

worth of repairs here

COND

ITIO

N IN

DEX

failed 0

very poor 20

poor 40

fair 60

good 80

excellent 100

0 20 40 60 80 100

AGE (%)

ASSET LIFE CYCLE

Vancouver

Campbell River

Surrey

Courtenay

Nanaimo

Duncan

VictoriaCalgary | Campbell River | Canmore | Courtenay | Cranbrook | Duncan | Edmonton | Kamloops | Kitimat | Nanaimo | Penticton | Prince George | Prince Rupert | Saskatoon | Smithers | Surrey | Terrace | Vancouver | Victoria

Stormwater Management

Roads & Streetscapes

Water & wastewater management

subdivision planning