STRAILastic a Inox Installation Instructions 02

download STRAILastic a Inox Installation Instructions 02

of 4

Transcript of STRAILastic a Inox Installation Instructions 02

  • 8/9/2019 STRAILastic a Inox Installation Instructions 02

    1/4

    STRAILlevel crossing systems/ STRAILastictrack damping systems

    KRAIBURG STRAILGmbH & Co. KG D-84529 Tittmoning Goellstrasse 8

    Phone + 49(0)8683/701-0 Fax -126 [email protected] www.strail.com www.strailastic.com

    STRAILastic_A INOXInstallation instructionsSubject to technical modifications / September 2012 / HUD

    www.strail.com / www.strailastic.com

  • 8/9/2019 STRAILastic a Inox Installation Instructions 02

    2/4

    Installation instructionsSTRAILastic_A inox page 2/4 September 2012 / Subject to technical modifications

    STRAILastictrack damping systems/D-84529 Tittmoning Phone +49(0)8683/701-0 [email protected] www.strailastic.com

    CONTENT

    1. Track availability

    2. Installation

    3. Installation performance

    4. Rail grinding, re-performing, etc.

    5. Removal, selective removal

    6. Quality & Environment

    > INSTALLATION INSTRUCTIONS

    These instructions describe the installation of our STRAILastic_A INOXabsorber with steel insert and steel

    clamp.

    PLEASE NOTE

    All work surfaces need to be cleaned prior to installation. Furthermore, all guidelines and manufacturers

    instructions need to be observed unconditionally. In case of non-compliance with the installation

    instructions, all guarantee and warranty claims expire on the part of the manufacturer.

    Please read all documents accompanying the supplied materials prior to use. All legal requirements as well

    as guidelines regarding health and environment protection are to be adhered to.

    # 1 /TRACK AVAILABILITY

    This system can be installed during on-going train traffic, when train breaks longer than 5 minutes are

    available. We absolutely recommend creating an appropriate and detailed work schedule (depending on

    the train schedule) in order to coordinate the work progress

    # 2 /INSTALLATION

    Bring the STRAILastic_Aabsorber to the installation position

    (use transport platform) and place it onto the sleeper bay.

    Use brushes, pressurised water and pressurised air to clean and

    dry the rail web from cinder, loose rust and dirt.

    If necessary, wet the surface of the rail web with STRAILastic_A

    coating (e.g. using a spray container, a portable pressure

    sprayer or a brush).

  • 8/9/2019 STRAILastic a Inox Installation Instructions 02

    3/4

    Installation instructionsSTRAILastic_A inox page 3/4 September 2012 / Subject to technical modifications

    STRAILastictrack damping systems/D-84529 Tittmoning Phone +49(0)8683/701-0 [email protected] www.strailastic.com

    Place the STRAILastic_AINOXabsorber onto the rail

    (install as much as possible in the middle of the

    sleeper bay), so that the rail web and the rail base

    are in full contact with the absorber and the edge of

    the rail base.

    If necessary, the rubber product/the damping

    element can be tailored on all sides to a depth of 20

    mm using a suitable tool.

    This could be possible at welding beads, at the rail

    fastening with differences in sleeping spaces, electric

    connections, and et.al.

    According to the chosen number of fixing clamps,

    pass through one, two or three clamps per absorberunder the rail and insert them on the outside and /

    or in the middle of the designated recesses.

    If necessary, remove hampering gravel from under

    the rail base.

    Fix the milling label between the order number

    and the product description e.g. by using a badge,galvanised nails, wood screws, or the like.

    The clamps are clipped on the rail base using the

    STRAILastic_AINOXmounting lever, so that the

    clamps click into their final position.

    Insert the opposite STRAILastic_AINOXabsorber as

    directly as possible into the opposing rail web and

    insert the clamps firmly.

    Final check:

    The absorber is in final position if the fixing clamps are fully protruding on the side opposing the

    absorber and the crank of the clamps lies against the channelling of the steel insert, thus in the recess of

    the absorber.

  • 8/9/2019 STRAILastic a Inox Installation Instructions 02

    4/4

    Installation instructionsSTRAILastic_A inox page 4/4 September 2012 / Subject to technical modifications

    STRAILastictrack damping systems/D-84529 Tittmoning Phone +49(0)8683/701-0 [email protected] www.strailastic.com

    # 3 /INSTALLATION PERMORMANCE

    A team of 12 workers (three or four installation tools) allows an installation performance (without check

    intervals, dependent on the cycle time) of a minimum of 150 metres of track per hour.

    # 4 /RAIL GRINDING, REPROFILING, TAMPING, ETC

    Removing STRAILastic_AINOXabsorbers is usually not necessary for rail grinding, tamping, rail

    measurements as well as track works with a ballast plough.

    # 5 /SELECTIVE REMOVAL / REMOVAL

    5.1 / Rail welding, rail breakage

    STRAILastic_A INOX absorbers are resistant against temporary increasing temperatures.

    This applies particularly to the scope of minor coat welding.

    The absorbers need to be removed in cases of repairing rail breakage and multi-layer coat welding.

    The STRAILastic_A INOXabsorbers are easy to remove in the event of rail breakage (see 5.2). In this case,

    please observe the DB AG guidelines.

    After the welding has been completed, the removed absorbers may be adapted to the new rail geometry.

    Complete installation in accordance with the installation instructions.

    5.2 / Removal

    Tools for the removal of STRAILastic_A INOX

    Preparation of the removal aid:

    j Backside of the mounting lever

    The clamp is pressed downwards with the back part of the

    installation tool foot and clicks out automatically.

    The STRAILastic_A INOXabsorbers can be removed with the foot

    of the installation tool as well.

    5.3 / Re-installation

    For re-installation please follow the steps as described in point # 2 / Installation

    # 6 / QUALITY & ENVIRONMENT

    KRAIBURG / STRAIL is a certified company according to standard ISO 9001:2000

    KRAIBURG / STRAIL use environmentally friendly materials.External supervision according to DIN ISO EN 18200