Store Fitout and Joinery.compressed

12
UP DN North North I.T Carlow Dept. Of Built Environment Architectural Technology Year 3 Technical Design and Detailing Mark Grincell - C00162901 Project No.1 - Internal Fitout Lecturer: Dan O'Sullivan, Noel Dunne Final Hand Up 21/10/2014 Sheet Index: No.01 1.1 Joinery - Counter - General Arrangments No.02 1.1 Joinery - Counter - Details No.03 1.2 Joinery - Display Unit - General Arrangments No.04 1.2 Joinery - Display Unit - Details No.05 1.3 Joinery - Display Case - General Arrangments No.06 1.3 Joinery - Display Case - Details No.07 2.0 General Arrangments - Floor Plans/ Elevations No.08 2.0 General Arrangments - Ceiling Plans/ Sections No.09 3.1 Regulations - TGD M - Plans/Elevations/Details No.10 3.2 Rgeulations - TGD B - Plans/ Elevations/Details No.11 4.0 Technology Details - Suspended Ceiling No.12 4.1 Technology Details - Internal Partitions No.13 4.2 Technology Details - Raised Access Flooring No.14 4.3 Technology Details - Stairs No.15 6.0 MEP Layout - Plans/Ceilings List Of Details: Sheet No.2 (Section 1.1) - Counter Detail No.1 - Counter Detail No.2 - Counter Detail No.3 - Counter Detail No.4 - Counter Detail No.5 - Counter Detail No.6 Sheet No.4 (Section 1.2) - Display Unit Detail No.1 - Display Unit Detail No.2 - Display Unit Detail No.3 - Display Unit Detail No.4 Sheet No.6 (Section 1.3) - Display Case Detail No.1 - Display Case Detail No.2 - Display Case Detail No.3 - Display Case Detail No.4 - Display Case Detail No.5 Sheet No.9 (Section 3.1) -TGD B Detail No.1 -TGD B Detail No.2 -TGD B Detail No.3 -TGD B Detail No.4 Sheet No.11 (Section 4.0) -Suspended Ceiling Detail No.1 -Suspended Ceiling Detail No.2 -Suspended Ceiling Detail No.3 Sheet No.12 (Section 4.1) - Internal Partition Details No.1 - Internal Partition Details No.2 - Internal Partition Details No.3 - Internal Partition Details No.4 - Internal Partition Details No.5 - Internal Partition Details No.6 Sheet No.13 (Section 4.2) - Raised Access Floor Details No.1 - Raised Access Floor Details No.2 - Raised Access Floor Details No.3 Sheet No.14 (Section 4.3) -Stairs Detail No.1 -Stairs Detail No.2 -Stairs Detail No.3 -Stairs Detail No.4

Transcript of Store Fitout and Joinery.compressed

Page 1: Store Fitout and Joinery.compressed

UP

DNNorth North

I.T CarlowDept. Of Built Environment

Architectural Technology Year 3Technical Design and Detailing

Mark Grincell - C00162901

Project No.1 - Internal Fitout

Lecturer: Dan O'Sullivan, Noel DunneFinal Hand Up 21/10/2014

Sheet Index:

No.01 1.1 Joinery - Counter - General Arrangments

No.02 1.1 Joinery - Counter - Details

No.03 1.2 Joinery - Display Unit - General Arrangments

No.04 1.2 Joinery - Display Unit - Details

No.05 1.3 Joinery - Display Case - General Arrangments

No.06 1.3 Joinery - Display Case - Details

No.07 2.0 General Arrangments - Floor Plans/ Elevations

No.08 2.0 General Arrangments - Ceiling Plans/ Sections

No.09 3.1 Regulations - TGD M - Plans/Elevations/Details

No.10 3.2 Rgeulations - TGD B - Plans/ Elevations/Details

No.11 4.0 Technology Details - Suspended Ceiling

No.12 4.1 Technology Details - Internal Partitions

No.13 4.2 Technology Details - Raised Access Flooring

No.14 4.3 Technology Details - Stairs

No.15 6.0 MEP Layout - Plans/Ceilings

List Of Details:

Sheet No.2 (Section 1.1)- Counter Detail No.1- Counter Detail No.2- Counter Detail No.3- Counter Detail No.4- Counter Detail No.5- Counter Detail No.6

Sheet No.4 (Section 1.2)- Display Unit Detail No.1- Display Unit Detail No.2- Display Unit Detail No.3- Display Unit Detail No.4

Sheet No.6 (Section 1.3)- Display Case Detail No.1- Display Case Detail No.2- Display Case Detail No.3- Display Case Detail No.4- Display Case Detail No.5

Sheet No.9 (Section 3.1)-TGD B Detail No.1-TGD B Detail No.2-TGD B Detail No.3-TGD B Detail No.4

Sheet No.11 (Section 4.0)-Suspended Ceiling Detail No.1-Suspended Ceiling Detail No.2-Suspended Ceiling Detail No.3

Sheet No.12 (Section 4.1)- Internal Partition Details No.1- Internal Partition Details No.2- Internal Partition Details No.3- Internal Partition Details No.4- Internal Partition Details No.5- Internal Partition Details No.6

Sheet No.13 (Section 4.2)- Raised Access Floor Details No.1- Raised Access Floor Details No.2- Raised Access Floor Details No.3

Sheet No.14 (Section 4.3)-Stairs Detail No.1-Stairs Detail No.2-Stairs Detail No.3-Stairs Detail No.4

Page 2: Store Fitout and Joinery.compressed

1248

1050

50

1026

1687

1481

600

350

1836

2036

1248

1050

50

301

950

600

1026563

1481

586

386

936

756

950

350

600

1248

586

386

350 950

350

600

756

93610

50

1248

7

No.01

2507

936

1694

1026

756

12

No.01

1No.02

2No.02

3No.02

3216

610

50

100 1836 100

2036

550

50

232 563 231

1651

350

6No.02

1026

950

Medium Density Fibreboard (MDF) With WhiteOak Veneer and Solid White Oak Edges.Measurements: 2440mm X 1220mm SheetsThickness Used:18mm

ESG TuffLam Safety Glass (Toughened Glass)Thickness Used: 9mmDisplay Unit on SISO PTO Sliders.

Philips iW Cove MX Powercore,White-light LED 6500 K

Shelving for TillElectrical Supply Unit Located Here

4No.02

5No.02

180 756

298

900

50

350 100 386 100

298

350

600

SISO PTO Drawer Sliders.Storage here for Materials

Marine plywood, WBPBase for Internal StructureThickness Used: 18mm

Medium Density Fibreboard (MDF) With WhiteOak Veneer and Solid White Oak Edges.

2Elevation

Elevation 3

Eleva

tion

4 5Ele

vatio

n

Push Button Alarm SystemWired to Shop Security SystemHidden from view, Easily Accessible

100 386 100586

600

350

1248

756

525 232

260

938

50

Medium Density Fibreboard (MDF) WithWhite Oak Veneer and Solid White Oak Edges.Measurements: 2440mm X 1220mm SheetsThickness Used:18mm, 25mm

ESG TuffLam Safety Glass(Toughened Glass)

Thickness Used: 6mm

Philips iW Cove MXPowercore, White-light

LED 6500 K

Interl StructureWhite Deal (Rough Cut)

Thickness Used: 25mm x 25mm

Shelving for Till*Electrical Supply Needed.

Electric Supply Unit for TillReassessed into MDF

Panel

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

20/1

0/20

14 1

5:51

:25

1.1 Joinery - Counter - GA

No.1

07/10/2014

No.01

No.01

1.1 Joinery - Counter - 3D Isometric View0

1 : 20No.01

1.1 Joinery - Counter - Front Elevation2

1 : 20No.01

1.1 Joinery - Counter - Rear Elevation3

1 : 20No.01

1.1 Joinery - Counter - Left Elevatin5

1 : 20No.01

1.1 Joinery - Counter - Right Elevation4

1 : 20No.01

1.1 Joinery - Counter - Plan1

1 : 10No.01

1.1 Joinery - Counter - Section AA6 1 : 10No.01

1.1 Joinery- Counter - Section BB7

Specifications:

Timber:Medium Density Fibreboard (MDF) With WhiteOak Veneer and Solid White Oak Edges.Measurements: 2440mm X 1220mm SheetsThickness Used:18mm

Marine plywood, WBP (weather and Boil proof)phenolic glue.Measurements: 2440mm X 1220mmThickness Used: 18mm, 25mm

White Deal (Rough Cut)Thickness Used: 25mm x 25mm, 50mm x 25mm,50mm x 100mm Battens.

Glass:ESG TuffLam Safety Glass (Toughened Glass)Thickness Used: 9mm, 6mm

Fittings:Point Fixture 30mm Diameter - M8 x 40mm Bolt- 303 Polished Stainless Steel Finish. Suited for 6 -16mm Glass.

FIX FX19 PSF Panel Screw System.303 Grade Stainless Steel (Polished) InteriorApplication. 10g Countersunk Screw Required19mm Diameter x 8mm Thickness

SISO Push to Open (PTO) 4500 Drawer Slider,2mm PTO.Cold Rolled Steel 1.2mm. Fixing via ChipboardScrews 4mm Dia.Travel: 600mm.

Lighting:Philips iW Cove MX Powercore, White-light LED6500 K. 100–240 V AC, auto-switching, 50-60Hz, White powder-coated finish.

1 : 20No.01

1.1 Joinery - Counter - Section AA - Lighting8

1 : 20No.01

1.1 Joinery- Counter -Section BB - Lighting9

No.01

1.1 Joinery - Counter - Interior View11

1 : 10No.01

1.1 Joinery - Counter - Section CC12

MDF Panel White Oak Veneer SecuredUsing FIX Panel Screw System.

303 Grade Stainless Steel (Polished)

Display Drawer, SISO Push to Open Sliders.Interior: Black Velvet Covering

Lighting under the Display Unit: Philips iWCove MX Powercore, White-light LED 6500 K.

ESG TuffLam Safety Glass (ToughenedGlass)

6mm Secured Via 30mm Stainless SteelPoint Fixtures

ESG TuffLam Safety Glass (ToughenedGlass)9mm secured via 30mm Point Fixtures

1 : 20No.01

1.1 Joinery - Counter -Section CC - Lighting13

Lighting:Philips iW Cove MXPowercore, White-

light LED 6500 K.- 70 Degrees Beam

Angle(Electrical Wiring

requires consultation.)

Luminaire Wiring

Light Area

Drawer Storage , SISO PTOSliders

Shelving for TillElectrical Supply UnitLocated Here

Page 3: Store Fitout and Joinery.compressed

50

50

25 25

1220

18 153

2514

918

18

89

150

18

ESG "Tufflam Glass"12mm Tempered GlassFixing: Via Point FixtureFinish: Polished

30mm Point FixtureFixing: Oak Veneer MDF PanelFinish: Polished Stainless Steel

19mm Panel Screw SystemFixing: Secure MDF Panel(White Oak Veneer)To Internal StructureFinish: Polished Stainless Steel

25mm x 25mm Internal Structure BattenFixing : To Joiner SpecFinished: N/A

18mm MDF Panel White OakVeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

Philips iW Cove MX Powercore,White-light LED 6500 K.

Fixing: Secured to MDF undersideFinished:White powder-coated

18mm MDF Panel White OakVeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

19mm Panel Screw SystemFixing: Secure MDF Panel

(White Oak Veneer)To Internal Structure, PlywoodFinish: Polished Stainless Steel

232

182

18mm Plywood x2Fixing: To internal Structure

Finish: Plain

200

1825

25

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

25mm x 25mm Internal Structure BattenFixing : To Joiner SpecFinished: N/A

5075

2518

43

18 50

68

2518

18

61

100

19mm Panel Screw SystemFixing: Secure MDF Panel

(White Oak Veneer) ToInternal Structure

Finish: Polished StainlessSteel

25mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

Philips iW Cove MXPowercore, White-light

LED 6500 K.Fixing: Secured to MDF

undersideFinished:White powder-

coated

18mm MDF Panel WhiteOak Veneer

Fixing: Via Panel ScrewSystem

Finish: Plain (Wood Grain)

25mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

50mm x 100mm Structure BattenFixing : To Joiner SpecFinished: N/A

100

1220

25

18

18 14 18 25

915

318

450

1850

100

25

37

30mm Point FixtureFixing: Oak Veneer MDF PanelFinish: Polished Stainless Steel

ESG "Tufflam Glass"12mm Tempered GlassFixing: Via Point FixtureFinish: Polished

19mm Panel Screw SystemFixing: Secure MDF Panel(White Oak Veneer)To Internal StructureFinish: Polished StainlessSteel

50mm x 25mm InternalStructure BattenFixing : To Joiner SpecFinished: N/A

18mm MDF Panel WhiteOak VeneerFixing: Via PanelScrew SystemFinish: Plain (Wood Grain)

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

50mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

Philips iW Cove MXPowercore, White-lightLED 6500 K.Fixing: Secured to MDFundersideFinished:White powder-coated

3212

1

18mm MDF PanelWhite Oak Veneer

Fixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

Black FeltLayed for interior of display

case

ESG "Tufflam Glass"9mm Tempered GlassFixing: Via Point Fixture

Finish: Polished

SISO Push to Open SliderModel: PTO 4500Travel: 650mm

Stainless Steel Strip

10030

25mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

25mm x 25mm Internal Structure BattenFixing : To Joiner SpecFinished: N/A

25

1220

25

37

140

5

913

25 18

1812

1

ESG "Tufflam Glass"12mm Tempered GlassFixing: Via Point FixtureFinish: Polished

Black FeltLayed for interior of

display case

25mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

18mm MDF Panel White OakVeneer

Fixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

ESG "Tufflam Glass"9mm Tempered GlassFixing: Via Point Fixture

Finish: Polished

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

Stainless Steel Strip

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

19mm Panel Screw SystemFixing: Secure MDF Panel (WhiteOak Veneer)To Internal StructureFinish: Polished Stainless Steel

30mm Point FixtureFixing: Oak Veneer MDF PanelFinish: Polished Stainless Steel

15

515

05

150

515

05

500

19mm Panel Screw SystemFixing: Secure MDF Panel(White Oak Veneer)To Internal StructureFinish: Polished StainlessSteel

19mm Panel Screw SystemFixing: Secure MDF Panel(White Oak Veneer)To Internal StructureFinish: Polished Stainless Steel

18mm MDF Panel White OakVeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain

18mm MDF Panel WhiteOak VeneerFixing: Via Panel ScrewSystemFinish: Plain (Wood Grain

SISO Push to Open SliderModel: PTO 4500Travel: 650mm

132

1813

218

1813

215

25

1825

25 18

2520

25

100

75

1224

912

2512

818

450

7

2525

1825

18 25 18

25

30

18 14 18

SISO Push to Open SliderModel: PTO 4500

Travel: 650mm

18mm MDF PanelWhite Oak Veneer

Fixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

18mm MDF Panel WhiteOak VeneerFixing: Via PanelScrew SystemFinish: Plain (WoodGrain)

50mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

19mm Panel Screw SystemFixing: Secure MDF Panel (White Oak Veneer)To Internal StructureFinish: Polished Stainless Steel

ESG "Tufflam Glass"12mm Tempered GlassFixing: Via Point FixtureFinish: Polished

30mm Point FixtureFixing: Oak Veneer MDF PanelFinish: Polished Stainless Steel

Stainless Steel Strip

ESG "Tufflam Glass"9mm Tempered GlassFixing: Via Point FixtureFinish: Polished

Black FeltLayed for interior of display case

25mm MDF Panel WhiteOak Veneer

Fixing: Via PanelScrew System

Finish: Plain (Wood Grain)

18mm MDF Panel WhiteOak Veneer

Fixing: Via PanelScrew System

Finish: Plain (Wood Grain)

50mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

50mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

1 : 2

20/1

0/20

14 1

5:23

:33

1.1 Joiner - Counter - Details

No.1

07/10/2014

No.02

1 : 2No.02

1.1 Joinery - Counter - Detail No.11 1 : 2No.02

1.1 Joinery - Counter - Detail No.22

1 : 2No.02

1.1 Joinery - Counter - Detail No.33

1 : 2No.02

1.1 Joinery- Counter - Detail No.44

1 : 2No.02

1.1 Joinery- Counter - Detail No.55

Specifications:

Timber:Medium Density Fibreboard (MDF) With WhiteOak Veneer and Solid White Oak Edges.Measurements: 2440mm X 1220mm SheetsThickness Used:18mm, 25mm

Marine plywood, WBP (weather and Boilproof) phenolic glue.Measurements: 2440mm X 1220mmThickness Used: 18mm

White Deal (Rough Cut)Thickness Used: 25mm x 25mm, 50mm x25mm, 50mm x 100mm Battens.

Glass:ESG TuffLam Safety Glass (Toughened Glass)Thickness Used: 9mm, 6mm

Fittings:Point Fixture 30mm Diameter - M8 x 40mm Bolt- 303 Polished Stainless Steel Finish. Suited for 6- 16mm Glass.

FIX FX19 PSF Panel Screw System.303 Grade Stainless Steel (Polished) InteriorApplication. 10g Countersunk ScrewRequired19mm Diameter x 8mm Thickness

SISO Push to Open (PTO) 4500 Drawer Slider,2mm PTO.Cold Rolled Steel 1.2mm. Fixing via ChipboardScrews 4mm Dia.Travel: 600mm.

Lighting:Philips iW Cove MX Powercore, White-light LED6500 K. 100–240 V AC, auto-switching, 50-60Hz, White powder-coated finish.

1 : 2No.02

1.1 Joinery - Counter - Detail No.66

Luminaire Wiring

Light Area

Page 4: Store Fitout and Joinery.compressed

50

1700

400

200

200

200

200

200

200

400 400

400

1100

800

5020

011

0040

0

1700

200

400

400400400

600

800

5020

0

1100

1700

400 400400

400

600100

400 400

200

400

200

1700

5020

020

0

600800

1500

2Elevation

Elevation 3

5Ele

vatio

n

Eleva

tion

4

8

No.03

9

No.03

400 400

400

400 400

400

400

400

5

No.04

1No.04

2No.04

3No.04

1700

1500

100

100

800

400

1300

600

Medium Density Fibreboard (MDF)With White Oak Veneer and Solid

White Oak Edges.Measurements: 2440mm X1220mm Sheets Thickness

Used:18mm

ESG TuffLam Safety Glass(Toughened Glass)

Thickness Used: 9mm

Philips iW CoveMX Powercore,White-light LED6500 K

Interl StructureWhite Deal(Rough Cut)Thickness Used:25mm x 25mm

4No.04

1700

400

1100

400

400 400

800

Medium DensityFibreboard

(MDF) With WhiteOak Veneer

and Solid WhiteOak Edges.

Philips iW Cove MXPowercore, White-light LED 6500 K

Interl StructureWhite Deal (Rough Cut)Thickness Used: 25mmx 25mm

SISO PTO Drawer Sliders.On Side of Unit for

Opening Display

Lighting:Philips iW Cove MXPowercore, White-lightLED 6500 K.- 70 Degrees Beam Angle(Electrical Wiring requiresconsultation.)

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

21/1

0/20

14 0

8:10

:44

1.2 Joinery - Display Unit -GA

No.1

07/10/2014

No.03

Specifications:

Timber:Medium Density Fibreboard (MDF) With WhiteOak Veneer and Solid White Oak Edges.Measurements: 2440mm X 1220mm SheetsThickness Used:18mm

Marine plywood, WBP (weather and Boil proof)phenolic glue.Measurements: 2440mm X 1220mmThickness Used: 18mm, 25mm

White Deal (Rough Cut)Thickness Used: 25mm x 25mm, 50mm x 25mm,50mm x 100mm Battens.

Glass:ESG TuffLam Safety Glass (Toughened Glass)Thickness Used: 9mm, 6mm

Fittings:Point Fixture 30mm Diameter - M8 x 40mm Bolt- 303 Polished Stainless Steel Finish. Suited for 6 -16mm Glass.

FIX FX19 PSF Panel Screw System.303 Grade Stainless Steel (Polished) InteriorApplication. 10g Countersunk Screw Required19mm Diameter x 8mm Thickness

SISO Push to Open (PTO) 4500 Drawer Slider,2mm PTO.Cold Rolled Steel 1.2mm. Fixing via ChipboardScrews 4mm Dia.Travel: 600mm.

Lighting:Philips iW Cove MX Powercore, White-light LED6500 K. 100–240 V AC, auto-switching, 50-60Hz, White powder-coated finish.

Luminaire Wiring

Light Area

1 : 20No.03

1.2 Joinery - Display Unit - Front Elevation1

1 : 20No.03

1.2 Joinery - Display Unit - Left Elevation2 1 : 20No.03

1.2 Joinery - Display Unit - Rear Elevation3

1 : 20No.03

1.2 Joinery - Display Unit - Right Elevation4

1 : 20No.03

1.2 Joinery - Display Unit - Plan6

No.03

1.2 Joinery - Display Unit - Interior View7

1 : 10No.03

1.2 Joinery - Display Unit - Section AA8 1 : 10No.03

1.2 Joinery - Display Unit - Section BB9 1 : 20No.03

1.2 Joinery - Display Unit - Section AA - Lighting10 1 : 20No.03

1.2 Joinery - Display Unit - Section BB - Lighting11

No.03

1.2 Joinery - Display Unit - 3D Isometric View12

The Lighting for the Display will be Directed Down From Above

MDF Panel White Oak Veneer SecuredUsing FIX Panel Screw System.303 Grade Stainless Steel (Polished)

MDF Panel White Oak VeneerSecured Using FIX Panel Screw

System.303 Grade Stainless Steel (Polished)

Display Drawer, SISOPush to Open Sliders.

ESG TuffLam Safety Glass(Toughened Glass)

9mm

Page 5: Store Fitout and Joinery.compressed

19mm Panel Screw SystemFixing: Secure MDF Panel

(White Oak Veneer)To Internal Structure

Finish: Polished Stainless Steel

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

25mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

25mm x 25mm Internal Structure BattenFixing : To Joiner SpecFinished: N/A

2518

30

ESG "Tufflam Glass"6mm Tempered GlassFixing: Base, Glue and

Oak WedgeFinish: Polished

Mitre Joint at ConnectionsGlass Panels. ConnectionSealed by UV Glass Glue.

66 6

20 1825

6

6

5075

25 18

43

1850

68

2518

18

61

100

19mm Panel Screw SystemFixing: Secure MDF Panel(White Oak Veneer) ToInternal StructureFinish: Polished StainlessSteel

25mm x 25mm InternalStructure BattenFixing : To Joiner SpecFinished: N/A

Philips iW Cove MXPowercore, White-lightLED 6500 K.Fixing: Secured to MDFundersideFinished:White powder-coated

18mm MDF Panel WhiteOak VeneerFixing: Via Panel ScrewSystemFinish: Plain (Wood Grain)

25mm x 25mm InternalStructure BattenFixing : To Joiner SpecFinished: N/A

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

50mm x 100mm Structure BattenFixing : To Joiner Spec

Finished: N/A

100

19mm Panel Screw SystemFixing: Secure MDF Panel

(White Oak Veneer)To Internal Structure

Finish: Polished Stainless Steel

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

25mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

18mm MDF Panel White OakVeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

25mm x 25mm InternalStructure BattenFixing : To Joiner SpecFinished: N/A

30

ESG "Tufflam Glass"6mm Tempered GlassFixing: Base, Glue and

Oak WedgeFinish: Polished

66 6

20 1825

19mm Panel Screw SystemFixing: Secure MDF Panel

(White Oak Veneer)To Internal Structure

Finish: Polished Stainless Steel

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

25mm x 25mm InternalStructure Batten

Fixing : To Joiner SpecFinished: N/A

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

25mm x 25mm Internal Structure BattenFixing : To Joiner SpecFinished: N/A

30

ESG "Tufflam Glass"6mm Tempered GlassFixing: Base, Glue and

Oak WedgeFinish: Polished

66 6

18

Mitre Joint at ConnectionsGlass Panels. ConnectionSealed by UV Glass Glue.

6

2518

20

2518

19mm Panel Screw SystemFixing: Secure MDF Panel

(White Oak Veneer)To Internal Structure

Finish: Polished Stainless Steel

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

25mm x 25mm InternalStructure BattenFixing : To Joiner SpecFinished: N/A

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw SystemFinish: Plain (Wood Grain)

25mm x 25mm Internal Structure BattenFixing : To Joiner SpecFinished: N/A

30

ESG "Tufflam Glass"6mm Tempered GlassFixing: Base, Glue and

Oak WedgeFinish: Polished

Mitre Joint at ConnectionsGlass Panels. ConnectionSealed by UV Glass Glue.

66 6

17.8

25

6

18

25

SISO Push to Open SliderModel: PTO 4500

Travel: 650mmSecured to Structure Inside

18

30

18mm MDF Panel White Oak VeneerFixing: Via Panel Screw System

Finish: Plain (Wood Grain)

1700

1500

100

100

800

400

1300

600

Medium Density Fibreboard (MDF)With White Oak Veneer and Solid

White Oak Edges.Measurements: 2440mm X1220mm Sheets Thickness

Used:18mm

ESG TuffLam Safety Glass(Toughened Glass)

Thickness Used: 9mm

Philips iW CoveMX Powercore,White-light LED6500 K

Interl StructureWhite Deal(Rough Cut)Thickness Used:25mm x 25mm

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

21/1

0/20

14 0

8:12

:38

1.2 Joinery - Display Unit -Details

No.1

07/10/2014

No.04

1 : 2No.04

1.2 Joinery - Display Unit - Detail No.11 1 : 2No.04

1.2 Joinery - Display Unit - Detail No.22

1 : 2No.04

1.2 Joinery - Display Unit - Detail No.33 1 : 2No.04

1.2 Joinery - Display Unit - Detail No.44

Specifications:

Timber:Medium Density Fibreboard (MDF) With WhiteOak Veneer and Solid White Oak Edges.Measurements: 2440mm X 1220mm SheetsThickness Used:18mm, 25mm

Marine plywood, WBP (weather and Boilproof) phenolic glue.Measurements: 2440mm X 1220mmThickness Used: 18mm

White Deal (Rough Cut)Thickness Used: 25mm x 25mm, 50mm x25mm, 50mm x 100mm Battens.

Glass:ESG TuffLam Safety Glass (Toughened Glass)Thickness Used: 9mm, 6mm

Fittings:Point Fixture 30mm Diameter - M8 x 40mm Bolt- 303 Polished Stainless Steel Finish. Suited for 6- 16mm Glass.

FIX FX19 PSF Panel Screw System.303 Grade Stainless Steel (Polished) InteriorApplication. 10g Countersunk ScrewRequired19mm Diameter x 8mm Thickness

SISO Push to Open (PTO) 4500 Drawer Slider,2mm PTO.Cold Rolled Steel 1.2mm. Fixing via ChipboardScrews 4mm Dia.Travel: 600mm.

Lighting:Philips iW Cove MX Powercore, White-light LED6500 K. 100–240 V AC, auto-switching, 50-60Hz, White powder-coated finish.

1 : 10No.04

1.2 Joinery - Display Unit - Section AA Details5

Page 6: Store Fitout and Joinery.compressed

UP

DNDN

UP

2000

4500

5050

4011

3100

1672

4500

5050

3000

1885

1500

1000

7 m²Staff Canteen

No.7

6 m²Safe Room

No.8

5 m²WCNo.6

3 m²StoreNo.5

21 m²Hallway

No.3

22 m²Workshop

No.4

North

50504115

9184

2700

1270

0

1710

5065

1900

1000

300 1000 1515 1000

935

1200

47 m²Shop Floor

No.1

7 m²Consultation Room

No.2

North

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level -1

-3000

2.2 GA - Plan -Level -1

-3000

Solid Oak WindowsHeight: 1500mmWidth: 1000mm

Triple Glazed Unit

Veneer Oak MDF FireRated Door.

Head Height: 2200mmWidth: 1500mm

30min Fire Resistance

1500

2200

1000

1500

Existing BrickworkWall 215mm

Existing Brick WorkWall 215mm

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level -1

-3000

2.2 GA - Plan -Level -1

-3000

Basement

Solid Oak WindowsHeight: 1500mmWidth: 1000mmTriple Glazed Unit

Solid Oak Double DoorHead Height: 2200mmWidth: 1900mmTriple Glazed Unit

2200

700

10411000 19731900

5050

4115

9184

2700

1710

Existing Windows Were Removed and theVoid was Filled with a Standard BrickworkWall to Match the Existing Structure

Triple Glazed Solid White Oak SashWindows Replace the Existing OnesMeasurements: 1000mm x 1500mmThe Cill Height must be raised to 1200 toaccommodate the Raised AccessFlooring

Existing Shop Front Door and GlazingRemoved and Replaced by StandardBrickwork Wall to Match the existingStructure.

Solid Oak Windows and Solid OakDouble Door will Replace the Entrance.

The Door will be 2200mm HH, 1900mmWidth Which will Comply with TGD M.

Triple Glazed Solid White Oak SashWindows Replace the Existing OnesMeasurements: 1000mm x 1500mm

The Existing WC and Staff Kitchen willbe moved down stairs and theconsultation Room will be moved tothe Ground Floor.The Reasoning behind this is the Toiletand Kitchen are a Staff only facilityand having the consultation RoomUp Stairs will allow the Whole Public toaccess it.

A new Stairs will have to replace theExisting Hatch to Allow Access intothe Basement Level.The Stairs will be Designed so to bean Ambient Stairs.It Will Also Act as an OptionalEscape Route, Leading Directly tothe Final Exit

Existing Projects in the Brickwork Wallwill be Removed.(Required Structural Analysis)

This will allow easy to line the wall andgain space as the Floor Area is quiteSmall.Existing Projects in the Brickwork

Wall will be Removed.Possible Fire Place.(Required Structural Analysis)

This will allow easy to line the walland gain space as the Floor Areais quite Small.

5065

Raised Access Floor Area to Levelthe Area and over Come theExisting Stepped Area.Platform Lift Will be placed toallow Wheelchair Access.

North

2000

4500

Existing Rear Door Replaced with Oak MDFFire Rated Door.Width: 1500mm to Allow Access of Materialsand Machinery.Door will be used as Rear Exit but also as anEmergency Escape.

A new Stairs will have to replace theExisting Hatch to Allow Access into theBasement Level.The Stairs will be Designed so to be anAmbient Stairs.It Will Also Act as an Optional EscapeRoute, Leading Directly to the Final Exit

Existing Projects in the Brickwork Wallwill be Removed.(Required Structural Analysis)

This is Required to Allow the StairsStructure to be Installed.

The Basement Boundary Extends Furtherthen the Ground Floor Above.

The Above Wall Sits on an Concrete Floorwhich close the gap between thebasement retaining wall and Front Wall.

All Existing Internal Walls will be taken out.New Steel Partitions will Replace these.

New Oak Veneer MDF 3Omin FireRated Doors Will be Installed intothe Stud Partitions.Width: 1000mm to meet TGD M andB.

A One Sided Partition Will beConstructed here to allow a run forservices as the Kitchen/ Canteenare along this Side of The Building.

The WC will be located here. Thiswill be fully AccessibleThe Services will Run In The OneSides Partition.

The Work Shop is a High Risk Area. Thisneeds to be a Secure Area as well asneeds 60min Fire Resistance as wellneeds its own Ventilation.

Existing Building on Both Sides of theBuilding. Terraced Building.

5050

4011

3100

1672

4500

5050

3000

North

Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel with

Catalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal, 601.5mm Rise.

Oak Veneer MDF 3Omin Fire Rated DoorsWill be Installed into the Stud Partitions.Width: 1000mm to meet TGD M and B.

Stairs Structure 31mm Toughened Glazing, StainlessSteel Hand Rail, Treads Solid White Oak Panel, 30mm x1200mm x 300mm, Held in Place by PanelScrew/Tread System 19mm Dia.

Gyproc MF Suspended Panel System, 600mm x 600mmFreshtone panel, Shadow Gap Around Edges.

Oak Veneer MDF 3Omin Fire Rated DoorsWill be Installed into the Stud Partitions.Width: 1000mm to meet TGD M and B.

Pilkington LCD FILM Glass12mm, Partition System. MildSteel Frame, 100mmx50mm

Gyproc Suspended Ceiling System, Plasterboard9mm, 15mm MDF Oak Veneer Feature Supportedby Gyproc Framing System (GL5)

Steel Stud System (50mm x50mm C-Channel) using:Gyproc Plasterboard

Gyproc MF Suspended Panel System,600mm x 600mm Freshtone panel,

Shadow Gap Around Edges.

225mm Wooden Joists 500c/c, Lath andPlaster removed and 12.5mm + 12.5mmGyproc Fibreboard replaces it securedto Joists, 2.5mm Plaster Skim.

Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF Oak VeneerFeature Supported by Gyproc FramingSystem (GL5)

225mm Wooden Joists 500c/c, Lath andPlaster removed and 12.5mm + 12.5mm

Gyproc Fibreboard replaces it secured toJoists, 2.5mm Plaster Skim.

215mm Brickwork, 15mmGyproc Plasterboard, 2.5mm

Plaster Skim..

Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF OakVeneer Feature Supported by GyprocFraming System (GL5)

Gyproc MF Suspended PanelSystem, 600mm x 600mmFreshtone panel, 10mm ShadowGap Around Edges

Steel Stud System (50mm x 50mm C-Channel) using: Gyproc Plasterboard

Pilkington LCD FILM Glass 12mm, PartitionSystem. Mild Steel Frame, 100mmx50mm

Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Board Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal

New Oak Veneer MDF 3Omin Fire Rated DoorsWill be Installed into the Stud Partitions. Width:1000mm meet TGD M and B.

Gyproc MF Suspended Panel System,600mm x 600mm Freshtone panel,

10mm Shadow Gap Around Edges

Elevation North

Elevation South

Eleva

tion

Wes

t

Eleva

tion

East

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

20/1

0/20

14 1

5:55

:42

2.0 GA - Floor Plans /Elevations

No.1

07/10/2014

No.07

1 : 100No.07

2.2 GA - Plan - Level -11

1 : 100No.07

2.2 GA - Plan - Level 02

1 : 50No.07

2.1 GA - South Elevation6 1 : 50No.07

2.1 GA- North Elevation7

1 : 100No.07

2.1 GA - Alterations - Ground Floor Level8

1 : 100No.07

2.1 GA - Alterations - Basment Level9

Specifications:

Wall Build Up:Existing: Wall Build Up 2015mm Brickwork,Lime Based Mortar.

New: 215mm Brickwork, 15mm GyprocPlasterboard, 2.5mm Plaster Skim.

Floor Build Up:Existing: 225mm Wooden Joists 500 c/c, Lathand Plaster Finish.

New: 225mm Wooden Joists 500c/c, Lathand Plaster removed and 12.5mm + 12.5mmGyproc Fibreboard replaces it secured toJoists, 2.5mm Plaster Skim.

Suspended Ceiling Build Up:Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF Oak VeneerFeature Supported by Gyproc FramingSystem (GL5)

Gyproc MF Suspended Panel System,600mm x 600mm Freshtone panel, ShadowGap Around Edges.

Partition Build Up:Various Steel Stud System (50mm x 500mmC-Channel) using:

- Gyproc Fireboard,One Sided:Skim 2.5mm Plaster 15mm +15mm 2.5mmPlaster Skim, Shadow gap, (90MIN)

- Gyproc Wallboard, Two sided:Plaster Skim 2.5mm,, 2x12.5mm, 50mm Stud,2x12.5mm, Plaster Skim 2.5mm, (90MIN)

Pilkington LCD FILM Glass 12mm, PartitionSystem. Mild Steel Frame, 100mmx50mm

Internal Doors:New Oak Veneer MDF 3Omin Fire RatedDoors Will be Installed into the Stud Partitions.Width: 1000mm to meet TGD M and B.

External Doors:Front Door - Solid Oak Double Door HeadHeight: 2200mm Width: 1900mm TripleGlazed Unit, 30min Fire Rated.

Back Door - Veneer Oak MDF Fire RatedDoor. Head Height: 2200mm Width: 1500mm30min Fire Rated.

External Windows:Solid Oak Windows Height: 1500mm Width:1000mm Triple Glazed Unit

Raised Access Flooring:Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal, 601.5mm Rise.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatalogue Finish: Calcutta GoldButech 10mm Catches System.

Stairs Construction:Stairs Structure 31mm Toughened Glazing,Stainless Steel Hand Rail, Treads Solid WhiteOak Panel, 30mm x 1200mm x 300mm, Heldin Place by Panel Screw/Tread System19mm Dia.

1 : 50No.07

2.1 Internal Elevation - East3

1 : 50No.07

2.1 Internal Elevation - North4 1 : 50No.07

2.1 Internal Elevation - South5

1 : 50No.07

2.1 Internal Elevation - West10

Existing Construction (Demolished):

New Construction:

Butech 15k Panel System, Thickness 12.5mm, 600mm x600mm Calcium Sufile Core with Catalogue Finish: CalcuttaGold Butech 10mm Catches System.

Front Door - Solid OakDouble Door HeadHeight: 2200mm Width:1900mm Triple GlazedUnit, 30min Fire Rated

Page 7: Store Fitout and Joinery.compressed

The Ceiling Requires a 600mm x 600mm Grid SystemThe Ceiling is a Duel Level Ceiling:

-The Plasterboard at -350 From First Floor Level

-The MDF White Oak Veneer at -600 from First Floor Level

Gyproc MF Suspended PanelSystem, 600mm x 600mmFreshtone panel, Shadow GapAround Edges

Gyproc Suspended Ceiling Grid System

- 9mm Plasterboard 9mm- Supported by Gyproc Framing System600mm x 600mm-150mm Bulk Head Upstanding-350mm from FFL

Gyproc Suspended Ceiling System

-15mm MDF Oak Veneer Feature-Supported by Gyproc Framing System600mm x 600mm-150mm Bulk Head Upstanding-600mm from FFL

1020

0

3000 1200

8400

4243

98.13

°81.87°

Gyproc Suspended Ceiling Grid System-9mm Plasterboard

Gyproc Suspended Ceiling System-15mm MDF Oak Veneer Feature

500 2994 1471

3966

4105

1710

North

Shadow GapGrid

Framing System

Freshtone Panel

Shadow Gap Feature 10mm

Shadow Gap Bead

Freshtone Panel

4450

5050

1572

1950

3000

4228

148

1803

1793

2990

2255

5030

4430

1930

1552

2520

4416

4667

1783

1783

2980

2234 18

15

Gyproc MF Suspended Panel System.600mm x 600mm Freshtone panelThickness 10mm, Diamond White vinyl-faced

-10mm Shadow Gap Around Edges

Suspended Aluminium Grid System, secured toplasterboard above.Shadow Line Grid

The Hall way that thestairs occupies has nosuspended Ceiling, It hasa plaster finish.

North

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level -1

-3000

2929

3000

2706

2200

2929

2200

1000

900

2419

220025

91

2400

1No.11

3No.13

250

276.

588

.5

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level -1

-3000

2929

900

1940

.5

1993

657

2705

.5

2200

2929

3000

2200

2200

1000

2705

.5

294.

5

200

205.

5

2500

235.

5

1No.13

2No.11

5No.12

4No.11

2No.13

1No.12

3No.12

2314

1150

276.

5 338.

5

1248

1066

600

3

No.08

4

No.08

10

No.08

Level 13200

Level 13200

204

175

350

1164

179

265 503485668

Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF OakVeneer Feature Supported by GyprocFraming System (GL5)

Gyproc MFSuspended PanelSystem, 600mm x600mm Freshtonepanel, ShadowGap Around Edges.

Stairs Structure 31mm Toughened Glazing,Stainless Steel Hand Rail, Treads Solid WhiteOak Panel, 30mm x 1200mm x 300mm, Heldin Place by Panel Screw/Tread System19mm Dia.

Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal, 601.5mm Rise.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatalogue Finish: Calcutta GoldButech 10mm Catches System.

Oak Veneer MDF 3Omin Fire Rated DoorsWill be Installed into the Stud Partitions.

Width: 1000mm meet TGD M and B.

Gyproc Suspended Ceiling System, Plasterboard9mm, 15mm MDF Oak Veneer FeatureSupported by Gyproc Framing System (GL5)

Gyproc MF Suspend Panel System, 600mmx 600mm Freshtone panel, Shadow Gap

Around Edges.

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level -1

-3000

Stairs Construction:Stairs Structure 31mm Toughened Glazing, Stainless Steel Hand Rail, Treads Solid White Oak Panel, 30mm x 1200mm x300mm, Held in Place by Panel Screw/Tread System 19mm Dia.

The Stairs Meets all the requirements of TGD K the stairs will meet the requirements set out in TGD M , to Allow Accessto People of All Disability, it will not be an Ambient Disability Stairs but will meet the Highest Standard.

Steps: 18 Rises in TotalLanding: 1000mm1200mmRise: 170mmGoing: 300mmWidth 1200mm

900

2706

900

1000

1053

167

275300

170

100012 Steps

2000

1706

6 Steps

31mm Toughened Glass ESG

Solid White oak Panel,30mm Thick x 300mm

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

20/1

0/20

14 1

5:56

:13

2.0 GA - Ceiling Plans /Sections

No.1

07/10/2014

No.08

1 : 100No.08

2.2 GA - Plan - Level 01

1 : 100No.08

2.2 GA - Plan - Level -12

Specifications:

Wall Build Up:Existing: Wall Build Up 2015mm Brickwork, LimeBased Mortar.

New: 215mm Brickwork, 15mm GyprocPlasterboard, 2.5mm Plaster Skim.

Floor Build Up:Existing: 225mm Timber Joists 500 c/c, Lathand Plaster Finish UNder Joists

New: 225mm Wooden Joists 500c/c, Lath andPlaster removed and 12.5mm + 12.5mmGyproc Fireboard replaces it secured to Joists,2.5mm Plaster Skim.

Suspended Ceiling Build Up:Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF Oak VeneerFeature Supported by Gyproc Framing System(GL5)

Gyproc MF Suspend Panel System, 600mm x600mm Freshtone panel, Shadow Gap AroundEdges.

Partition Build Up:Various Steel Stud System (50mm x 50mm C-Channel) using:

- Gyproc Fireboard,One Sided:Skim 2.5mm Plaster 15mm +15mm 2.5mmPlaster Skim, Shadow gap, (90MIN)

- Gyproc Wallboard, Two sided:Plaster Skim 2.5mm,, 2x12.5mm, 50mm Stud,2x12.5mm, Plaster Skim 2.5mm, (90MIN)

Pilkington LCD FILM Glass 12mm, PartitionSystem. Mild Steel Frame, 100mmx50mm

Internal Doors:New Oak Veneer MDF 3Omin Fire Rated Doorand Frame Will be Installed into the StudPartitions. Width: 1000mm meet TGD M and B.

External Doors:Front Door - Solid Oak Double Door HeadHeight: 2200mm Width: 1900mm Triple GlazedUnit, 30min Fire Rated.

Back Door - Veneer Oak MDF Fire Rated Door.Head Height: 2200mm Width: 1500mm 30minFire Rated.

External Windows:Solid Oak Windows Height: 1500mm Width:1000mm Triple Glazed Unit

Raised Access Flooring:Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal, 601.5mm Rise.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatalogue Finish: Calcutta GoldButech 10mm Catches System.

Stairs Construction:Stairs Structure 31mm Toughened Glazing,Stainless Steel Hand Rail, Treads Soiled WhiteOak Panel, 30mm x 1200mm x 300mm, Held inPlace by Panel Screw/Tread System 19mmDia.

1 : 50No.08

2.4 GA - Section - AA3 1 : 50No.08

2.4 GA - Section - BB4

No.08

2.0 GA - 3D Interior View7 1 : 25No.08

2.4 GA - Section - AA - GF Ceiling8

No.08

2.4 GA - Section - AA 3D6No.08

2.4 GA - Section - BB 3D9

1 : 50No.08

2.4 GA - Section - Stairs10

Page 8: Store Fitout and Joinery.compressed

DN

UP

DN

UP

North

FD No.2

47 m²Shop Floor

No.1

7 m²Consultation Room

No.2

TD:13

.5m

TD: 2.5m

TD:1

3.5m

TD:13.5m

TD:13.5m

Final Exit Ground Floor Level 0mm

From the back of theShop to the FrontEntrance there is ClearSight, This will Aid in FireDetection and EnsureQuick Detection.

3

No.09

The Stairs is designed to leadDirectly to the Final Exit.

The Stairs is not Part of the EscapeRoute but as it designed in this

manor it can aid in evacuation.

The Consultation Room ismoved from the basement tothe Ground Floor as it is to be

fully assessable. The GlassPartition allows clear view of

the shop and Visa Versa

North

FD No.6

FD No.7

FD No.5

FD No.3

FD No.8

22 m²Workshop

No.4

21 m²Hallway

No.3

3 m²StoreNo.5

5 m²WCNo.6

7 m²Staff Canteen

No.7

6 m²Safe Room

No.8

TD:4.6m

TD:17

.7m

TD:17.7m

TD:17.7m

TD:17

.7m

TD:17m

Finial ExitBasement Level-3000mm

Store is an High RiskArea as it will be leftunattended forlong periods oftime.

The Safe Room is of HighRisk as it is Left Unintended

for Long Periods of time.

The Stairs is notpart of the

Escape Route butis an Option

The Workshop is wherethe most high risk workwill be undertaken This

enclosed with an 60minFire Rating.

3

No.09

1000

4No.09

5No.09

6No.09

7No.09

Gyproc CoreBoard

Gyproc FireStrip (continuous Strip)

Existing Wall Block Work 215mm

Existing Floor Joists 250mm at600mm c/c

Sealant Bead (continuous Strip)Steel Stud 50mm x50mm

Product:12.5mm x 2 Gyproc FireLine BoardFixing: Secured to Steel StudFinish: Plaster Skin 2.5mm

Resistance: 60Min

Service Cavity 150mm.

1313

1313

50150

Gyproc CoreBoardGyproc FireStrip (continuous Strip)

Existing Wall Block Work 215mm

Existing Floor Joists 250mm at600mm c/c

Service Cavity 150mm.

Product:12.5mm x 2 Gyproc FireLine BoardFixing: Secured to Steel StudFinish: Plaster Skin 2.5mm

Resistance: 60Min

Butech Floor Build Up

Sealant Bead (continuous Strip)Steel Stud 50mm x50mm

Product:12.5mm x 2 Gyproc FireLine BoardFixing: Secured to Steel StudFinish: Plaster Skin 2.5mm

Resistance: 60Min

Service Cavity 150mm.

50149

40

1313

1313

50150

Rockwool Cavity Barrier 75mm60min Fire Resistance

Layed ontop of the Joists andSecured

2

Existing Wall Block Work 215mm

Service Cavity 150mm.

Product:12.5mm x 2 GyprocFireLine BoardFixing: Secured to Steel StudFinish: Plaster Skin 2.5mm

Resistance: 60Min

Steel Stud 50mm x50mm

13 13 50 25

30

Exiting Basement Floor

4016

0

35 87

Solid Oak Step 300mm GoingFixing: Secured by Stainless

Steel Screw Fixing

32mm Hardened Glass StringerESG Glass

Butech Floor Build Up

Existing Wall Block Work 215mm

Service Cavity 150mm.

Product:12.5mm x 2 GyprocFireLine Board

Fixing: Secured to Steel StudFinish: Plaster Skin 2.5mm

Resistance: 60Min

Steel Stud 50mm x50mm

1313 50 25

Solid Oak Step 300mm GoingFixing: Secured by StainlessSteel Screw Fixing

32mm Hardened Glass StringerESG Glass

3016

0

FFL

47 m²Shop Floor

No.1

7 m²Consultation Room

No.2

22 m²Workshop

No.4

21 m²Hallway

No.3

3 m²StoreNo.5

5 m²WCNo.6

7 m²Staff Canteen

No.7

6 m²Safe Room

No.8

In Accordance with TGD B, B3Table A2:The Structural Element must bemaintained for 60min.

This forms compartmentation forthe building as Required in B3

This will be Achieved by Liningthe Underside of the Joists withGyproc Fireboard.

Staff Canteen and WC30min Fire Resistance on theCeiling will be given here inaccordance with TGD B, B3Table A21.

This will be Achieved byLining the Underside of theJoists with Gyproc Fireboard.

As the Stairs is in theHallway the Ceiling

requires no FireResistance, As it is

Breached.

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

20/1

0/20

14 1

5:56

:23

3.1 Regulations - TGD B

No.1

07/10/2014

No.09

1 : 50No.09

3.1 Regulations - TGD B - Level 01 1 : 50No.09

3.1 Regulations - TGD B - Level -12

Purpose GroupShop 4(a)Premises used for a retail or wholesale tradeor business (including retail sales byauction, self-selection and over-the-counter wholesale trading, the business oflending books or periodicals for gain andthe business of a barber or hairdresser) andpremises to which the public is invited todeliver or to collect goods in connectionwith their hire, repair or other treatment, orwhere they themselves may carry out suchrepairs or other treatments.

Rooms ScheduleNumber Name Area Occupancy Risk Profile

No.1 Shop Floor 47 m² 10 MinimumNo.2 Consultation Room 7 m² 4 MinimumNo.3 Hallway 21 m² 0 MinimumNo.4 Workshop 22 m² 3 HighNo.5 Store 3 m² 0 HighNo.6 WC 5 m² 1 MinimumNo.7 Staff Canteen 7 m² 3 MediumNo.8 Safe Room 6 m² 0 High

Legend TGD-B:

Travel Distances/ Escape Routes Max 18m

30min Fire Rated Plasterboard Stud WallConstruction. Gyproc Wallboard, ENCLASSIFICATION A.

60min Fire Rated Plasterboard Stud WallConstruction. Gyproc Wallboard, ENCLASSIFICATION A.

30min Fire Resistance Doorset in Accordancewith Tale B1 TGD B, Fitted with fitted withintrumescent strips and smoke seals. Doorsetto be fitted with automatic self-closingdevice which shall be capable of closing thedoor from any angle and against any latchfitted to this door in accordance withAppendix B - B2.

60min Fire Resistance Doorset in Accordancewith Table B1 TGD B, Fitted with fitted withintrumescent strips and smoke seals. Doorsetto be fitted with automatic self-closingdevice which shall be capable of closing thedoor from any angle and against any latchfitted to this door In accordance withAppendix B - B2.

30min Fire Resistant Ceiling in In Accordancewith TGD B, B3 Table A2:Compartmentation.The Structural Elementmust be maintained for 30min.

60min Fire Resistant Ceiling in In Accordancewith TGD B, B3 Table A2:Compartmentation.The Structural Elementmust be maintained for 60min.

General Notes:30min Fire Resistance Ceilings, GyprocFireline, EN CLASSIFICATION A. Plasterboardsecured to Existing Joists.

Emergency escape lighting to comply withtable1.8 TGD - Part B to be designed, installedand certified in accordance with IS3217:2013.

Fire detection system type: L3 to bedesigned, installed and certified inaccordance with IS 3218:2009[2013], i.e.mains powered with battery back-up to beprovided throughout entire building.

The use, siting, inspection and maintenanceof portable fire extinguishers to be designed,installed and certified in accordance with IS291 2002.

All Penetrations in Stud Walls are to be Filledusing FireSeal, Fire Batt – Nullifire B747.

Door ScheduleDoor Number Fire Rating Height Width Level

FD No.1 NA 2000 1000 2.2 GA - Plan - Level 0FD No.2 30Min 2200 1900 2.2 GA - Plan - Level 0FD No.3 60Min 2200 1000 2.2 GA - Plan - Level -1FD No.4 30Min 2200 1000 2.2 GA - Plan - Level -1FD No.5 30Min 2200 1000 2.2 GA - Plan - Level -1FD No.6 30Min 2200 1000 2.2 GA - Plan - Level -1FD No.7 NA 2200 1500 2.2 GA - Plan - Level -1FD No.8 60Min 2200 1000 2.2 GA - Plan - Level -1

1 : 50No.09

3.1 Regulations - Section AA3

1 : 5No.09

3.1 TGD M - Detail No.14

1 : 5No.09

3.1 TGD M - Detail No.25 1 : 5No.09

3.1 TGD M - Detail No.36

1 : 5No.09

3.1 TGD M - Detail No.47

1 : 100No.09

3.1 TGD B - Level 0 - Ceiling Fireproofing8 1 : 100No.09

3.1 TGD B - Level -1 - Ceiling Fireproofing9

In Accordance with TGD B, B3Table A2:The Structural Element must bemaintained for 60min.

This forms compartmentationfor the building as Required inB3

This will be Achieved by Liningthe Underside of the Joists withGyproc Fireboard.

Page 9: Store Fitout and Joinery.compressed

DN

UP

DN

North

47 m²Shop Floor

No.1

7 m²Consultation Room

No.2

Existing Level AccessWidth: 1900mm in Accordancewith TGD-M Part 1.2.4

1900

1200

11761200

1026

.611

00

1400

900Ascension Lifts

Melody 1 Lifting Platform

Platform Lift inCompliance with TGD M -

Part 2.3.4.1.1

1000

Internal Doors in Compliancewith TGD M - Part 1.3.3.2Handles at 900mm above FFLHead Height: 2200mmWidth: 1000mm

Visual Contrasting between:Opening Furniture and SurfaceDoor, Door Frame and Wall.

300

1109.9

1109.9

1109.91000

1000

1000

900

931.

899

7.2

1257.9

1100

Stairs in Accordancewith TGD - K (Handrails)

and TGD M - Part 1.3.4.3and Diagram 14

Clear Width: 1200mmGoing:300mm

Rise160mm

See Illustration No.9+10

Floor finishes throughout thebuilding shall be in

accordance with BS8300:2009 Annex E (Non Slip)

Internal Doors in Compliancewith TGD M - Part 1.3.3.2

Handles at 900mm above FFLHead Height: 2200mm

Width: 1000mm

Visual Contrasting between:Opening Furniture and Surface

Door, Door Frame and Wall.

Stairs in Accordance with TGD -K (Handrails) and TGD M - Part

1.3.4.3 and Diagram 14

Clear Width: 1200mmGoing:300mm

Rise160mm

See Illustration No.9+10

North

22 m²Workshop

No.4

21 m²Hallway

No.3

3 m²StoreNo.5

5 m²WCNo.6

7 m²Staff Canteen

No.7

6 m²Safe Room

No.8

1200

1000

50

1000

2200

1000

300

1000

1000

300

300

1500

1628.51650.0

Floor finishes throughout thebuilding shall be inaccordance with BS8300:2009 Annex E (Non Slip)

1000

3989

.6

600

1242

.5

1802.5

Splash Back Tiling100mm x 100mmPorcelain TilesFixing: Ceramic Grout

1802.5

3000

1800.0

ø 1500

Pull Down Grab Rail atsame Height as HorizontalGrab Rail when at Rest

Vertical Grab Rail

Horizontal Grab Rail

WC with FlatTopped CloseCouple Cistern

Hand Rinse Basin withTap on side closest to WC

Alarm Pull Cord(Two Bangles)

100mm and900mm Above FFL

Non Slip Floor Finish inAccordance with BS

8300:2009 Annex E

500

500

320

150

400

464.5

1000

500mm x 500mm Shelf

Disposal Bin

Sanitary Dispenser CoinSlot 950mm from FFL

800

1200

1028

.4

11501200

1200

Landing in Accordance with:TGD-M Part1.2.4.3

Rise, Going, RunLength, Width inAccordance with TGD- M Part 1.2.4.3

2.2 GA - Plan -Level 0

0

2.2 GA - Plan -Level -1

-3000

900

2706

900

1000

1053

167

275300

170

100012 Steps

2000

1706

6 Steps

Stairs Structure 31mm Toughened Glazing, Stainless Steel Hand Rail, Treads Solid White Oak PaOak, 30mm x 1200mm x 300mm, Held in Place by Panel Screw/Tread System 19mm Dia.

The Stairs Meets all the requirements of TGD K the stairs will meet the requirements set out in TGD M , toAllow Accessto People of All Disability, it will not be an Ambient Disability Stairs but will meet the Highest Standard.

Steps: 18 Rises in Total - Landing: 1000mm1200mm - Rise: 170mm - Going: 300mm - Width 1200mm

410

300

300

1100

730

2500

3000

Vertical Grab Rail

Pull Down Grab Rail at sameHeight as Horizontal Grab Rail

when at Rest

WC with Flat ToppedClose Couple Cistern

Alarm Pull Cord (Two Bangles)100mm and 900mm Above FFL

Hand Rinse Basin with Tap onside closest to WC

Non Slip Floor Finish in Accordancewith BS 8300:2009 Annex E

Vertical grabrails equal distancefrom centre of hand rinse basin

Gyproc MF Suspended Panel System,600mm x 600mm Freshtone panel,Shadow Gap Around Edges.

Lighting Sensor Connected toLight and Extractor Fan

Extractor Fan

1802.51800

2500

2200

410

730

300

300

1100

700

Sanitary Dispenser Coin Slot950mm from FFL

Vertical grabrails equal distancefrom centre of hand rinse basin

Pull Down Grab Rail atsame Height as Horizontal

Grab Rail when at Rest

WC with Flat ToppedClose Couple Cistern

Non Slip Floor Finish in Accordancewith BS 8300:2009 Annex E

Alarm Pull Cord (Two Bangles)100mm and 900mm Above FFL

Vertical Grab Rail

Vertical grabrails equal distancefrom centre of hand rinse basin

Hand Rinse Basinwith Tap on sideclosest to WC

Gyproc MF Suspended Panel System,600mm x 600mm Freshtone panel, ShadowGap Around Edges.

Lighting Sensor Connected toLight and Extractor Fan

Extractor Fan

800

100

4213.44200

900

602.

377

7.7

Small Kitchen UnitOak Veneer MDF Panels

Seating for Staff

2400

1242.5

Splash Back Tiling100mm x 100mmPorcelain TilesFixing: Ceramic Grout

Gyproc MF SuspendedPanel System, 600mm x600mm Freshtone panel,Shadow Gap AroundEdges.

5050

1099

.8

900

1000

1176

1042

.7

1200

1000

Raised Access Floor StepsGoing:300mm

Rise: 165mmIn Accordance with TGD-M Part 1.3.4.3

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

20/1

0/20

14 1

5:58

:38

3.2 Regulations - TGD M

No.1

07/10/2014

No.10

1 : 50No.10

3.2 Regulations - TGD M - Level 01 1 : 50No.10

3.2 Regulations - TGD M - Level -12

1 : 50No.10

3.2 Regulations - TGD M - Kitchen8

1 : 20No.10

3.2 Regulations - TGD M - Toilet3

1 : 50No.10

3.2 Regulations - TGD M - Stairs10 1 : 50No.10

3.2 Regulations - TGD M - Stairs Elevation9

1 : 20No.10

3.2 Regulations - TGD M - Toilet Elevation Front4 1 : 20No.10

3.2 Regulations - TGD M - Toilet Elevation Side5

1 : 50No.10

3.2 Regulations - TGD M - Canteen Elevation Front7

General Notes:The Consultation Room is moved upstairs to allowaccess to people of all disabilities, the ambientsteps and Platform Lift to the Raised Access FloorArea will ensure this.

The Facilities, Toilet and Kitchen is moved downstairs. This area is Staff Only Area.

Section 2 (Access and Use of an Existing Buildingother than Dwellings)of TGD M is relevant to thisBuilding, where possible the Standard set inSection 1 (Access and Use of buildings other thandwellings ) will be Achieved.

Existing Construction has Level Threshold.

Glazed doors (internal & external) to be providedwith permanent manifestations on the glass, withintwo zones, at 900mm and 1500mm above the floorwhich shall visually contrast with the backgroundseen through the glass in all lighting conditions

Switches, outlets and controls within thedevelopment shall be provided in accordancewith diagram 30, TGD M - Part 2.5.7

Signage within the development will be providedwith the international symbol for access on signs tofeatures andfacilities that are accessible such as entrances,routes, sanitary and other facilities in accordancewith TGD M - Part1.6.3

Visual Contrast, The difference in the LRV (lightreflectance values) of surfaces shall be inaccordance with TGD M - Part 1.6.4

Internal doors to be provided in accordance withthe requirements of diagram 10, Table 2 TGD M -Parts 1.3.3. (900mm One Leaf)

Handrails to all stairwells, steps and ramped accessroutes to be provided in accordance with the TGDM - Part 1.1.3

Floor finishes throughout the building shall be inaccordance with BS 8300:2009 Annex E

Legend TGD M:

Unobstructed Circulation Route Min:1000mmTGD-M Part 2.3.3.3

1500mm Turning Circle in Accordance with TGD-M Part 2.3.3.3 (1000Min)

1800mm Turning Circle in Accordance with TGD-M Part 1.4 (Sanitary Facilities) (1500mm Min)

Ascension Platform Lift: Melody 1

Complies with Part M of the BuildingRegulations and meets the requirementsof the Disability Discrimination Act

Application range: People with impairedmobility andWheelchair users. Internal &External Locations

Safe working Load: 250kg (hydraulic scissoroperation)

Maximum travel: 1Metre (1000mm)

Rated speed: 0.06 metres per second

Power supply electrical requirements: 220 /240v~50 /m60 Hz-680mA (max)

Low voltage operating system: 24VDC

Operating temperature range: -10°C to +40°C

Safety: Full platform safe edge which stops thelift should it touch any obstacle in the downdirection only. Fully interlocked upper andlower gates

Emergency lowering facility

Kitchen/Canteen inAccordance with TGD M -Part 1.5 (Diagram 28)See Illustration No.7+8

WC Facilities inAccordance with TGDM - Part 1.4 (Diagram15A)See Illustration No.3+4+5

1 : 50No.10

3.2 Regulations - TGD M - Consultation Room6

Platform Lift inCompliance with TGD

M - Part 2.3.4.1.1

Ascension LiftsMelody 1 Lifting Platform

Platform Lift in Compliancewith TGD M - Part 2.3.4.1.1

Page 10: Store Fitout and Joinery.compressed

Gyproc CoreBoardFixing:Secured to C Channel

and Joist Above

Gyproc FireStrip (continuous Strip)

Existing Wall Block Work 215mm

Existing Floor Joists 250mm at600mm c/c

Sealant Bead (continuous Strip)

Steel Stud 50mm x50mmSecured to C Channel at

Head and Base.

12.5mm x 2 Gyproc FireLine BoardFixing: Secured to Steel Stud

Finish: Plaster Skin 2.5mm

Resistance: 60Min

Service Cavity 150mm.

12.512.5

50150

2x 12.5mm Gyproc FireLineFixing: Secured to Existing JoistsFinish: Plaster Skin 2.5mm

Resistance: 60Min

Existing Floor Joists 250mm at600mm c/c

12.5

356.

2

12.5

150

150 665

12.5mm Gyproc WallboardFixing: Secured to HorizontalBoard Via Steel Angle BracketFinish: 2.5mm Plaster

Vertical Gyproc FurringChannel

12.5mm Gyproc WallBaardFixing: Secured to Gyproc Furring ChannelFinish: 2.5mm Plaster

Gyproc Suspension Rod BracketFixing: Secured to Existing Joist 600mm c/c

Gyproc Suspension ChannelFixing: Top Bracket and Bottom Clip

Gyproc Top Cross RailSecured to Furring ChannelVia Locking Key

9mm MDF Panel White Oak VeneerFixing:Secured to Horizontal BoardVia Steel Angle Bracket

Vertical Gyproc Furring Channel

9mm MDF Panel White Oak VeneerFixing:Secured to Vertical Board ViaSteel Angle Bracket

Gyproc Top Cross RailSecured to Furring ChannelVia Locking Key

Gyproc Suspension ChannelFixing: Top Bracket andBottom Clip

250

Gyproc Furring Channel

138.5

9

9

Vertical Gyproc Furring Channel

10230.

6

300

10

Gyproc Freshtone SuspednedCeiling Panel

600mm x 600mm 10mm ThickFinish: Diamond White Vynal

Gyproc MF CeilingMain Tee SupportFixing: Secured to

Ceiling Via SteelHanger Strip

Gyproc MF CeilingSteel Hanger

Fixing: Secured toExisting Joists

Existing Wall Block Work 215mmExisting Plaster Board and Plaster12.5mm + 2.5mm

Existing Floor Joists 250mmat 600mm c/c

Gyproc MF Ceiling Cross Tee600mm x 600mm Grid System

Shadow Gap Joint

10mm Shadow Gap Bead, Supportingedge of Panel and Cross TeeFixing: Secured to Existing PlasterboardVia Mecanical Fixings

2x 12.5mm Gyproc FireLineFixing: Secured to Existing JoistsFinish: Plaster Skin 2.5mm

Resistance: 60Min

1413.5

138.5 138.5

250

632.

712

.5

12.5

9

9

12.5

368.

7

Vertical Gyproc Furring Channel

9mm MDF Panel White Oak VeneerFixing:Secured to Horizontal Board Via Steel AngleBracket

12.5mm Gyproc WallboardFixing: Secured to Gyproc Furring

Channel Finish: 2.5mm Plaster

Gyproc FurringChannel

9mm MDF Panel White Oak VeneerFixing:Secured to Vertical Board ViaSteel Angle Bracket

Gyproc Suspension ChannelFixing: Top Bracket and Bottom Clip

Gyproc Top Cross RailSecured to FurringChannel Via Locking Key

Gyproc Suspension ChannelBracketFixing: Secured to ExistingJoist 600mm c/c

Existing FloorJoists 250mm at

600mm c/c

2x 12.5mm Gyproc FireLineFixing: Secured to Existing Joists

Finish: Plaster Skin 2.5mm

Resistance: 60Min

Reccesses LuminairePhilips SmartForm LED LightingBBS 415 Family - 4000K

1054.5

The Ceiling Requires a 600mm x 600mm Grid SystemThe Ceiling is a Duel Level Ceiling:

-The Plasterboard at -350 From First Floor Level

-The MDF White Oak Venner at -600 from First Floor Level

Gyproc MF Suspended PanelSystem, 600mm x 600mmFreshtone panel, Shadow GapAround Edges

Gyproc Suspended Ceiling Grid System

- 9mm Plasterboard 9mm- Supported by Gyproc Framing System600mm x 600mm-150mm Bulk Head Upstand-350mm from FFL

Gyproc Suspended Ceiling System

-15mm MDF Oak Veneer Feature-Supported by Gyproc Framing System600mm x 600mm-150mm Bulk Head Upstand-600mm from FFL

1020

0

3000 1200

8400

4243

98.13

°81.87°

Gyproc Suspended Ceiling Grid System-9mm Plasterboard

Gyproc Suspended Ceiling System-15mm MDF Oak Veneer Feature

500 2994 1471

3966

4105

1710

North

4450

5050

1572

1950

3000

4228

148

1803

1793

2990

2255

5030

4430

1930

1552

2520

4416

4667

1783

1783

2980

2234 18

15

Gyproc MF Suspended Panel System.600mm x 600mm Freshtone panelThickness 10mm, Diamond White vinyl-faced

-10mm Shadow Gap Around Edges

Suspended Aluminium Grid System, securedto plasterboard above.Shadow Line Grid

The Hall way that thestairs occupies has nosuspended Ceiling, It hasa plaster finish.

North

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

21/1

0/20

14 0

1:21

:54

4.0 Technology Details -Suspended Ceiling

No.1

07/10/2014

No.11

1 : 5No.11

4.0 Suspended Ceiling - Detail No.11

1 : 5No.11

4.0 Suspended Ceiling - Detail No.22

1 : 5No.11

4.0 Suspended Ceiling - Detail No.34

Specifications:

Wall Build Up:Existing: Wall Build Up 2015mm Brickwork,Lime Based Morter.

New: 215mm Brickwork, 15mm GyprocPlasterbard, 2.5mm Plaster Skim.

Floor Build Up:Existing: 225mm Wooden Joists 500 c/c, Lathand Plaster Finsh.

New: 225mm Wodden Joists 500c/c, Lathand Plaster removed and 12.5mm + 12.5mmGyproc Fireboard replaces it secured toJoists, 2.5mm Plaster Skim.

Suspended Ceiling Build Up:Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF Oak VennerFeature Suspported by Gyproc FramingSystem (GL5)

Gyproc MF Suspened Panel System, 600mm x600mm Freshtone panel, Shadow GapAround Edges.

Partition Build Up:Various Steel Stud System (50mm x 50mm C-Channel) using:

- Gyproc Fireboard,One Sided:Skim 2.5mm Plaste 15mm +15mm 2.5mmPlaster Skim, Shadow gap, (90MIN)

- Gyproc Wallboard, Two sided:Plaster Skim 2.5mm,, 2x12.5mm, 50mm Stud,2x12.5mm, Plaster Skim 2.5mm, (90MIN)

Pilkington LCD FILM Glass 12mm, PartitionSystem. Mild Steel Frame, 100mmx50mm

Internal Doors:New Oak Veneer MDF 3Omin Fire RatedDoors Will be Installed into the StudPartitions.Width: 1000mm meet TGD M and B.

External Doors:Front Door - Solid Oak Double Door HeadHeight: 2200mm Width: 1900mm TripleGlazed Unit, 30min Fire Rated.

Back Door - Veneer Oak MDF Fire RatedDoor. Head Height: 2200mm Width: 1500mm30min Fire Rated.

External Windows:Solid Oak Windows Height: 1500mm Width:1000mm Triple Glazed Unit

Raised Access Flooring:Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Partical Bard Panel withCatolouge Finish: Calacata GoldKingspan Alpha 5 Pedistal, 601.5mm Rise.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatolouge Finish: Calacata GoldButech 10mm Catches System.

Stairs Construction:Stairs Structure 31mm Thoughened Glazing,Stainless Steel Hand Rail, Treads Soild WhiteOak Panel, 30mm x 1200mm x 300mm, Heldin Place by Panel Screw/Tread System 19mmDia.

1 : 100No.11

4.0 Suspended Ceiling - Level 05

1 : 100No.11

4.0 Suspended Ceiling - Level -16

Page 11: Store Fitout and Joinery.compressed

UP

Gyproc MF Ceiling Main Tee SupportFixing: Secured to Ceiling Via SteelHanger Stringer

Gyproc Freshtone SuspendedCeiling Panel 600mm x 600mm10mm Thick Finish: DiamondWhite Vinyl

Gyproc MF Ceiling Steel HangerFixing: Secured to Existing Joists

2x 12.5mm Gyproc FireLine BoardFixing: Secured to Existing Floor Joist

Existing Floor Joists250mm at 600mm c/c

Gyproc MF Ceiling MainTee SupportFixing: Secured to CeilingVia Steel Hanger Stringer

Gyproc FreshtoneSuspended Ceiling Panel

600mm x 600mm 10mmThick Finish: Diamond

White Vinyl

Pilkington Switchblade MirropaneGlass Partition 6mmFixing: Secured at top and bottom

Gyproc FireStrip(continuous Strip)

Pilkington Glazing Gasket

Pilkington Glazing UnitDeflection Head Detail

Fixing: Secured to Rafters

Pilkington SwitchbladeMirropane

Glass Partition 6mmFixing: Secured at top and

bottom by unit and gaskets

Gyproc Steel Stud 50mm x50mmFixing: Secured to C Channel at base

12.5mm Gypson WallBoardFixing: Secured to Gyproc Steel Stud

Kingspan Alpha V Pedistal

Existing Basment Floor Build Up

Sealent Bead andJoining Material

Gypson C ChannelSecured to Exising Floor

Butech 40N Panel System,Thickness 31mm, 600Xmm x600mm Partical Bard Panel withCatolouge Finish: Calacata Gold

Pilkington Glazing UnitFixing: Secured to C Channel Below

673.

3

75

31

12

12.3 12.5

50

160

200

1515

BuTech Expansion Joint Material

Existing Basment Floor Build Up

235.

5

1040

114

50 12.512.512.5 12.5

Joining Material

Sealent Bead

Plaster SkimCoat 2.5mm

2 X 12.5mmGyproc FireLine Board

Fixing: Secured toGyproc Stud Frame

Finish: Plaster Skim

Resistance: 60Min

Gyproc Steel Stud50mm x50mm

Fixing: Secured to CChannel at base

600mm C/C

Gyproc FrameworkC Channel

Fixing: Secured toExisting Floor

Shadow GapBead 10mm

2.5

12.512.52.5

12.512.5

50114

Corner Bead

Gyproc MF Ceiling MainTee Support

Fixing: Secured toCeiling Via SteelHanger Stringer

Gyproc FreshtoneSuspedned Ceiling Panel

600mm x 600mm 10mmThick Finish: Diamond

White Vyna

Gyproc MF CeilingSteel Hanger

Fixing: Secured toExisting Joists

2x 12.5mm GyprocFireLine Board

Fixing: Secured toExisting Floor Joist

Sealent Bead Gyproc FireStrip (continuous Strip)

Existing Floor Joists250mm at 600mm c/c

12.5

12.5

C Channel 50x50mm secured toGyproc CoreBoardDeflection Head Detail

GyprocCoreBoard

Gyproc Steel Stud50mm x50mm

2 X 12.5mmGyproc FireLine BoardFixing: Secured toGyproc Stud FrameFinish: Plaster Skim

Plaster SkimCoat 2.5mm

Butech 15k Panel System,Thickness 12.5mm, 600mm x600mm Calcium Sufile Corewith Catalogue Finish:Calcutta Gold

Butech 10mm Catches System.

6No.12

7No.12

8No.12

12.512.5

2.5

12.512.5

2.5

114

2.5

25

4010

2.512.5

12.5

230.

6

Gyproc FreshtoneSuspedned Ceiling

Panel 600mm x 600mm10mm Thick Finish:

Diamond White Vyna

Gyproc MF CeilingSteel Hanger

Fixing: Secured toExisting Joists

Gyproc MF CeilingMain Tee SupportFixing: Secured to

Ceiling Via SteelHanger Stringer

2x 12.5mm Gyproc WallBoardFixing: Secured to Existing

Floor Joists

2 X 12.5mmGyproc WallBardFixing: Secured to GyprocStud FrameFinish: Plaster Skim

Gyproc Steel Stud50mm x50mm

Plaster Skim Coat2.5mm

Gyproc FireStrip (continuous Strip)

Deflection Head DetailC Channel 60mm x 50mm

Sealent Bead

Existing FloorJoists 250mmat 600mm c/c

Plaster SkimCoat 2.5mm

2 X 12.5mmGyproc WallBard

Fixing: Secured to GyprocStud Frame

Finish: Plaster Skim

Gyproc Steel Stud50mm x50mm

Fixing: Secured to CChannel at base

600mm C/C

Gyproc FrameworkC Channel

Fixing: Secured toExisting Floor

Shadow GapBead 10mm

50

114

50114

Butech 15k Panel System,Thickness 12.5mm, 600mm x600mm Calcium Sufile Corewith Catalogue Finish:Calcutta Gold

Butech 10mm Catches System.

Existing Basment Floor Build Up

Joining Material

Sealent Bead

12.5

10

Corner Bead

2x 12.5mm Gyproc FireLine BoardFixing: Secured to Existing Floor Joist

Existing Floor Joists 250mm at 600mm c/c

Gyproc FireStrip(continuous Strip)

Pilkington Glazing Gasket

Pilkington Glazing UnitDeflection Head DetailFixing: Secured to Existing Wall

Pilkington SwitchbladeMirropaneGlass Partition 6mmFixing: Secured at top andbottom by unit and gasket

1515

50105

150

12.5 12.5 50

77.5

50

Gyproc Steel Stud50mm x50mm

Fixing: Secured to CChannel at base

600mm C/C

Gyproc Steel Stud50mm x50mmFixing: Secured to CChannel at base600mm C/C

Existing BasmentFloor Build Up

Service Cavity

2 X 12.5mmGyproc Fireline Board

Fixing: Secured toGyproc Stud Frame

Finish: Plaster Skim

Plaster SkimCoat 2.5mm

2 X 12.5mmGyproc FireLine BoardFixing: Secured toGyproc Stud FrameFinish: Plaster Skim

Corner Bead

Corner Bead

Gyproc FireStrip(continuous Strip)

Sealent Bead

Gyproc Framework C ChannelFixing: Secured to Existing Floor

1515

50105

150

12.5 12.5 50

77.5

50

Gyproc Steel Stud50mm x50mm

Fixing: Secured to CChannel at base

600mm C/C

Gyproc Steel Stud50mm x50mmFixing: Secured to CChannel at base600mm C/C

Existing BasmentFloor Build Up

Service Cavity

2 X 12.5mmGyproc WallBardFixing: Secured to

Gyproc Stud FrameFinish: Plaster Skim

Plaster SkimCoat 2.5mm

2 X 12.5mmGyproc WallBardFixing: Secured toGyproc Stud FrameFinish: Plaster Skim

Corner Bead

Corner Bead

Gyproc FireStrip(continuous Strip)

Sealent Bead

Gyproc Framework C ChannelFixing: Secured to Existing Floor

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

As indicated

21/1

0/20

14 0

1:22

:02

4.1 Technology Details -Internal Partitons

No.1

07/10/2014

No.12

Specifications:

Wall Build Up:Existing: Wall Build Up 2015mm Brickwork,Lime Based Mortar.

New: 215mm Brickwork, 15mm GyprocPlasterboard, 2.5mm Plaster Skim.

Floor Build Up:Existing: 225mm Wooden Joists 500 c/c, Lathand Plaster Finish.

New: 225mm Wooden Joists 500c/c, Lath andPlaster removed and 12.5mm + 12.5mmGyproc Fibreboard replaces it secured toJoists, 2.5mm Plaster Skim.

Suspended Ceiling Build Up:Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF Oak VeneerFeature Supported by Gyproc Framing System(GL5)

Gyproc MF Suspended Panel System, 600mmx 600mm Freshtone panel, Shadow GapAround Edges.

Partition Build Up:Various Steel Stud System (50mm x 500mm C-Channel) using:

- Gyproc Fireboard,One Sided:Skim 2.5mm Plaster 15mm +15mm 2.5mmPlaster Skim, Shadow gap, (90MIN)

- Gyproc Wallboard, Two sided:Plaster Skim 2.5mm,, 2x12.5mm, 50mm Stud,2x12.5mm, Plaster Skim 2.5mm, (60MIN)

Pilkington LCD FILM Glass 12mm, PartitionSystem. Mild Steel Frame, 100mmx50mm

Internal Doors:New Oak Veneer MDF 3Omin Fire RatedDoors Will be Installed into the Stud Partitions.Width: 1000mm to meet TGD M and B.

External Doors:Front Door - Solid Oak Double Door HeadHeight: 2200mm Width: 1900mm Triple GlazedUnit, 30min Fire Rated.

Back Door - Veneer Oak MDF Fire Rated Door.Head Height: 2200mm Width: 1500mm 30minFire Rated.

External Windows:Solid Oak Windows Height: 1500mm Width:1000mm Triple Glazed Unit

Raised Access Flooring:Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal, 601.5mm Rise.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatalogue Finish: Calcutta GoldButech 10mm Catches System.

Stairs Construction:Stairs Structure 31mm Toughened Glazing,Stainless Steel Hand Rail, Treads Solid WhiteOak Panel, 30mm x 1200mm x 300mm, Held inPlace by Panel Screw/Tread System 19mmDia.

1 : 5No.12

4.1 Internal Partitions - Detail No.41 1 : 5No.12

4.1 Internal Partitions - Detail No.55

1 : 100No.12

4.1 Internal Partitions - Plan 02

1 : 100No.12

4.1 Internal Partitions - Plan -14

1 : 5No.12

4.1 Internal Partitions - Detail No.63

1 : 5No.12

4.1 Internal Partitions - Detail No.76 1 : 5No.12

4.1 Internal Partitions - Detail No.87 1 : 5No.12

4.1 Internal Partitions - Detail No.98

Page 12: Store Fitout and Joinery.compressed

Butech 15k Panel System, Thickness12.5mm, 600mm x 600mm Calcium

Sufile Core with Catalogue Finish:Calcutta Gold

Butech 10mmCatches System.

300

Butech 40N Panel System, Thickness31mm, 600Xmm x 600mm ParticleBard Panel with Catalogue Finish:

Calcutta Gold

Butech 40N Panel System, Thickness31mm, 600Xmm x 600mm Particle BardPanel with Catalogue Finish: Calcutta

Gold

Kingspan Alpha V PedestalFixing:Secured to Existing Ground Floor

20mm MDF Panel White Oak VeneerFixing: Secured to Bottom Angle via

Stainless Steel Fixing

19mm Panel Screw SystemFixing: Secure MDF Panel (White Oak Veneer)

Finish: Polished Stainless Steel

162.

4

162.

5

672.

4

509.

9

347.

4

184.

9

300600

673.

9

12.5mmGyproc Wallboard

Fixing: Secured to Existing WallFinish: Plaster Skim

Plaster Skim Coat 2.5mm

Shadow Gap Bead 10mm

Existing Brickwork Wall215mm

Butech Expansion Joint Material

Butech 40N Panel System, Thickness31mm, 600Xmm x 600mm Particle BardPanel with Catalogue Finish: Calcutta

Gold

Kingspan Alpha V PedestalFixing:Secured to Existing

Ground Floor

Existing Ground Floor

Kingspan Alpha V PedestalPerimeter Head

673.

9

12.5mm x 2 Gyproc FireLineBoard

Fixing: Secured to Steel StudFinish: Plaster Skin 2.5mm

Resistance: 60Min

Plaster Skim Coat 2.5mm

Shadow Gap Bead 10mm

Existing Brickwork Wall215mm

Gyproc FireStrip (continuous Strip)

Butech 40N Panel System, Thickness31mm, 600Xmm x 600mm Particle BardPanel with Catalogue Finish: Calcutta

Gold

Kingspan Alpha V PedestalFixing:Secured to Existing

Ground Floor

Existing Ground Floor

Kingspan Alpha V PedestalPerimeter Head

Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatalogue Finish: Calcutta GoldButech 10mm Catches System.

Ascension Platform Lift: Melody 1

Complies with Part M of the BuildingRegulations and meets the requirementsof the Disability Discrimination Act

Steps Comply with TGD M - Part 1.3.4.3Going : 300mmRise: 162.5mm

Scale

Drawn by

Date

Technical Design andDetailing Year 3

Project 1 : Fitout

Mark Grincell

Dan O'Sullivan / Noel Dunne

1 : 5

21/1

0/20

14 0

1:22

:43

4.2 Technology Details -Raised Access Flooring

No.1

07/10/2014

No.13

Specifications:

Wall Build Up:Existing: Wall Build Up 2015mm Brickwork, LimeBased Mortar.

New: 215mm Brickwork, 15mm GyprocPlasterboard, 2.5mm Plaster Skim.

Floor Build Up:Existing: 225mm Wooden Joists 500 c/c, Lathand Plaster Finish.

New: 225mm Wooden Joists 500c/c, Lath andPlaster removed and 12.5mm + 12.5mmGyproc Fibreboard replaces it secured toJoists, 2.5mm Plaster Skim.

Suspended Ceiling Build Up:Gyproc Suspended Ceiling System,Plasterboard 9mm, 15mm MDF Oak VeneerFeature Supported by Gyproc Framing System(GL5)

Gyproc MF Suspended Panel System, 600mm x600mm Freshtone panel, Shadow Gap AroundEdges.

Partition Build Up:Various Steel Stud System (50mm x 500mm C-Channel) using:

- Gyproc Fireboard,One Sided:Skim 2.5mm Plaster 15mm +15mm 2.5mm PlasterSkim, Shadow gap, (90MIN)

- Gyproc Wallboard, Two sided:Plaster Skim 2.5mm,, 2x12.5mm, 50mm Stud,2x12.5mm, Plaster Skim 2.5mm, (90MIN)

Pilkington LCD FILM Glass 12mm, PartitionSystem. Mild Steel Frame, 100mmx50mm

Internal Doors:New Oak Veneer MDF 3Omin Fire Rated DoorsWill be Installed into the Stud Partitions.Width: 1000mm to meet TGD M and B.

External Doors:Front Door - Solid Oak Double Door HeadHeight: 2200mm Width: 1900mm Triple GlazedUnit, 30min Fire Rated.

Back Door - Veneer Oak MDF Fire Rated Door.Head Height: 2200mm Width: 1500mm 30minFire Rated.

External Windows:Solid Oak Windows Height: 1500mm Width:1000mm Triple Glazed Unit

Raised Access Flooring:Butech 40N Panel System, Thickness 31mm,600Xmm x 600mm Particle Bard Panel withCatalogue Finish: Calcutta GoldKingspan Alpha 5 Pedestal, 601.5mm Rise.

Butech 15k Panel System, Thickness 12.5mm,600mm x 600mm Calcium Sufile Core withCatalogue Finish: Calcutta GoldButech 10mm Catches System.

Stairs Construction:Stairs Structure 31mm Toughened Glazing,Stainless Steel Hand Rail, Treads Solid WhiteOak Panel, 30mm x 1200mm x 300mm, Held inPlace by Panel Screw/Tread System 19mm Dia.

1 : 5No.13

4.2 Raised Access Flooring - Detail No.121

1 : 5No.13

4.2 Raised Access Flooring - Detail No.102 1 : 5No.13

4.2 Raised Access Flooring - Detail No.113

No.13

4.2 Section - Raised Access Floor - Section4