Outline
• Background
• Fuel Gas & LNG Optimization
• LNG Weathering Model
• LNG Rollover Model
• Ship Vaporizer Utilization
• Conclusion
Conclusion
Imported LNG, planned
and executed in 4 weeks
Recycled LNG using the
ship’s vaporizer
Developed weathering
and rollover model
Optimized fuel gas and
LNG usage