FY 2006-2009 STIP PID Project Nam Ds Project Descriptio Sponsoring Agency MPO Phas Subphas Total Amt Fiscal Year SAC Fund Code Fund Descr Fund Type ID Air Quality Status 76547 1 LACRPC 1 ALL 06 LACRPC Reg. Trans. Plng. Lima MPO Regional Transportation Planning Program supplemental funding 0 Planning & Research LIMA (TCC) SPR Planning $100,000 2006 4AM7 Q240 STP Anywhere Federal Exempt 76549 1 LACRPC 2 ALL 07 LACRPC Reg. Trans. Plng. Lima MPO 07 Regional Transportation Planning Program supplemental funding 0 Planning & Research LIMA (TCC) SPR Planning $100,000 2007 4AM7 Q240 STP Anywhere Federal Exempt 76550 1 LACRPC 3 ALL 08 LACRPC Reg. Trans. Plng. Lima MPO 08 Regional Transportation Planning Program supplemental funding 0 Planning & Research LIMA (TCC) SPR Planning $100,000 2008 4AM7 Q240 STP Anywhere Federal Exempt Page 1 of 2084 July 2005

Transcript of STIP Project copy 1...PID Ds Project Nam Project Descriptio Sponsoring Agency MPO Phas Subphas Total...

  • FY 2006-2009 STIP

    PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    76547 1 LACRPC 1 ALL 06 LACRPC Reg. Trans. Plng.

    Lima MPO Regional Transportation Planning Program supplemental funding 0 Planning & Research

    LIMA (TCC)SPR Planning $100,000 2006 4AM7 Q240 STP AnywhereFederal Exempt

    76549 1 LACRPC 2 ALL 07 LACRPC Reg. Trans. Plng.

    Lima MPO 07 Regional Transportation Planning Program supplemental funding 0 Planning & Research

    LIMA (TCC)SPR Planning $100,000 2007 4AM7 Q240 STP AnywhereFederal Exempt

    76550 1 LACRPC 3 ALL 08 LACRPC Reg. Trans. Plng.

    Lima MPO 08 Regional Transportation Planning Program supplemental funding 0 Planning & Research

    LIMA (TCC)SPR Planning $100,000 2008 4AM7 Q240 STP AnywhereFederal Exempt

    Page 1 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    78999 1 LACRPC 4 ALL CR 118-0.89 Rehabilitate bridge, Deck Replacement ALL CR 118-0.89 Bridge Deck Replacement

    ALLEN COUNTY ENGINEER

    CO CO Engr $25,380 2009 4B87 H250 STP

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ALLEN COUNTY ENGINEER

    CO CO Contr $2,072,710 2006 4B87 Q100 BRIDGE REPLACEMENT 65% ON SYSTEM

    Federal Exempt

    ALLEN COUNTY ENGINEER

    CO CO Engr $10,910 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Exempt

    ALLEN COUNTY ENGINEER

    CO CO Contr $109,090 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Exempt

    ALLEN COUNTY ENGINEER

    CO CO Engr $207,290 2006 4B87 Q100 BRIDGE REPLACEMENT 65% ON SYSTEM

    Federal Exempt

    24489 1 LACRPC 6 ALL Eastown Rd. 0.00

    EXTEND EASTOWN RD. FROM THE ELM ST. JCT. TO SR117. EASTOWN RD. FROM ELM ST. TO SR117. New Construction

    ALLEN COUNTY ENGINEER

    CO CO Contr $2,688,720 2009 4B77 Q240 STP AnywhereFederal Analyzed

    Page 3 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ALLEN COUNTY ENGINEER

    CO CO Contr $672,180 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Analyzed

    ALLEN COUNTY ENGINEER

    CO CO Engr $268,880 2009 4B77 Q240 STP AnywhereFederal Analyzed

    ALLEN COUNTY ENGINEER

    CO CO Engr $67,220 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Analyzed

    24491 1 LACRPC 7 ALL Eastown Rd. 1.18

    WIDEN EXISTING 2-LANE EASTOWN RD. TO A 5-LANE ROADWAY. PRE. DEV. IS UNDER PID 24488. EASTOWN RD. FROM THE ELM ST. JCT. TO THE ALLENTOWN RD. JCT. Major Widening

    ALLEN COUNTY ENGINEER

    CO CO Engr $21,640 2006 4PS7 2 State Funds (S,O)

    State

    ALLEN COUNTY ENGINEER

    CO CO Contr $216,398 2006 4PS7 2 State Funds (S,O)

    State

    Page 4 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    24490 1 LACRPC 8 ALL Eastown Rd. 2.29

    WIDEN EXISTING 2-LANE EASTOWN RD. TO A 5-LANE ROADWAY. PRE. DEV. IS UNDER PID 24488. EASTOWN RD. FROM THE ALLENTOWN RD. JCT. TO THE ELIDA RD. JCT. Major Widening

    ALLEN COUNTY ENGINEER

    CO CO Contr $559,600 2008 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Analyzed

    ALLEN COUNTY ENGINEER

    CO CO Contr $2,238,400 2008 4B77 Q240 STP AnywhereFederal Analyzed

    ALLEN COUNTY ENGINEER

    CO CO Engr $224,000 2008 4B77 Q240 STP AnywhereFederal Analyzed

    ALLEN COUNTY ENGINEER

    CO CO Engr $56,000 2008 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Analyzed

    78993 1 LACRPC 9 ALL Eastown Road SIB loan

    Improve Eastown Road from just south of ElmStreet to just north of SR81. Widen existing 2 lane pavement to 5 lanes with curb and gutter. Provide storm sewers, traffic signals, and paveent markings. The 5 lane pavement will be all nw construction. Eastown

    Page 5 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ALLEN COUNTY ENGINEER

    OTH Dbt Serv $726,108 2007 4TA7 H240 STP FLEXIBLE

    Federal Exempt

    ALLEN COUNTY ENGINEER

    OTH Dbt Serv $1,182,356 2006 4TA7 H240 STP FLEXIBLE

    Federal Exempt

    76691 1 LACRPC 10 ALL IR 75 0.21 Candidate Major Rehabilitation project from District Interstate Plan. Project consists of a total reconstruction of IR75 from Auglaize Co. Line through the SR81 interchange. Project will be initiated in step 1 of ODOT's Major PDP 14 step process and will

    ODOT SPONSORING AGENCY

    PE Env PE $735,667 2006 4RA7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $4,500,000 2007 4RC7 Q010 INTERSTATE MAINTENANCE

    Federal

    ODOT SPONSORING AGENCY

    PE Env PE $6,621,002 2006 4RC7 Q010 INTERSTATE MAINTENANCE

    Federal

    Page 6 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $500,000 2007 4RA7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    RW Acquis $1,500,000 2008 4RA7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    RW Acquis $13,500,000 2008 4RC7 Q010 INTERSTATE MAINTENANCE

    Federal

    79337 1 LACRPC 11 ALL LACRPC 09 Sup. Funding

    LACRPC SFY 2009 Regional Transportaion Planning Program Supplemental funding. 0 Planning & Research

    LIMA (TCC)SPR Planning $100,000 2009 4AM7 Q240 STP AnywhereFederal Exempt

    25179 1 LACRPC 12 ALL SR 117 24.44

    REHABILITATE CONCRETE SLAB STRUCTURE OVER THE AUGLAIZE RIVER BY REPLACING THE DECK EDGES, REMOVE EXISTING DECK OVERLAY AND PLACE NEW OVERLAY ON DECK AND APPROACH SLABS, AND REBUILD WINGWALLS FOR NEW BRIDGE TERMINAL ASSEMBLIES. THIS IS A

    Page 7 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $200,000 2007 4PS7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $20,000 2007 LABR State Exempt

    75467 1 LACRPC 13 ALL SR 117/309 17.52/15.04

    Improve safety of corridor by designing recommendations made from Corridor study. Safety improvements include, but are not limited too; signal coordination, raised concrete curb median east of I-75 along SR309, driveway definition through curb and gutter,

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $50,000 2008 4BC7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    RW Acquis $900,000 2006 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $300,000 2008 4BC7 2 State Funds (S,O)

    State Exempt

    Page 8 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $450,000 2008 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Exempt

    ODOT SPONSORING AGENCY

    RW Acquis $100,000 2006 4BC7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $2,700,000 2008 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Exempt

    25134 1 LACRPC 14 ALL SR 198 0.00 2-LANE RESURFACING ON SR198 FROM THE AUGLAIZE COUNTY LINE TO THE SR117 JCT. BEGIN AT THE AUGLAIZE COUNTY LINE AND END AT THE SR117 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $100,000 2008 4PS7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $11,000 2008 LABR State Exempt

    Page 9 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    24247 1 LACRPC 15 ALL SR 309 7.05 Improve safety of corridor by implementing corridor study recommendations. Work to include, but not limited too; construction of raised concrete curb median from Robb to Eastown, improving Hartzler Rd./SR309 intersection, additional signal coordination, w

    ODOT SPONSORING AGENCY

    CO CO Contr $300,000 2008 4BC7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $2,700,000 2008 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Exempt

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $180,000 2006 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Exempt

    ODOT SPONSORING AGENCY

    RW Acquis $150,000 2006 4BC7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    RW Acquis $1,350,000 2006 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Exempt

    Page 10 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $20,000 2006 4BC7 2 State Funds (S,O)

    State Exempt

    78625 1 LACRPC 16 ALL SR 501 0.00 RESURFACE SR 501 SR 501 CROM AUGLAIZE COUNTY LINE TO SR 117 Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $280,000 2007 4PS7 2 State Funds (S,O)

    State Exempt

    24123 1 17 HAN US 30 15.95SR

    REPLACE EXISTING CULVERT WITH A NEW CULVERT. APPROX. 3.40 MILES EAST OF THE US68 JCT. Culvert Construction/Reconstr/Repair

    ODOT SPONSORING AGENCY

    CO CO Engr $6,900 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $69,000 2007 4PS7 2 State Funds (S,O)

    State

    Page 11 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    78584 1 18 HAN US 30-WILLIAMSTOWN OVERPASS

    Reconstruct the existing 4-lane section of US30 around Williamstown following the construction of new US30 as part of an agreement for the abandonment of existing US30 to Hancock County. Roadway will be reconstructed as a 2-lane with an overpass of the CS

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $400,000 2006 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $4,000,000 2008 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $1,000,000 2008 4BD7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $100,000 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Engr $400,000 2008 LABR Federal

    Page 12 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $100,000 2006 4BD7 2 State Funds (S,O)

    State

    75520 1 19 HAN US 68 12.73

    Minor rehabilitation of US68 and SR15, grind and pave mainline pavement. Begin at the IR75 interchange and end at the SR37 intersection. Mill and Fill

    ODOT SPONSORING AGENCY

    CO CO Contr $1,818,000 2009 4PF7 Q050 NATIONAL HIGHWAY SYSTEM

    Federal

    ODOT SPONSORING AGENCY

    CO CO Engr $181,800 2009 LABR Federal

    21612 1 20 HAN US 68 15.31

    CORRIDOR STUDY TO MAKE RECOMMENDATIONS FOR IMPROVEMENTS TO US68/SR15. SPECIFICALLY, DEVELOPING ALTERNATIVES TO ADDRESS THE DEFICIENT US68 STRUCTURE OVER LIMA AVE. AS WELL AS THE RAMPS AT THE LIMA AVE. INTERSECTION. ALSO, LOOK AT

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $500,000 2006 4PS7 2 State Funds (S,O)

    State

    Page 13 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    76823 1 21 HAN/WYA SR 568 2.06/0.00

    2 lane resurfacing on SR568 in Hancock and Wyandot Counties. Begin at the east corporation limit of the City of Findlay and end at the west corporation limit of the Village of Carey. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $703,000 2009 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    Ada, Village of

    CO CO Engr $48,000 2007 4B97 H240 STP FLEXIBLE

    Federal

    Ada, Village of

    CO CO Contr $230,800 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Ada, Village of

    CO CO Engr $12,000 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    78066 1 24 HAR SR 195 9.20

    REPLACE THE CULVERT AND PROVIDE CLEAR ZONE GRADING. REPLACE CATCH BASIN AND THE PIPE CROSSOVER, THE CROSSOVER WILL NO LONGER RUN UNDERNEATH THE CULVERT. RIGHT OF WAY WILL BE REQUIRED. APPROXIMATELY 0.22 MILES SOUTH OF THE SR 309

    ODOT SPONSORING AGENCY

    CO CO Contr $105,000 2009 4PS7 2 State Funds (S,O)

    State

    17238 1 25 DEF/PAU SR 2/49/500

    2-Lane resurfacing on SR2, SR18, and SR49 in Defiance and Paulding County. Includes all state routes within Village of Hicksville. 2-LANE RESURFACING ON SR2, SR18 & SR49 IN DEFIANCE COUNTY; AND ON SR49 IN PAULDING COUNTY. Resurfacing, Undivided System

    Page 15 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $80,000 2006 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $881,000 2006 4PF7 H250 STP

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    Findlay, City of

    RW RW Serv $150,000 2006 4TA7 H240 STP FLEXIBLE

    Federal

    Findlay, City of

    CO CO Engr $144,750 2008 4TA7 H240 STP FLEXIBLE

    Federal

    24480 1 27 HAN 103 19.04 2-LANE RESURFACING OF SR103 FROM THE SR37 JCT. TO THE WYANDOT COUNTY LINE. BEGIN AT THE SR37 JCT. AND END AT THE WYANDOT COUNTY LINE. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $294,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    ODOT SPONSORING AGENCY

    CO CO Engr $18,500 2006 LABR State

    23536 1 28 HAN CR 11 1.80 REPLACE EXISTING STRUCTURE OVER OUTLET DITCH WITH A NEW STRUCTURE. APPROX. 1.80 MILES NORTH OF THE WYANDOT COUNTY LINE. Bridge Replacement

    Page 17 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Engr $21,565 2006 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $215,935 2006 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $11,365 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Engr $1,135 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    23545 1 29 HAN CR 24 7.96 REPLACE EXISTING STRUCTURE OVER EAGLE CREEK WITH A NEW STRUCTURE. APPROX. 0.25 MILES EAST OF THE CR70 JCT. Bridge Replacement

    HANCOCK COUNTY ENGINEER

    CO CO Contr $13,635 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Page 18 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Engr $25,935 2006 4B87 H110 BRIDGE 15% OFF

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $259,065 2006 4B87 H110 BRIDGE 15% OFF

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Engr $1,365 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    75795 1 30 HAN CR 304 0.00

    Resurface the existing roadway with asphalt concrete. CR304 from the CR15 intersection to the SR235 intersection. Resurfacing, Undivided System

    HANCOCK COUNTY ENGINEER

    CO CO Engr $14,546 2009 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Contr $145,454 2009 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Contr $186,562 2006 4B77 H200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Contr $13,635 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    23877 1 33 HAN CR 37/TR 79 7.96/1.04

    REPLACE TWO EXISTING STRUCTURES, CR37 OVER TIDERISHI DITCH AND TR79 OVER OTTAWA CREEK WITH TWO NEW STRUCTURES. CR37 - APPROX. 0.04 MILES WEST OF SR698 JCT.; TR79 - APPROX. 0.16 MILES EAST OF CR12 Bridge Replacement

    HANCOCK COUNTY ENGINEER

    CO CO Engr $2,725 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Engr $51,775 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $518,225 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $27,275 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Page 22 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    75796 1 34 HAN CR 9 12.65 Resurface existing roadway with asphalt concrete. Portions of CR9, CR18, CR140, CR236 and CR86 in Hancock County. Resurfacing, Undivided System

    HANCOCK COUNTY ENGINEER

    CO CO Engr $13,550 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Contr $135,450 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Engr $4,978 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Contr $50,022 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Contr $541,800 2006 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Engr $54,200 2006 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $731,000 2008 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $199,000 2007 4PS7 2 State Funds (S,O)

    State

    25139 1 39 HAR SR 31/67/117 0.00/0.00/1.58

    2-LANE RESURFACING ON SR31 FROM THE UNION COUNTY LINE TO THE SR292 INTERSECTION. BEGIN AT THE UNION COUNTY LINE AND END AT THE SR292 INTERSECTION. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $85,000 2006 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $1,140,600 2006 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $517,000 2009 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $20,000 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $200,000 2007 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    RW Acquis $8,000 2006 4PS7 2 State Funds (S,O)

    State

    77410 1 43 HAR SR 67 2.58 Improvement of intersection sight distance problem. Intersection of SR67 and SR235. Intersection Improvement

    ODOT SPONSORING AGENCY

    CO CO Contr $295,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    ODOT SPONSORING AGENCY

    CO CO Engr $29,500 2006 LABR State

    Page 28 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    24334 1 44 PAU US 24 0.00 NEW CONSTRUCTION OF 4-LANE EXPRESSWAY ON NEW ALIGNMENT AND COMPLETE ALL NECESSARY WORK INCLUDING DRAINAGE. ADDITIONAL L/A R/W REQ'D. BEGIN AT THE INDIANA STATE LINE AND END JUST WEST OF US127. New Construction

    ODOT SPONSORING AGENCY

    RW RW Serv $100,000 2006 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $11,027,600 2007 4BD7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    RW Utl Remb $560,000 2007 4BD7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Contr $44,110,400 2007 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    CO CO Engr $554,420 2007 LABR State

    Page 29 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    RW Acquis $1,147,341 2006 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    CO CO Engr $2,217,680 2007 LABR Federal

    24336 1 45 PAU/DEF US 24 12.300/0.00

    NEW CONSTRUCTION OF 4-LANE EXPRESSWAY ON NEW ALIGNMENT AND COMPLETE ALL NECESSARY WORK INCLUDING DRAINAGE. ADDITIONAL L/A R/W REQ'D. BEGIN JUST WEST OF THE US127 INTERSECTION AND END AT THE SR424 INTERSECTION. New Construction

    ODOT SPONSORING AGENCY

    CO CO Engr $727,680 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $11,106,944 2007 4BD7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $2,910,720 2007 LABR Federal

    Page 30 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    RW Utl Remb $1,560,000 2007 4BD7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    RW RW Serv $100,000 2007 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    RW RW Serv $75,000 2006 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $44,427,776 2007 4BK7 H050 NATIONAL HWY SYST

    Federal

    ODOT SPONSORING AGENCY

    RW Acquis $8,265,000 2006 4BK7 H050 NATIONAL HWY SYST

    Federal

    25849 1 46 PUT CR 18 10.72

    Replace existing structure over North Powell Creek with a new structure. Approximately 2.10 miles north of the SR15 jct. Bridge Replacement

    Page 31 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PUTNAM COUNTY ENGINEER

    CO CO Engr $4,600 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Contr $46,000 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Contr $414,000 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    PUTNAM COUNTY ENGINEER

    CO CO Engr $41,400 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    24514 1 47 PUT SR 15 12.57

    2-LANE RESURFACING OF SR15 FROM THE SR108 JCT. TO THE N.C.L. OF OTTAWA. BEGIN AT THE SR108 JCT. AND END AT THE N.C.L. OF OTTAWA. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $24,800 2006 LABR State

    Page 32 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $320,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    19377 1 48 PUT SR 15 12.76

    Line three existing culverts and pave the invert of a fourth culvert, all structures over intermittent waterways. 4 LOCATIONS ON SR15. Culvert Construction/Reconstr/Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $50,000 2007 4PS7 2 State Funds (S,O)

    State

    25234 1 49 PUT SR 190 4.30

    2-LANE RESURFACING ON SR190 FROM THE N.C.L. OF FT. JENNINGS TO THE US224 JCT. BEGIN AT THE N.C.L. OF FT. JENNINGS AND END AT THE US224 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $169,000 2008 4PS7 2 State Funds (S,O)

    State

    Page 33 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    25298 1 50 PUT SR 613 0.00

    2-LANE RESURFACING ON SR613 FROM THE PAULDING COUNTY LINE TO THE SR15 JCT. BEGIN AT THE PAULDING COUNTY LINE AND END AT THE SR15 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $341,000 2009 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    22073 1 52 PUT SR 65 12.63

    PURCHASE RIGHT OF WAY, CHANGE PROFILE AND REALIGN ROADWAY AT THE TR 7 INTERSECTION. APPROXIMATELY 2.46 MILES NORTH OF THE OTTAWA N.C.L. AT THE TR 7 JCT. Intersection

    ODOT SPONSORING AGENCY

    CO CO Engr $50,000 2009 LABR State

    25163 1 53 PUT SR 694 5.02

    2-LANE RESURFACING ON SR694 FROM THE SR115 JCT. TO THE WEST CORP. LIMIT OF GLANDORF. BEGIN AT THE SR115 JCT. AND END AT THE W.C.L. OF GLANDORF. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $22,300 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $258,000 2008 4PS7 2 State Funds (S,O)

    State

    25852 1 54 PUT TR 19A 1.77

    Replace existing structure over North Powell Creek with a new structure. Approximately 1.77 miles north of the SR15 jct. Bridge Replacement

    Page 35 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PUTNAM COUNTY ENGINEER

    CO CO Contr $357,570 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    PUTNAM COUNTY ENGINEER

    CO CO Contr $39,730 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Engr $3,970 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Engr $35,730 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    25853 1 55 PUT TR 23 4.67 Replace existing structure over South Powell Creek with a new structure. Approximately 0.12 miles south of the SR15 jct. Bridge Replacement

    PUTNAM COUNTY ENGINEER

    CO CO Contr $387,810 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    Page 36 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PUTNAM COUNTY ENGINEER

    CO CO Engr $38,790 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    PUTNAM COUNTY ENGINEER

    CO CO Contr $43,090 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Engr $4,310 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    25854 1 56 PUT TR O 25 0.52

    Replace existing structure over Little Auglaize River with a new structure. Approximately 0.20 miles west of the TR25M jct. Bridge Replacement

    PUTNAM COUNTY ENGINEER

    CO CO Engr $67,770 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    PUTNAM COUNTY ENGINEER

    CO CO Contr $677,430 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    Page 37 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PUTNAM COUNTY ENGINEER

    CO CO Contr $75,270 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Engr $7,530 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    25855 1 57 PUT TR U 13 0.45

    Replace existing structure over Sugar Creek with a new structure. Approximately 0.45 miles east of the SR115 jct. Bridge Replacement

    PUTNAM COUNTY ENGINEER

    CO CO Engr $35,796 2008 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    PUTNAM COUNTY ENGINEER

    CO CO Engr $3,977 2008 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    PUTNAM COUNTY ENGINEER

    CO CO Contr $366,957 2008 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    Page 38 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PUTNAM COUNTY ENGINEER

    CO CO Contr $40,773 2008 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    25237 1 58 PUT US 224 0.00

    2-LANE RESURFACING ON US224 FROM THE VAN WERT COUNTY LINE TO EAST OF THE SR190 JCT. BEGIN AT THE VAN WERT COUNTY LINE AND END EAST OF THE SR190 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $60,000 2008 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $431,000 2008 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $477,400 2008 4PS7 2 State Funds (S,O)

    State

    78627 1 60 PUT US 224/115-11.32/9.57

    2 LANE RESURFACING US 224 IN THE VILLAGE OF KALIDA FROM EAST VILLAGE LIMIT TO THE WEST VILLAGE LIMIT, SR 115 FROM SOUTH VILLAGE LIMIT TO NORTH Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $335,000 2008 4PS7 2 State Funds (S,O)

    State

    24750 1 61 PUT US 224/SR 189 4.74/9.92/10.5

    REPLACE THREE EXISTING CULVERTS WITH NEW STRUCTURES. US224 - APPROX. 1.08 MILES EAST OF THE VILLAGE OF OTTOVILLE; SR189 - APPROX. 1.08 AND 1.72 MILES WEST OF THE SR115 JCT. Culvert Construction/Reconstr/Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $231,000 2007 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $23,100 2007 LABR State

    Page 40 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    23093 1 62 VAN CR 192 12.06

    REPLACE EXISTING STRUCTURE OVER HOAGLIN CREEK WITH A NEW STRUCTURE. APPROX. 0.20 MILES EAST OF THE US127 JCT. Bridge Replacement

    VAN WERT COUNTY ENGINEER

    CO CO Engr $24,100 2006 4B87 Q120 BRIDGE OFF/ON SYSTEM

    Federal

    VAN WERT COUNTY ENGINEER

    CO CO Contr $240,900 2006 4B87 Q120 BRIDGE OFF/ON SYSTEM

    Federal

    76575 1 LACRPC 63 ALL SR 65/81/117 6.58

    Grind and pave various routes in the City of Lima. SR65 (Elm St.), SR81 (N. Jackson St.) and SR117 (Elm St. and Bellefontaine St.) in the City of Lima. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $484,000 2006 4PF7 Q240 STP AnywhereFederal Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $121,000 2006 4BG7 2 Local MatchLocal Match

    Exempt

    Page 41 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    78626 1 LACRPC 64 ALL SR 66 0.00 2 LANE RESURFACING SR 66 FROM AUGLAIZE COUNTY LINE TO THE SOUTH CORPORATION LIMIT OF DELPHOS Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $159,400 2008 4PS7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $637,600 2008 4PF7 H200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    RW Utl Remb $12,000 2006 4PS7 2 State Funds (S,O)

    State Exempt

    75734 1 LACRPC 66 ALL SR 696 1.30 Remove and replace existing curb, gutter, sidewalk and storm sewer. SR696 (Main St.) from the Church St. intersection to the West St. intersection. Add Sidewalks

    Beaverdam, Village of

    CO CO Engr $31,790 2007 LABR Local Match

    Exempt

    Beaverdam, Village of

    CO CO Contr $24,500 2007 4PS7 2 State Funds (S,O)

    State Exempt

    Beaverdam, Village of

    CO CO Contr $209,460 2007 4TC7 Q220 STP ENHANCEMENT

    Federal Exempt

    Beaverdam, Village of

    CO CO Contr $52,365 2007 4BG7 2 Local MatchLocal Match

    Exempt

    Page 43 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    Beaverdam, Village of

    CO CO Contr $31,575 2007 4BG7 2 Local MatchLocal Match

    Exempt

    75928 1 LACRPC 67 ALL SR 81 13.45 Widening of SR81 (Allentown Road) to allow for a five lane road with curb and gutters. SR81 (Allentown Road) from the Eastown Road intersection to the Cable Road intersection. Minor Widening

    ODOT SPONSORING AGENCY

    CO CO Engr $10,000 2006 LABR State Analyzed

    ODOT SPONSORING AGENCY

    CO CO Contr $110,000 2007 4BC7 2 State Funds (S,O)

    State Analyzed

    ODOT SPONSORING AGENCY

    CO CO Contr $990,000 2007 4BJ7 Q280 STP Hazard Elimination

    Federal Analyzed

    ODOT SPONSORING AGENCY

    RW Utl Remb $3,500 2008 4BC7 2 State Funds (S,O)

    State Analyzed

    Page 44 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    RW Utl Remb $31,500 2008 4BJ7 H280 STP HAZARD ELIMINATION

    Federal Analyzed

    ODOT SPONSORING AGENCY

    CO CO Engr $90,000 2006 LABR Federal Analyzed

    78989 1 LACRPC 68 ALL SR 81 7.24 Purchase right-of-way triangle in the northeast quardrant of the intersection in order to achieve appropriate sight distance. intersection of SR 81 and Conant Rd Intersection Improvement

    ODOT SPONSORING AGENCY

    RW Acquis $5,000 2006 4PS7 2 State Funds (S,O)

    State Exempt

    75593 1 LACRPC 69 ALL TR 26 0.99 Fruend Rd.

    Replace the existing structure over Jennings Creek with a new structure. TR26 (Fruend Road) approximately 0.49 miles east of the Kill Road intersection. Bridge Replacement

    ALLEN COUNTY ENGINEER

    CO CO Engr $34,740 2009 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    Page 45 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ALLEN COUNTY ENGINEER

    CO CO Contr $38,640 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    ALLEN COUNTY ENGINEER

    CO CO Engr $3,860 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    ALLEN COUNTY ENGINEER

    CO CO Contr $347,760 2009 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    75518 1 LACRPC 70 ALL US 30 13.16 Minor rehabilitation of US30, grind and pave mainline pavement. Begin at the 13.16 milepost just east of the SR65 interchange and end at the Napoleon Road bridges. Mill and Fill

    ODOT SPONSORING AGENCY

    CO CO Contr $2,574,000 2009 4PF7 Q050 NATIONAL HIGHWAY SYSTEM

    Federal Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $257,400 2009 LABR Federal Exempt

    Page 46 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    23835 1 LACRPC 71 ALL/HAN IR 75 9.60

    MINOR REHABILITATION OF IR75, GRIND AND PAVE FROM NORTH OF SR81 TO THE SR235 JCT IN HANCOCK COUNTY. BEGIN NORTH OF THE SR81 JCT. AND END AT THE SR235 JCT. IN HANCOCK COUNTY. Resurfacing, Divided System

    ODOT SPONSORING AGENCY

    CO CO Contr $3,519,000 2008 4PF7 Q010 INTERSTATE MAINTENANCE

    Federal Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $385,700 2008 LABR Federal Exempt

    75517 2 TMACOG 72 LUC 280 Multi use trail

    Build a single multi-use trail along the north side of the existing spans. Remove center median, patch existing deck and install bridge mounted PCB to separate vehicular traffic from the proposed bicycle/multi-use trail facility crossing the Craig bridge

    ODOT SPONSORING AGENCY

    CO CO Contr $340,800 2007 4TC7 Q220 STP ENHANCEMENT

    Federal Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $34,080 2007 LABR Federal Exempt

    Page 47 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $42,600 2007 LABR Federal Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $85,200 2007 4BG7 2 Local MatchLocal Match

    Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $426,000 2007 4B37 Q220 STP ENHANCEMENT

    Federal Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $36,500 2007 LABR State Exempt

    ODOT SPONSORING AGENCY

    CO CO Contr $365,000 2007 4PS7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $8,520 2007 LABR Local Match

    Exempt

    Page 48 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    75937 2 TMACOG 73 LUC 475 2.54 Salisb Interchg

    Design and construction of new/modified I-475/Salsibury Rd interchange in Lucas county; perform necessary related work.Feasibility Study by locals under PID 19119. I-475/Salisbury Rd interchange Interchange, Reconstruction

    DISTRICT 2 PRODUCTION

    CO CO Contr $1,160,000 2007 4BD7 2 State Funds (S,O)

    State Analyzed

    DISTRICT 2 PRODUCTION

    CO CO Contr $12,760,000 2007 4BG7 2 Local MatchLocal Match

    Analyzed

    DISTRICT 2 PRODUCTION

    CO CO Contr $10,440,000 2007 4BK7 Q010 INTERSTATE MAINTENANCE

    Federal Analyzed

    DISTRICT 2 PRODUCTION

    RW Acquis $2,500,000 2006 4BK7 Q010 INTERSTATE MAINTENANCE

    Federal Analyzed

    DISTRICT 2 PRODUCTION

    CO CO Contr $2,900,000 2007 4TA7 44 TOLEDOFederal Analyzed

    Page 49 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    DISTRICT 2 PRODUCTION

    CO CO Engr $1,566,000 2007 LABR Local Match

    Analyzed

    DISTRICT 2 PRODUCTION

    CO CO Engr $1,044,000 2007 LABR Federal Analyzed

    DISTRICT 2 PRODUCTION

    CO CO Engr $116,000 2007 LABR State Analyzed

    DISTRICT 2 PRODUCTION

    RW Utl Remb $500,000 2006 4BK7 Q010 INTERSTATE MAINTENANCE

    Federal Analyzed

    77581 2 TMACOG 74 LUC Albon/SR-2 intersection

    Widen Albon Rd (CR 86) at Airport Hwy (SR-2) to provide for new left turn lanes on Albon Rd. Replace existing traffic signals, provide street ligting, install pedestrian signals, provide vehicular and pedestrian activated signal operations. Project shou

    LUCAS COUNTY ENGINEER

    CO CO Contr $180,000 2006 4TB7 Q400 Congestion Mitigation & Air Quality

    Federal Analyzed

    Page 50 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    LUCAS COUNTY ENGINEER

    CO CO Contr $45,000 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Analyzed

    LUCAS COUNTY ENGINEER

    CO CO Engr $20,000 2006 4TB7 Q400 Congestion Mitigation & Air Quality

    Federal Analyzed

    LUCAS COUNTY ENGINEER

    CO CO Engr $5,000 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Analyzed

    LUCAS COUNTY ENGINEER

    CO CO Engr $52,000 2006 LABR Local Match

    Analyzed

    LUCAS COUNTY ENGINEER

    CO CO Contr $307,000 2006 LNTP 2 Local MatchLocal Match

    Analyzed

    17441 2 TMACOG 75 LUC BRENNE MARINA

    FERRY BOAT DISCRETIONARY PROGRAM. RENOVA TE STRUCTURE TO BE FERRY BOAT TERMINAL B Y INTERIOR IMPROVEMENTS, PASSENGER ACCES S, PARKING SPACES, DREDGING,RELATED WORK BRENNE MARINA, CITY OF TOLEDO, PROVIDE FERRY BOAT TERMINAL. Other

    Page 51 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    Toledo-Lucas County Port Authority

    CO CO Contr $300,000 2007 LNTP 2 State Funds (S,O)

    Local Match

    Toledo-Lucas County Port Authority

    CO CO Contr $745,125 2007 4D57 3270 Ferry Boat - Discretionary

    Federal

    Toledo-Lucas County Port Authority

    CO CO Contr $500,000 2007 4D57 Q950 Ferry Boats & Terminal Construction

    Federal

    Toledo-Lucas County Port Authority

    CO CO Contr $1,200,000 2007 4D57 3270 Ferry Boat - Discretionary

    Federal

    Toledo-Lucas County Port Authority

    CO CO Contr $125,000 2007 LNTP 2 State Funds (S,O)

    Local Match

    Toledo-Lucas County Port Authority

    CO CO Contr $186,281 2007 LNTP 2 State Funds (S,O)

    Local Match

    Page 52 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    21891 2 TMACOG 76 LUC Front/Summit Conversion

    CONVERT THE CRAIG BRIDGE/FRONT ST/SUMMIT ST INTERCHG INTO AT-GRADE INTERSECTIONS ; PERFORM NECESSARY RELATED WORK. Note: Summit St (PID 21893) added. I-280/FRONT ST INTERCHANGE & I-280/SUMMIT ST INTERCHANGE Intersection

    ODOT SPONSORING AGENCY

    CO CO Engr $538,100 2007 LABR State Analyzed

    ODOT SPONSORING AGENCY

    CO CO Contr $5,381,000 2007 7BDB 2 State Funds (S,O)

    Bonds Analyzed

    78945 2 TMACOG 77 LUC Herr Rd (CR 41) 0.23 Bridge

    Rehabilitate Herr Rd bridge over Ten Mile Creek by removing and replacing superstructure and abutments (salvage piers); perform necessary related work. This is TMACOG small project category capped at $300,000 of TMACOG's funds. Herr Rd bridge over Ten Mi

    LUCAS COUNTY ENGINEER

    CO CO Contr $264,000 2006 4TA7 44 TOLEDOFederal Exempt

    LUCAS COUNTY ENGINEER

    CO CO Contr $66,000 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Exempt

    Page 53 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    LUCAS COUNTY ENGINEER

    CO CO Engr $9,000 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Exempt

    LUCAS COUNTY ENGINEER

    CO CO Contr $70,000 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Exempt

    LUCAS COUNTY ENGINEER

    CO CO Engr $36,000 2006 4TA7 44 TOLEDOFederal Exempt

    25217 1 LACRPC 78 ALL/HAN SR 103 0.00

    2-LANE RESURFACING ON SR103 IN ALLEN AND HANCOCK COUNTIES. BEGIN AT THE IR75 JCT. AND END AT THE SR698 JCT. IN HANCOCK COUNTY. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $616,000 2008 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    25127 1 LACRPC 79 ALL/VAN SR 66/190/697 11.07

    2-LANE RESURFACING ON SR190 FROM THE SR66 JCT. TO THE PUTNAM COUNTY LINE AND ON SR697 FROM THE STATE ST. JCT. TO THE MAIN ST. JCT. IN THE CITY OF DELPHOS AND ON SR66 FROM THE S.C.L. OF DELPHOS TO THE STATE ST. JCT. IN THE CITY OF DELPHOS. 2-LANE RESURFACI

    ODOT SPONSORING AGENCY

    CO CO Contr $500,000 2008 4PS7 2 State Funds (S,O)

    State Exempt

    ODOT SPONSORING AGENCY

    CO CO Engr $12,500 2008 LABR State Exempt

    25119 1 80 D01 BM FY06 PERFORM MISCELLANEOUS BRIDGE MAINTENANCE ON 11 VARIOUS STRUCTURES THROUGHOUT DISTRICT ONE FOR FY06 INCLUDING PAVE INVERTS OF CULVERTS, SEAL CONCRETE DECKS WITH GRAVITY FED RESIN, ENCASE PIERS WITH CONCRETE, AND PATCHING OF ABUTMENTS

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2006 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $250,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    Page 55 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    25193 1 81 D01 BM FY07 MISCELLANEOUS BRIDGE MAINTENANCE ON VARIOUS STRUCTURES THROUGHOUT DISTRICT ONE FOR FY07. VARIOUS STRUCTURES THROUGHOUT DISTRICT ONE. Bridge Repair

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $250,000 2007 4PS7 2 State Funds (S,O)

    State

    25260 1 82 D01 BM FY08 MISCELLANEOUS BRIDGE MAINTENANCE ON VARIOUS STRUCTURES THROUGHOUT DISTRICT ONE FOR FY08. VARIOUS STRUCTURES THROUGHOUT DISTRICT ONE. Bridge Repair

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $250,000 2008 4PS7 2 State Funds (S,O)

    State

    Page 56 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    22019 1 83 D01 BPFY04 00.000

    CLEANING AND PAINTING OF ALL EXISTING STRUCTURAL STEEL ON 13 BRIDGES LOCATED THROUGHOUT DISTRICT ONE USING PAINT SYSTEM OZEU. VARIOUS STRUCTURES THROUGHOUT DISTRICT ONE. Bridge Painting

    ODOT SPONSORING AGENCY

    CO CO Contr $1,150,000 2008 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $115,000 2008 LABR State

    25251 1 84 D01 ENV FY07 HIRE CONSULTANT BY TASK ORDER AGREEMENT TO PERFORM MISC. ENVIRONMENTAL TASKS DUE TO LIMITED STAFFING IN DISTRICTS AND CENTRAL OFFICE. 24 MONTH AGREEMENT TO BE ENCUMBERED FY07. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE.

    ODOT SPONSORING AGENCY

    PE Env PE $200,000 2007 4PS7 2 State Funds (S,O)

    State

    25169 1 85 D01 GES FY06 HIRE CONSULTANT BY WAY OF TASK ORDER AGREEMENT TO PERFORM MISC. GENERAL ENGINEERING TASKS DUE TO LIMITED STAFFING. 24 MONTH AGREEMENT TO BE ENCUMBERED FY06. VARIOUS ROUTES AND LOCATIONS THROUGHOUT DISTRICT ONE. General Engineering

    Page 57 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $200,000 2006 4PS7 2 State Funds (S,O)

    State

    25310 1 86 D01 GES FY08 HIRE CONSULTANT BY WAY OF TASK ORDER AGREEMENT TO PERFORM MISC. GENERAL ENGINEERING TASKS DUE TO LIMITED STAFFING. 24 MONTH AGREEMENT TO BE ENCUMBERED FY08. VARIOUS ROUTES AND LOCATIONS THROUGHOUT DISTRICT ONE. General Engineering

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $200,000 2008 4PS7 2 State Funds (S,O)

    State

    23068 1 87 D01 GPR FY04 HIRE COMPANY BY WAY OF TASK ORDER AGREEMENT TO PERFORM GROUND PENETRATING RADAR ON VARIOUS STRUCTURES AND PAVEMENTS. 24 MONTH AGREEMENT TO BE ENCUMBERED HALF IN FY05 AND HALF IN FY06. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT

    ODOT SPONSORING AGENCY

    PE Pln Stdy $100,000 2006 4PS7 2 State Funds (S,O)

    State

    25170 1 88 D01 GPR FY07 HIRE COMPANY BY WAY OF TASK ORDER AGREEMENT TO PERFORM GROUND PENETRATING RADAR ON VARIOUS STRUCTURES AND PAVEMENTS. 24 MONTH AGREEMENT. FUNDS TO BE ENCUMBERED IN FY07 AND FY08. VARIOUS ROUTES AND LOCATIONS THROUGHOUT DISTRICT ONE.

    Page 58 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $100,000 2007 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $100,000 2008 4PS7 2 State Funds (S,O)

    State

    25319 1 89 D01 GPR FY09 HIRE COMPANY BY WAY OF TASK ORDER AGREEMENT TO PERFORM GROUND PENETRATING RADAR ON VARIOUS STRUCTURES AND PAVEMENTS. 24 MONTH AGREEMENT TO BE ENCUMBERED FY08. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Technical

    ODOT SPONSORING AGENCY

    PE Dtl Dsgn $100,000 2009 4PS7 2 State Funds (S,O)

    State

    24783 1 90 D01 HS FY06 HERBICIDAL SPRAYING FOR 4-LANE, 2-LANE AND GUARDRAIL SECTIONS IN DISTRICT ONE FOR FY06. NO R/W REQ'D. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Herbicidal Spraying

    ODOT SPONSORING AGENCY

    CO CO Contr $260,000 2006 4CP7 2 State Funds (S,O)

    State

    Page 59 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $26,000 2006 LABR State

    25247 1 91 D01 HS FY07 HERBICIDAL SPRAYING FOR 4-LANE, 2-LANE AND GUARDRAIL SECTIONS IN DISTRICT ONE FOR FY07. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Herbicidal Spraying

    ODOT SPONSORING AGENCY

    CO CO Engr $26,000 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $260,000 2007 4CP7 2 State Funds (S,O)

    State

    25301 1 92 D01 HS FY08 HERBICIDAL SPRAYING FOR 4-LANE, 2-LANE AND GUARDRAIL SECTIONS IN DISTRICT ONE FOR FY08. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Herbicidal Spraying

    ODOT SPONSORING AGENCY

    CO CO Engr $26,000 2008 LABR State

    Page 60 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $260,000 2008 4CP7 2 State Funds (S,O)

    State

    75931 1 93 HAR SR 67 22.56

    Replace bridge. Structure over Little Tymochtee Creek approximately 2.21 miles west of the Wyandot County Line. Bridge Repair

    ODOT SPONSORING AGENCY

    CO CO Engr $11,100 2006 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $315,000 2008 4PS7 2 State Funds (S,O)

    State

    78861 1 94 HAR SR 68-8.44 Bridge replacement 0.81 miles South of SR 53. Bridge Replacement

    ODOT SPONSORING AGENCY

    CO CO Engr $56,300 2008 LABR Federal

    Page 61 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $563,000 2008 4PF7 H200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PAULDING COUNTY ENGINEER

    CO CO Engr $25,600 2009 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PAULDING COUNTY ENGINEER

    CO CO Engr $26,550 2009 4B87 Q100 BRIDGE REPLACEMENT 65% ON SYSTEM

    Federal

    PAULDING COUNTY ENGINEER

    CO CO Contr $29,550 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    23087 1 98 PAU CR 171 6.75

    REPLACE EXISTING STRUCTURE OVER FLAT ROCK CREEK WITH A NEW STRUCTURE. APPROX. 0.25 MILES EAST OF THE TR170 JCT. Bridge Replacement

    PAULDING COUNTY ENGINEER

    CO CO Contr $500,000 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    PAULDING COUNTY ENGINEER

    CO CO Engr $50,000 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    75194 1 99 PAU CR 87 2.00 Resurface existing roadway with a minimum of 3 inches of asphalt concrete and place stabilized crushed aggregate along pavement edge. Begin at the SR114 intersection and end at the SR613 intersection. Resurfacing, Undivided System

    Page 64 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PAULDING COUNTY ENGINEER

    CO CO Engr $28,800 2009 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    PAULDING COUNTY ENGINEER

    CO CO Engr $18,000 2006 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2006 LABR State

    25248 1 103 D01 PM FY07 UPGRADE EXISTING PAINTED PAVEMENT MARKINGS ON RURAL STATE HIGHWAY SYSTEM TO LONGER LIFE POLYESTER AND EPOXY FOR FY07. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Pavement Marking

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $500,000 2007 4CP7 2 State Funds (S,O)

    State

    25303 1 104 D01 PM FY08 UPGRADE EXISTING PAINTED PAVEMENT MARKINGS ON RURAL STATE HIGHWAY SYSTEM TO LONGER LIFE POLYESTER AND EPOXY FOR FY08. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Pavement Marking

    ODOT SPONSORING AGENCY

    CO CO Contr $500,000 2008 4CP7 2 State Funds (S,O)

    State

    Page 67 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $25,000 2008 LABR State

    24785 1 105 D01 RPM FY06 REPLACE RAISED PAVEMENT MARKER CASTINGS AS NEEDED ON VARIOUS ROUTES THROUGHOUT DISTRICT ONE FOR FY06. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Raised Pavement Markers

    ODOT SPONSORING AGENCY

    CO CO Engr $6,000 2006 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $197,800 2006 4CP7 2 State Funds (S,O)

    State

    25249 1 106 D01 RPM FY07 REPLACE RAISED PAVEMENT MARKER CASTINGS AS NEEDED ON VARIOUS ROUTES THROUGHOUT DISTRICT ONE FOR FY07. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Raised Pavement Markers

    ODOT SPONSORING AGENCY

    CO CO Contr $250,000 2007 4CP7 2 Local MatchState

    Page 68 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $6,000 2007 LABR State

    25305 1 107 D01 RPM FY08 REPLACE RAISED PAVEMENT MARKER CASTINGS AS NEEDED ON VARIOUS ROUTES THROUGHOUT DISTRICT ONE FOR FY08. VARIOUS ROUTES AND SECTIONS THROUGHOUT DISTRICT ONE. Raised Pavement Markers

    ODOT SPONSORING AGENCY

    CO CO Engr $6,000 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $250,000 2008 4CP7 2 State Funds (S,O)

    State

    75590 1 108 D01 sign replace Replace existing roadway information signs (extrusheets) on various routes and sections throughout District One. Various routes and locations throughout District One. Signing

    ODOT SPONSORING AGENCY

    CO CO Engr $100,000 2007 LABR Federal

    Page 69 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $1,000,000 2007 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    75599 1 110 DEF CR 143 6.20

    Replace the existing structure over Prairie Creek with a new structure. CR143 (Glenburg Road) structure over Prairie Creek approximately 0.15 miles north of the TR90 intersection. Bridge Replacement

    DEFIANCE COUNTY ENGINEER

    CO CO Contr $237,500 2009 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    DEFIANCE COUNTY ENGINEER

    CO CO Engr $1,250 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    DEFIANCE COUNTY ENGINEER

    CO CO Contr $12,500 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    DEFIANCE COUNTY ENGINEER

    CO CO Engr $23,750 2009 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    78124 1 Findlay 111 HAN Crystal Avenue

    Installation of curbs, gutters, sidewalks and pavement widening, also any necessary drainage. North corporation line, north of melrose to construct turn lane. Blanchard avenue to south. Crystal has more width curbs, better Major Rehabilitation

    Page 71 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    Findlay, City of

    RW Acquis $115,000 2007 4TA7 H240 STP FLEXIBLE

    Federal

    Findlay, City of

    PE Dtl Dsgn $330,000 2006 4TA7 H240 STP FLEXIBLE

    Federal

    78601 1 Findlay 112 HAN FINDLAY-LIGHTING

    ENHANCE MAIN STREET BY INSTALLING NEW LIGHTING, TRAFFIC SIGNALS AND STREET SIGNS FINDLAY-MAIN STREET FROM CENTER ST TO LIMA AVENUE Environmental/Scenic

    Findlay, City of

    CO CO Engr $11,592 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Findlay, City of

    CO CO Contr $115,920 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Findlay, City of

    CO CO Engr $46,368 2006 4B37 H220 STP ENHANCEMENT

    Federal

    Page 72 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    Findlay, City of

    CO CO Contr $463,680 2006 4B37 H220 STP ENHANCEMENT

    Federal

    78258 1 113 HAN IR 75 1.24 Repair the slide by excavating the slide area and benching it back in.Temporary R/W may be required. Southeast quadrant of the IR75 structure over CR 33 and the abandoned RR. Slide Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $360,000 2007 4PS7 2 State Funds (S,O)

    State

    23830 1 114 HAN IR 75 14.39 DOWELL BAR RETROFIT PLACEMENT TO REPAIR MID-SLAB CRACKS IN CONCRETE PAVEMENT. ALSO PERFORM SOME FULL DEPTH JOINT REPAIRS. BEGIN 0.56 MILES NORTH OF THE CR313 JCT. AND END O.41 MILES SOUTH OF THE CR99 JCT. Minor Rehabilitation - Pavement Prmy Sys

    ODOT SPONSORING AGENCY

    CO CO Engr $60,000 2006 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $821,700 2006 4PF7 H010 INTERSTATE MAINTENANCE

    Federal

    Page 73 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    76369 1 115 HAN IR 75 18.60 Replace existing deck with a new deck. CR 95 structure over IR 75 in the City of Findlay. Bridge Deck Replacement

    ODOT SPONSORING AGENCY

    CO CO Contr $624,000 2008 4PF7 Q010 INTERSTATE MAINTENANCE

    Federal

    25203 1 116 HAN IR 75 22.42 MINOR REHABILITATION OF IR75, GRIND AND PAVE FROM NORTH OF THE CR109 JCT. TO THE WOOD COUNTY LINE. BEGIN 0.30 MILES NORTH OF THE CR109 JCT. AND END AT THE WOOD COUNTY LINE. Resurfacing, Divided System

    ODOT SPONSORING AGENCY

    CO CO Engr $52,100 2008 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $588,000 2008 4PF7 Q010 INTERSTATE MAINTENANCE

    Federal

    21616 1 117 HAN IR 75 3.22 GRIND AND RESURFACE IR75 FROM THE SR235 JCT. TO THE US68 JCT. BEGIN APPROXIMATELY 0.56 MILES SOUTH OF THE SR235 JCT. AND END AT THE US68 JCT. Resurfacing, Divided System

    Page 74 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $385,000 2007 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $4,212,000 2007 4PF7 Q010 INTERSTATE MAINTENANCE

    Federal

    25268 1 118 HAN SR 12 4.93 2-LANE RESURFACING ON SR12 FROM THE W.C.L. OF BENTON RIDGE TO THE 9.57 MILEPOST. BEGIN AT THE W.C.L. OF BENTON RIDGE AND END AT THE 9.57 MILEPOST. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $281,000 2008 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $20,000 2008 LABR State

    24482 1 119 HAN SR 235/613 21.32

    2-LANE RESURFACING OF SR235 AND SR613 IN HANCOCK COUNTY. RESURFACING OF SECTIONS ON SR235 AND SR613 IN HANCOCK COUNTY. Resurfacing, Undivided System

    Page 75 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $52,000 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $508,000 2008 4PS7 2 State Funds (S,O)

    State

    75659 1 120 VAN CR 77 0.17 Rehabilitate the existing structure by replacing the bridge deck with prestressed concrete box beams. CR77 structure over Maddox Creek just south of the Old Tile Factory Road intersection. Bridge Repair

    VAN WERT COUNTY ENGINEER

    CO CO Engr $12,276 2009 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    VAN WERT COUNTY ENGINEER

    CO CO Contr $122,724 2009 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    VAN WERT COUNTY ENGINEER

    CO CO Engr $1,364 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Page 76 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    VAN WERT COUNTY ENGINEER

    CO CO Contr $13,636 2009 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    78599 1 121 VAN OHIO CITY SIDEWALKS

    Construct sidewalks within the existing public right of way. SR 709 FROM MAIN STREET TO THE NORTH CORPORATION LIMITS IN THE VILLAGE OF OHIO CITY Add Sidewalks

    CO CO Contr $96,000 2007 4B37 H220 STP ENHANCEMENT

    Federal

    CO CO Contr $24,000 2007 4BG7 2 Local MatchLocal Match

    CO CO Engr $2,400 2007 LABR Local Match

    CO CO Engr $9,600 2007 LABR Federal

    Page 77 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    23096 1 122 VAN TR 208 6.10

    REPLACE EXISTING STRUCTURE OVER MADDOX CREEK WITH A NEW STRUCTURE. APPROX. 2.90 MILES EAST OF THE US127 JCT. Bridge Replacement

    VAN WERT COUNTY ENGINEER

    CO CO Contr $240,900 2006 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    VAN WERT COUNTY ENGINEER

    CO CO Engr $24,100 2006 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    21666 1 123 VAN US 224 0.00

    RESURFACE US224 FROM THE INDIANA STATE LINE TO THE 9.31 MILEMARKER. BEGIN AT THE INDIANA STATE LINE AND END AT THE 9.31 MILEMARKER. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $47,200 2007 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $472,000 2007 4PS7 2 State Funds (S,O)

    State

    Page 78 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    25240 1 124 VAN US 224 9.31/15.84

    2-LANE RESURFACING ON US224. SKIP US 30 OVERLAP SECTION BEGIN AT THE 9.31 MILEPOST AND END AT THE PUTNAM COUNTY LINE. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $97,500 2008 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $721,000 2008 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    25207 1 126 VAN US 30 15.97

    MINOR REHABILITATION OF US30, GRIND AND PAVE FROM EAST OF THE TR127 JCT. TO EAST OF THE CR185 JCT. BEGIN 0.16 MILES EAST OF THE TR127 JCT. AND END 0.11 MILES EAST OF THE CR185 JCT. Resurfacing, Divided System

    ODOT SPONSORING AGENCY

    CO CO Contr $1,058,000 2008 4PF7 Q050 NATIONAL HIGHWAY SYSTEM

    Federal

    ODOT SPONSORING AGENCY

    CO CO Engr $98,900 2008 LABR Federal

    25261 1 127 VAN US 30 4.05 MINOR REHABILITATION OF US30, GRIND AND PAVE FROM EAST OF THE SR49 JCT. TO EAST OF THE US224 JCT. BEGIN AT THE 4.05 MILEPOST AND END 0.40 MILES EAST OF THE US224 JCT. Minor Rehabilitation - Pavement Prmy Sys

    ODOT SPONSORING AGENCY

    CO CO Contr $1,467,000 2009 4PF7 Q050 NATIONAL HIGHWAY SYSTEM

    Federal

    ODOT SPONSORING AGENCY

    CO CO Engr $135,300 2009 LABR Federal

    Page 80 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    79597 1 128 VAN US 30-12.92

    REPAIR STRUCTURE THAT HS BEEN HIT BY OVERHEIGHT LOADS US 127/US 224 OVER US 30 Bridge Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $50,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    76876 1 129 HAN SR 37 1.36 2 lane resurfacing on SR37. Begin at the Blanchard Street intersection and end at the east corporation limit of the City of Findlay. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $73,000 2009 4PS7 2 State Funds (S,O)

    State

    76625 1 130 HAN SR 568 4.52

    Replace existing culvert with a new structure and provide clear zone grading. Located approximately 2.39 miles east of the City of Findlay. Culvert Construction/Reconstr/Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $80,000 2007 4PS7 2 State Funds (S,O)

    State

    Page 81 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    RW Acquis $5,000 2006 4PS7 2 State Funds (S,O)

    State

    23079 1 131 HAN TIFFIN ST. RRGS

    CONSTRUCT AN OVERHEAD BRIDGE OVER THE CSX RAILROAD. Located at the intersection of Tiffin St. and CSX RR. on the west side of the City of Fostoria. West of Vickie Ln to Cleveland St. Railroad Grade Separation

    ODOT SPONSORING AGENCY

    CO CO Contr $265,000 2006 4BG7 2 Local MatchLocal Match

    ODOT SPONSORING AGENCY

    CO CO Engr $9,000 2006 LABR State

    ODOT SPONSORING AGENCY

    RW Utl Remb $57,000 2008 4F27 H240 STP FLEXIBLE

    Federal

    ODOT SPONSORING AGENCY

    CO CO Engr $171,000 2006 LABR Federal

    Page 82 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    RW Utl Remb $3,000 2008 4BG7 2 Local MatchLocal Match

    ODOT SPONSORING AGENCY

    CO CO Contr $5,035,000 2006 4F27 Q240 STP AnywhereFederal

    ODOT SPONSORING AGENCY

    CO RR Remb $10,000 2006 4BG7 2 Local MatchLocal Match

    ODOT SPONSORING AGENCY

    CO RR Remb $190,000 2006 4F27 Q240 STP AnywhereFederal

    23872 1 132 HAN TR 217/Elm St./Summit St.

    REPLACE THREE EXISTING STRUCTURES, ELM ST. AND SUMMIT ST. OVER EAST BRANCH PORTAGE RIVER AND TR217 OVER TOBIAS MARTIN DITCH WITH THREE NEW STRUCTURES. THREE STRUCTURES. TWO LOCATED IN THE CITY OF FOSTORIA. Bridge Replacement

    HANCOCK COUNTY ENGINEER

    CO CO Contr $518,225 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    Page 83 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Engr $51,775 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $27,275 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Engr $2,725 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    23870 1 133 HAN TR 241 0.09

    REPLACE EXISTING STRUCTURE OVER THE BLANCHARD RIVER WITH A NEW STRUCTURE. APPROX. 0.10 MILES SOUTH OF THE SR568 JCT. Bridge Replacement

    HANCOCK COUNTY ENGINEER

    CO CO Engr $43,225 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Contr $22,725 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    Page 84 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Contr $431,775 2007 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    HANCOCK COUNTY ENGINEER

    CO CO Engr $2,275 2007 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    23876 1 134 HAN TR 30/66/66

    REPLACE THREE EXISTING STRUCTURES, TR30, TR66 AND TR66 OVER EAGLE CREEK WITH THREE NEW STRUCTURES. TR30 - APPROX. 0.37 MILES EAST OF CR9 JCT.; TR66 - APPROX. 0.45 MILES SOUTH OF CR31 JCT.; TR66 - APPROX. 0.20 MILES SOUTH OF CR31 Bridge Replacement

    HANCOCK COUNTY ENGINEER

    CO CO Contr $27,275 2008 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Engr $2,725 2008 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    HANCOCK COUNTY ENGINEER

    CO CO Engr $51,775 2008 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    Page 85 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    HANCOCK COUNTY ENGINEER

    CO CO Contr $518,225 2008 4B87 Q110 BRIDGE OFF SYSTEM

    Federal

    25222 1 135 HAN US 224 0.00

    2-LANE RESURFACING ON US224 FROM THE PUTNAM COUNTY LINE TO THE SR235 JCT. BEGIN AT THE PUTNAM COUNTY LINE AND END AT THE SR235 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $42,500 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $280,000 2008 4PS7 2 State Funds (S,O)

    State

    22006 1 136 HAN US 224 5.50/5.79/6.41/6.80

    Replace two culverts and get clear zone grading, pave the invert and rehabilitate two culverts, replace and reset pipe sections on two culverts. 6 LOCATIONS ON US224. Culvert Construction/Reconstr/Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $633,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    Page 86 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $50,000 2006 LABR State

    75824 1 137 HAN US 30 11.24

    Overlay the existing deck with micro-silica concrete. Structure over Woodruff Ditch, approximately 1.01 miles west of the US 68 jct. Bridge Repair

    ODOT SPONSORING AGENCY

    CO CO Engr $7,100 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $71,000 2008 4PS7 2 State Funds (S,O)

    State

    25285 1 138 PAU SR 111 0.00

    2-LANE RESURFACING ON SR111 FROM THE INDIANA STATE LINE TO THE SR49 JCT. BEGIN AT THE INDIANA STATE LINE AND END AT THE SR49 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $17,500 2008 LABR State

    Page 87 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $227,000 2008 4PS7 2 State Funds (S,O)

    State

    25290 1 139 PAU SR 114 0.00

    2-LANE RESURFACING ON SR114 FROM THE INDIANA STATE LINE TO THE US127 JCT. BEGIN AT THE INDIANA STATE LINE AND END AT THE US127 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Engr $90,000 2008 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $501,000 2008 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    25230 1 141 PAU SR 500 0.00

    2-LANE RESURFACING ON SR500 FROM THE INDIANA STATE LINE TO THE SR49 JCT. BEGIN AT THE INDIANA STATE LINE AND END AT THE SR49 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $228,000 2007 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $37,500 2007 LABR State

    22065 1 142 PAU SR 500/637 2.05/10.55/10.53

    REPLACE THREE EXISTING CULVERTS AND PURCHASE RIGHT OF WAY TO GET CLEAR ZONE GRADING AND ELIMINATE THE NEED FOR GUARDRAIL. Also, lay ditch back on SR500 between section 2.05 to 2.60 2 CULVERTS LOCATED ON SR500 AND 1 LOCATED ON SR637. Culvert Construction/

    ODOT SPONSORING AGENCY

    RW Utl Remb $5,000 2008 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Contr $300,000 2007 4PS7 2 State Funds (S,O)

    State

    Page 89 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    76878 1 143 PAU SR 613 13.16

    2 lane resurfacing on SR613. Begin at the US127 intersection and end at the SR66 intersection. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $492,000 2009 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    24748 1 146 PAU SR 66 2.44 REPLACE EXISTING CULVERT WITH A NEW STRUCTURE. APPROXIMATELY 0.33 MILES NORTH OF THE SR114 JCT. Culvert Construction/Reconstr/Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $107,000 2007 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $1,070 2007 LABR State

    25228 1 147 PAU SR 66 8.90 2-LANE RESURFACING ON SR66 FROM THE N.C.L. OF OAKWOOD TO THE DEFIANCE COUNTY LINE. BEGIN AT THE N.C.L. OF OAKWOOD AND END AT THE DEFIANCE COUNTY LINE. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $378,000 2009 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $65,000 2008 LABR State

    Page 91 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    22541 1 148 WYA CR 47 14.12

    REPLACE EXISTING STRUCTURE WITH A STRUCTURE ON NEW ALIGNMENT. EXISTING STRUCTURE TO REMAIN, BUT TAKEN OFF THE HIGHWAY SYSTEM. APPROX. 0.60 MILES EAST OF SR67 JCT. Bridge Replacement

    WYANDOT COUNTY ENGINEER

    CO CO Engr $214,700 2006 4B87 Q120 BRIDGE OFF/ON SYSTEM

    Federal

    WYANDOT COUNTY ENGINEER

    CO CO Contr $2,147,300 2006 4B87 Q120 BRIDGE OFF/ON SYSTEM

    Federal

    76623 1 149 WYA SR 103 19.80

    Replace deck, repair backwalls and replace approach slabs. Structure over Sycamore Creek approximately 0.98 miles east of the Village of Sycamore. Bridge Repair

    ODOT SPONSORING AGENCY

    CO CO Contr $289,000 2008 4PS7 2 State Funds (S,O)

    State

    25246 1 150 WYA SR 231 0.00/3.04

    2-LANE RESURFACING ON SR231 FROM THE 3.74 MILEPOST TO THE S.C.L. OF NEVADA. BEGIN AT THE 3.74 MILEPOST AND END AT THE S.C.L. OF NEVADA. Resurfacing, Undivided System

    Page 92 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $35,000 2008 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $330,000 2008 4PS7 2 State Funds (S,O)

    State

    24008 1 151 WYA SR 231/294 1.33

    2-LANE RESURFACING ON SR294 FROM THE US23 JCT. TO THE CRAWFORD COUNTY LINE INCLUDING THE SR231 OVERLAP SECTION. BEGIN AT THE US23 JCT. AND END AT THE CRAWFORD COUNTY LINE INCLUDING THE SR231 OVERLAP SECTION. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $385,000 2007 4PS7 2 State Funds (S,O)

    State

    22791 1 152 WYA SR 294 0.00

    2-LANE RESURFACING ON SR294 FROM THE SR37 JCT. TO THE US23 JCT. BEGIN AT THE SR37 JCT. AND END AT THE US23 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $660,000 2007 4PS7 2 State Funds (S,O)

    State

    Page 93 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    24538 1 153 WYA SR 37 0.48 2-LANE RESURFACING OF SR37 FROM THE SR53 JCT. TO THE MARION COUNTY LINE. BEGIN AT THE SR53 JCT. AND END AT THE MARION COUNTY LINE. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $419,000 2008 4PS7 2 State Funds (S,O)

    State

    ODOT SPONSORING AGENCY

    CO CO Engr $37,700 2008 LABR State

    76688 1 154 WYA SR 53/199 12.76/0.17

    2-lane resurfacing on SR53 and SR199. Begin at the US23 jct. and end at the north corporation limit of the City of Upper Sandusky. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $394,000 2009 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $254,000 2009 4PS7 2 State Funds (S,O)

    State

    23832 1 156 WYA US 23 15.89

    MINOR REHABILITATION OF US23, GRIND AND PAVE FROM THE STRUCTURES OVER THE LITTLE TYMOCHTEE CREEK TO THE SR103 JCT. BEGIN AT THE STRUCTURES OVER THE LITTLE TYMOCHTEE CREEK AND END AT THE SR103 JCT. Resurfacing, Divided System

    ODOT SPONSORING AGENCY

    CO CO Engr $180,000 2007 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $2,530,000 2007 4PF7 Q050 NATIONAL HIGHWAY SYSTEM

    Federal

    25242 1 157 WYA US 23 23.19

    2-LANE RESURFACING ON US23 AND SR103. US23 - BEGIN AT THE S.C.L. OF CAREY AND END AT SENECA COUNTY LINE; SR103 - BEGIN AT THE US23 JCT. AND END AT THE SR199 JCT. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $382,000 2008 4PS7 2 State Funds (S,O)

    State

    Page 95 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $40,000 2008 LABR State

    24365 1 158 WYA US 23 24.43

    REPLACE EXISTING STRUCTURE OVER SPRING RUN WITH A NEW STRUCTURE. APPROXIMATELY 0.09 MILES NORTH OF THE SR103 JCT. IN THE VILLAGE OF CAREY BETWEEN SOUTH ST. & FINDLAY ST. Bridge Replacement

    ODOT SPONSORING AGENCY

    CO CO Engr $13,600 2006 LABR State

    ODOT SPONSORING AGENCY

    CO CO Contr $263,000 2006 7BPB 2 State Funds (S,O)

    Bonds

    ODOT SPONSORING AGENCY

    RW Acquis $2,500 2006 4PS7 2 State Funds (S,O)

    State

    25117 1 159 WYA US 30 17.15/21.09

    Rehabilitate existing structure over Rock Run by replacing the deck edges and replace the existing structure over Indian Run with a new structure. Approximately 1.05 miles east of the US23 jct. and approximately 1.81 miles west of the Crawford County line

    Page 96 of 2084July 2005

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Engr $50,000 2006 LABR Federal

    ODOT SPONSORING AGENCY

    CO CO Contr $539,600 2006 4PF7 H200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    CO CO Contr $1,795,850 2009 4B87 H120 BRIDGE 20% ON/OFF

    Federal

    CO CO Contr $2,866,000 2009 4B77 H250 STP

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    DISTRICT 2 PRODUCTION

    CO CO Contr $350,000 2006 4CP7 2 State Funds (S,O)

    State Exempt

    75623 1 164 DEF CR 27 0.77 Widen the existing pavement, resurface the roadway, replace drainage structures and various intersection improvements. Begin at the Cleveland Avenue intersection in the City of Defiance and end at the Harris Road intersection. Widening

    DEFIANCE COUNTY ENGINEER

    CO CO Engr $218,184 2008 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    75216 1 165 DEF PM FY06 Replace existing pavement markings on various routes throughout Defiance County. Various routes and sections throughout Defiance County. Pavement Marking

    DEFIANCE COUNTY ENGINEER

    CO CO Engr $7,074 2006 LNTP LNTP NON TRADITIONAL LOCAL MATCH

    Local Match

    DEFIANCE COUNTY ENGINEER

    CO CO Contr $75,000 2006 4B77 H200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    DEFIANCE COUNTY ENGINEER

    CO CO Engr $5,000 2007 4B77 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    24306 1 169 DEF SR 18 4.08 Resurface SR18 from the east corporation limit of Hicksville to the SR15 jct. Begin at the E.C.L. of Hicksville and end at the SR15 jct. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $850,000 2007 4PF7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    ODOT SPONSORING AGENCY

    CO CO Contr $2,200,000 2007 4BU7 Q200 STP UA

  • PID Project NamDs Project Descriptio Sponsoring

    Agency

    MPO Phas Subphas Total Amt Fiscal Year

    SAC Fund

    Code

    Fund DescrFund

    Type

    ID Air Quality Status

    76695 1 174 DEF SR 66 0.00 2 lane resurfacing on SR66. Begin at the Paulding County Line and end at the south corporation limit of the City of Defiance. Resurfacing, Undivided System

    ODOT SPONSORING AGENCY

    CO CO Contr $181,000 2009 4PS7 2 State Funds (S,O)