Nabil A. Rahman, Ph.D., P.E. Introduction Buildings require a vertical load resisting system to provide lateral stiffness and to transfer acting lateral loads from wind or seismic forces down to the foundation. Lateral stiffness is required to prevent the floors and roof from excessive side sway. In addition, buildings with sufficient lateral stiffness will suffer less non-structural damage, which means less cracking in walls and finishes, less water infiltration, and increased durability. StiffWall® is a pre-engineered system intended to simplify and optimize the design and installation of strap bracing shear walls to resist wind or seismic forces and provide required lateral stiffness. The system eliminates the need for plywood, OSB, or steel sheet sheathed shear panels all of which require excessive and complex fastener schedules. The system also eliminates the need for corner gusset plates traditionally used in strap bracing shear walls. In the StiffWall, the load path for shear forces through floor slabs is simplified by using corner “Boot” connection and through bolts. StiffWall has been effectively used in residential and commercial low and mid-rise cold-formed steel applications. The product is designed and manufactured to meet the performance requirements of each project.
Components of StiffWall The StiffWall system is composed of panels where each panel connects two floors vertically. For a multi-story building, the number of panels for a single StiffWall system equals the number of stories. The panel consists of several structural components, which are the vertical end Columns (vertical chords), the diagonal strap bracing, the corner Boot connections, and the floor-to-floor through bolts. Figure 1 shows the components of a StiffWall system. Note that the horizontal top and bottom chords of the shear wall panel consist of the floor/roof slabs or diaphragm, which are not part of the StiffWall. The top and bottom runner tracks of the wall may be engineered to act as part of the horizontal top and bottom chords. Other components that are built within the panel that are not part of the resisting strength and stiffness are the intermediate studs and any intermediate horizontal bracing.
________The Stee
The end and extenfit withinto have aof the typdeformattypical worder to ffit into th The diagbetween recommeconnectioconnectiothe Colum
__________l Network, I
Columns of nd from floon the stud spa design axiapical wall stution, the Cowall stud. Stfit inside thehe corner Bo
gonal strap floor/roof d
ended to be on at the twon using #12mn, strappin
___________Inc.
Figure 1:
f the StiffWaor slab to flopacing betweal compressiud in the samlumns can stiffWall Coe StiffWall coot.
bracing is diaphragms
a minimumwo ends. The
2 self-drillinng, and corne
__________www.st
Jan
Two-panel
all system (laor slab. Theeen studs. Inion capacityme wall. Thisupport gravlumns are m
corner Boot
the tension through the
m of 4 inche straps can b
ng screws or er Boot.
___________eelnetwork.cnuary 2016
l StiffWall s
abeled C/STe end Columnn either casey not less thas requiremenvity loads emanufactureconnection.
element uscorner Boo
es wide and be attached using fillet w
__________com
shear wall s
TW) are spacns may repla
e, the end Coan the designnt is to ensuquivalent to
ed with nonTherefore, s
sed to transot connectio
54 mil (16 at the ends welds. Figu
___________
system
ced at the deace typical wolumns shoun axial comp
ure that wheno the loads s-standard wstandard (S)
sfer lateral on. Diagonal ga) thick toto the StiffWre 2 shows t
__________888-474-
esign panel wwall studs oruld be enginpression capn under floorsupported b
web dimensio sections wi
loads diagol strap bracio achieve pWall corner the connecti
_____ -4876
width r may eered
pacity r/roof y the on in ill not
onally ing is
proper Boot
ion of
________The Stee
The Stifftrack of bracing. structuradown to for flooranchoragbeams or Design CComponethe DesiStandardstandard exceedinmomentssystem p The Stiffapplied adiaphragmdesign orStandardshear wais not cap When thecalculateChapter C5.2 in design wis given Categoryseismic
__________l Network, I
Fig
fWall cornerthe wall anIn addition l steel uprigthe floor sla
r-to-floor coge of Boot atr embedded p
Consideratioents of StiffWgn of Cold-
d for Cold-folimits the a
ng 2:1 unlesss in the desirovides desi
fWall systemat joints thatms. Load shr allowable
d for Minimuall panel, onlpable of resi
e StiffWall sd based on 12 of the ASthe AISI S2
when R is takSection C1
y A through loads and t
___________Inc.
ure 2: C/ST
r Boot consnd is designto the Strap
ghts that attaab on the otonnection ot a podium fplates.
ons Wall system-Formed Ste
ormed Steel Fspect ratio (s a rational ign of the enign data for a
m is typicalt represent t
hould be factstress desig
um Design Lly diagonal bsting compre
system is dea seismic r
SCE 7-10 sta213 standardken greater t.1 of AISI SC, the desigthereby avo
__________www.st
Jan
TW end Col
sists of a 12ed to receiv
p Track, the ach to the Sther side. Thor mechanicfloor level c
m are designeeel StructuraFraming – L(height/width
analysis is nd chord Coa range of w
lly analyzedthe points otored based
gn) and propLoads for Bbracing actinession force
signed to resresponse moandard. Howd for the cothan 3. FurthS213 standaner has the o
oid the spec
___________eelnetwork.cnuary 2016
lumn and c
inch, 97 mve and secuBoot includ
StiffWall Cohe anchorageal/adhesive
can also be a
ed accordingal Members
Lateral Desigh) of a shearperformed w
olumns. Thewall aspect ra
d as a truss f contact beon the desig
per load comBuildings and
ng in tensions.
sist lateral seodification c
wever, attentionsideration her clarificatard. The claroption to usecial detailing
__________com
orner Boot
mil strap tracure the attacdes various solumn on one of Boot is
anchors atachieved via
g to the Norths (AISI S10gn (AISI S21r wall with dwhich inclu
e technical iatio between
model withetween the sgn method smbinations sd Other Strun should be
eismic forcecoefficient, ion should bof special
tion for the urification stae an R = 3 (ig in Sectio
___________
connection
ck that sits ihment of thsizes of coldne side and achieved w
t the founda direct weld
h American 00) and the 13). Section diagonal str
udes joint fleinformation 0.6 and 2.
h lateral andshear wall aelected for ashould be apuctures (ASC
modeled sin
es, the seismR = 4, as
be given to Sseismic requse of speciates that forinstead of 4)
on C5.2. In
__________888-474-
inside the ruhe diagonal d-formed steanchor the
with through ation level.
ding to floor
SpecificatioNorth AmeC4 in AISI ap bracing texibility andfor the Stiff
d/or gravity and the flooranalysis (strepplied per ACE 7-10). Innce strap br
mic loads are recommend
Sections C1.quirements ial seismic dr Seismic D) to determin
Seismic D
_____ -4876
unner strap
eel or Boot bolts The
r steel
on for erican S213
to not d end fWall
loads r/roof ength
ASCE n any acing
to be ed in 1 and n the
design Design ne the esign
________The Stee
CategoryC5.2. ConstruThis sectcondition Connecti When thethe load reaction transferrethe bottorecommeensure futhe Boot
__________l Network, I
y D through
ction Detailtion demonsns in multi-st
ion through C
e StiffWall spath for shefrom the S
ed through tom face of ended to solull bearing. Tbelow throu
Fig
___________Inc.
F, the desig
ls trates and dtory steel fra
Corrugated M
system runs ear and tensStiffWall Bohe bolts to tthe slab is
lid-fill the cThe tension ugh the bolts
gure 3: Con
__________www.st
Jan
gner must us
iscusses Stifaming constr
Metal Deck
through corsion forces ooot above athe StiffWalls not flat a
corrugation areaction from
s.
nnection thr
___________eelnetwork.cnuary 2016
se R = 4 and
ffWall construction.
Floor Slab (
rugated metof the Boot and the shel Boot belowagainst the above the Sm the StiffW
rough corru
__________com
d must apply
truction deta
(Figure 3)
tal deck flooconnection
ear load frow through berunner trac
Strap Track Wall Boot ab
ugated meta
___________
y special det
ails for sever
r slab, it is ithrough the
om the slabearing again
ck of the Barea with st
bove is trans
al deck slab
__________888-474-
tailing in Se
ral typical d
important to e slab. The b diaphragmnst the slab. SBoot below, tructural grosferred direc
_____ -4876
ection
design
trace shear
m are Since it is
out to tly to
________The Stee
StiffWall When thetrace the Columnsinch to 2floor diapthe floor member floor joisadditionabelow. Inthe shearpart of thand the Sreaction blocking/StiffWall
Anchorag The Stiffsteel beamfor shearachievedrequired
__________l Network, I
l Connection
e StiffWall sload path fo
s through the24 inches. Thphragm musspace. If thcan be the ests or floor al joist or adn either caser force. The he load path Strap Track
from the /stiffener del Boot above
Fig
ge Welded C
fWall systemm by weldin
r and uplift rd directly fro
for this conn
___________Inc.
n Through F
system runs or shear, come floor spacehe shear reacst be transferhe floor joistend rim tractrusses run
dditional truse, the solid btwo wall ruat the Strap with a connStiffWall Cesigned to se is transferr
gure 4: Con
Connection a
m is sometimng instead ofreactions of tom the Stifnection in th
__________www.st
Jan
loor Joist or
through lighmpression, ane. Floor joistction from thrred to the Sts or floor trck of the join parallel toss installed fblocking or tunner tracks Track locati
nection capaColumn abosupport the red directly t
nnection thr
at Podium Le
mes required f anchor boltthe Boot con
ffWall Boot he case of a f
___________eelnetwork.cnuary 2016
r Truss Fram
ht steel floornd tension fots and floor the StiffWalltiffWall Boorusses run pists or the soo the wall, tfor the full lethe additiona(one above
ions, and shoacity equivalove is trans
compressionto the Boot b
rough floor
evel or Foun
to be anchots. In such cannection to tto a steel
foundation s
__________com
ming (Figure
r joist or truforces of the trusses can hl Boot aboveot below thrperpendiculaolid blockinthis horizonength on topal joist/truss and one bel
ould be connlent to the ssferred to tn force. Th
below throug
joist or tru
ndation (Fig
ored to the fases, it is imthe supportinbeam. Howlab or a conc
___________
e 4)
uss framing, Boot conne
have a depthe and the sherough a horizar to the walng between tntal memberp of the Stiff
must be deslow the trannected to thehear force. Tthe Columnhe tension regh the bolts.
ss framing
ure 5)
foundation, amportant to tr
ng structurewever, an em
crete slab. T
__________888-474-
it is importaction and th
h ranging froear load fromzontal membll, this horizthe trusses. Ir needs to bfWall shear psigned to trasfer member
e transfer meThe compre
n below threaction from
a podium slarace the loade. Welding cmbedded plaThe shear rea
_____ -4876
ant to e end
om 12 m the ber in zontal If the be an panel
ansfer r) are
ember ession rough m the
ab, or d path an be ate is action
________The Stee
from theTrack anbe transfholes to ttrimmed to be sloembeddeto restore
F InstallatThis sectmulti-stodocumen Diagonal Diagonalwill perfremove aStiffWallor weld
__________l Network, I
StiffWall Bnd the steel bferred by fillthe steel beaone inch on
otted or notced plate. It ise the protecti
Figure 5: An
tion Recommtion discuss
ory steel framnt “Construct
l Flat Straps
l flat straps iform as desany wavinesl system to ato the Strap
___________Inc.
Boot can be beam or the elet welds at am or the emn each side toched at all los recommendive coating o
nchorage co
mendations ses some imming constrtion Guide: L
in the StiffWsigned. It isss or bowingapply up to p Track. It
__________www.st
Jan
transferred embedded pthe two end
mbedded plato match the ocations of wded to cleanof the steel.
onnection to
mportant recoruction. OtheLoad Bearin
Wall system m recommend
g and ensure50 lbs of tenis recomme
___________eelnetwork.cnuary 2016
by fillet weplate. The upds of the baste. Notice thlength of theweld to allon then spray-
o embedded
ommendatioer installatio
ng Wall Syst
must be instded to insta
e tightness. Ansion into a ended to tigh
__________com
elds betweeplift reactionse plate of thhat the ends oe base plate.w direct acc-paint all we
d plate at po
ons while inon recommetems” by the
talled tight toall the strapA tool, Tighflat strap behten the flat
___________
n the two sn from the Sthe Boot andof the Strap . The wall rucess to the seld areas wit
odium or fou
nstalling Stifendations are Steel Netw
o ensure theps with somhtStrap®, is pefore fastenint straps in th
__________888-474-
ides of the tiffWall Boo
d through theTrack need
unner track nsteel beam oth zinc-rich
undation
ffWall systee outlined i
work, Inc.
e shear wall pme pre-tensioprovided witng it with sche field afte
_____ -4876
Strap ot can e bolt to be
needs or the paint
em in in the
panel on to th the crews er the
______________________________________________________________________________ The Steel Network, Inc. www.steelnetwork.com 888-474-4876
January 2016
application of gravity loads on floor where the StiffWall shear wall panels exist. In the case of panelized wall panels in the fabrication shop, it is recommended to compress the wall panels, with the StiffWall included, in a jig before the flat straps are tighten and secured to the Strap Track. Flat strap cannot be installed, then un-installed by releasing the screws to the Strap Track, and then re-installed with screws again in the same screw holes. Either a new piece of strap is required, or the exposed edge of the strap to be welded to the Strap Track with an approved weld design. It is not recommended to fasten the diagonal flat straps to the intermediate studs between the StiffWall end Columns. However, the typical or occasional attachment of sheathing and/or resilient channel to the intermediate studs through the straps is acceptable. Finally, diagonal flat straps are major elements in the lateral load resistance of the building, and therefore the straps should not be cut, punched or spliced without an approved design. Fitting StiffWall Columns between Wall Studs When the end Columns of the StiffWall are designated to fit in the stud spacing between the typical wall studs, the Columns should be centered such that there is no interference between the StiffWall Strap Track and the neighboring wall studs (refer to Figure 1). The length of the Strap Track is 12 inches, and the full StiffWall Boot connection should fit in any stud spacing 16 inches or larger (center-to-center). When the stud spacing is 12 inches or less, either one stud is to be shifted to allow space for the StiffWall Boot, or the design of the StiffWall Column is to be updated to replace and accommodate the gravity load of one of the wall studs. Connection of StiffWall Boot to Roof Rafter or Beam at a Slope When the StiffWall Boot is required to be connected at the top end to a roof rafter or a beam at a sloped angle, special Boot consideration is required since standard Boot fit only 90 degrees angle attachment. If the roof slope is very small, the StiffWall Boot maybe shimmed with steel sheets with bolt holes to accommodate the slope. The steel sheets must be placed between the Strap Track and the wall runner track, and must be welded together as well as welded to the Strap Track. If the roof slope is large, a special steel wedge maybe manufactured to accommodate the slope. The wedge must be placed between the Strap Track and the wall runner track, and must be welded to the Strap Track. Holes in Concrete Floor Slab for Through Bolts There are several ways to provide holes in concrete floor slabs to accommodate the through-floor bolts of the StiffWall Boot. Since shear loads are transferred through the floor slab via bolt bearing against the concrete, it is important to ensure there are no gaps between the bolts and the concrete after full concrete pouring and curing. Any gaps due to the method of creating the bolt holes must be grouted with structural grout or filled with structural epoxy. The same applies to hollowcore precast concrete floor planks, where the hollow cells of the planks containing the through bolts must be broken open and filled with structural grout. Pre-Installed Anchors Rods in Foundation If the anchorage of the StiffWall system into the foundation is designed with pre-installed anchor rods, it is important to maintain the alignment and the correct spacing between these anchors
______________________________________________________________________________ The Steel Network, Inc. www.steelnetwork.com 888-474-4876
January 2016
while the concrete is being poured. One method to ensure proper alignment and spacing between the anchors is to install a steel template at the top surface of the foundation and secure it to the concrete forms. It is also recommended to tape the threads of the anchor rods to prevent any contamination by the concrete. If sleeves or wrappers are used around the anchors during pouring of concrete and then taken out, they will create gaps between the anchors and the StiffWall Boot. These gaps must be grouted with structural grout or filled with structural epoxy. Design Example: The following example illustrates the design capabilities of the StiffWall system as a shear panel to resist lateral loads using hand calculations and also using SteelSmart® System software. A user guide is available for the software input data as part of the software Help menu. Certain assumptions are made within the example problem, and the analysis shown does not replace building code specific loading requirements and/or load combinations. The example utilizes StiffWall in the construction of a 5-story building. Applied loads and reactions at each story have been provided as well as overall foundation reactions for anchorage design. It should be noted that distribution of applied loads to multiple shear walls in a building can also be performed in the SteelSmart System software. Service wind loads and ASD design method are used. Two load cases were examined: (1) Dead + In-plane Wind, (D + W) (2) Dead + 0.75 Live + 0.75 In-plane, (D + 0.75L + 0.75W) Important Design Considerations:
D + W load combination is the controlling combination in this example. The wall depth is chosen as 6 inch.
Uplift and tension loads in StiffWall Columns are calculated with a tributary width from the dead load = 5 ft. (about 1/3 of panel width). Compression loads in StiffWall Columns are calculated with a tributary width from dead load equals to stud spacing = 2 ft.
End Columns are designed as unbraced full height in the lateral and torsional directions under compression forces. Otherwise, if bracing is considered, it must be adequately designed for bracing force.
Back-to-back end Columns are designed to be attached together @ 24 inches max. o.c. StiffWall does not substitute for floor rigidity. Sufficient diaphragm stiffness or an
additional horizontal compression member is required to transfer the load. f’c of foundation concrete = 4,000 psi.
Assumptions:
Stud Spacing = 24 inch o.c. Dead Load = 0.5 kips/ft. Live Load = 0.75 kips/ft. Tributary Width = 2.0 ft. for Compression check; 5 ft. for Uplift check D + W load combination checked D + 0.75L + 0.75W load combination checked
________The Stee
Analysis
__________l Network, I
Results:
___________Inc.
__________www.st
Jan
Input scree
___________eelnetwork.cnuary 2016
en in SSS so
__________com
oftware
_____________________888-474-
_____ -4876
________The Stee
__________l Network, I
___________Inc.
__________www.st
Jan
Analysis m
___________eelnetwork.cnuary 2016
model and re
__________com
eactions
___________
__________888-474-
_____ -4876
________The Stee
Load
1. C
2. U3. A
__________l Network, I
M
ds on Top Flo
Column comp Use 6
Use StiffWallAttach StiffW
___________Inc.
Maximum c
oor Shear W
pression = 300C/STW25l Light Boot
Wall Light Bo
__________www.st
Jan
compression
Wall (from an
.1 kips. No t50-54 with at with T1 capoot to Colum
___________eelnetwork.cnuary 2016
n check resu
nalysis):
tension in Coallowable cappacity = 6.5 mn using (4)
__________com
ults in SSS s
olumn pacity = 3.5 kips #12 screws
___________
software
kips > 3.1 k
__________888-474-
kips
_____ -4876
________The Stee
4. T
5. N
Load
1. C
2. U3. A4. T
5. U
Load
__________l Network, I
The tension in Use (2 Use (6
No uplift in th Use O
ds on 4th Floo
Column comp Use 6
Use StiffWallAttach StiffWThe tension in
Use (2 Use (7
Uplift in throu Use O Use (2
ds on 3rd Floo
___________Inc.
n the flat stra2) 4” x 54 m6) #12 screwhrough-floor
One 7/8” A32
or Shear Wal
pression = 800C/STW25l Plus Boot w
Wall Plus Boon the flat stra2) 4” x 54 m7) #12 screwugh-floor co
One 7/8” A322) 7/8” A325
or Shear Wa
__________www.st
Jan
aps is: 3.7 kmil straps witws each strapr connection25 bolt throu
ll (from anal
.4 kips. No t50-118 with with T1 capaot to Columnaps is: 7.4 k
mil straps witws each straponnection = 25 bolt throu5 bolts at bas
all (from anal
___________eelnetwork.cnuary 2016
kips in 2 strath capacity =p to Strap Tran, shear = 3.0ugh floor
lysis):
tension in Coallowable ca
acity = 11.6 n using (4) #kips in 2 strath capacity =p to Strap Tra1.4 kips, sheugh floor se to connec
lysis):
__________com
aps: = 11.5 kips >ack with cap0 kips
olumn apacity = 10kips
#12 screws aps: =11.5 kips > ack with capear = 6.0 kip
ct to Small B
___________
> 3.7 kips pacity = 6.8
0.7 kips > 8.4
7.4 kips pacity = 8.0 ps
Boot below
__________888-474-
kips > 3.7 k
4 kips
kips > 7.4 k
_____ -4876
ips
ips
________The Stee
1. C
2. U3. A4. T
5. U
__________l Network, I
Column comp Use (2
Use StiffWallAttach StiffWThe tension in
Use (2 Use (
kips Uplift in throu
Use (2
___________Inc.
pression = 12) 600C/STWl Small Boot
Wall Small Bn the flat stra2) 4” x 54 m10) #12 scre
ugh-floor co2) 7/8” A325
__________www.st
Jan
5.8 kips. NoW250-97 wit with T1 cap
Boot to Columaps is: 11.1
mil straps witews each str
onnection = 55 bolt throug
___________eelnetwork.cnuary 2016
o tension in Cth allowablepacity = 18.mn using (4)kips in 2 str
th capacity =rap to Strap
5.3 kips, shegh floor
__________com
Column e capacity = 9 kips ) ½” A325 braps: = 11.5 kips >
Track with
ear = 9.0 kip
___________
25.5 kips >
bolts
> 11.1 kips capacity =
ps
__________888-474-
15.8 kips
11.4 kips >
_____ -4876
> 11.1
________The Stee
Load
1. C
2. C
3. A
4. T
5. U
*Uplside o
__________l Network, I
ds on 2nd Floo
Column comp Use (2
Column tensi Use S
Attach StiffW Capac
The tension in Use (2 Use (
kips Uplift in throu
Use (2ift calculatedof the wall.
___________Inc.
or Shear Wa
pression = 22) 600C/STWion = 2.8 kip
StiffWall SmWall Small Bcity of (4) ½n the flat stra2) 6” x 54 m12) #12 scre
ugh-floor co2) 7/8” A325d using 5 ft.
__________www.st
Jan
all (from ana
4.7 kips W250-97 wips*
mall Boot witBoot to Colum
” A325 boltsaps is: 13.5
mil straps witews each str
onnection = 5 bolt througtributary wi
___________eelnetwork.cnuary 2016
alysis):
th allowable
h T1 capacitmn using (4)s to (2) 97 mkips in 2 str
th capacity =rap to Strap
10.7 kips, shgh floor idth and dea
__________com
e capacity =
ty = 18.9 kip) ½” A325 b
mil Columns raps: = 17.3 kips >
Track with
hear = 11.0 k
ad load used
___________
25.5 kips >
ps & T2 capabolts
= 21.2 kips
> 13.5 kips capacity =
kips
to offset up
__________888-474-
24.7 kips
acity = 15.3
> 2.8 kips
13.7 kips >
plift at the ten
_____ -4876
kips
> 13.5
nsion
________The Stee
Load
1. C
2. C
3. A
__________l Network, I
ds on 1st Floo
Column comp Use (2
Column tensi Use S
Attach StiffW
___________Inc.
Desig
or Shear Wal
pression = 32) 600C/STWion = 8.2 kip
StiffWall SmWall Small B
__________www.st
Jan
gn results fo
ll (from anal
5.0 kips W250-118 wps*
mall Boot witBoot to Colum
___________eelnetwork.cnuary 2016
or SW-2 in S
lysis):
with allowabl
h T1 capacitmn using (4)
__________com
SSS softwar
le capacity =
ty = 18.9 kip) ½” A325 b
___________
re
= 34.7 kips ≈
ps & T2 capabolts
__________888-474-
≈ 35.0 kips
acity = 15.3
_____ -4876
kips
________The Stee
4. T
*Uplside o5. A
Final De
The t
The d
Wall #
SW-5
SW-4
SW-3
SW-2
SW-1
__________l Network, I
CapacThe tension in
Use (2 Use (
kips ift calculateof the wall.
Anchorage up Use (2
Embe
sign: table below p
detail below
StiffWall® ColuSectio
600C/STW25
600C/STW250
600C/STW250
600C/STW250
600C/STW250
___________Inc.
city of (4) ½n the flat stra2) 6” x 54 m15) #12 scre
d using 5’ tr
plift = 17.5 k2) 7/8” Hiltidment depth
presents a de
shows a sam
D
umn & Boot on
0-54-1-LT
0-118-1-PL
0-97-2-SM
0-97-2-SM
0-118-2-SM
__________www.st
Jan
” A325 boltsaps is: 16.0
mil straps witews each str
ributary wid
kips, shear =i HIT-HY 20h = 10.5 inch
esign summa
mple detailed
Detailed Bo
StiffWa
Strap Bracing
(2) 4" x 54 mil
(2) 4" x 54 mil
(2) 4" x 54 mil
(2) 6" x 54 mil
(2) 6" x 54 mil
___________eelnetwork.cnuary 2016
s to (2) 118 kips in 2 str
th capacity =rap to Strap
dth and dead
= 13.0 kips 00 Adhesiveh; check add
ary of all par
d Boot conne
ot connectio
all® SWS Schedu
ColuConnection
l (4) #12 S
l (4) #12 S
l (4) ½” A3
l (4) ½” A3
l (4) ½” A3
__________com
mil Columnraps: = 17.3 kips >
Track with
d load used t
e Anchors, Hditional tensi
rt of the Stif
ection at the
on for SW-2
ule
umn n to Boot
Str#12(Ea
Screws
Screws
325 Bolts
325 Bolts
325 Bolts
___________
ns = 21.2 kip
> 16.0 kips capacity =
to offset upl
HAS Super Aon from pry
ffWall system
e 2nd floor (S
2
rap Track 2 Screws ach Side)
6 (
7 (1
10 (2
12 (2
15 (2)200
__________888-474-
ps > 8.2 kips
17.1 kips >
lift at the ten
ASTM A193ying action.
m.
SW-2).
Floor/AnchoragConnection
(1) 7/8" A325 Bo
1) 7/8" A325 Bo(2) at base
2) 7/8" A325 Bo
2) 7/8" A325 Bo
) 7/8” Hilti HIT-0 Adhesive Anc
_____ -4876
> 16.0
nsion
3 B7,
ge
olt
olt,
olts
olts
-HY chors
________The Stee
ReferencAISI S10
MAISI S2
AASCE 7
AASI SSS
S
__________l Network, I
Drawing ge
ces 00-12, “Nor
Members”, A13-07, “Nor
American Iro7-10, “StandAmerican SocS7, “Steel Science Intern
___________Inc.
enerator in
rth AmericanAmerican Irorth Americanon and Steel dard for Miciety for Civmart Systemnational, LL
__________www.st
Jan
SSS softwar
n Specificatin and Steel In Standard Institute (AIinimum Devil Engineersm Version 7LC, Durham,
___________eelnetwork.cnuary 2016
re showing
ion for the DInstitute (AIfor Cold-fo
ISI), 2007/20sign Loads s, VA, USA7.3”, Cold F NC.
__________com
StiffWall el
Design of CISI), 2012 Edormed Steel 012 Edition,
for Buildi.
Formed Stee
___________
levation and
Cold-Formeddition, WashFraming –
, Washingtonings and O
el Design So
__________888-474-
d details
d Steel Struchington, DCLateral Desn, DC. ther Structu
oftware, Ap
_____ -4876
ctural . sign”,
ures”,
pplied