STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

19
The STH 29 and CTH O interchange is in the background.

Transcript of STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Page 1: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

The STH 29 and CTH O interchange is in the background.

Page 2: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

STH 29 & CTH O interchange looking west from the eastbound off ramp.

Page 3: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

CTH O looking south at the STH 29 & CTH O interchange.

Page 4: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

CTH O interchange looking north from the eastbound on ramp. The barrier wall along STH 29 can be in the median and the rock cuts along CTH O can be seen in the background.

Page 5: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Intersection of CTH O and 120th Connector looking south.

Page 6: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

CTH O looking east through the rock cut.

Page 7: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

120th Connector Road looking north from CTH O.

Page 8: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Beginning stages of excavation at the STH 29 and CTH O interchange.

Page 9: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Construction of STH 29 and CTH O interchange south of STH 29.

Page 10: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Embankment construction on CTH O south of STH 29.

Page 11: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Fill construction on the north section of CTH O.

Page 12: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Drilling for blasting operations on CTH O north of the new interchange.

Page 13: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Blasting on CTH O north of the new STH 29 and CTH O interchange.

Page 14: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Rock excavation on CTH O looking south toward the STH 29 and CTH O interchange

Page 15: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Box culvert construction at Artus Creek.

Page 16: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Sliding trench box that was used to facilitate box culvert construction at Artus Creek.

Page 17: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Grading along STH 29 including subgrade stabilization using geotextile fabric and breaker run.

Page 18: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

Paving operations on westbound STH 29.

Page 19: STH 29 from CTH O to STH 107 - Marathon County, Wisconsin

v

Crushing operations on CTH O north of the STH 29 and CTH O interchange.