    Step to upgrade Quality Center10 to Quality Center11

    1. System Requirements for QC11

    1. Server System Configurations for Starter Edition

    2. Client-Side System Requirements

    2. Steps to Upgrade from QC10 to QC11

    System Requirements for QC11

    All servers, unless otherwise stated, have been validated on 32 bit configurations.Following are the server system configurations for installing HP Quality Center 11.0on Windows, Linux, and Solaris.

    CPU Windows: Quad Core AMD64 processor

    Linux: Quad Core AMD64 processor or equivalent x86-compatible processor

    Memory (RAM) 4 GB minimum

    Free disk space 8 GB minimum

    Operating System Application Server Database Server Web Server

    Windows Server 2003 SP2 (32bit)

    Windows Server 2003 SP2 (64bit

    Windows Server 2008 SP2 (64bit)

    Sun Solaris 10 64 bit

    Linux Red Hat 5.4 64 bit

    HPUX 11.31 v3 (64 bit Itanium)

    Linux Suse 10 (64 bit)

    JBoss 5.1

    WebLogic 10.3

    WebSphere 7.0.0.9

    Oracle 10.2.0.4

    SQL 2005 SP3

    Oracle 11.2.0.1

    SQL 2008 SP1

    JBoss 5.1

    Apache 2.2

    WebLogic 10.

    IHS Server

    IIS6

    II7

  • 8/3/2019 Steps to Upgrade Quality Center10 to Quality Center11

    2/4

    Server System Configurations for Starter Edition

    OperatingSystem

    Database Server Application and WServer

    Windows XP(SP3) Microsoft SQL Server 2005 SP2 Express edition installed during the installation process

    Note: Installed during the installation process. If SQL Server 2005 or 2008 is alreadyinstalled on the server machine, you can instruct Quality Center to use it, by providing theadministrator name and password.

    JBoss

    Note: Installed durininstallation process.

    Client-Side System Requirements

    CPU Core duo 1.6 Ghz (or higher) or equivalent compatible processor

    Memory (RAM) 2 GB minimum

    Free disk space 2 GB minimum

    Operating System Windows XP ( (SP3) 32 bit

    Window Vista (SP1) 32 bit

    Windows 7 32 bit (recommended)

    Notes: If you are integrating HP Quality Center with other HP testing tools, you must modify the DCOMpermissions on your client machine.

    You can work with the HP Quality Center client using a remote desktop

    Browser Microsoft Internet Explorer 7 or 8

    Note: For customers who have restrictions on plugins in their browsers, such as ActiveX, ALM can be loin the HP ALM Explorer Add-in. For more information on downloading and installing the add-in, refer to HP Application Lifecycle Management Installation Guide

    Prerequisites Visual C++ 2005 SP1 ATL Security Update Redistributable

    Microsoft .NET Framework 3.5 (SP1)

    Microsoft Office 2007 (SP2)

    Steps to Upgrade from QC10 to QC11

    1. Before migration, deactivate all projects from the Site Administrator

    2. Backup the projects repositories from the QC10 server. Each project has the

    location of the repository at the project properties in the Site Administration

    web site.

  • 8/3/2019 Steps to Upgrade Quality Center10 to Quality Center11

    3/4

    3. Restore the project databases/schemas and the Site administrations

    database/schema at the QC11 database server (if you are using a new

    database server)

    o Note: If upgrading QC, theres no need to move projects

    databases/schemas however is important to take backups.

    4. Install QC11, if you are using the same application server you must uninstall

    QC10

    o QC has 2 different databases, the project databases and the site admin

    database. When migrating, to keep users, user configurations, and site

    administration parameters you must install using the same database

    name that was used to restore the project in your DB server. Select

    Upgrade a copy or Upgrade the existing schema option during

    installation.

    5. Paste/Restore the repositories in the expected repository location in the new

    installation

    6. Restore the projects

    o Login Site Administrator and create a new empty project.

    o Go to the new empty projects folder repository and make a copy of

    the dbid.xml file.

    o Remove your projects from the Site Administration (Reason: it has

    connections to the old database server). Do not delete the projectbecause it will remove the project schema from the database server.

    o Go to the projects folder and rename the existing dbid.xml file to

    dbidold.xml

    o Paste a copy of the dbid.xml file from the empty new project.

    7. From the site administrator restore projects using the dbid.xml file editedfor all projects.

    8. Verify, repair and upgrade projects:

    a. Right click on it and select Maintain Projectb. Select Verify Projectc. After verification finished, select Repair projectd. After project repair, select Upgrade project

  • 8/3/2019 Steps to Upgrade Quality Center10 to Quality Center11

    4/4