StephenToddCV

5
S TEPHEN T ODD 07427095089 [email protected] E XECUTIVE S UMMARY An experienced and extensively qualified Level 1 Rope Access Rigger with vast expertise of working on many projects both on and Offshore. Possesses demonstrable experience in carrying out various duties pertaining to Rope Access, Maintenance, Cleaning, Rigging, Cable Pulls to name a few. Demonstrates the ability to maintain high and also safe working standards in every aspect, working individually or as part of a team, and proficient in following operational requirements closely. K EY A CHIEVEMENTS Followed IRATA Rope Access safety protocol and completed current Health and Safety legislation working on several projects including the Solan Platform, Dunlin Alpha Platform, Amrumbank West Offshore Wind Farm, Humber Gateway Wind Farm to name a few. Acquired a thorough grasp of offshore working with experience of Platform and Wind Farm environments and has successfully participated in Tool Box Talks, Risk Assessments and Method Statements. Improved Rope Access Rigging practices working on the Dunlin Alpha Platform by identifying complicated methods before suggesting improvements that were implemented. K EY S KILLS Cable Pulls Cleaning Client liaison Confined Space Construction Health & Safety High Pressure Industrial Cleaning Installation Method Statements Offshore Working Painting Re-pointing Rigging Risk Assessments Rope Access Spraying Steel Work Erecting Working as team Tower Maintenance Training Wind Farms Wind Turbines Working at Height

Transcript of StephenToddCV

Page 1: StephenToddCV

STEPHEN TODD07427095089

[email protected]

EXECUTIVE SUMMARY

An experienced and extensively qualified Level 1 Rope Access Rigger with vast expertise of working on many projects both on and Offshore. Possesses demonstrable experience in carrying out various duties pertaining to Rope Access, Maintenance, Cleaning, Rigging, Cable Pulls to name a few. Demonstrates the ability to maintain high and also safe working standards in every aspect, working individually or as part of a team, and proficient in following operational requirements closely.

KEY ACHIEVEMENTS

Followed IRATA Rope Access safety protocol and completed current Health and Safety legislation working on several projects including the Solan Platform, Dunlin Alpha Platform, Amrumbank West Offshore Wind Farm, Humber Gateway Wind Farm to name a few.

Acquired a thorough grasp of offshore working with experience of Platform and Wind Farm environments and has successfully participated in Tool Box Talks, Risk Assessments and Method Statements.

Improved Rope Access Rigging practices working on the Dunlin Alpha Platform by identifying complicated methods before suggesting improvements that were implemented.

KEY SKILLS

Cable Pulls Cleaning Client liaison Confined Space Construction Health & Safety High Pressure Industrial Cleaning Installation Method Statements Offshore Working Painting

Re-pointing Rigging Risk Assessments Rope Access Spraying Steel Work Erecting Working as team Tower Maintenance Training Wind Farms Wind Turbines Working at Height

CAREER HISTORY

Siem Offshore Contractors/ASP Nov 2016 to PresentOpito Stage 3 Rigger Project: Nordsee 1 Offshore Windfarm, North Sea, Germany Seim N. Sea CLV

Pre rig and De rig of rigging equipment. Carried out rigging on filter bag units. Conducted good radio communications with crane operations.

Page 2: StephenToddCV

Aker Solutions October 2016 to Oct 2016

Opito Stage 3 Rigger Project: Ninian Central Platform, North Sea (Shut Down)

Pre rig and De rig of rigging equipment. Various installations and removal of spools, valves, motors and pumps. Rigging loft management.

Siem Offshore Contractors/ASP June 2016 to Aug 2016Opito Stage 3 Rigger Project: Nordsee 1 Offshore Windfarm, North Sea, Germany Siddis Mariner CLV

Assembling of cable protection systems. Carried out rigging on subsea power cables. Conducted good radio communications with winching operations.

Aker Solutions Dec 2015 to May 2016 Opito Stage 3 Rigger Project: Solan Platform, North Sea

During my time on the Solan project I carried out and was PA for various rigging operations which consisted of.

Installation and removal of various valves, spools, pumps and motors. Crossed hailing and installation of 3 meter 2.5 ton caisson sections. Installation of helideck netting. Rigging Loft management.

Aquaterra Solutions Aug 2015 to Oct 2015 Level 1 Rope Access Technician/Rigger Project: Dunlin Alpha Platform, North Sea

Installation of pre-rigging equipment including chain blocks, Air hoists, roosters, to name a few. Rigging and installation of Subsea cleaning tools i.e. conductor guides and caissons. Using Rope Access techniques to complete Rigging tasks and installations. Following Toolbox Talks, Method Statements and complying with Work Permits. Making sure all works are in line with Platform Health and Safety protocol. Ensuring compliance to IRATA protocol and other safety legislation.

Aquaterra Solutions Apr 2015 to Jul 2015 Level 1 Rope Access Technician/Rigger Project: Dunlin Alpha Platform, North Sea

Installation of webbing system and working under deck to install wiring. Removal/replacement of Safety netting using Rope Access working under deck.

Page 3: StephenToddCV

Rigging/securing talon bridle clamps onto conductor guides and caissons. Respecting Risk Assessments, H&S legislation and Personal Protection Equipment (PPE) protocols.

SIEM Offshore Contractors/ASP Oct 2014 to Present Level 1 Rope Access Technician/Rigger Project: Amrumbank West Offshore Wind Farm (E-ON), North Sea, Germany Siem Moxie ISV

Carrying out Rigging of power cables and pull-ins working at the TP mono piles. Stripping cable, rigging/redirecting cable and installing hang offs. Application of resin using Rope Access techniques.

SIEM Offshore Contractors/ASP Aug 2014 to Oct 2014 Level 1 Rope Access Technician/Rigger Project: Humber Gateway Offshore Wind Farm (E-ON), North Sea, UK Siddis Mariner CLV

Rigging of power cables and pulling in J-tubes. Installation of temporary/permanent hang offs. Ensuring that Health & Safety measures are fully complied with at all times.

SIEM Offshore Contractors/ASP Apr 2014 to Aug 2014Level 1 Rope Access Technician/Rigger Project: Amrumbank West Offshore Wind Farm (E-ON), North Sea, Germany Siem Moxie ISV

Rigging/redirecting cables, installation of hang offs and application of resin. Power cable rigging/pull ins e.g. at the TP mono piles. Protection, Rigging and lowering of anodes into mono piles.

The Diverse Cleaning Company Oct 2013 to Apr 2014Level 1 Rope Access Technician/Rigger

Utilising Rope Access/powered access skills when carrying out maintenance, high pressure washing, building work and cleaning.

Installation of Rigging/signage as well as structural steel work.

PROFESSIONAL QUALIFICATIONS

IRATA Level 1 Stage 3 RiggerBOSIET with HUET and EBS Norwegian Escape ChuteMinimum Industry Safety Training First Aid at workOffshore MedicalWorking at heights British Seaman’s BookPolice Clearance check Confined Space Certificate

Page 4: StephenToddCV

CSCS CardIPAF International powered accessNVQ Level 2 Customer Service