STEAM BLOWING

Transcript of steamblowing-140909102821-phpapp02.ppsx

Page 1: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 1/27

STEAM BLOWING

Page 2: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 2/27

OBJECTIVE

Steam blowing of MS lines, CRH,HRH,SH,RH,HP & LP bypass pipe lines ofturbine is carried out in order to remove welding slag, loose foreign

materials, iron pieces, rust etc. from te system, generated during

manufacturing, transportation & erection.

PRINCIPLE OF STEAM BLOWING

To ensure that sufficient cleaning forces are applied to the piping, thesteam momentum during the steam blow must be equal to or greater than

the steam momentum at normal maximum load condition. The Cleaning

Force Ratio (CFR) is typically used to ealuate if satisfactory blow

conditions are obtained.

Page 3: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 3/27

PRECONDITIONS FOR STEAM LINE

BLOWING

1)  Chemical cleaning  should be completed

2) SH primary and secondary de-superheater piping andRH’s emergency de-superheater piping ready for

operation3) All permanent piping & temporary piping insulatedand supports/hangers are released ith cold setting

4)   Silencer  should be connected at temporary pipe e!it

") Soot bloing for A#H should be a$ailable%) a'e up for deaerator made ready

() otor ri$en *+# ith all controls made ready

Page 4: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 4/27

,) Hydraulic test of the folloing lines completed

*+eed .ines

* S HRH 0RH .ines

* S to Au!1 #RS .ine

* All other au!iliary lines identified for steam

 bloing) Sampling system made ready

4) All safety $al$e disc installed after remo$ing

hydro-static plug in drum5sub-critical)

superheaters and reheaters

) Ade6uate communication beteen control room

 boiler and 78 area ensured1

Page 5: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 5/27

2) +lo no99le control $al$es and :R; flaps here$er

applicable should be not erected before steam bloing and

suitable spool pieces are erected1 Strainers in the path

should be remo$ed1

3) Re6uired number of 7arget #lates and holder made

a$ailable

Page 6: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 6/27

BASIC TECHNIQUE USED

) #<++=:8 >7H?

2) #<R8=:8 >7H? / 0?:7=:>?<S *.?@

>7H?

Page 7: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 7/27

7o gi$e a thermal shoc' to the contour being purged to

dislodge the scale etc1

#rocedure Raise the boiler pressure to a pre-determined $alue

54-%4 'g/cm2) shut off firing and at the same time open the

6uic' opening $al$e5>?7;) thus alloing the steam to

escape to atm1 ith high $elocity carrying ith it the loose

debris1

PUFFING METHOD

Page 8: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 8/27

 The initial procedure is same as pufng

method except shutting o the ring

during blowing.

Continuous ring till the completion osteam blowing.

Maintain constant pressure during theblow

CONTINEOUS BLOWING

METHOD

Page 9: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 9/27

STAGESSteam blowing done in stages

• Stage-1a!- S"# MS$# %S&# temporar' lines

rom %S& to %(T&# %(T& to C)" line# C)" lines

upto boiler end with temporar' exhaust pipe.

• stage 1a end point will be concluded b'obser*ing the indents on the target plate.

Page 10: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 10/27

S!"#$% 'a(

Page 11: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 11/27

STAGE- 1(b)

S"#MS$# "+ b'pass inter connection# handoperated *al*e mounted in place o "+ b'pass*al*e and C)" lines upto ,oiler end withtemporar' exhaust piping.

n this stage to / blows will be gi*en through "+b'pass lines to ensure cleanliness o the limb.

%(T& will be 0ept closed. Manuall' (peratedsolation &al*es in "+ b'pass lines will be 0eptopened ull'.

Page 12: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 12/27

S!"#$% 'b(

Page 13: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 13/27

STAGE-2(a)

1a plus reheater# ")" lines # nterceptor&al*e and temporar' pipe.

C)" line along with attemperator shall bewelded with reheater beore start o stage a.$+ b'pass lines shall be blan0ed during stage

a. Stage a end point will be concluded b'obser*ing the indents on target plates

Page 14: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 14/27

S!"#$% )'a(

Page 15: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 15/27

STAGE- 2(b)

2a upto =; B .# bypass lines ith temporary

e!haust pipe1

  Stage 2b bloing ill be parallel blo in the

 path 2a & 2b1 .# *ypass blan's shall be remo$ed

for stage 2b1 blos ill be gi$en through .1#1

*ypass line to ensure cleanliness of the limbs

Page 16: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 16/27

STAGE- 2(b)

Page 17: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 17/27

TARGET PLATE•  8enerally Stainless steel panel

•  7arget plate set at the first si!th ninth telfth purging

thereafter set target for each purging until purging results

6ualified 1

•  @idth about ,C of the steam $ent tubes inner diameter5=)

and length e6ual to =

•  *rinell hardness D 4

•  Steam $elocity E 2", m/sec

•  7arget plates to be introduced Fust before steam bloing /

light upGto be remo$ed soon after bloing is completed1

Page 18: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 18/27

STEAM BLOWING COMPLETION

CRITERIA 

• At least 2 continuous target plates should not ha$e?R=+=0> 8RA:<.AR=7 on the target shall be not larger

than 41, mm

•  :o impacts ith a diameter larger than mm1

•  :ot more than impacts ith a diameter larger than 41"mm1

•  :ot more than 4 impacts ith a diameter of 412 to 41" mm1

Page 19: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 19/27

Page 20: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 20/27

Page 21: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 21/27

Page 22: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 22/27

Page 23: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 23/27

   F   i  n  a   l   !   "

   F   i  n  a   l   !   "

#!$ 

#!$ 

%artyr $& 

%artyr $& 

   "   '   (  y  p  a  s  s

CR" ine

CR" *R$  CR" +rain

'ot 

R" & "dr 

"R" ine

%!$ 

   )   '   (  y  p  a  s  s

-' !$ 

pen Close %artyr $ale

!team low ine

Temporary ine

're !tep / 0 %! ine !team lowing

   F   i  n  a   l   !   "

   F   i  n  a   l   !   "

#!$ 

#!$ 

%artyr $& 

%artyr $& 

   "   '   (  y  p  a  s  s

%! ine

CR" *R$  CR" +rain

'ot 

R" & "dr 

"R" ine

%!$ 

%!$ 

   )   '   (  y  p  a  s  s

-' !$ 

pen Close %artyr $ale

!team low ine

Temporary ine

're !tep / 0 %! ine !team lowing

'' $&

Page 24: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 24/27

   F   i  n  a   l   !   "

   F   i  n  a   l   !   "

#!$ 

#!$ 

%artyr $& 

%artyr $& 

   "   '   (  y  p  a  s  s

%! ine

CR" ine

CR" *R$  CR" +rain

'ot 

R" & "dr 

"R" ine

%!$ 

%!$ 

   )   '   (  y  p  a  s  s

-' !$ 

pen Close %artyr $ale

!team low ine

Temporary ine

're !tep 1 0 "'' & CR" ine !team lowing

Page 25: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 25/27

   F   i  n  a   l   !   "

   F   i  n  a   l   !   "

#!$ 

#!$ 

%artyr $& 

%artyr $& 

   "   '   (  y  p  a  s  s

%! ine

CR" ine

CR" *R$  CR" +rain

'ot 

R" & "dr 

"R" ine

%!$ 

%!$ 

   )   '   (  y  p  a  s  s

-' !$ 

pen Close %artyr $ale

!team low ine

Temporary ine

%ain !tep / 0 "R" ine !team lowing

Page 26: steamblowing-140909102821-phpapp02.ppsx

7/24/2019 steamblowing-140909102821-phpapp02.ppsx

http://slidepdf.com/reader/full/steamblowing-140909102821-phpapp02ppsx 26/27

   F   i  n  a   l   !   "

   F   i  n  a   l   !   "

#!$ 

#!$ 

%artyr $& 

%artyr $& 

   "   '   (  y  p  a  s  s

%! ine

CR" ine

CR" *R$  CR" +rain

'ot 

R" & "dr 

"R" ine

%!$ 

%!$ 

   )   '   (  y  p  a  s  s

-' !$ 

pen Close %artyr $ale

!team low ine

Temporary ine

%ain !tep 1 0'' ine !team lowing