Steam Bending Methods + Operations

22
TIMBER SEASONING SHELTER - STEAM BENDING METHODS + OPERATIONS DESIGN AND MAKE 2013 - OMRI MENASHE ARCHITECTURAL ASSOCIATION SCHOOL OF ARCHITECTURE

description

This portfolio was made in conjunction with the construction of the Timber Seasoning Shelter at Hooke Park, the Architectural Association School of Architecture's woodland campus.

Transcript of Steam Bending Methods + Operations

Page 1: Steam Bending Methods + Operations

TIMBER SEASONING SHELTER - STEAM BENDING METHODS + OPERATIONSDESIGN AND MAKE 2013 - OMRI MENASHEARCHITECTURAL ASSOCIATION SCHOOL OF ARCHITECTURE

Page 2: Steam Bending Methods + Operations

P L AT E S :

01. STEAM BENT RECIPROCATION02. FIXED JIG + VARIABLE JIG - CURVATURE DIFFERENTIATION03. JIG COMPARISON - SURFACE DIFFERENTIATION04. FIXED JIG - PARTS BREAK DOWN05. FIXED JIG - BENDING SEQUENCE06. VARIABLE JIG - COMPONENT D14 ALIGNMENT + BENDING SEQUENCE07. VARIABLE JIG - COMPONENT B13 ALIGNMENT + BENDING SEQUENCE08. VARIABLE JIG - EXPLODED PERSPECTIVE09. CURVATURE ANALYSIS - SHALLOW - SYMMETRICAL + ASYMMETRICAL CURVATURE10. CURVATURE ANALYSIS - DEEP - ASYMMETRICAL CURVATURE 11. VARIABLE JIG - BENDING SEQUENCE - TIME + FORCE 12. COMPRESSION STRAP - PARTS + BENDING SEQUENCE 13. OPERATIONAL SEQUENCE - STEAMING + BENDING + ASSEMBLY + SEASONING14. WOOD BURNER - PARTS + EXPLODED ASSEMBLY15. STEAMBOX AND WOOD BURNER - OPERATION16. STEAMBOX - BENDING SCHEDULE + TIMING OPERATION17. VARIABLE JIG - PROJECTION BOUNDARY + MOUNTING

APPENDICES

18. CYLINDER COMPARISON - TYPE 1 + 2 CYLINDER STROKE LENGTH 19. PARTS INVENTORY - BENDING JIG COMPONENTS + PNEUMATICS CONTROLS20. PARTS INVENTORY - BENDING JIG + STEAM BOX COMPONENTS - HARDWARE

Page 3: Steam Bending Methods + Operations

BASIC QUAD MEMBER OVERLAP

QUAD NOTCHED RECIPROCAL SYSTEM

PLANAR QUAD STEAM-BENT RECIPROCAL SYSTEM

TRIANGULATED HEXAGON OVERLAP

PLANAR CONNECTION TRI-HEX STEAM BENT RECIPROCAL SYSTEM

STEAMED JOINERY SOLUTIONS

UNSTEAMED TIMBER SYSTEMS

STRUCTURAL DEPTH

ADJUSTABLE PERPENDICULAR JOINT

Page 4: Steam Bending Methods + Operations

TYPE 1 FIXED CURVATURE.UNBENT ELEMENT. UNBENT ELEMENT. TYPE 1 VARIABLE CURVATURE. TYPE 2. TYPE 3. TYPE 4.

FIXED CURVATURE. VARIABLE CURVATURE.

Page 5: Steam Bending Methods + Operations

PLANAR SURFACE

FREE FORM SURFACEDOUBLE CURVATURE

IRREGULAR TOP AND BOTTOMMEMBERS

MIRRORED TOP AND BOTTOMMEMBERS

FIXED CYLINDERS AND BLOCKING

ADJUSTABLE CYLINDERS AND BLOCKING

Page 6: Steam Bending Methods + Operations

FIXED BASE

500

420

340

FB - 1

260

180

100

FIXED CENTERDATUM BLOCK

CENTER SUPPORTBLOCK

CENT X

CENT Y

FB - 2 FB - 2

FB -1

FB - 3 FB - 3

FB - 4 FB - 4

CYLINDER CONTROLON / OFF

ELECTRICAL CONTROLON / OFF

CFB - 1 CFB - 1

CFB - 2 CFB - 2

CFB - 3 CFB - 3

CFB - 4 CFB - 4

CFB - 5 CFB - 5

ROTATIONAL DISPLACEMENT

2 PHASE DROP - IN CYLINDERS

Page 7: Steam Bending Methods + Operations

STAGE 1 - STEAMED TIMBER PLACED IN JIG

STAGE 2 - PHASE ONE CYLINDERS ENGAGED - FIRST BEND

STAGE 3 - PHASE TWO CYLINDERS ENGAGED - RECURVE BEND

ALIGNMENT - SINGLE MEMBERS COMBINED AND VERIFIED

CLAMPING - COMPONENT POSITIONING FOR DRILLING

DRILLING - CENTRE AND EDGE POINTS

SECURE - BOLT THE COMPONENT 20 MM ROD AND NUT

PHASE ONE CYLINDERS

PHASE TWO CYLINDERS

PLANAR PROTOTYPE PRODUCTION

Page 8: Steam Bending Methods + Operations

D12TOP

340

B1 - T5

180

B1 - T4

420

260

B2 - T3

180

B1 - T3

2.1100

500

100

260

2.16

420

D14

BASE RIGHT

100

180

BASE LEFT

BASE CENT

260

100

420

B1 - T1

340

500

B2 - T1

500

B3 - T1

420

B4 - T1

500

340

B1 - T2

180

340

B2 - T2

260

CEN Y

D16

B1 - T6

ACTUATOR STROKE

ACTUATOR ROTATIONAL DISPLACEMENT

PHASE 1 - SITUATIONAL ALIGNMENT PHASE 2 - PNEUMATIC BENDING

BASE CENT

D142.16

2.1

TOP

CAR 5

D12

B2 - T2

340

B2 - T3

B1 - T2

D16

260

B1 - T4

B4 - T1

500

420

C5

340

B1 - T5B3 - T1B2 - T1

CAR 3

B1 - T1

B1 - T6

260

180

180

CEN X

100

C3

100

180

260

340

420

500

100

BASE RIGHT

180

BASE LEFT

100

260

CAR 4

CAR 2

C1

B1 - T3

340

C4

420

CAR 1

500 500

420

CEN Y

C2

Page 9: Steam Bending Methods + Operations

3.16 180

B3 - T1

100

B1 - T3

BASE LEFT

340

CAR 4

B1 - T4

260

500

B2 - T2

420

D13

C4

B1 - T2

B1 - T1

500

100CEN X

340

100

500

340

B2 - T3

BASE CENT

B2 - T1

260

180

B4 - T1

340

3.13

500

180

C2

420

B13

CAR 2

C3

420

420

B1 - T5

100

CAR 3

C5

260 260

B1 - T6

CAR 5

180

CEN Y

BASE RIGHT

CAR 1

TOP

C1

C1C2

C3C4

C5

PHASE 1 - SITUATIONAL ALIGNMENT

CENTRAL CLAMP CYLINDER

SOLENOID VALVE BANK

SOLENOID VALVE BANKCONTROL SWITCHES

SOLENOID VALVE BANKCONTROL SWITCHES

Page 10: Steam Bending Methods + Operations

PNEUMATIC CYLINDERPRESSURE = 8 BAR MAX.O 80mm - 320mm STROKE

12MM THREADED RODZINC PLATED

CYLINDER CARRIAGE90mm x 125mm x 25mm

KERTO CYLINDER END BLOCK120MM x 94MMMADE UP 2 x 55MM

CYLINDER HEAD TUBE120MM x O 100MM

JIG SUPPORT BEAM70MM x 110MM x 3000MM

12MM THREADED RODZINC PLATED

JIG SUPPORT JOISTS70MM x 110MM x 2360MM

KERTO CURVATUREBLOCKING 3 x 55MM

12MM THREADED RODZINC PLATED

12MM NUT & WASHERZINC PLATED

Page 11: Steam Bending Methods + Operations

SYMMETRICAL

TENSION

COMPRESSION

D11

B113.11

3.14

TOP

B7

D7

2.58

2.61TOP

F4

F2

1.68

1.73

TOP

ASYMMETRICAL

ASYMMETRICAL

A B C D E F G H I J

1

2

3

4

5

6

A B C D E F G H I J

1

2

3

4

5

6

Page 12: Steam Bending Methods + Operations

C13

E11

TENSION

COMPRESSION

2.13

2.06TOP

H28

H26

H24

1.93

2.08

TOP

B30

B32 B282.31

2.07

TOP

ASYMMETRICAL

ASYMMETRICAL

ASYMMETRICAL

1

2

3

4

5

6

1

2

3

4

5

6

A B C D E F G H I OJ K L M N

A B C D E F G H I OJ K L M N

Page 13: Steam Bending Methods + Operations

TOP

2.08

1.93

H24

H26

H28

T = 0

T = 0.15

T = 0.25

T = 0.35

T = 0.45

kg = 0

kg = 4000

kg = 800

kg = 1600

kg = 2400

kg = 3200 T = 0.50

Page 14: Steam Bending Methods + Operations

H26

H24H28

2.08

1.93

TOP

B30

B32

B282.07

2.31

TOP

F4F21.73

1.68

TOP

B7D7 2.61

2.58

TOP

D11B11

3.11

3.14

TOP

E11C13

2.13

2.06

TOP

RECURVE SUPPORT STRAP

SINGLE FACE SUPPORT STRAP

1MM STAINLESS STEEL

1MM STAINLESS STEEL

20 MM THREADED ROD

PARALLELOGRAM CLAMP

HIGH TENSION

HIGH TENSION

HIGH TENSION

HIGH TENSION

HIGH TENSION

COMPRESSION END - STOP

COMPRESSION END - STOP

COMPRESSION END - STOP

COMPRESSION END - STOP

CLAMPING ROTATION

CLAMPING ROTATION

Page 15: Steam Bending Methods + Operations

A. B. C.D.

100 DEG.10 - 20 DEG.

STEAMING

PREPARATION + SELECTION

BENDING SEASONING

ASSEMBLY

3000

140

35

3000

140

35

NEUTRAL AXIS

M.C. - 65% +

M.C. - 20% +

Page 16: Steam Bending Methods + Operations

FIRE CHAMBER

HEADER TANK

BOILER CHAMBER

EXHAUST CHIMNEY

FIRE DOOR

STEAM OUTPUT

STOVE SUPPORT

WOOD BURNING STEAMER

WOOD BURNING STEAMER

EXHAUST CHIMNEYO 100 MM

STEAM OUTPUTO 15 MM

FIRE CHAMBER19 KG TANK

BOILER CHAMBER9 KG TANK

HEADER TANK9 KG TANK

Page 17: Steam Bending Methods + Operations

1. GATHER WOOD FOR BURNING2. LIGHT FIRE IN MAIN CHAMBER3. FILL HEADER TANK4. OPEN FILL VALVE5. FILL BOILER6. CONNECT TO STEAMBOXCAUTION - STEAM EXHAUST & FIRE CHAMBER BECOME EXTREMELY HOT

3.

5. 6.

2.

BOILER CHAMBER

FIRE CHAMBER

HEADER TANK

EXHAUST CHIMNEY

STEAM OUTPUT

STOVE SUPPORT4.

300 mm DOUBLE WALL DRAINAGE PIPE

STEAMBOX SUPPORT STAND

STEAMBOX DOOR ACCESS AND END CAP

UNSTEAMED MEMBER 35 MM X 140MM X 3000MM

Page 18: Steam Bending Methods + Operations

STEAMBOX 1

STEAMBOX 2

TSS DAILY STEAM LOG :date

member length

DAILY MATERIAL SUMMARY: min lengths

position time in: box # time out: +90 minutes

:FIRE STARTED

:STEAM READY

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

COMPONENT NODE (EXISTING ABOVE NEIGHBORS)

COMPONENT NODE (EXISTING BELOW NEIGHBORS)

GROUPING REGION

A3.0MEMBRANE EXTENSION AT NODE

UV UNROLLED COMPONENT LAYOUT KEYGS

17 JULY 2013

mm, UON

TSS

TIMBER SEASONING SHELTER

Architectural AssociationSchool of Architecture

MArch Design & Make2012/2013

Hooke ParkBeaminster, DorsetUK, DT8 3PH

t: 01308 863 588f: 01308 863 226e: [email protected]

UNROLLEDSURFACECOMPONENTLAYOUT

Dwg Title

Drawn by

ProjectDateScale

Units COLUMN CONNECTION AT NODE

GRID ORIENTATION

A

#

GRID ORIENTATION

A

#REGION W

REGION X

REGION Y

REGION Z

3231

30 2928 27 26 25 24 23 22 21 20 19 18 17 16 15

1413

12 1110

98

7

65

B

B

A

A

C

C

D

D

E

E

F

F

G

G

H

HH

I

I

B

A

C

D

E

F

G

I

32

31

30

8

1213142021222324252629 28 27 19 18 17 16 15 11 10 97 6 5 4 3 2 1

:page

T: T: T:

T: T:

B: B: B:

B: B:

E21 F19 H18F20 G19 H17

2.52 2.802.78

2.60 2.53 2.73T:

2.452.48

2.56 2.57 2.76B:

2.49

7

60 MIN.

30 MIN.

15 MIN.45 MIN.

READY TO BENDINSERT INTO STEAMBOX

60 MIN.

30 MIN.

15 MIN.45 MIN.75 MIN.

90 MIN.

0 MIN. 90 MIN.45 MIN.

30 MIN.

Page 19: Steam Bending Methods + Operations

CAR 3

B1 - T4

500

500

BASE RIGHT

420

C4

B2 - T3

340

B1 - T3

500

BASE LEFT

260

340

CEN X

B1 - T1

260

C2

420

180

340

B2 - T1

100 100

B3 - T1

CAR 1

B4 - T1

420

B1 - T2

C5

260

180

180

B2 - T2

BASE CENT

100

CAR 2

260

340

100

CAR 5

CEN Y

180

420

CAR 4

B1 - T6

500

C3

B1 - T5

PROJECTOR CARRIAGE

PROJECTOR CARRIAGEROTATION RANGE - SERVICING 0

5000 mm

Page 20: Steam Bending Methods + Operations

PNEUMATIC CYLINDERSTROKE - 110 MMBORE O - 40 MMMAX PRESSURE: 8 BAR

TYPE 1.

0

50

100

150

0 180

160

0

320

0 320

PNEUMATIC CYLINDERSTROKE - 320 MMBORE O - 80 MMMAX PRESSURE: 8 BAR

TYPE 2.FULL EXTENSION RETRACTED

FULL EXTENSION RETRACTED

RETRACTED

FULL EXTENSION

FULL EXTENSION

RETRACTED

CAST ALUMINUM BODY STEEL SHAFT

CYLINDER MOUNTS

Page 21: Steam Bending Methods + Operations

PNEUMATIC CYLINDERSTROKE - 110 MMBORE O - 40 MM

PNEUMATIC CYLINDERSTROKE - 320 MMBORE O - 80 MM

PNEUMATIC COUPLING6 MM

PNEUMATIC 906 MM PNEUMATIC TEE

6 MM

PNEUMATIC THREADED 906 MM

TYPE 1. TYPE 2.

FITTINGS

ACTUATORS

BENDING JIG COMPONENTS - PNEUMATICS & CONTROLS

PNEUMATIC HOSEVARIOUS SIZES6 MM8 MM10 MM

ELECTRICAL SWITCHTWO - WAY. ON / OFF

PNEUMATIC SOLENOID VALVE BANK10 MM & 8 MM INPUT6 MM OUTPUT

Page 22: Steam Bending Methods + Operations

BENDING JIG & STEAM BOX COMPONENTS - HARDWARE

TIMBERLOCK75 MM100 MM125 MM150 MM

GALVANIZED THREADED ROD M 10M 12

GALVANIZED NUT M 10M 12

WASHERS M 10M 12

CAST PROPANE TANKS 10 KG19 KG

MILLED STEEL TUBE O - 25 MM

TWIN WALLED DRAINAGE PIPE O - 300 MM3000 MM

KERTO BLOCKS - VARIOUS SIZES 40 MM55 MM60 MM