Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS
ConsortiumJINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)-GSI
Task sharingLeading organization, assembling and QA
including in-beam tests
Assembling of modules and in-beam tests
Microcables, assembling of modules
Ultra light carbon fiber support and cooling, radiation test center
Double sided microstrip sensors and their QA
Cooling system design and prototyping
FEE and sensitive material supplies
The base ingredients for success
IBM==Igolkin+Borshchov+Merkin
Access to Russian funding
Recruiting of creative young people
Cooperation within IBM
Access to Radiation Test and in-beam test Facility
On the Road to CBM STS
2008 Tasks and their sharing
Technical design and production of CF support and cooling elements @SPbSU & KRI - Igolkin’s talk +
Establishing DSSDs production line @ SINP & ELMA – Merkin’s talk -
Development of n-irradiation site @KRI 20 MeV cyclotron + Murin’s (Jakovlev-Lashaev) talk Upgrading prototypes testing bench with collimated Ru-106 betas @
JINR + Organizing the in-beam testing site @ Protvino + Development of microcables prototypes @ Kharkov + Procenko’s talk Development of assembling site @ Russia (Protvino or/and Dubna) + Application for budgeting + Networking @ JINR or ITEP
Technical design and production of CF support and cooling elements @SPbSU & KRI ( S.N. Igolkin)
Details are in Sergey Igolkin’s talk
Establishing DSSDs production line @ SINP & ELMA( M.M. Merkin)
Details are in Michael Merkin’s talk
Development of n-irradiation testing site @KRI 20 MeV cyclotron
(V.A. Jakovlev, S.I.Lashaev (KRI)+D.E.Karmanov, M.G.Korolev(SINP) supported
by KRI Cyclotron Lab ) Зависимость напряжения полного обеднения от
интегрального потока нейтронов (в пересчёте на энергию нейтронов 1МэВ)
0
50
100
150
200
0 2E+12 4E+12 6E+12 8E+12 1E+13
Интегральный поток (n/см2)V
fdv
(В)
Vfd(init)=20VVfd(init)=30VFit
Equipment is purchased and implementedNeutron field studies done but need to be
confirmedFirst batch of one sided pad diods were
irradiated and analysed
Building Prototypes testing bench with Ru-106 betas @ JINR ( P.V. Nomokonov)
URGENT NEED: n-XITER FEE electronics + demonstrators
Current Activity:
Preparation of infrastucture and transition to N-xyter electronics and DAQ
Auxiliary electronics for demonstrator tests in 2009 on the way
Organizing the in-beam testing site @ Protvino
First run with Demonstrator-Zero-B is scheduled for 19.11-1.12.2008
final preparations are on the way
SVD-2 setup at IHEP/ 50 GeV protons with intensity up to 106/ spill
Development of microcables prototypes @ Kharkov
( V.N. Borshchov )
Demonstrator-Zero-B – talk of M.Procenko
Development of assembling site @ Russia (Protvino or Dubna or ?)
The next Step: visiting existing ALICE assembling sites at Strassburg (done) and/or Utrecht ( rescheduled for 2009)
To improve networking in FSU countries participating institutes (Skype to every member organization !)
Application for the support of the
3-d Work Meeting of the Consortium (together with MVD ?) in Sortavala, Karelia, June 1-4th,2009 (ready)
Milestones of the 2009 Work plan
Cooling Scheme Demonstrator ?
Demonstrator 1–A (technological) 1-B (electrical) 1-C (final)
Description: Three 1024 strip sensors connected serially
+short Al cable with pitch adapter
Demonstrator 2–A (technological) 2-B (electrical) 2-C (final)
Description: One 1024 strip sensor +long Al cable with pitch adapter
Ladder Demonstrator
Description: full scale mechanical dummy of the 4-th STS station (noncentral!)
In-Beam test time table ? In-Beam test time table for 2009 ?
(Protvino(April); Nuclotron (?) GSI(?)) Urgent need: Hybrid input pitch ?