Status of the oSLB project Jose C. Da SILVA LIP-Lisbon
description
Transcript of Status of the oSLB project Jose C. Da SILVA LIP-Lisbon
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
Status of the oSLB project
Jose C. Da SILVALIP-Lisbon
1
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
SLB Basic Connection
2
Trigger Main Board
1 to 9 SLBs(EB)
3 or 4 (EE)
SLB-TXABCD
4 x 1.2Gb cables
RCTReceiver
Card(present)
SLB-RXABCD
SLB-TXABCD
SLB-RXABCD
SLB-TXAB (CD)
SLB-RXAB(CD)
SLB-TXABCD
SLB-RXABCD
… …
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
RCTuTCA
Receiver Card
Adopted oSLB solution for ECAL
RCTReceiver
Card
3
ECAL EB/EETCC Board
9 SLBs (EB)3 or 4 SLBs (EE)
oSLBABCD1
Replace 2 SLBs by one “2slot” oSLB Using 4.8Gb modules
2x4.8Gb16TT
2x4.8GbspareoSLB
ABCD2
oSLBABCD3
1or 2 4.8Gb16TT
2or 3 4.8Gbspare
SLBAB(CD)4
oRMABCD
…oRM
ABCD
OptoPP
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
oSLB “hot points”
4
• Xloom optical solution under study:• 4 TX - 4RX (up to 5Gbps) 500 EURO/Piece
• Pro’s:• mechanics, number of channels (4 tx/rx @ 5gbps) • Israeli-CERN fund for (partial) payment || END||
• Open window to study TX or RX versions • Con’s: • Small company issues• Still poor input on these devices (ongoing)
• Xloom devices production received(4 units)• BER measurement tests to be done
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
oSLB “hot points”
5
• Fujitsu “microgiga” optical solution under study:• 4 TX - 4RX (up to 5Gbps) 255 EURO/Piece (!)
• Pro’s:• Price • mechanics, number of channels (4 tx/rx @ 5gbps) • Optical Module External to the oSLB • Fujitsu “company name” (2000 units sold)
• Con’s: • Infiniband connector dimensions• Modification on front panels mechanics of TCCs
• Fujitsu components ordered (4 units) • BER measurement tests to be done
IMPORTANT :• Both solutions have the same Footprint on the SLBs
Artist view of an SLB + microGigaCN solution
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
Production count :
• produce ONLY the final count (ECAL) of oSLBs + spares
• 1 to 1 = 324 EB, 252 EE (576)• 2 or 1 = 180 EB , 180 EE (360) = ~200 Links gain!!• 3 or 2 = 108 EB (3), 144(2) EE (252) = ~320 Links gain!!
• (~500-700 euros savings per oSLB)
• Cost effective! • ~200Euro/ oSLB + 255 USD /microgiga adaptor
• Cost estimate:~ 500 Euro / oSLB/optics• + 30K USD for optical bundles and adaptors
• production covers the ECAL final needs (400Pcs)
RCT/uTCA
GCT/uTCA
GT/GMT
ETCC:TPGs
uTCA-HTR:TPGs
oSLB
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
Upgrade step 1
7
RegionalCalorimeter
Trigger
HCAL uHTR Cards
(Q2 2013 (?)
ECAL TCCs
SLHCRCT
Cal TriggerProcessor
Cards(Q2 2012)
ORMs(Q4 2012)
HCAL FE Optical
Indiv. Fibers (LC)
To DAQ
Via BU“AMC13”
To DAQ
Via GCT
HCAL HTR Cards
HCAL Trigger
PrimitiveOpticalSplitter
(Q?)
RXsoSLBs
(Q2 2013)
Optical Ribbons
(Proto validation Q3 2012)(Series Q4 2012-Q2 2013)
ECAL Trigger
PrimitiveOptical
Patch Panel(Q2 2012)
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
TPG High speed links overview
8
RegionalCalorimeter
Trigger
HCAL uHTR Cards
ECAL TCCs
SLHCRCT
Cal TriggerProcessor
CardsOptic
al Ribbon
s
oSLBsORMs
TriggerPrimitiveOptical
Patch Panel
Optical Ribbons
Indiv. Fibers (LC)
Optical R
ibbons
To DAQ
Via BU“AMC13”
To DAQ
Via GCT
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
Optical PP connections
9
OptoPP
Replace 2 SLBs by one 2slots oSLB Using 4.8Gb modules
oRMABCD
oSLBABCD1
2x4.8Gb16TT
2x4.8GbspareoSLB
ABCD2
oRMABCDoRMABCDoRMABCDoRMABCDoRMABCDoRMABCD
1x4.8Gb8TTLC
oSLBABCDn
oSLBABCDn
oSLBABCDn
RCT/uTCA
4 outputs@5Gbps 1 input
@5Gbps
HTR -uTCAABCDn
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
Optical PP : MTP/LC/MTP
10
• MTP 12 to LC to MTP12 optical adaptors to match SLB-RCT inputs
• Xloom device has guide pins (MTP “female” bundle)• Cost (based on 2007 prices)• 12-way fan-out 3 or 10 meters – ~350 USD/each• 12-way adapters – 65 USD/each
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011
oSLB design and Schedule
11
• “Dual input” SLB Layout
• Use latest FPGA technology : Artix 7• 3v3 Compatible with present design • Reduced impact on design • Reduce costs <200 USD / Artix 7
• Artix 7 Available in May 2012
• Rev A Prototype validation up to August 2012 (10 units)• SLB test bench installation in 904 (started)• Integration with TCCs and oRMS -> Oct-Dec 2012 (904) • RevB ?
• oSLB production done in June 2013 ( ~6 months) *• P5 installation from August 2013 onwards
* If LHC machine operation schedule changes we SHOULD delay the oSLB production
José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011 12
Next steps:
• Bought 4 components (Israeli – Cern Fund)
• Bought 4 microGigaCN devices (Fujitsu)
• Dev kit from Xilinx (optical receiver)
• 2 slots oSLB design for Artix-7 Device
• oRM dual SFP design looks the best choice to match the oSLB
• Validation of the optical devices @ 5Gbps (ongoing)
• Production costs funding
WG twiki : https://twiki.cern.ch/twiki/bin/viewauth/CMS/ECALSLBOptical