Status of the oSLB project Jose C. Da SILVA LIP-Lisbon

12
José C. Da Silva CMS Upgrade Week Workshop, 7 -10 November 2011 Status of the oSLB project Jose C. Da SILVA LIP-Lisbon 1

description

Status of the oSLB project Jose C. Da SILVA LIP-Lisbon. SLB Basic Connection. 4 x 1.2Gb cables. Trigger Main Board 1 to 9 SLBs (EB) 3 or 4 (EE). RCT Receiver Card (present). SLB-TX ABCD. SLB-RX ABCD. SLB-TX ABCD. SLB-RX ABCD. …. …. SLB-TX ABCD. SLB-RX ABCD. SLB-TX - PowerPoint PPT Presentation

Transcript of Status of the oSLB project Jose C. Da SILVA LIP-Lisbon

Page 1: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

Status of the oSLB project

Jose C. Da SILVALIP-Lisbon

1

Page 2: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

SLB Basic Connection

2

Trigger Main Board

1 to 9 SLBs(EB)

3 or 4 (EE)

SLB-TXABCD

4 x 1.2Gb cables

RCTReceiver

Card(present)

SLB-RXABCD

SLB-TXABCD

SLB-RXABCD

SLB-TXAB (CD)

SLB-RXAB(CD)

SLB-TXABCD

SLB-RXABCD

… …

Page 3: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

RCTuTCA

Receiver Card

Adopted oSLB solution for ECAL

RCTReceiver

Card

3

ECAL EB/EETCC Board

9 SLBs (EB)3 or 4 SLBs (EE)

oSLBABCD1

Replace 2 SLBs by one “2slot” oSLB Using 4.8Gb modules

2x4.8Gb16TT

2x4.8GbspareoSLB

ABCD2

oSLBABCD3

1or 2 4.8Gb16TT

2or 3 4.8Gbspare

SLBAB(CD)4

oRMABCD

…oRM

ABCD

OptoPP

Page 4: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

oSLB “hot points”

4

• Xloom optical solution under study:• 4 TX - 4RX (up to 5Gbps) 500 EURO/Piece

• Pro’s:• mechanics, number of channels (4 tx/rx @ 5gbps) • Israeli-CERN fund for (partial) payment || END||

• Open window to study TX or RX versions • Con’s: • Small company issues• Still poor input on these devices (ongoing)

• Xloom devices production received(4 units)• BER measurement tests to be done

Page 5: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

oSLB “hot points”

5

• Fujitsu “microgiga” optical solution under study:• 4 TX - 4RX (up to 5Gbps) 255 EURO/Piece (!)

• Pro’s:• Price • mechanics, number of channels (4 tx/rx @ 5gbps) • Optical Module External to the oSLB • Fujitsu “company name” (2000 units sold)

• Con’s: • Infiniband connector dimensions• Modification on front panels mechanics of TCCs

• Fujitsu components ordered (4 units) • BER measurement tests to be done

IMPORTANT :• Both solutions have the same Footprint on the SLBs

Artist view of an SLB + microGigaCN solution

Page 6: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

Production count :

• produce ONLY the final count (ECAL) of oSLBs + spares

• 1 to 1 = 324 EB, 252 EE (576)• 2 or 1 = 180 EB , 180 EE (360) = ~200 Links gain!!• 3 or 2 = 108 EB (3), 144(2) EE (252) = ~320 Links gain!!

• (~500-700 euros savings per oSLB)

• Cost effective! • ~200Euro/ oSLB + 255 USD /microgiga adaptor

• Cost estimate:~ 500 Euro / oSLB/optics• + 30K USD for optical bundles and adaptors

• production covers the ECAL final needs (400Pcs)

RCT/uTCA

GCT/uTCA

GT/GMT

ETCC:TPGs

uTCA-HTR:TPGs

oSLB

Page 7: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

Upgrade step 1

7

RegionalCalorimeter

Trigger

HCAL uHTR Cards

(Q2 2013 (?)

ECAL TCCs

SLHCRCT

Cal TriggerProcessor

Cards(Q2 2012)

ORMs(Q4 2012)

HCAL FE Optical

Indiv. Fibers (LC)

To DAQ

Via BU“AMC13”

To DAQ

Via GCT

HCAL HTR Cards

HCAL Trigger

PrimitiveOpticalSplitter

(Q?)

RXsoSLBs

(Q2 2013)

Optical Ribbons

(Proto validation Q3 2012)(Series Q4 2012-Q2 2013)

ECAL Trigger

PrimitiveOptical

Patch Panel(Q2 2012)

Page 8: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

TPG High speed links overview

8

RegionalCalorimeter

Trigger

HCAL uHTR Cards

ECAL TCCs

SLHCRCT

Cal TriggerProcessor

CardsOptic

al Ribbon

s

oSLBsORMs

TriggerPrimitiveOptical

Patch Panel

Optical Ribbons

Indiv. Fibers (LC)

Optical R

ibbons

To DAQ

Via BU“AMC13”

To DAQ

Via GCT

Page 9: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

Optical PP connections

9

OptoPP

Replace 2 SLBs by one 2slots oSLB Using 4.8Gb modules

oRMABCD

oSLBABCD1

2x4.8Gb16TT

2x4.8GbspareoSLB

ABCD2

oRMABCDoRMABCDoRMABCDoRMABCDoRMABCDoRMABCD

1x4.8Gb8TTLC

oSLBABCDn

oSLBABCDn

oSLBABCDn

RCT/uTCA

4 outputs@5Gbps 1 input

@5Gbps

HTR -uTCAABCDn

Page 10: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

Optical PP : MTP/LC/MTP

10

• MTP 12 to LC to MTP12 optical adaptors to match SLB-RCT inputs

• Xloom device has guide pins (MTP “female” bundle)• Cost (based on 2007 prices)• 12-way fan-out 3 or 10 meters – ~350 USD/each• 12-way adapters – 65 USD/each

Page 11: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011

oSLB design and Schedule

11

• “Dual input” SLB Layout

• Use latest FPGA technology : Artix 7• 3v3 Compatible with present design • Reduced impact on design • Reduce costs <200 USD / Artix 7

• Artix 7 Available in May 2012

• Rev A Prototype validation up to August 2012 (10 units)• SLB test bench installation in 904 (started)• Integration with TCCs and oRMS -> Oct-Dec 2012 (904) • RevB ?

• oSLB production done in June 2013 ( ~6 months) *• P5 installation from August 2013 onwards

* If LHC machine operation schedule changes we SHOULD delay the oSLB production

Page 12: Status of the  oSLB  project Jose C. Da SILVA LIP-Lisbon

José C. Da SilvaCMS Upgrade Week Workshop, 7 -10 November 2011 12

Next steps:

• Bought 4 components (Israeli – Cern Fund)

• Bought 4 microGigaCN devices (Fujitsu)

• Dev kit from Xilinx (optical receiver)

• 2 slots oSLB design for Artix-7 Device

• oRM dual SFP design looks the best choice to match the oSLB

• Validation of the optical devices @ 5Gbps (ongoing)

• Production costs funding

WG twiki : https://twiki.cern.ch/twiki/bin/viewauth/CMS/ECALSLBOptical