LBDS Audit Follow-up Jan Uythoven Thanks to: Etienne Carlier and Brennan Goddard 1.
Status of the LSS5 beam dump and proposed relocation of LSS5 systems Etienne Carlier on behalf of...
-
Upload
aubrey-higgins -
Category
Documents
-
view
214 -
download
0
description
LSS5 Internal Beam Dump – Optics 3 MKDVs One upstream the QD.517 and two after (better use of kicker strength) Better dynamic range 3 MKDHs As today New MKDH & MKDV tracking functions Better use SPS apertures Single dump for all energies and beam types No low energy TIDH dump Francesco Velotti (TE-ABT) (3oo3)(2oo3)