42
STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT BASIC INFORMATION Name of the Local Body and address Jalgaon Municipal Corporation, Mahatma Gandhi Road, Nehru Chowk, Jalgaon, Tal. & Dist. Jalgaon Name of the facility operator( municipal corporation/council/outside agencies or both) M/s. Hanjer Biotech Energies (Jalgaon) Pvt. Ltd. Nodal Officer and designation with Telephone No. with mobile no. and e-mail id Shri. Sanjay Kapadnis, Commissioner Jalgaon Municipal Corporation, Jalgaon. Tel: 0257 -2222261 to 65 Extn. 133 Mobile 09422927408 Email: [email protected] Population 467000 Generation of the MSW per day (T/D) 220 Quantity of Treated MSW per day (T/D) 220 DETAILS OF SITE (APPROVED) Name of approved site as per District Collector Site Selection Committee Gat No. 864, Avahane Shivar, Tal. & Dist. Jalgaon. Authorisation obtained for approved site and validity Yes, Authorization obtained and valid up to 31/03/2017 Approved site is used for MSW Collection, Segregation, Processing & Land filling Area of the Site(acres) 4 FACILITY AT APPROVED SITE Quantity ( MT/D) Name of Operator Dumping M/s. Hanjer Biotech Energies (Jalgaon) Pvt. Ltd Segregation 220 landfill 60 Composting 85 Vermi composting RDF/Pelletisation 75 Bio-methanation Waste to Energy DETAILS OF SITE ( NON-APPROVED) Name of non approved site NA Authorisation obtained for non approved site and validity NA Non approved site is used for MSW NA Area of the Site (acres) NA FACILITY AT NON APPROVED SITE Quantity ( MT/D) Name of Operator Dumping NA Segregation NA landfill NA Composting NA Vermi composting NA RDF/Pelletisation NA Bio-methanation NA Waste to Energy NA 85

Transcript of STATUS OF MUNICIPAL SOLID WASTE MANAGEMENTmpcb.gov.in/ereports/pdf/Mumbai Booklet Final All 171...

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Jalgaon Municipal Corporation, Mahatma Gandhi

Road, Nehru Chowk, Jalgaon, Tal. & Dist. Jalgaon

Name of the facility operator( municipal

corporation/council/outside agencies or both)

M/s. Hanjer Biotech Energies (Jalgaon) Pvt. Ltd.

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Shri. Sanjay Kapadnis,

Commissioner

Jalgaon Municipal Corporation, Jalgaon.

Tel: 0257 -2222261 to 65 Extn. 133

Mobile 09422927408

Email: [email protected]

Population 467000

Generation of the MSW per day (T/D) 220

Quantity of Treated MSW per day (T/D) 220

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

Gat No. 864, Avahane Shivar, Tal. & Dist. Jalgaon.

Authorisation obtained for approved site and

validity

Yes, Authorization obtained and valid up to

31/03/2017

Approved site is used for MSW Collection, Segregation, Processing & Land filling

Area of the Site(acres) 4

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping

M/s. Hanjer Biotech

Energies (Jalgaon) Pvt.

Ltd

Segregation 220

landfill 60

Composting 85

Vermi composting

RDF/Pelletisation 75

Bio-methanation

Waste to Energy

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site NA

Authorisation obtained for non approved site and

validity

NA

Non approved site is used for MSW NA

Area of the Site (acres) NA

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping NA

Segregation NA

landfill NA

Composting NA

Vermi composting NA

RDF/Pelletisation NA

Bio-methanation NA

Waste to Energy NA

85

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site Gat No. 864, Avahane Shivar, Tal. & Dist. Jalgaon.

Area of the Site (acres) 4 Acres

Authorisation for this site Yes, Autorization obtained and valid up to

31/03/2017

Present mode of treatment disposal Dumping only

Processing plant whether Provided/Not

Provided/Under Progress

Provided

Whether processing facility/plant is in operation

or not (Yes/No)

Not in operation

If applied for authorisation mention present status Valid Autorization

If existing site is exhausted, steps taken for

closure.

NA

New site is identified for MSW and status NA

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for securing

compliances as per schedule given

in the High Court Order

dtd.02/04/2013(please go

through action plan mention in

the High Court Order

dtd.02/04/2013)

Present Status of

compliance

Setting up of waste processing

& disposal facilities

Provided -- Installation is

completed by the

Municipal

Corporation but

presently site is

not in operation

due to the dispute

between JMC and

Operator.

improvement of existing

landfill sites as per provisions

is undertaken

NA -- --

Identification of landfill sites

for future use & making site(s)

ready for operation

NA -- --

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

NA

Whether applied for new site NA

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant its

status

NA

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

NA

Whether site which has exceeded capacity is

closed down

NA

86

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

NA

If not, whether the compost plant is closed NA

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not NA

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

NA

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

NA

If yes, attached the copy. --

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B.G.Details)

Direction issued by RO, Nashik Vide

MPCB/RONK/MSW/Dir – 747/1176/2013 Dtd.

30/04/2013 and accordingly this office has sent

proposal to RO Nashik vide No. 1684 dated

12/09/2013 and requested to forfeit the BG of Rs.

5.0 lakhs for the non-compliances and not in

operation of facility due to the dispute between

JMC and operator.

B.G.Details

a. Obtain

b. Forfeited

a. Rs. 5.0 lakhs which is valid up to

31/03/2017

b. NA

Any court cases pending No

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped, Covered, Idle)

No

Comments Presently MSW facility is not in operation due to

dispute between JMC and Operator and collected

MSW waste is dumping on site only.

Note: If no. of sites are more than one, please attach separate sheet.

87

JALGAON (AVHANE SHIVAR) MSW PROCESSING SITE

88

JALGAON (AVHANE SHIVAR) MSW PROCESSING SITE

89

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address M/s Ahmednagar Municipal Corporation

Ahmednagar

Near DSP Chouk, Nagar Aurangabad Road,

AhmednagarTq/Dist- Ahmednagar

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Corporation

Nodal Officer and designation with Telephone

No. with mobile no. and e-mail id

Shri Vijay Kulkarni

Commissioner

M - Office Tel – 0241– 2343622, 2345127 Fax –

0241 2328837

email –[email protected]

Population 346755 Souls

Generation of the MSW per day (T/D) 125

Quantity of Treated MSW per day (T/D) NIL

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

S.No. 34, Vill- Burudgaon Tal/Dist -Ahmednagar

Authorisation obtained for approved site and

validity

BO/MSWA/B-330 Dated 22.01.2014 Valid up to

31.12.2014.

Approved site is used for MSW Yes

Area of the Site(acres) 20

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping 125 AMC

Segregation ----

landfill -----

Composting -----

Vermi composting ----

RDF/Pelletisation ---

Bio-methanation ----

Waste to Energy -----

DETAILS OF SITE ( NON-APPROVED)

Name of non-approved site Savedi, S. No 289

Authorisation obtained for non-approved site

and validity

No

Non approved site is used for MSW NO

Area of the Site (acres) 10

90

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping ----

Segregation ----

landfill ----

Composting ----

Vermi composting ----

RDF/Pelletisation ----

Bio-methanation ----

Waste to Energy ----

CURRENTPRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site S.No. 34, Vill-Burudgaon Tal/Dist -Ahmednagar

Area of the Site (acres) 20

Authorisation for this site Valid up to 31.12.2014

Present mode of treatment disposal Open Dumping without any treatment

Processing plant whether Provided/Not

Provided/Under Progress

Not Provided

If applied for authorisation mention present

status

Up to 31.12.2014.

If existing site is exhausted, steps taken for

closure.

------

New site is identified for MSW and status -----

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for

securing compliances as per

schedule given in the High Court

Order dtd.02/04/2013(please go

through action plan mention in

the High Court Order

dtd.02/04/2013)

Present Status of

compliance

91

Setting up of waste

processing & disposal

facilities

By 31.12.2003

or earlier

Within 2 Months after

possession of land

At Burudgaon S. No 34 the proposal of Mechanical composting & Sanitary landfill site is proposed the proposal of the private agency to be appointed is submitted to the Standing committee for approval

improvement of existing

landfill sites as per provisions

is undertaken

By 31.12.2001

or earlier

Within 6 Months Work in Under Progress

Identification of landfill sites

for future use & making

site(s) ready for operation

By 31.12.2002

or earlier

Within 18 Months Yes, AMC has required

10 Acres of land for

landfill which will be

sufficient for 25

years

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site The District committee for MSW has visited the new site at savedi S.No 289 and the Proposal for sanction is awaited.

Whether applied for new site

No

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant

its status

------

Local Body which have facilities & which have non complied of MSW Rules &

Authorization(Re:9 of court order)

Whether dumping site which are not designated

are closed/discontinued or not

Not closed

Whether site which has exceeded capacity is

closed down

No

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

Joint Action Plan submitted

If not, whether the compost plant is closed No

92

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or

not

No

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

No

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as

per order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

Commissioner AMC with RO Nashik has

prepared Joint Action Plan & assured to comply

secure landfill site up to 22.11.2014.

If yes, attached the copy. -----

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices

with date-attached separate sheet with B.G.

Details)

• Interim Direction issued by RO, Nashik

MPCB/RONK/TB/ID/191/1907Dt.

20.06.2009.

• P.D. by RO, Nashik Vide No.

MPCB/RONK/MSW-Dir-730/1140 Dt.

30.04.2013

• DO letter issued by MSvide No. DO.

MPCB/MS/40 Dt. 30.03.2013.

• DO letter issued by MS for MSW vide No.

DO.MPCB/MS/MSW/2013/85 Dt.

24.09.2013.

Any court cases pending � Application for the prosecution has been

filed in the court of JMFC, Ahmednagar.

� NGT Pune Case No. 9(THC)/2013(WZ)

matter is sub- judice in NGT

OTHER INFORMATION

Any old dump site (abandoned ) which is not in

operation and its status(Capped, Covered, Idle)

--------

Comments � Commissioner AMC with RO Nashik has

prepared Joint Action Plan to comply

secure landfill site up to 22.11.2014 and

submitted in NGT.

� Board has directed to submit Bank

Guarantee of Rs. 25 Lakhs as per

Authorisation Condition. The same is not

yet submitted

93

AHMEDNAGAR (BURUDGAON) MSW DUMING SITE

94

AHMEDNAGAR (BURUDGAON) MSW DUMING SITE

95

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Dhule Municipal Corporation Dhule, Tal. & Dist.

Dhule.

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Dhule Municipal Corporation.

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Municipal Commissioner, Mr. Daulat Khan Pathan.

02562-288301/2/3/4

Population 3,76,093

Generation of the MSW per day (T/D) 120

Quantity of Treated MSW per day (T/D) 120

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

District Committee has issued the NOC for Vermi

Composting Site at - Sr. No. 207/3 Area-3 Ha, 79

R. & Landfill Site - Sr. No.61 & 62 Area - 4 Ha, 67 R.

Only Dumping is done.

Authorization obtained for approved site and

validity

Application for Authorization has been submitted

by corporation & same was forwarded to HQ by

R.O. Nashik vide no. 853 Dtd. 01/04/2013.

Approved site is used for MSW Yes

Area of the Site(acres) Sr. No. 207- 3 Ha 79 R.

Sr. No. 61 & 62- 4 Ha 67 R.

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping 100 Dhule Municipal

Corporation.

Segregation -- --

landfill -- --

Composting -- --

Vermi composting 20 Dhule Municipal

Corporation.

RDF/Pelletisation -- --

Bio-methanation -- --

Waste to Energy -- --

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site N.A. Authorisation obtained for non approved site and validity N.A.

Non approved site is used for MSW N.A.

Area of the Site (acres) N.A.

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping N.A. N.A.

Segregation N.A. N.A.

landfill N.A. N.A.

Composting N.A. N.A.

Vermi composting N.A. N.A.

RDF/Pelletisation N.A. N.A.

Bio-methanation N.A. N.A.

Waste to Energy N.A. N.A.

96

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site Vermi Composting Site at - Sr. No. 207/3 Area-3

Ha, 79 R. & Landfill Site - Sr. No.61 & 62 Area - 4

Ha, 67 R. Only Dumping is done.

Area of the Site (acres) Sr. No. 207- 3 Ha 79 R.

Sr. No. 61 & 62- 4 Ha 67 R.

Authorization for this site Application for Authorization has been submitted

by corporation & same was forwarded to HQ by

R.O. Nashik vide no. 853 Dtd. 01/04/2013.

Present mode of treatment disposal Vermicomposting & Landfill.

Processing plant whether Provided/Not

Provided/Under Progress

Vermicomposting plant is provided.

Whether processing facility/plant is in operation

or not (Yes/No)

Yes (Provided)

If applied for authorization mention present status Application for Authorization has been submitted

by corporation & same was forwarded to HQ by

R.O. Nashik vide no. 853 Dtd. 01/04/2013.

If existing site is exhausted, steps taken for

closure.

--

New site is identified for MSW and status No

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for securing

compliances as per schedule given

in the High Court Order

dtd.02/04/2013(please go

through action plan mention in

the High Court Order

dtd.02/04/2013)

Present Status of

compliance

Setting up of waste processing

& disposal facilities Yes June 2014 Complied

improvement of existing

landfill sites as per provisions

is undertaken

No September, 2013 Not Complied

Identification of landfill sites

for future use & making site(s)

ready for operation

No May, 2013 Not Complied

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

--

Whether applied for new site --

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification, selection,

acquisition for additional new site ant its status --

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

--

Whether site which has exceeded capacity is

closed down

--

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

20 MT/Day is treated in Vermicomposting,

Partially Complied

If not, whether the compost plant is closed --

97

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not Yes

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

--

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

No

If yes, attached the copy. --

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B.G.Details)

Directions issued vide no. MPCB/RONK/MSW-Dir-732/

1151/2013 dtd. 30/04/2013.

B.G.Details

a. Obtain

b. Forfeited

Corporation has not submitted BG of

Rs. 1,00,000/- till date.

Any court cases pending No

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped, Covered, Idle)

--

Comments --

Note: If no. of sites are more than one, please attach separate sheet.

98

DHULE MSW DUMPING SITE

99

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Nashik Municipal Corporation, Nashik,

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Nashik Municipal Corporation, Nashik,

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Executive Engineer, (Mech Div)

Nashik Municipal Corporation, Nashik,

Population 15,00,000 (as per 2011 census)

Generation of the MSW per day (T/D) 350

Quantity of Treated MSW per day (T/D) Approx. 350

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

Sr. No – 278, A/p - Pathardi, Tal & Dist – Nashik

Authorisation obtained for approved site and

validity

Yes, vide no – vide no – BO/MSWA/B-4061,

dtd – 13/09/2013,

Validity - 31/03/2015.

Approved site is used for MSW Yes

Area of the Site(acres) 82

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping 350 MT/Day

Segregation

landfill

Composting

Vermi composting

RDF/Pelletisation Plant is Provided but

Not in Operation

Bio-methanation ---

Waste to Energy ---

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site NA Authorisation obtained for non approved site and validity NA

Non approved site is used for MSW NA

Area of the Site (acres) NA

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping NA NA

Segregation NA NA

landfill NA NA

Composting NA NA

Vermi composting NA NA

RDF/Pelletisation NA NA

Bio-methanation NA NA

Waste to Energy NA NA

100

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site Sr. No – 278, A/p - Pathardi, Tal & Dist – Nashik

Area of the Site (acres) 82

Authorisation for this site Yes, vide no – BO/MSWA/B-4061,

dtd – 13/09/2013,

Validity - 31/03/2015.

Present mode of treatment disposal Composting and Leachate treatment

Processing plant whether Provided/Not

Provided/Under Progress

Yes, Provided.

Whether processing facility/plant is in operation

or not (Yes/No)

Yes In operation.

If applied for authorisation mention present status Obtained.

vide no – BO/MSWA/B-4061,

dtd – 13/09/2013,

Validity - 31/03/2015.

If existing site is exhausted, steps taken for

closure.

………

New site is identified for MSW and status …………

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for securing

compliances as per schedule

given in the High Court Order

dtd.02/04/2013

(please go through action plan

mention in the High Court Order

dtd.02/04/2013)

Present Status of

compliance

Setting up of waste processing

& disposal facilities

By

31/12/2003

or earlier

Jun - 2014 NMC having

treatment facility

at Survey no 278

Patherdi shivar,

Nashik.

improvement of existing

landfill sites as per provisions

is undertaken

By

31/12/2001

or earlier

Sep - 2014 Existing site is

secured land fill

facility

Identification of landfill sites

for future use & making site(s)

ready for operation

By

31/12/2002

or earlier

May – 2013 NA

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

…………

Whether applied for new site …………

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant its

status

……….

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

…………

Whether site which has exceeded capacity is

closed down

…………

101

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

…………

If not, whether the compost plant is closed …………

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not …………

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

…………

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

………..

If yes, attached the copy.

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B. G. Details)

SCN issued vide no- SCN-644/931, issued on dtd

29.03.2014, By RO Nashik.

B. G.Details

a. Obtain

b. Forfeited

Rs. 5 Lacks

Rs. 5 Lacks

Any court cases pending 1. PIL No – 96/2009 in Hon High Court, Mumbai.

2. PIL no – 16/2014 in Hon. NGT (WZ) Pune.

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped, Covered, Idle)

…….

Comments ……

Note: If no. of sites are more than one, please attach separate sheet.

102

NASHIK (PATHARDI) MSW PROCESSING SITE

103

NASHIK (PATHARDI) MSW PROCESSING SITE

104

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Malegaon Municipal Corporation, Malegaon, Tal-

Malegaon, Dist - Nashik

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Malegaon Municipal Corporation, Malegaon, Tal-

Malegaon, Dist - Nashik

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Chief Sanitary Inspector,

Malegaon Municipal Corporation, Malegaon, Tal-

Malegaon, Dist - Nashik,

Population 5, 60, 000 (as per 2011 census)

Generation of the MSW per day (T/D) 300

Quantity of Treated MSW per day (T/D) 50

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

H.28-00 out of mauje Dasane,Gat No.131/1.The

above MSW project site’s proposal is presented to

District Collector,but till not got the site land in

possession.

Authorisation obtained for approved site and

validity

………….

Approved site is used for MSW …..

Area of the Site(acres) H.28-00 R

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping …………. ………….

Segregation …………. ………….

landfill …………. ………….

Composting …………. ………….

Vermi composting …………. ………….

RDF/Pelletisation …………. ………….

Bio-methanation …………. ………….

Waste to Energy …………. ………….

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site Gat No - 4/1,33 S No- 171, Malde Shivar,

Tal - Malegaon, Dist - Nashik.

Authorisation obtained for non approved site and

validity

Yes, Authorisation was granted vide no -

BO/MSWA/B-2044, Issued on dtd - 24/08/2006,

Validity - 31/12/2006. Then application for

renewal was made on dtd - 10/01/2010. But Same

was not consider by MPC Board vide letter dtd -

03/12/2010, ststing that the site is in A-II class of

water Zone of Girana River. (as per RRZ Policy).

Non approved site is used for MSW Yes

Area of the Site (acres) 28

105

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping 300 MT (partly

composting is done

Quantum is not

specified)

Malegaon Municipal

Corporation,

Malegaon, Tal-

Malegaon, Dist -

Nashik

Segregation …………. ………….

landfill …………. ………….

Composting …………. ………….

Vermi composting 50 Malegaon Municipal

Corporation

RDF/Pelletisation …………. ………….

Bio-methanation …………. ………….

Waste to Energy …………. ………….

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site Presently MSW site is in operation at Gat No. -

4/1, 33 S No- 171, Malde Shivar, with Partly Vermi

Composting Method.

Area of the Site (acres) 28

Authorisation for this site Authorisation was granted vide no - BO/MSWA/B-

2044, Issued on dtd - 24/08/2006, and Validity -

31/12/2006. Then application for renewal was

made on dtd - 10/01/2010. But Same was not

consider by MPC Board vide letter dtd -

03/12/2010, ststing that the site is in A-II class of

water Zone of Girana River. (as per RRZ Policy).

Present mode of treatment disposal Partly Composting & Open Dumping

Processing plant whether Provided/Not

Provided/Under Progress

No,

Partly Vermi Composting is done then Open

Dumping.

Whether processing facility/plant is in operation

or not (Yes/No)

Partly Vermi Composting is done then Open

Dumping.

If applied for authorisation mention present status Applied

If existing site is exhausted, steps taken for

closure.

………

New site is identified for MSW and status …………

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for

securing compliances as per

schedule given in the High

Court Order dtd.02/04/2013

(please go through action plan

mention in the High Court

Order dtd.02/04/2013)

Present Status of

compliance

Setting up of waste

processing & disposal

facilities

By

31/12/2003 or

earlier

Jun – 2014 Partly

vermicomposting in Sr.

No. 33,4 &111 Malvde

Shivar & rest of MSW

waste are dumping in

same site.

(Unauthorised site).

Said Site is situated at

106

about 100 Mtrs from

River Girana and was

Refused for MSW

processing due to not

complying the RRZ

Policy.

improvement of existing

landfill sites as per

provisions is undertaken

By

31/12/2001 or

earlier

Sep – 2014 No

Identification of landfill

sites for future use &

making site(s) ready for

operation

By

31/12/2002 or

earlier

May – 2013 No

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

No

Whether applied for new site No

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant its

status

……….

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

…………

Whether site which has exceeded capacity is

closed down

…………

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

…………

If not, whether the compost plant is closed …………

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not …………

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

…………

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

………..

If yes, attached the copy. ……..

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B. G. Details)

……

B. G. Details

a. Obtain

b. Forfeited

NOT Obtained

Any court cases pending No

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped, Covered, Idle)

…….

Comments ……

Note: If no. of sites are more than one, please attach separate sheet.

107

MALEGAON (MALADE SHIVAR) MSW DUMPING SITE

108

MALEGAON (MALADE SHIVAR) MSW DUMPING SITE

109

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Pune Municipal Corporation, Pune.

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Details enclosed (Annex-1)

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Shri. Jagtap Saheb, (Add. Comm.) Mb.

No.9689931414.

Population 35-40 lacs.

Generation of the MSW per day (T/D) 1500- 1600

Quantity of Treated MSW per day (T/D) 1000- 1200

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

NA

Authorisation obtained for approved site and validity NA

Approved site is used for MSW NA

Area of the Site(acres) 163

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping -- --

Segregation -- --

landfill -- --

Composting -- --

Vermi composting -- --

RDF/Pelletisation -- --

Bio-methanation -- --

Waste to Energy -- --

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site Attached as Annex-1 (These are only processing

sites & not require approval).

Authorisation obtained for non approved site and

validity

Yes.( Authorization Granted for all site vide dated

9/12/2013 which was valid up to 31.12.2014, for

the daily Total quantity of MSW 2127 MT).

Non approved site is used for MSW Yes( Only for Processing Activity)

Area of the Site (acres) There 06 processing sites. 1) M/s Hanjar Biotech-

163 acre, 2) M/s Rochem separation system-2.5

acres. 3)Disha waste management-5.0 acres 4)M/s

Ajinky Biotech-4 acres 5)M/s M/s. Excel Industry,

Aundh-1/2 acres 6) M/s. save Environment,-1/2

acres Ramtekadi i, Pune 7)Biogas plant(16 nos)-

avg. ½ acres each.

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping -- ---

Segregation --- ---

landfill NA NA

110

Composting 1. 2 MT

2. 2 MT

1. M/s. Excel Indusry,

Aundh

2. M/s. save

Environment,

Ramtekadi i, Pune

Vermi composting 1. 100 MT

2. 200MT

1. M/s Disha Waste

Management Pvt.

Ltd. Ramtekadi

2. M/s Ajinkya Bio

Fertiliser. Hadapsar

RDF/Pelletisation 200 MT M/s Hanjar Biotech

Bio-methanation 80 MT Details of 16 Site

enclosed. as (Annx-3)

Waste to Energy 300 MT 1.M/s. Rochem

Seperation System Pvt.

Ltd, Plot No. 86,

Ramtekdi, Ind. Estate,

Pune

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site Details Enclosed as Annx.1

Area of the Site (acres) 1) There 06 processing sites. 1) M/s Hanjar

Biotech-163 acre, 2) M/s Rochem seperation

system-2.5 acres. 3) Disha waste

management-5.0 acres 4) M/s Ajinky Biotech-

4 acres 5)M/s M/s. Excel Indusry, Aundh-1/2

acres 6) M/s. save Environment,-1/2 acres

Ramtekadi i, Pune 7)Biogas plant(16 nos)-avg.

½ acres each.

Authorisation for this site Authorization Granted vide dated 9/12/2013

which was valid up to 31.12.2014, for the daily

Total quantity of MSW 2127 MT).

Present mode of treatment disposal Details Enclosed as Annx.1

Processing plant whether Provided/Not

Provided/Under Progress

Details Enclosed as Annx.1

Whether processing facility/plant is in operation

or not (Yes/No)

Yes

If applied for authorisation mention present status NA

If existing site is exhausted, steps taken for

closure.

No

New site is identified for MSW and status Identification of new site, In Process through PMC

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for securing

compliances as per schedule given

in the High Court Order

dtd.02/04/2013(please go

through action plan mention in

the High Court Order

dtd.02/04/2013)

Present Status of

compliance

Setting up of waste processing

& disposal facilities

By

31/12/2003

or earlier

June 2014 Complied

improvement of existing

landfill sites as per provisions

By

31/12/2001

Sept-2013 Complied

111

is undertaken or earlier

Identification of landfill sites

for future use & making site(s)

ready for operation

By

31/12/2002

or earlier

May-2013 In progress.

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

---

Whether applied for new site --

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant

its status

--

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

---

Whether site which has exceeded capacity is

closed down

----

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

PMC has taken steps for disposal of MSW by

segragation & composting, RDF method.

If not, whether the compost plant is closed ----

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not No

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

Not closed. This office show cause notice for cap

on the storage.

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

No

If yes, attached the copy. NA

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B.G.Details)

Board has issued direction vide no.BO/P&L Divn/B-

2322 dt.17/05/2013.

B.G.Details

a. Obtain

b. Forfeited

NO

Any court cases pending Yes, Ramtekdi ind. Vs Disha Waste management

No.4542/2012

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped,Covered,Ideal)

NA

Comments NO

Note: If no. of sites are more than one, please attach separate

112

Municipal Solid Waste Management at Pune

Municipal Corporation

Details of facility operator at PMC-Annex-1

S. No.

Name & Address of

Operating Agency Capacity

Method of

Treatment

MPCB

Authorization

Capacity

Present Status

1. M/s Hanjar Biotech

Energy Uruli Devachi

Fursungi

500

MT/Day

1)Composting 500 MT/Day Presently plant is in

operation with

capacity.200 Tons/Day.

500

MT/Day

2)RDF

(Refuse

Derived Fuel)

500 MT/Day Presently plant is in

operation with Max. 200

Tons/Day. (Due to no

demand for RDF)

• Several Complaints

from vill. Devachi

Urali&Phurusungi.

• Pil No.19 ---Hon’Ble

High Court Mumbai.

• Biodiesel Project ( 4

T/Day )is not in

opeation

• Several Complaints

from vill. Devachi

Urali&Phurusungi

2 M/s Rochem Seperation

System Pvt. Ltd.,

Mumbai.

Plot No. 86, TPS-2,

Hadapsar Ind. Estate,

Pune

700

MT/Day

Pyrolysis /

Gasification

700 MT/Day 1) 3 Phase Project with

capacity 700 MT/day.

2) Presently only one

phase in operation

with 300 MT/Day

capacity only due to

project problem.

Vermicompost-2 Sites

1 M/s Ajinkya Bio

Fertiliser. Hadapsar

MSW Ramp

200

MT/Day

Vermicompost 200 MT/Day Presently is in operation

with capacity 200

MT/day

113

2 M/s Disha Waste

Management Pvt. Ltd.

Hadapsar Ind. Estate

Final Plot No. 87.

Ramtekadi, Pune

100

MT/Day

Vermicompost 100 MT/Day Presently is in operation,

But with low capacity.

• Several Complaints

from Ramtekadi

Industrial

Assocation.

• Court case No.4542

of 2012

Bio-Methanation- 16 Sites

1 Pune Municipal

Corporation. Hadapsar

Ramp-II

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

2 Pune Municipal

Corporation Rajiv gandhi

Udyan, Katraj Rap-II

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

3 Pune Municipal

Corporation. Pesheve

park- Ramp 1

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

4 Pune Municipal

Corporation. Pesheve

park- Ramp 2

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

5 Pune Municipal

Corporation. Aundh,

Kachara ,Ramp-1

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

6 Pune Municipal

Corporation. Ghole

Road

3MT/Day Bio-

Methanation

3MT/Day Presently is in operation,

7 Pune Municipal

Corporation. Bawadhan

Kh.

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

8 Pune Municipal

Corporation. Model

colony

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in

operation,

9 Pune Municipal

Corporation. Parati, S.

No.67,68. Tuljai Pathar-I

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

10 Pune Municipal

Corporation. Parati, S.

No.67,68. Tuljai Pathar-

II

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

11 Pune Municipal

Corporation. S. No.

22, Dhanori

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

114

12 Pune Municipal

Corporation. Katraj

Ramp-III

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

13 Pune Municipal

Corporation. Katraj

Ramp - ivI

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

14 Pune Municipal

Corporation.

Dhankawadi Trac

Terminal.

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

15 Pune Municipal

Corporation.

AlandiRoad

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

16 Pune Municipal

Corporation. Wadgaon

Sheri

5 MT/Day Bio-

Methanation

5 MT/Day Presently is in operation,

Mechanical Composting- 2 Sites

1 Pune Municipal

Corporation. M/s. Excel

Indusry, Aundh

2 MT/Day Mechanical

Composting

2 MT/Day Presently is in operation,

2 Pune Municipal

Corporation. M/s. save

Environment,

Ramtekadi

2 MT/Day Mechanical

Composting

2 MT/Day Presently is in operation,

115

PUNE MSW PROCESSING SITE

Waste to energy ROCHEM Plant

Dishawaste management

116

Bio-methanization at Hadapsar

LEACHATE TREATMENT

117

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Pimpri Chinchwad Municipal Corporation, Moshi

Kachara Depo, Moshi.

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Pimpri Chinchwad Municipal Corporation

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Sanjay Kulkarni, Executive Engg.( Environment)

Phone No. 9922501739.

Population As of 2011 India census, Pimpri Chinchwad had a

population of 17,29,359.

Generation of the MSW per day (T/D) 646

Quantity of Treated MSW per day (T/D) 450

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

S.No.462,463,464,466,467, Moshi, Tal. Haveli,

Dist.Pune

Authorisation obtained for approved site and

validity

Authorisation No. BO/MSW/B-6253 dated

05/11/2011 valid up to 31/10/2016

Approved site is used for MSW Yes

Area of the Site(acres) 80

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping

Segregation 450.0 BVG India Ltd.,

landfill 210.0 BVG India Ltd.,

Composting 425.0 BVG India Ltd.,

Vermi composting 30.0 Urjit Passco

RDF/Pelletisation 1.5 BVG India Ltd.,

Bio-methanation

Waste to Energy

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site NA

Authorisation obtained for non approved site and

validity

NA

Non approved site is used for MSW NA

Area of the Site (acres) NA

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping

Segregation

landfill

Composting

Vermi composting

RDF/Pelletisation

Bio-methanation

Waste to Energy

118

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site Pimpri Chinchwad Municipal Corporation, Moshi

Kachara Depo, Moshi. S.No.462,463,464,466,467,

Moshi, Tal. Haveli, Dist. Pune

Area of the Site (acres) 81

Authorisation for this site Authorisation No. BO/MSW/B-6253 dated

05/11/2011 valid up to 31/10/2016

Present mode of treatment disposal Mechanical composting, vermi composting, waste

plastic to fuel plant.

Processing plant whether Provided/Not

Provided/Under Progress

Provided

Whether processing facility/plant is in operation

or not (Yes/No)

Yes

If applied for authorisation mention present status valid up to 31/10/2016

If existing site is exhausted, steps taken for

closure.

Applied for authorisaion of Punawale site &

considering 30 years further planning demanded

for additional 250 acres land to Hon. Collector.

New site is identified for MSW and status Yes

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for securing

compliances as per schedule given

in the High Court Order

dtd.02/04/2013(please go

through action plan mention in

the High Court Order

dtd.02/04/2013)

Present Status of

compliance

Setting up of waste processing

& disposal facilities

Existing Site -- Existing Site

improvement of existing

landfill sites as per provisions

is undertaken

SLF

provided at

Existing site

--- Segregation &

Composting,

vermi composting

& RDF is in

operation.

Identification of landfill sites

for future use & making site(s)

ready for operation

New site

identified at

Punavale &

approved by

Collector.

--- Identified site for

future use

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

NA

Whether applied for new site NO

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant

its status

New site Identified for future use. Identified site at

Punavale village acquisitions process Demand

letter was given to Hon. Collector, Pune Disrict 250

additional land considering 30 years of city

growth.

119

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

NA

Whether site which has exceeded capacity is

closed down

NA

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

NA

If not, whether the compost plant is closed --

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not Y

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

NA

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

--

If yes, attached the copy. --

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B.G.Details)

--

B.G.Details

a. Obtain

b. Forfeited

Submitted BG of Rs. 5 lacs.

Directed to submit fresh BG of Rs. 10 Lakhs

Any court cases pending

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped, Covered ,Idle)

---

Comments NA

Note: If no. of sites are more than one, please attach separate sheet.

120

PIMPRI-CHINCHWAD (MOSHI VILLAGE) MSW PROCESSING SITE

121

PIMPRI-CHINCHWAD MSW COMPOST IN BAG

PIMPRI-CHINCHWAD (MOSHI VILLAGE) MSW CAPPED SITE

122

STATUS OF MUNICIPAL SOLID WASTE MANAGEMENT

BASIC INFORMATION

Name of the Local Body and address Municipal Corporation, Parbhani, Dist- Parbhani

Name of the facility operator( municipal

corporation/council/outside agencies or both)

Municipal Corporation, Parbhani.

Nodal Officer and designation with Telephone No.

with mobile no. and e-mail id

Mr. Nagesh Joshi, mob- 08975766368.

Population 3,17,000

Generation of the MSW per day (T/D) 75

Quantity of Treated MSW per day (T/D) 75

DETAILS OF SITE (APPROVED)

Name of approved site as per District Collector

Site Selection Committee

At- Gut No.26, Borwand (Kh), Gangakhed road, Tq.

& Dist- Parbhani.

Authorisation obtained for approved site and

validity

No.MPCB/ROA/MSWA/2406/07

Date 07.06.2006

Validity. 31.12.2007.

Approved site is used for MSW Yes

Area of the Site(acres) 2 Hector & 40 R

FACILITY AT APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping 37.5 Municipal Corporation,

Parbhani.

Segregation 7.5 Municipal Corporation,

Parbhani.

Landfill ------- -------

Composting 30 Municipal Corporation,

Parbhani.

Vermi composting ------- -------

RDF/Pelletisation ------- -------

Bio-methanation ------- -------

Waste to Energy ------- -------

DETAILS OF SITE ( NON-APPROVED)

Name of non approved site -------

Authorisation obtained for non approved site and

validity

-------

Non approved site is used for MSW -------

Area of the Site (acres) -------

FACILITY AT NON APPROVED SITE

Quantity ( MT/D) Name of Operator

Dumping ------- -------

Segregation ------- -------

Landfill ------- -------

Composting ------- -------

Vermi composting ------- -------

RDF/Pelletisation ------- -------

Bio-methanation ------- -------

Waste to Energy ------- -------

123

CURRENT PRESENT STATUS OF MSW SITE AND FACILITY

Name of the Site At- Gut No.26, Borwand (Kh), Gangakhed Road,

Tq. & Dist- Parbhani.

Area of the Site (acres) 2 Hector & 40 R

Authorisation for this site No. MPCB/ROA/MSWA/2406/07

Date 07.06.2006

Validity. 31.12.2007.

Present mode of treatment disposal Dumping, Segregation, Composting

Processing plant whether Provided/Not

Provided/Under Progress

Not provided

Whether processing facility/plant is in operation

or not (Yes/No)

No

If applied for authorisation mention present status Not applied for renewal of authorization

If existing site is exhausted, steps taken for

closure.

No

New site is identified for MSW and status No

Compliance Status Of Setting Up Facility

Compliance Criteria Schedule as

per MSW

Rules,2000

Proposed time frame for securing

compliances as per schedule given

in the High Court Order

dtd.02/04/2013(please go

through action plan mention in

the High Court Order

dtd.02/04/2013)

Present Status of

compliance

Setting up of waste processing

& disposal facilities

Schedule-I ------ Civil work for

Setting up of

waste processing

is not completed

improvement of existing

landfill sites as per provisions

is undertaken

Schedule-I ------ No

Identification of landfill sites

for future use & making site(s)

ready for operation

Schedule-I ------ yes

Local Body which do not have the landfill site/dumping ground(Re: 7 of court order)

Whether any steps are taken for identification,

selection, acquisition for new site

------

Whether applied for new site -----

Local Body which have inadequate facilities(Re: 8 of court order)

Whether any steps are taken for identification,

selection, acquisition for additional new site ant

its status

-----

Local Body which have facilities & which have non complied of MSW Rules & Authorization(Re:9 of

court order)

Whether dumping site which are not designated

are closed/discontinued or not

-----

Whether site which has exceeded capacity is

closed down

-----

Local Body which do not have processing facilities(Re:12 of court order)

Steps taken for treatment of in accordance with

MSW Rules as Schedule –III and its status

-----

If not, whether the compost plant is closed -----

124

Site for composting/Vermi composting(Re:14 of court order)

Whether storage of wet garbage is stopped or not -----

If not complied compost plant shall be closed

down [Sr. No. 14(II) of court order]

-----

Action Plan(Sr. No.15 of court order)

Whether an action plan has been prepared as per

order passed by Hon’ble HC dtd.2/4/2013 for

Management of MSW Rules

-----

If yes, attached the copy. -----

LEGAL INFORMATION

Legal Action( Directions/Prosecution Notices with

date-attached separate sheet with B.G. Details)

1. Poposed Direction issued by Regional

Officer, M.P.C. Board, Aurangabad vide

No. MPCB/RO/MSW/DIR/1017/2013. Dtd.

30.04.2013.

2. D. O. Letter issued by Member Secretary,

M.P.C. Board, Mumbai on 30.03.2013 &

24.09.2013 & 27.01.2014.

3. High Court order Mumbai on 02.04.2013.

B.G.Details

a. Obtain

b. Forfeited

B.G. of Rs. 1.0 Lack submitted by M.C. Parbhani.

Any court cases pending -----

OTHER INFORMATION

Any old dump site (abandoned )which is not in

operation and its status(Capped, Covered, Idle)

-----

Comments -----

Note: If no. of sites are more than one, please attach separate sheet.

125

PARBHANI (BORWAND) MSW DUMPING SITE

126