Status of Magnets and financial orders (including RPC) Mario Spinetti15’
description
Transcript of Status of Magnets and financial orders (including RPC) Mario Spinetti15’
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 1
1. Status of Magnets and financial orders (including RPC)Mario Spinetti
15’
2. Status of RPC (including Mechanics, Strips and FE electronics)Luca Stanco
15’3. Status System Test at LNGS
Carlo Gustavino20’
4. RPC production at GT and Automatic Pushing TestAlberto Garfagnini
20’5. First developments of DAQ/Trigger for RPC
Adele Di Cicco15’
6. Results of RPC under tests at LNGSAlessandro Paoloni
20’7. Status of RPC test at CERN
Stefano Dusini10’
8. Status of Drift TubesRaoul Zimmermann
30’
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 2
• Mechanics• Strips• Situation on Production• System Test Facility• Automatic tests on RPC• Electronics• FE – DAQ• RPC under tests at LNGS and Cern
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 3
MECHANICS
• frame and “culla” for installation here at LNF !• to be checked on the magnet prototype next
• 5+5 transportation boxes ordered.
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 4
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 5
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 6
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 7
• Final design reached (2.6 cm pitch in x-view, 3.5 cm pitch in y-view)• Full double layer (x any view) (final) prototype ordered at Pol.Hi.Tech• To be ready in November• To be tested at LNF in December
• Started procedure for tendering to be ended in January-February 2003
STRIPS
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 8
RPC PRODUCTION
• Production plan for OPERA: October 1rst
• Delayed 1 month in cooperation with ARGO November 4th
• Bakelite planes ready at PanPla company. To be sent to General Technica (this week)
500 chambers are necessary for one SpectrometerEach Spectrometer has to be installed, together with RPC’s in 6 months
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 9
ELECTRONICS
Front-End card (2nd prototype):- 64 channels (final, 16 ch for prototype)- differential receivers exaustively studied (good response until 5 mV)- Zin = 100 - input polarization for at least two samples- threshold tunable 0 – 300 mV for groups of 16 channels- mask single input- digital test-in- FastOR over 16 channels 1 s long, TTL output at 50 - generation of interrupt on the FastOR- external trigger/gate for all the channel. TTL output at high Z- double buffer for the events- VME-like read-out
… under test with RPC in Padova
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 10
Backplane:- for Eurocrate 6U- 19 FE cards of 64 channels each- in the 2 free positions a power supply “switching”-like 250 W, +3.3 V, +5 V, ±12 V, standard PCI
…offers from company on the way…possibility to build the prototype in Padova under investigation
FE 64 channels card:- final design under going
Strip-connectors-FE-cards:- Impedence adapters- under definition at LNF
Cabling:- ready to buy
High Voltage system:- under development at LNF
OPERA Coll.Meet. October 2002 Luca Stanco - Padova 11
• System test at Gran Sasso very well in time and succesfully set-up• RPC pre-production will allow complete test of the system for end of August• Many tests on the full scale RPC prototypes -> good results• Mechanics on the way on. First prototype for installation end of July• Electronics well suited. Need FE – DAQ integration. More people are coming• Production for OPERA at General Technica tight but acceptable.
of June 2002 …
end of September
Naple
not yet
true
true
… at October 2002