Status of LHC Operations
description
Transcript of Status of LHC Operations
![Page 1: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/1.jpg)
LPCC, R. Assmann 1
Status of LHC Operations
R. Assmannfor the LHC commissioning team and LHC teams & groups
LPCC 23.7.2010
23.7.2010
![Page 2: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/2.jpg)
LPCC, R. Assmann 2
Outline
Stable beams for requested 100 nb-1 plus more
Increasing intensity to > 1012 p at injection
Issues during stable beams
Optimizing conditions in collision
Analysis of record physics fill
Intensity outlook
Conclusion
23.7.2010
![Page 3: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/3.jpg)
LPCC, R. Assmann 3
Stable Beams for Requested 100 nb-1
23.7.2010
ca. 70 nb-1 in last fill!
Approach with high bunch intensity paid off (investment of commissioning time)
9e10 p per bunch up to 13 bunches
![Page 4: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/4.jpg)
LPCC, R. Assmann 4
Collision Scheme (LPC, M. Ferro-Luzzi)
23.7.2010
8 collisions per IP
![Page 5: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/5.jpg)
LPCC, R. Assmann 5
Increasing intensity to > 1012 p at injection
No interlock masking allowed at high intensities, even at injection.
Transfer line trajectories drifting away. Incoming tails from SPS. Improved setup of transfer lines, injection protection
and collimation required. B. Goddard, C. Bracco, M. Meddahi and team
23.7.2010
![Page 6: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/6.jpg)
LPCC, R. Assmann 6
Increasing intensity to > 1012 p at injection
23.7.2010
Wrong polarity BPM
Excellent agreement with model
![Page 7: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/7.jpg)
LPCC, R. Assmann 7
Increasing intensity to > 1012 p at injection
23.7.2010
![Page 8: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/8.jpg)
LPCC, R. Assmann 8
Tunnel View
Collimation Team
23.7.2010
Transfer line collimator
Ring magnets with beam loss monitors
![Page 9: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/9.jpg)
LPCC, R. Assmann 9
Increasing intensity to > 1012 p at injection
23.7.2010
With SPS scrapers
![Page 10: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/10.jpg)
LPCC, R. Assmann 10
Issues During Stable Beams
We are learning continually and solver issue after issue: Losses during stable beams Orbit Transverse damper RF noise
23.7.2010
![Page 11: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/11.jpg)
LPCC, R. Assmann 11
Losses during stable beams (9.7.)
23.7.2010
Intensity B1
Intensity B2
![Page 12: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/12.jpg)
LPCC, R. Assmann 12
Losses during stable beams (9.7.)
23.7.2010
Takes place at collimators in cleaning insertions OK
![Page 13: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/13.jpg)
LPCC, R. Assmann 13
Losses during stable beams (9.7.)
23.7.2010
Losses Peak at 0.315
All beams, all planes!
![Page 14: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/14.jpg)
LPCC, R. Assmann 14
Losses during stable beams (9.7.)
23.7.2010
HUMP
Tunes
R. Steinhagen
![Page 15: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/15.jpg)
LPCC, R. Assmann 15
Losses during stable beams (9.7.)
23.7.2010
Losses only in first 4 bunches from bucket 1 onwards!
![Page 16: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/16.jpg)
LPCC, R. Assmann 16
Lifetime 12.7. – “Regular” Drops
23.7.2010
crossingcollision
12.7.
Not easily avoidable losses in operation…
![Page 17: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/17.jpg)
LPCC, R. Assmann 17
Orbit control in IR: After normal correction
23.7.2010
Bumps in IR’s
Real?
YES Correct
NO Leave it in
![Page 18: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/18.jpg)
LPCC, R. Assmann 18
Orbit control in IR: H correction IR1
23.7.2010
30% of correction sent
![Page 19: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/19.jpg)
LPCC, R. Assmann 19
Orbit control in IR: Problem with Crossing Angle
23.7.2010
Non-closure when putting crossing angle…
![Page 20: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/20.jpg)
Orbit in the ramp fill 1232
20
Orbit correction became unstable – seemed to be coming from IR4.
Orbit FB switches off. Switch on worked, instability disappeared!
Very good stability
50 mm rms !!
LPCC, R. Assmann23.7.2010
![Page 21: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/21.jpg)
Ghost bunches
Small ghost bunches around main bunches reported by the experiments. Intensity at the level of 0.1% of the main bunch.
Ghost bunches confirmed measurements of the RF group. Bunches extend up to -80 ns. Spacing is 5 ns. Abort gap population isbelow 5E6 p/bucket (exceptfor messy 80 ns).
Problem: Collision ofghost bunches withone of nominal bunches
21 LPCC, R. Assmann23.7.2010
RF group
![Page 22: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/22.jpg)
LPCC, R. Assmann 22
Losses from RF bucket
23.7.2010
![Page 23: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/23.jpg)
LPCC, R. Assmann 23
Losses from RF bucket
23.7.2010
Use momentum-collimators (IR3) for cleaning uncaptured beam before beam dump!
![Page 24: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/24.jpg)
LPCC, R. Assmann 24
Losses from RF bucket
23.7.2010
Cleaning of uncaptured beam
![Page 25: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/25.jpg)
LPCC, R. Assmann 25
Transverse Damper in Stable Beams
23.7.2010
Damper off
Damper off
Damper noise reduction beam 2
Damper on
Damper on
W. Hoefle et al
![Page 26: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/26.jpg)
LPCC, R. Assmann 26
Optimizing conditions in collision
Various measures done in parallel… Beam-beam investigation ongoing. Equalize beam parameters:
Blow-up of longitudinal emittances to have nominal values. Blow-up of transverse emittances to have nominal values. Equalize bunch currents and B1/B2 currents by more stringent
injection process, good 450 GeV orbit correction. Minimize losses at flat top (crossing angle in steps, skip chromaticity
measurement for best fill, only manual IP scans, …). Use of transverse damper with reduced noise at 3.5 TeV. Increased B1/B2 tune split: 0.003 0.005
23.7.2010
![Page 27: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/27.jpg)
LPCC, R. Assmann 27
Record physics fill: Intensities
23.7.2010
only ~20 % loss of intensity over 19 h
~ 1% per hour excellent!
No lumi burn-off: 3.5 TeV, higher b*
19 hours stable beam
![Page 28: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/28.jpg)
LPCC, R. Assmann 28
Record physics fill: Peak luminosity
23.7.2010
Requested limit on peak lumi for LHC-b
Requested limit on peak lumi for ALICE
![Page 29: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/29.jpg)
LPCC, R. Assmann 29
Record physics fill: Bunch Specific Luminosity
23.7.2010
should be constant without emittance growth
![Page 30: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/30.jpg)
LPCC, R. Assmann 30
Record physics fill: Lumi Measured & Calculated
23.7.2010
calculated with measured bunch intensity, nominal ge = 3.75 mm and b*=3.5m
Emittance growth
ATLASCMS
CALCULATED
Machine parameters very well controlled!
![Page 31: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/31.jpg)
LPCC, R. Assmann 31
Effective Average Emittance Growth
23.7.2010
~ 0.13 mm rad per hour1.0 mm rad per hour at 450 GeV
![Page 32: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/32.jpg)
LPCC, R. Assmann 32
Beam-beam parameter
23.7.2010
Emittance growth
assuming nominal emittance
from measured charge and luminosity
~ design beam-beam parameter!
€
ξ =rp ⋅N4π ⋅ε n
![Page 33: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/33.jpg)
LPCC, R. Assmann 33
Intensity outlook LHC performs already outstanding… We are high already:
Presently we have established: ~ 0.7 MJ Remember: Beams are much smaller at LHC and 3.5 TeV! Transverse energy density is already ~ 7 MJ/mm2 at some relevant
locations. Far beyond previous CERN experience (ISR), HERA and Tevatron!
We want to increase from 0.7 MJ to 1.4 MJ the next days. Then plan for multi-week stable period without changes! What limits the increase in intensity?
No immediate danger, otherwise we would have to drop intensity. I have shown that we have still frequent non-conform issues. Use stable period to sort them out and then push ahead! Must always be prepared for infrequent problems (irregular dumps)!
23.7.2010
![Page 34: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/34.jpg)
LPCC, R. Assmann 34
Conclusion LHC operation has made significant progress:
Optimized working point for physics. All performance parameters well known and controlled! Record fill with expected luminosity, very small intensity losses and
very small emittance blow-up! Can run at design beam-beam parameter! LHC stored energy is at ~ 0.7 MJ: about 30% of world record! LHC stored energy density is at ~ 7 MJ/mm2 this is ~3 times world
record. Highly destructive beam! Push intensity up factor ~2 in next days/week. Still issues:
learning with highly destructive beams! Regularly see and solve non-conform issues (orbit, procedures, …). Want stable run period (~4 weeks) for solving them.
Then push into 10-30 MJ regime!
23.7.2010
![Page 35: Status of LHC Operations](https://reader035.fdocuments.in/reader035/viewer/2022070502/56814a5b550346895db780bc/html5/thumbnails/35.jpg)
LPCC, R. Assmann 35
Thank you for your attention!