Status of ATF2 Cavity BPM ProjectSep 29, 2005
• Project Scope: Instrument both couplers ATF2 cavity BPM’s (35)
• Produce prototype for December cavity test
• Production complete 31.03.06
• Want full integration into ATF2 control system.
Table 1: System Specifications:
BPM dipole frequency (MHz) 6430
Kick factor (J/C^2/mm^2) 1.3e10
Decay time (ns) 350
Required resolution (single bunch – nm) 100
Dynamic range (um) 1000
Nominal charge (ppb) 1e10
Hardware Status – Downmix Chassis
• Prototype submitted for printing Sept 29 (CA). • Parts on hand –
– Except limiters (4 to 6 weeks) and power meter– Testing begins Oct 12
• Tests of HOM board (similar)– gain 33dB– Linearity second side band 70dB down at top of range
of -24dBm– Noise figure 5dB– Channel to channel coupling -60dB
• Board designed for machine assembly
Table 2: Key sub-components of the ATF2 BPM system.
Component Responsible for production
Number
Hybrid KEK 2 for each cavity
Front end heterodyne receiver
SLAC, ILC Department 2 channels / cavity
Digitizer & crate SLAC and Struck I. Systeme
3 cavities per 8 channel VME digitizer module; 9 modules per crate (one crate required)
LO Source and amplifier
SLAC, ILC Department 1
Calibration source SLAC (purchased) 1