21
Innovate Steel, Design Future 1 POSLAB 1 5 November 2013 Status and Future of FINEX ® Process for Reducing CO 2 Emissions

Transcript of Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate...

Page 1: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 1 POSLAB 1

5 November 2013

Status and Future of FINEX® Process

for Reducing CO2 Emissions

Page 2: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 2 POSLAB

Contents

1. Introduction of FINEX® Process

2. Direct Reduction of CO2 Emissions

3. Indirect Reduction of CO2 Emissions

4. Future of FINEX® Process

Page 3: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 3 POSLAB

Contents

1. Introduction of FINEX® Process

2. Direct Reduction of CO2 Emissions

3. Indirect Reduction of CO2 Emissions

4. Future of FINEX® Process

- Scale up History

- FINEX® Process Flow

- Characteristics of FINEX® Process

Page 4: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 4 POSLAB

1996 1999 2003 2007

Pilot Plant

(150t/d)

No.1 FINEX®

(0.6 MTPA)

Model Plant

(15t/d)

1992

Annual

Production

(MTPA)

2014

No.3 FINEX® (2.0 MTPA)

(Construction Site)

No.2 FINEX®

(1.5 MTPA)

2.0

1.5

1.0

0.5

0.0

Jun. 2003 0.6 MTPA FINEX® (Demo.)

Apr. 2007 1.5 MTPA FINEX®

Dec. 2013 2.0 MTPA FINEX®

FINEX® R&D

Kick-off

Scale-up History

Page 5: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 5 POSLAB

No.1 FINEX®

(0.6 MTPA)

No.2 FINEX®

(1.5 MTPA)

Panoramic Views

No.3 FINEX®

(2.0 MTPA) Melter-gasifier

Fluidized bed Reactor

Page 6: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 6 POSLAB

CO2

Removal

(PSA)

Power Plant

Oxygen Plant

Ore Fine Non-Coking

Coal

Melter Gasifier

Fluidized Bed Reactors

PCI

Oxygen

Coal Briquetter

Hot DRI Compactor

R2

R1

FINEX® Process Flow

R2

R1

R3

R4

Scrubber

Page 7: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 7 POSLAB

No pretreatment plants

Flexibility of raw materials in use

Environmentally-friendly process

Flexibility of hot metal production

Characteristics of FINEX® Process

Page 8: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 8 POSLAB

Contents

1. Introduction of FINEX® Process

2. Direct Reduction of CO2 Emissions

3. Indirect Reduction of CO2 Emissions

4. Future of FINEX® Process

- Coal Briquette

- CO2 Removal Process - Pulverized Coal Injection

Page 9: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 9 POSLAB

Briquettes

Binder

Coal Fine

Mixing

46

35

100

Lump

Coal

Coal

Briquette Coke

95 78

100

Lump

Coal

Coal

Briquette Coke

Cold Strength

Hot Strength

Coal Briquette

Page 10: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 10 POSLAB

CO2 Removal Process

Production (t/d)

Co

al C

on

sum

ptio

n R

ate

(k

g/t

HM

)

After CO2 Removal

Before CO2 Removal

1000

1100

1200

1300

1500 1800 2100 2400 2700

700

800

900

Coal

Heat

Gas

DRI

Off Gas Recycling

Page 11: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 11 POSLAB

Pulverized Coal Injection

Continuous Operation (days)

Reduction Degree (%)

37

83

200

300

Pulverized

Coal

Gas + Dust

Coal Pyrolysis

Hot Metal

Coal Briquettes

Coal Bq. Coal PC

Pyrolysis,

Dust loss

Dome,

Char Bed -

56% Raceway 100%

Gas

Carbon solution loss

Combustion

Fluidized Bed Reactor Availability

Page 12: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 12 POSLAB

FINEX COREX

Pro

du

ctio

n (

T/D

)

CO2 Rmv.

PCI

500

1000

2000 1,800 T/D (0.6MT)

1500

Co

al R

ate

(k

g/t

)

750

850

1050

950

2500 1150

1250 3000 Coal Briq.

2003 2004 2005 2006 2007

7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 12 1 2 3 4

FINEX® Demo Plant Operational Performance

Page 13: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 13 POSLAB

Operating Parameters of No. 2 FINEX®

Indices Target

(designed)

Operation

(2008)

Production Mt/y 1.5 1.5

t/d ≥ 4,200 4,300

Coal Rate

kg/t-HM

≤ 730 720

Coke ≤ 70 60

PCR ≥ 140 150

Hot

Metal

[S] % ≤ 0.030 0.027

[Si] % ≤ 0.80 0.81

11

FINEX® Comm. Plant Operational Performance

Page 14: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 14 POSLAB

Contents

1. Introduction of FINEX® Process

2. Direct Reduction of CO2 Emissions

3. Indirect Reduction of CO2 Emissions

4. Future of FINEX® Process

- Heat Recovery System

- Dry Dust Collectors

- Recycling of By-products

Page 15: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 15 POSLAB

Heat Recovery System

Demineralized water

Steam 40 t/hr

260 ºC

13.5 bar

Off gas 300 kNm3/h,

380 ºC

230 ºC

Scrubber

Heat Recovery System

Reducing Gas Water Treatment System Heat Recovery System

Page 16: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 16 POSLAB

Dry Dust Collectors

Ceramic Filter

(Commercial Stage)

Multi-Cyclone

(Commercial Stage)

Bag Filter

(Pilot Stage)

Bag Filter

(Commercial Stage)

DRI Feed Bin

Fluidized Bed Reactors

700 ºC

380 ºC 230 ºC

Page 17: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 17 POSLAB

Recycling of By-products

Sludge

Hot Briquetter

DRI Feed Bin Dust

Fluidized Bed Reactors

DRI

Dryer

Melter-Gasifier

Composition(%) Total Fe RD C SiO2 CaO Al2O3 MgO

By-products 50~55 15~20 5~10 4~6 3~4 3~4 ~ 1

Agglomeration

Agglomerates

Page 18: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 18 POSLAB

Contents

1. Introduction of FINEX® Process

2. Direct Reduction of CO2 Emissions

3. Indirect Reduction of CO2 Emissions

4. Future of FINEX® Process

Page 19: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 19 POSLAB

CO2 Removal

Power Plant

Oxygen Plant

Ore Coal

Melter Gasifier

Fluidized Bed Reactors

PCI

Oxygen

Coal Briquetter

R2

FINEX® Process Flow

R1

R2

R3

TRT

Prep.

Tail Gas

CO2 Purification (CO2 > 95 %)

CO2 Sequestration

Product Gas

Heat Ex. Filter Scrubber

Chemical Plant

Page 20: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 20 POSLAB

After starting R&D activities of FINEX® in 1992, it is being scaled up to 2.0 Mt/y

CO2 emissions from FINEX® drastically fell down because POSCO has

developed coal briquetting process and has optimized the FINEX process

by adopting CO2 removal system and pulverized coal injection

A series of technical developments such as heat recovery system, dry dust

collectors and recycling by-products could reduce CO2 emissions furthermore

FINEX® has lots of potential for lowering coal consumption rate and saving energy

as a developing process

Summary

Page 21: Status and Future of FINEX Process for Reducing CO2 Emissions and Steel... · POSLAB 20 Innovate Steel, Design Future ®After starting R&D activities of FINEX in 1992, it is being

Innovate Steel, Design Future 21 POSLAB