Open HouseAvenue Road to Bayview Avenue
![Page 2: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/2.jpg)
2
East Tunnel Construction Timeline
Contract award Construction of launch shaft – 1 year Utility relocation at headwalls Construction of headwalls – 6 to 8 months Construction of extraction shaft at Yonge Street
![Page 3: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/3.jpg)
3
Tunnel Boring Machine
The construction of new tunnels under Eglinton Avenue is done by tunnel boring machines (TBMs).
Each TBM moves forward by pushing off against concrete segments. The operator advances the machine as soil is removed from the TBM
face through a conveyor system. The launch pit remains active for removal of muck/spoils.
![Page 4: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/4.jpg)
4
Launch of the Tunnel Boring Machine
The Eglinton Crosstown tunnel will consist of side-by-side or twin tunnels.
Each tunnel will be 6.75 metres internal diameter.
Initially, one machine will begin excavation; the other will follow on a parallel course soon after.
![Page 5: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/5.jpg)
5
The TBM is carefully aligned with the eye of the tunnel. The machine will break through this focal point to start excavation.
Eye of the tunnel
![Page 6: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/6.jpg)
6
Preparing the site
Workers lay track during the assembly and launch phase
The pieces of the TBMs are lowered into the shaft and assembled
![Page 7: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/7.jpg)
7
Launch Shaft Operations
To keep the tunnel safe for the crew a ventilation system pumps fresh air into the tunnel and exhaust air is moved out of the tunnel.
Cranes remain in position during the mining operation; muck will be hauled out and new concrete tunnel segments will be delivered.
![Page 8: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/8.jpg)
8
Tunnelling Begins
Tunnel boring machines work beneath Eglinton Avenue
Business activities and traffic will continue with this method.
A single TBM will tunnel 75 metres per week.
Each machine is capable of moving 500 cubic metres of earth per day.
The machines are made in Toronto by Caterpillar Tunnelling Canada Corporation, formerly LOVAT, a world leader in tunnel boring machine manufacturing.
![Page 9: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/9.jpg)
9
East Tunnels Launch Shaft
To Brentcliffe To Leslie
![Page 10: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/10.jpg)
10
Emergency Exit Buildings and Cross Passages
![Page 11: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/11.jpg)
11
1. A strong conceptual narrative vision across the system
2. Design that elevates the quality of the public transit experience
3. Civic caliber and scale of built form and materials
4. Clarity and simplicity of architectural expression through integrated design of building systems and elements
5. Responsiveness to contextual, local and future conditions
Crosstown Principles of Design Excellence
![Page 12: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/12.jpg)
12
A coherent and unified architectural strategy for the
entire Crosstown line
1. A Strong Conceptual Narrative Vision across the System
Clear strategy for consistent and variable
elements
![Page 13: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/13.jpg)
13
Openness through optimal spatial penetration
2. Design that Elevates the Quality of the Public Transit Experience
Optimized daylight penetration
![Page 14: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/14.jpg)
14
Unified ground plane inside and outside stations and at stops
3. Civic Calibre and Scale of Built Form and Materials
Civic materials and character of open spaces
![Page 15: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/15.jpg)
15
Integrated structural, mechanical, and electrical systems
4. Clarity and Simplicity of Architectural Expression through Integrated Building Systems and Elements
A clear hierarchy and plan for user-centred integrated information
![Page 16: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/16.jpg)
16
Integration with historic elements
5. Responsiveness to Contextual, Local and future Conditions
Sustainability measures
![Page 17: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/17.jpg)
17
Accessible path from street to platform Accessible routes identified Station attendant Platform edge tactile strip Wayfinding tiles on platforms Near level boarding of trains Platform edge illumination Audible messages throughout stations Signage with accessible features Designated Waiting Area Colour contrast between station walls and floors Equipment mounted at accessible heights Benches
Crosstown Accessible Features: Stations
![Page 18: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/18.jpg)
18
Platform edge tactile strip Platform edge illumination Colour contrast at between walls and platform Equipment mounted at accessible heights Sheltered benches Sheltered wheelchair area Passenger assistance intercom Ramp access to platforms Signage with accessible features
Crosstown Accessibility Features: Stops
![Page 19: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/19.jpg)
19
Avenue StationLocal Context: Demand
![Page 20: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/20.jpg)
20
Avenue Road Local Context: Land Use
![Page 21: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/21.jpg)
21
Avenue RoadSecondary Entrance
![Page 22: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/22.jpg)
22
Avenue RoadLongitudinal Section
![Page 23: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/23.jpg)
23
Eglinton StationLongitudinal Section through LRT and Eglinton
![Page 24: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/24.jpg)
24
Eglinton StationLongitudinal Section through Subway and Yonge Street
![Page 25: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/25.jpg)
25
Eglinton StationStreet Level
![Page 26: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/26.jpg)
26
Eglinton StationUpper Concourse Level Yonge
![Page 27: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/27.jpg)
27
Mount Pleasant StationLocal Context: Demand
![Page 28: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/28.jpg)
28
Mount Pleasant StationLocal Context: Land Use
![Page 29: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/29.jpg)
29
Mount Pleasant StationProfile View
![Page 30: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/30.jpg)
30
Mount Pleasant StationPlan View
Possible future entrance
![Page 31: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/31.jpg)
31
Mount Pleasant StationPreliminary Station Concept
![Page 32: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/32.jpg)
32
Mount Pleasant StationLongitudinal Section
Eglinton Avenue
Mount Pleasant
![Page 33: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/33.jpg)
33
Mount Pleasant StationPrimary Entrance
![Page 34: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/34.jpg)
34
Mount Pleasant StationSecondary Entrance
![Page 35: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/35.jpg)
35
Bayview StationLocal Context: Demand
![Page 36: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/36.jpg)
36
Bayview StationLocal Context: Land Use
![Page 37: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/37.jpg)
37
Bayview StationLongitudinal Section
![Page 38: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/38.jpg)
38
Bayview StationPrimary Entrance
![Page 39: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/39.jpg)
39
Bayview StationSecondary Entrance
![Page 40: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/40.jpg)
40
New Approach:Alternative Financing and Procurement (AFP)
Public Private Partnership models have been underway in Canada for 20 years165 projects21 transportation projects$51 billion total project valueCanada-wide examples
Canada Line rapid transit project (Vancouver) Autoroute 25 (Montréal) Trans-Canada Highway (Atlantic Canada)
Ontario examples Pan Am games athletes village Ottawa Light Rail Transit Highway 407 East Phase 1 The Rt. Hon. Herb Gray Parkway (Formerly the Windsor Essex Parkway
![Page 41: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/41.jpg)
41
Owner’s Role Changes with AFP
![Page 42: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/42.jpg)
42
New Approach: Advantages of (AFP) Increased capacity to bring projects to market
Transfer of risk• Appropriate risks transferred to private sector to ensure “on time, on budget” delivery
and offer value for money• Design, construction, cost escalation, schedule delays, operations, maintenance, life
cycle, financial risk
Cost certainty• Optimal cost combination: combines capital, maintenance and life cycle costs• Integration of design and construction
![Page 43: Station Design Update Meeting: Open House Avenue Road to Bayview](https://reader038.fdocuments.in/reader038/viewer/2022102922/54c4250f4a795906798b4650/html5/thumbnails/43.jpg)
43
New Approach:Roles and Responsibilities in the Design Build Finance Maintain model
Metrolinx Role Design
• Overall scope (inclusion of maintenance, operations, etc.)
• Project-Specific Output Specifications (with Consultant team)
• Real Estate Acquisition (with City of Toronto)
Build• Oversee Construction Phase• Quality Assurance
Finance• Project Budget • With Infrastructure Ontario run a
competetive prcurement process; select the winning contractor
Maintain• Testing & Commissioning (with Toronto
Transit Commission)• Safety Certification and Project
Acceptance TTC to operate
• Integrated with existing TTC system