Page 1: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

Statement of Qualifications District Green Infrastructure Funding Programs Green Vendor Pre-Qualification List RFQ No. P-2634

April 1, 2015

Page 2: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,
Page 3: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

SUSTAINABLE BUILDING

What is The Green 50? Inc. magazine asked their

staffers and contributors to find the most

intriguing set of entrepreneurs leading today’s

green revolution.

IBC Engineering Services is extremely proud to be

recognized in such esteemed company.

SELECT SUSTAINABLE PROJECTS

• Alterra @ the Lake, Milwaukee, Wisconsin

• Barclay Gallery & Garden Cafe,

Milwaukee, Wisconsin

• Bethel Commercial Center, Chicago, Illinois

• Bolingbrook High School, Bolingbrook, Illinois

• Chicago Center for Green Technology,

Chicago, Illinois

• Clifton Park-Halfmoon Public Library,

Clifton Park, New York

• Guesthouse at Wingspread, Racine, Wisconsin

• Homan Square Charter School, Chicago, Illinois

• Homewood Middle School,

Birmingham, Alabama

• Lake Forest Montessori School,

Lake Forest, Illinois

• Lynde & Harry Bradley Technology & Trade

School, Milwaukee, Wisconsin

• Milwaukee Theatre, Milwaukee, Wisconsin

• Nine Springs Wastewater Treatment Plant,

Madison, Wisconsin

• Orchard Street Residence, Lincoln Park, Illinois

• Outpost Natural Foods, Wauwatosa, Wisconsin

• Prairie Crossing Charter School,

Grayslake, Illinois

• Ryerson Woods Visitor Center,

Deerfield, Illinois

• Starbuck Middle School, Racine, Wisconsin

• Union Station Multiplex, Chicago, Illinois

• Villa Park Police Station, Villa Park, Illinois

• Washington Park Library, Milwaukee, Wisconsin

Sustainable building practices have been a part of IBC

Engineering Services’ core values since our inception. A

successful sustainable building will prove to be economical

throughout it’s life, consuming less energy which leads to

lower operating costs and lessens the impact on the

environment.

Our strategy involves more than a

just checklist of the latest green

trends. We work with our client’s

goals in mind, incorporating existing

technologies while exploring new

approaches to sustainability

throughout a building. Our design

solutions have resulted in significant reduction of energy costs,

healthier working and educational environments, an increase

in productivity, and happier end-users in general.

From the evaluation of energy conservation measures to the

design of geothermal heating and cooling systems, IBC

Engineering’s experience encompasses a broad range of

sustainability. We believe that successful sustainable strategies

encompasses both creative design and economical sense.

Page 4: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

ATTACHMENT A 1

REQUEST FOR QUALIFICATIONS DISTRICT GREEN INFRASTRUCTURE FUNDING PROGRAMS

GREEN VENDOR PRE-QUALIFICATION LIST RFQ No. P-2634

ATTACHMENT A

QUALIFICATIONS WORKSHEET

VENDOR INFORMATION Vendor Name: IBC Engineering Services, Inc.

Address: N8 W22195 Johnson Drive, STE. 180, Waukesha, WI 53186

Tax Identification #: 39-1678340

Year Established:

1990

VENDOR’s CONTACT PERSON:

Name:

Fieena Zvenyach Title:

President & CEO Telephone #:

262-522-4411

Email: [email protected]

Page 5: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

ATTACHMENT A 2

RESOURCE INFORMATION

Scale of Work (check all that apply)

Commercial / Industrial

Multifamily

Residential

Specialties (check all that apply)

Design Landscaping

Engineering Maintenance

Construction Plumbing

Downspouts and Gutters

GI Type (check all that apply)

Green Roofs Cisterns

Stormwater Trees Soil Amendments

Native Landscaping Rain Gardens

Porous Pavement Bioswales

Constructed Wetlands

xOther Storm water collection & reuse

SWMBE Certified?

Yes No

Page 6: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

ATTACHMENT A 3

TECHNICAL QUALIFICATIONS AND EXPERIENCE Project Descriptions Include one to three (1-3) project descriptions per type of GI that your Vendor has experience with. If your Vendor has experience in only one (1) type of green infrastructure please provide three (3) examples for that type of green infrastructure. Projects must have been completed within the last seven (7) years, or may be ongoing projects that are more than 50% complete. Fill out this form for each project to demonstrate your Vendor’s experience on specific green infrastructure installations.

Type of Green Infrastructure(s):

Project Information: Project Name: Clock Shadow Building Address/City/State/Zip: 138 West Bruce Street, Milwaukee, Wisconsin 53204

Project Owner Information: Owner’s Name: Fix Development – Juli Kaufmann Address/City/State/Zip: 538 South 2nd Street, Milwaukee, Wisconsin 53204 Phone:

Email: [email protected]

Project Construction Information: Construction Management Vendor: CG Schmidt Project Manager Name: Greg Morelli

Project Manager’s Vendor history: xcurrently employed ☐no longer employed ☐otherClick here to

enter text. Email: [email protected] Contract information (if applicable): 414-577-1177 Final Contract Amount (contracted and amended if applicable): $6 Million

Construction Start date (contracted): 2010 Construction Start date (actual): 2010 Construction End date (contracted): 2012 Construction End date (actual): 2012

Was the project completed on-time? xYes ☐No; Explanation: Click here to enter text.

Was the project completed on-budget? xYes ☐No; Explanation: Click here to enter text.

Was the project completed to the owner’s satisfaction? xYes ☐No; Explanation: Click here to enter text.

Page 7: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

ATTACHMENT A 4

Type of Green Infrastructure(s):

Project Information: Project Name: Ryerson Woods Welcome Center Address/City/State/Zip: 21950 West Riverwoods Drive, Riverwoods, IL 60015

Project Owner Information: Owner’s Name: Lake County Forest Preserves Address/City/State/Zip: 1899 West Winchester Road, Libertyville, IL 60048 Phone: 847-367-6640

Email: [email protected]

Project Construction Information: Construction Management Vendor: Boller Construction Company Project Manager Name: Derek Watson

Project Manager’s Vendor history: xcurrently employed ☐no longer employed ☐otherClick here to

enter text. Email: [email protected] Contract information (if applicable): 847-662-5566 Final Contract Amount (contracted and amended if applicable): $3 Million

Construction Start date (contracted): 2004 Construction Start date (actual): 2004 Construction End date (contracted): 2005 Construction End date (actual): 2005

Was the project completed on-time? xYes ☐No; Explanation: Click here to enter text.

Was the project completed on-budget? xYes ☐No; Explanation: Click here to enter text.

Was the project completed to the owner’s satisfaction? xYes ☐No; Explanation: Click here to enter text.

Page 8: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

ATTACHMENT A 5

Type of Green Infrastructure(s):

Project Information: Project Name: Tobias Henson Apartments Rain Water Reuse Address/City/State/Zip: 1443 Savannah Street, Washington DC 20032

Project Owner Information: Owner’s Name: Urban Green, LLC. – Mark James Address/City/State/Zip: 1717 Pennsylvannia Avenue NW, #1025, Washington DC 20006 Phone: 202-559-9068

Email: [email protected]

Project Construction Information: Construction Management Vendor: Hamel Builders Project Manager Name: Oscar Maccio

Project Manager’s Vendor history: x currently employed ☐no longer employed ☐otherClick here to

enter text. Email: [email protected] Contract information (if applicable): 202-584-2100 Final Contract Amount (contracted and amended if applicable): $3 Million

Construction Start date (contracted): Anticipated 2015 Construction Start date (actual): Construction End date (contracted): Anticipated 2016 Construction End date (actual):

Was the project completed on-time? ☐Yes xNo; Explanation: Final Design Phase

Was the project completed on-budget? ☐Yes xNo; Explanation: Final Design Phase

Was the project completed to the owner’s satisfaction? ☐Yes xNo; Explanation: Final Design Phase

Experience

Page 9: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

ATTACHMENT A 6

Project #1: Clock Shadow Building Property Owner’s: Fix Development

Address/City/State/Zip: 538 South 2nd Street, Milwaukee, Wisconsin 53204

Type of green infrastructure installed (check all that apply): x Green roofs

☐Constructed wetlands

☐Native Landscaping

☐Porous Pavement

☐Rain Barrels

x Cisterns

☐Stormwater Trees

☐Bioswales

☐Greenways

☐Rain Gardens

x Other, Geothermal heating and cooling

Project #2: Ryerson Woods Welcome Center Property Owner’s: Lake County Forest Preserves

Address/City/State/Zip: 1899 West Winchester Road, Libertyville, IL 60048

Type of green infrastructure installed (check all that apply):

☐Green roofs

☐Constructed wetlands

☐Native Landscaping

xPorous Pavement

☐Rain Barrels

x Cisterns

☐Stormwater Trees

☐Bioswales

☐Greenways

x Rain Gardens

x Other, Ground source heating and cooling system

Project #3: Tobias Henson Apartments Rain Water Reuse Property Owner’s: Urban Green, LLC. Address/City/State/Zip: 1717 Pennsylvannia Avenue NW, #1025, Washington DC 20006

Type of green infrastructure installed (check all that apply):

x Green roofs

☐Constructed wetlands

x Native Landscaping

x Porous Pavement

x Rain Barrels

x Cisterns

x Stormwater Trees

x Bioswales

☐Greenways

x Rain Gardens

x Other, Non-Potable Reuse

Project #4: Property Owner’s: Click here to enter text. Address/City/State/Zip: Click here to enter text. Type of green infrastructure installed (check all that apply):

☐Green roofs

☐Constructed wetlands

☐Native Landscaping

☐Porous Pavement

☐Rain Barrels

☐Cisterns

☐Stormwater Trees

☐Bioswales

☐Greenways

☐Rain Gardens

☐Other, Click here to enter text.

Project #5: Property Owner’s: Click here to enter text. Address/City/State/Zip: Click here to enter text. Type of green infrastructure installed (check all that apply):

☐Green roofs

☐Constructed wetlands

☐Native Landscaping

☐Porous Pavement

☐Rain Barrels

☐Cisterns

☐Stormwater Trees

☐Bioswales

☐Greenways

☐Rain Gardens

☐Other, Click here to enter text.

Page 10: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

Clock Shadow Building Milwaukee, Wisconsin

Size:

28,500 SF

Construction Cost:

$6 million

Completion:

2012

sustainable m.e.p. design : ground source heat pumps : 2013 Top Ten Green Projects AIA COTE

This four-story 28,500 square foot building replaces an abandoned, contaminated lot in one of Milwaukee’s

most vibrant neighborhoods. Embracing the tenets of the Living Building Challenge the completed building

is one of Milwaukee’s most “radically sustainable.”

The design first aims to reduce demand for energy, then draws energy where needed from renewable

sources by maximizing window orientations to capture natural light and solar energy; including operable

windows to allow for natural air flow; providing elements like accessible, beautiful stairs to encourage

walking over mechanical elevator use; reducing demand on energy further by using state-of-art energy

efficient lighting and innovative regenerative elevator technology; and capturing the efficient energy of the

earth’s thermal mass through geothermal heating and cooling.

Additionally, the building harvests all storm water on site for use to irrigate rooftop food production, and

captures excess rainwater and building grey water discharge into a cistern that re-circulates to feed the

internal water demand for toilet flushing—the first in Milwaukee.

Page 11: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

Ryerson Woods Welcome Center Deerfield, Illinois

Size:

5,600 SF

Construction Cost:

$3 million

Completion:

2006

sustainability consulting : building commissioning : LEED Platinum Certified

Part of the 552-acre Ryerson Conservation Area near Deerfield, Illinois, he 5,600 square foot Center is a

vision of the Lake County Forest Preserve District to create an innovative space for educational and

outreach programs that focused on energy efficiency, recycled materials, and water conservation.

The Center provides a home for Ryerson Woods’ Environmental Education staff and new space for public

programs and school field trips. Sustainable strategies include a ground source heating and cooling system,

two rain gardens, a porous asphalt parking lot, and a large underground cistern that collects rainwater

from the rooftop to be used in case of fire.

Page 12: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

SUSTAINABILITY STATEMENT Sustainable building practices have been a part of IBC Engineering Services’ core values since our inception. The

design and construction of our office followed LEED guidelines, including the use of wheat-board cabinetry,

soybean countertops, and low VOC paints and sealants throughout.

In collaboration with a number of different equipment vendors our office has become both a showcase and

laboratory for our work, and we continue to incorporate sustainable elements as technologies evolve and become

more readily available and cost effective.

WASTE MINIMIZATION

Our office promotes the reduction of waste wherever possible.

Kitchen: In addition to paper and aluminum recycling bins we provide real plates, drinking glasses, and cutlery

for employee use.

Restrooms: Our restrooms are stocked with recycled paper hand towels, as well as reusable cloth alternatives.

Stockroom: We procure our office supplies from E-Z Office Products, a Wisconsin based business specializing

in eco-friendly products. All paper contains at least 30% post-consumer waste and we utilize greener cleaning

products from brands such as Seventh Generation and Method.

General: The majority of our communication is paperless, including the company newsletter and vendor

invoicing. Double sided printing and copying is the default setting for all workstations.

ENERGY EFFICIENCY

Energy efficiency is the backbone of our company mission and our office includes:

High efficiency equipment with cooling energy efficiency 20% above ASHRAE guidelines.

Variable volume system with DDC control to optimize operation schedules, fan power, and evening setbacks.

High-performance, total energy heat recovery for exhaust/outside air.

Low-density, high efficiency lighting, with 90% day lighting.

Occupancy Sensors in all occupied spaces.

Page 13: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES : SUSTAINABILITY STATEMENT

WATER EFFCIENCY

Living so close to Lake Michigan reinforces our commitment to water efficiency and conservation.

Restrooms: Our restrooms first utilized 1.6 gallon per flush water, along with low flow faucet aerators which

cut water usage by 40%. In 2006, we were asked to provide feedback on a waterless urinal, which was

estimated to save 100,000 gallons of water a year. The fixtures were recently upgraded to a pint flush urinal

and water closets that utilize pressure assist flush valves, which uses less than 1 gallon of water per flush,

saving more than 120,000 gallons of water per year.

Drinking Water: A filtered water faucet and ice maker cuts back on the need for bottled water in the kitchen;

while a water pitcher and drinking glasses are available for guest use in the conference rooms.

STAFF

Fostering an environment committed to sustainable practices is important to our company culture.

Transportation: Employees have use of the company hybrid car, and are encouraged to utilize the train and

other modes of public transportation whenever possible.

Shower Facility: As a number of our employees prefer to cycle into the office, we provide showering facilities

and bike storage.

LEED AP: Of the seven LEED Accredited Professionals in our office, five are senior personnel, with four of us

having been accredited since 2004.

Wisconsin Green Building Alliance: We have been active members of Wisconsin’s USGBC affiliate for over a

decade. Employees have served on various committees, presented at conferences, and volunteered time and

expertise on a number of projects, including the greening of their own offices.

EDUCATION

Every day affords the opportunity to gather, grow and share our knowledge with our clients, our colleagues, and

our selves.

Founders: Lev and Fieena Zvenyach, the founders of IBC Engineering Services, have installed both a ground

source heating and cooling system and PV panels at their home. Employees were invited to witness the

installations to further their understanding of the technologies.

The Green 50:

What is The Green 50? In November 2006, Inc. magazine asked their staffers and contributors to find the

most intriguing set of entrepreneurs leading today’s green revolution. Narrowing the list to 50, they came up

with a wide range of businesses, from high-tech firms making big bets on the future of energy to decidedly

low-tech concerns that are simply determined to find a different way to do business. IBC Engineering Services

is extremely proud to be listed among The Builders.

: a shortcut for “Regarding : Engineering.” : means to “Engineer Again.”

@ IBC ENGINEERING SERVICES

both concepts apply.

REGARDING ENGINEERING As both student and teacher we are constantly looking, listening, and learning. We are asking questions not only in search of solutions, but often, in search of the core problem. At the heart of our practice is the notion of sustainability, and the belief that the best engineering systems aren’t necessarily dependent on cost or complexity. ENGINEERING AGAIN Renovation and life cycle are both important components in our work and we approach it with an eye on efficiency. Whether a building is changing its occupancy type (from an abandoned power house to a high school, for instance), or it’s just not aging very gracefully, IBC Engineering strives to design effective systems with a minimum of waste, expense, or unnecessary effort for our clients and our larger environment.

Page 14: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

CUSTOMER SERVICE APPROACH Please provide an example of a conflict that arose during the course of a project and how that conflict was resolved. Please be detailed in your description of the issue and how it was resolved. Projects are often complex and multifaceted. A key factor to good project performance is the Project Manager’s ability to integrate personnel from many disciplines into an effective work team. We expect our Project Manager’s to communicate effectively with all organizational levels regarding both project objectives and decisions. Additionally, regularly scheduled status review meetings are an important communication vehicle, as well as, effective project planning, contingency planning, securing of commitments, and involving top management which help to avoid or minimize many conflicts before they impede project performance. When conflicts do arise we seek to find the root cause and come to a collaborative resolution that is agreeable to all members of the team.

Page 15: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

ORGANIZATIONAL CHART

Fieena Zvenyach

President

Lev Zvenyach, PE, CIPE

Vice President

Project Team Leaders

Doug Sauer

Scott Beglinger

Tom King

Mike Roller

Dave Piluski

Technical Staff

Dave Schaefer

John Fry

Brian Kuhn

Administrative Support

Laurie Grabow

Page 16: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES , INC.

LEV H. ZVENYACH, PE, CPMP, LEED® AP Engineering Principal

EDUCATION AND REGISTRATION

MS Mechanical Engineering

Polytechnic University, Minsk, Belarus

Commissioning Process Management

Professional, ASHRAE

Professional Engineer: Wisconsin

Also: Colorado, Illinois, Iowa,

Michigan, Minnesota, New York,

Ohio, Washington

An outstanding leader and educator, Lev’s 30+ years of

experience include projects with a focus on sustainable

technologies. A proactive problem solver who believes

every building should be designed with an emphasis on

higher energy efficiency, occupancy comfort and minimal

impact on the environment, Lev excels at creating

innovative solutions for a variety of environments.

SELECT PROJECT EXPERIENCE

Fortaleza Hall | Racine, Wisconsin

Designed by London-based Foster + Partners, Project Honor creates two companion buildings:

Fortaleza Hall, which will form a permanent home for a replica Carnaúba plane and convey the

extraordinary story of H. F. Johnson’s flight on the aircraft in 1935; and the Community Building,

which will give the campus a new social heart.

Rush University Medical Center : Brennan Pavilion | Chicago, Illinois

Bridging the original hospital with the new LEED-Gold Certified 14-story Patient Tower, the

Pavilion incorporates the most environmentally ingenious engineering, aesthetics and design,

including central skylights and a large terrarium “tube” filled with plants that stretch to the

meditative green roof gardens above.

Clock Shadow Building | Milwaukee, Wisconsin

This 30,000 square foot multi-tenant building is located on a former brownfield site, this $7 million

project houses sustainably minded tenants like The Healing Collective, Clock Shadow Creamery,

and the Purple Door Ice Cream shop, Using principles from the Living Building Challenge, the

Clock Shadow Building is a stellar example of sustainability in Milwaukee.

Riverbend Place / Manpower International | Milwaukee, Wisconsin

This LEED-Gold Certified project includes a 280,000 square foot, four-story office building, a seven-

level, 1,260 space parking structure and 1,800 square feet of retail space. The new site currently

houses more than 900 employees with plans to add 300 more over the next five years. Its

impressive layout consists of a client center, state-of-the-art learning center and cafeteria in the first

floor and staff workspace in the upper floors.

Chicago Center for Green Technology | Chicago, Illinois

One of the USGBC’s pilot projects for LEED v1.0, the CCGT is still considered a shining example

of sustainable building practices. IBC Engineering designed and commissioned innovative HVAC and

plumbing system solutions throughout the two-story, 34,000 square foot building. In addition to its

LEED-Platinum Certification, the CCGT was also the only U.S. facility to be honored with a first

place in ASHRAE’S International Technology Awards in 2006.

Page 17: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

LEV ZVENYACH, PE continued

IBC ENGINEERING SERVICES , INC.

Duke University : Marine Science and Conservation Genetics Center

A new research facility for Duke University’s Nicholas School of the Environment and Earth

Sciences, this $6.5 million project will house a 20-seat molecular biology research laboratory; a 16-

seat teaching lab designed for molecular-based coursework, as well as office space and meeting

areas. In addition to maximizing green design elements, the Center will serve as a demonstration

project for construction methods that anticipate sea level rise.

Main Street Revitalization | West Union, Iowa

IBC Engineering Services was asked to incorporate a district heating and cooling systems in the

design of a new Main Street in West Union. The proposed distribution system will consist of

approximately 60 buildings. The ground source heat pump system contains 180 vertical bores, at a

depth of 300 feet. All downtown buildings will receive a “stub line” to the system free of charge;

property owners can decide if or when they want to participate in the district wide system.

PROFESSIONAL REFERENCES Donald Guzzetta

Director of Facility Operations

The Johnson Foundation

33 East Four Mile Road

Racine, Wisconsin 53402

(262) 639-3211

[email protected]

Larry Kearns

Principal

Wheeler Kearns Architects

343 South Dearborn Street

Chicago, Illinois 60604

(312) 939-7787

[email protected]

Frank Jarosz

(retired Director of Facilities,

Racine Unified School District)

Viable Facilities Management

725 Perry Ave.

Racine, Wisconsin 53406

(262) 634-6180

AVAILABILITY (July 2013 – May 2016) Because Lev’s main focus on projects is quality control and overall guidance, his schedule is flexible and he could be

available immediately. As Engineering Principal, we expect Lev to spend 50% to 75% of his time on this project.

Page 18: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES , INC.

MIKE ROLLER, PE, LEED AP

MEP Project Manager

EDUCATION AND REGISTRATION

BS, Civil Engineering

Marquette University

WI PE REGISTRATION: E-24969-6

Registered Professional Engineer:

Florida, Illinois, Minnesota, Oklahoma

AWARDS

2011 Wisconsin Builder Top Project

Beaver Dam Wastewater

Treatment Plant

2010 Wisconsin Builder Top Project

Well No. 13

Muskego, Wisconsin

A specialist in building mechanical system design, Mike’s more than 24 years of

experience includes a broad range of projects for industrial, municipal and

institutional clients. He is a responsive project manager who believes in

keeping his clients involved and informed. With his natural leadership abilities

and exceptional problem solving skills Mike also mentors our younger staff,

focusing on team work and quality control.

Mike’s experience includes projects at a number of Water and Wastewater

Treatment Facilities, ranging from the design of new multiple-structure plants

to the HVAC upgrade and expansion at existing facilities.

SELECT PROJECT EXPERIENCE

Nine Springs Wastewater Treatment Plant: 11th Addition | Madison, Wisconsin

Currently in design, this $41million project is the 11th addition to this wastewater treatment plant that treats an average

of 43 million gallons per day. The design scope follows the recommendations of the Facility Plan for sludge thickening,

sludge digestion, foam mitigation, struvite precipitation, and auxiliary systems and includes construction of a solids

handling system to convert the existing anaerobic digestion process multi-stage acid-phase digestion.

Rhinelander Wastewater Treatment Plant | Rhinelander, Wisconsin

Schedule for completion in July 2011, this new $32 million plant that will employ a biological phosphorous removal

process that will limit the presence of phosphorous in the wastewater to one part per million, a considerable

improvement in terms of environmental impact from the existing facility, which uses a chemical treatment process and

only achieves the standard of 3.5 parts per million. The facility will also create a solid-waste by-product that will qualify

as Class A sludge, a material that can be mixed with top soil for use as a fertilizer.

Wastewater Treatment Facility Improvement & BioEnergy Project | Beaver Dam, Wisconsin

This $20 million project is a public/private partnership between the City of Beaver Dam and Kraft Foods. The main

improvements made to the Beaver Dam Wastewater Treatment Facility include a new 2,270 square foot screening

building, a 14,325 square foot addition to the existing service building, and a new 56'-0" high by 49'-0" diameter UASB

reactor. Design of the project was completed in August 2009, with construction commencing in early 2010 and

projected completion of the project in mid-2011.

Wisconsin Rapids Wastewater Treatment Plant | Wisconsin Rapids, Wisconsin

The treatment plant treats the sewage from Wisconsin Rapids and the Village of Biron and has a capacity of 5.16 million

gallons per day. It serves both residential and industrial customers and treats an average of 3 million gallons per day. The

$25 million expansion and upgrade will facilitate the needs of industrial customers, and when completed, will be as

energy-efficient and self-sustaining as technology allows. The new design will be easily upgraded to accommodate both

residential and industrial growth.

Page 19: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

MIKE ROLLER, continued

Other Wastewater Treatment Plant Projects:

Dane-Iowa Wastewater Treatment Plant

New Multiple Structure Facility

Mazomanie, Wisconsin

Waconda Wastewater Treatment Plant

Plant Expansion and Water Quality Upgrade

Waconda, Illinois

West Salem Wastewater Treatment Plant

New Multiple Structure Facility

West Salem, Wisconsin

Marshall Wastewater Treatment Plant

New Multiple Structure Facility

Marshall, Wisconsin

Reedsburg Wastewater Treatment Plant

New Headworks Building, Various Upgrades

Reedsburg, Wisconsin

Hebron, Wisconsin

Lyons, Wisconsin

Waupun, Wisconsin

Burlington, Wisconsin

Cadott, Wisconsin

Watertown, Wisconsin

Dekorra, Wisconsin

Ellsworth, Wisconsin

Evansville, Indiana

Jefferson, Wisconsin

Linden, Wisconsin

Menomonie, Wisconsin

Oregon, Wisconsin

Portage, Wisconsin

Rice Lake, Wisconsin

Spring Valley, Illinois

Antioch, Wisconsin

Dousman, Wisconsin

Mukwonago, Wisconsin

Slinger, Wisconsin

Page 20: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC E NG INEER ING SERVICE S, I NC .

DAVID K. PILUSKI, PE Senior Project Manager

EDUCATION AND REGISTRATION

Northern Illinois University

Mechanical Engineering

DeKalb, IL

University of North Dakota

Mechanical Engineering

Grand Forks, ND

Registered Engineer: Wisconsin,

Colorado, Arizona, Nevada, Maryland

Massachusetts, North Carolina

A highly focused and organized engineer and manager, Dave’s 25 years of

experience span the entire spectrum of projects with a concentration in

renovation and system upgrades for educational, municipal, and industrial clients.

He has been instrumental in the mechanical and electrical design and

coordination of numerous renovation spaces.

Dave also has experience working with community based organizations,

projects reliant on campaign and grant funding drives, as well as projects with

multiple stake holders. His strong communications skills will be an asset in

moving this unique project forward.

SELECT PROJECT EXPERIENCE

GATEWAY TECHNICAL COLLEGE

South Building Renovation | Elkhorn, Wisconsin

One of the original campus buildings built in 1970, the South Building has endured a half dozen disjointed additions over

the years. With this $3.5 million facelift portions of the south building's interior will be reconstructed, and an addition

will transform two courtyards into a student life center and dining area. New electrical, mechanical, and plumbing will

bring systems up to modern codes, as well as improve energy efficiencies.

S.C. Johnson Integrated Manufacturing and Engineering Technology (iMET) Center | Sturtevant, Wisconsin

This 61,000 square foot project houses Gateway Technical College’s engineering technology and construction sciences

programs. The State of the art facility offers training in computer numerical control (CNC) machining, welding, metal

fabrication, automated manufacturing systems and industrial robotics, and features an Industrial Design Fab Lab, one of

only 100 in the world.

Boiler Plant Upgrade | Racine, Wisconsin

Composed of four major buildings, the Racine Campus is the largest campus of Gateway Technical College. IBC

Engineering conducted a thorough assessment of the campus boiler plant in order to address the capital maintenance

program as it relates to major equipment, such as chillers, boilers, air handlers, etc. Our findings concluded that the

existing system was inefficient, and in many cases, not functioning properly. The implementation of our

recommendations is currently being discussed.

NORTHWESTERN UNIVERSITY

• Nusslock Lab in Cresap Hall

• Dearborn Observatory

• Norris Student Center

• Maple-Noyes Residence Hall

Page 21: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES , INC.

TOM KING, RE, LEED® AP

MEP Project Manager / Engineer

EDUCATION AND REGISTRATION

Associate Degree, Applied Science

Mechanical Design | Anoksa-Ramsey

Community College - Minnesota

Registered Designer of Engineering

Systems, State of Wisconsin (1956-7)

LEED® Accredited Professional, U.S.

Green Building Council

A dedicated team player, Tom’s strong construction background

incorporates over fifteen years of experience in mechanical, plumbing and fire

protection contracting and design. He is a highly organized and detail

oriented professional, with particular expertise in the technical aspects of the

construction process.

Tom’s varied experience incorporates a variety of project types, including

educational and medical projects throughout the United States. He is a

focused leader with strong communications skills and a commitment to

sustainable design, and has been instrumental in our success with various IDIQ

contracts throughout the United States.

SELECT PROJECT EXPERIENCE

Tom has served as Project Manager on the following projects:

Clement Zablocki VA Medical Center IDIQ Contract | Milwaukee, Wisconsin

IBC Engineering Services has been working on an open-end, multi-discipline A/E contract at this VA Hospital since 2005.

Projects have included the complete renovation of an intravenous preparation lab on the hospital’s main floor, the

renovation of the education center, the expansion of the dental clinic, as well as various power, fire alarm, and

vengineering system upgrades.

Muchin College Prep | Chicago, Illinois

The eighth campus in the Noble Network of Charter Schools, Muchin College Prep is the only school of its kind to be

located within a high-rise in downtown Chicago. Designed to achieve efficiencies 20% above ASHARE Energy Standards,

the $10 million 70,000 square foot project is expected to earn a LEED-Gold certification.

River Shores | West Bend, Wisconsin

River Shores is a $90 million development located along the Milwaukee River. IBC Engineering Services worked with the

developer on two projects at this site: the renovation of an existing factory building to house a new YMCA; and the

renovation of existing offices into a parking structure for the new addition of 30 condominiums.

Wisconsin Veterans Home : Boland Skilled Nursing Center | Union Grove, Wisconsin

The Union Grove Wisconsin Veterans Home was opened in 2001 to serve the estimated 77,000 veterans over the age

of 65 living in Southern Wisconsin. A new 120-bed Skilled Nursing Facility completes the continuum of care at this

location. In addition to resident rooms, the three-story 97,000 square foot facility contains OT/PT rooms, community

rooms, full laundry facilities, administration space and a chapel.

Page 22: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES , INC.

SCOTT BEGLINGER, RD, LEED® AP MEP Project Manager / Design Engineer

EDUCATION AND REGISTRATION

Registered Designer of Engineering

Systems, State of Wisconsin (2091-7)

LEED® Accredited Professional

RECENT AWARDS

2012 Wisconsin Builder Top Project:

Westlawn Gardens

Lapham Park Revitalization

An accomplished HVAC and plumbing systems designer

with nearly 20 years of experience, Scott possesses a

keen sense for details and excellent communication

skills. Passionate about the environment and sustainable

building practices, he has been involved in a number of

facilities that incorporate renewable energy features.

SELECT PROJECT EXPERIENCE

Riverbend Place / Manpower International | Milwaukee, Wisconsin

This LEED-Gold Certified project includes a 280,000 square foot, four-story office building, a

seven-level, 1,260 space parking structure and 1,800 square feet of retail space. The new site

currently houses more than 900 employees with plans to add 300 more over the next five years. Its

impressive layout consists of a client center, state-of-the-art learning center and cafeteria in the

first floor and staff workspace in the upper floors.

St. John’s on the Lake | Milwaukee, Wisconsin

A new 21-story tower housing 100 luxury independent living units, connected to the existing

buildings via a shared town-center. This town center acts as link for both the new and present

residents while providing amenities to the entire site such as a wellness facility, multi-purpose

room, art gallery, and a semi-public bistro.

Rush University Medical Center : Brennan Pavilion | Chicago, Illinois

Bridging the original hospital with the new LEED-Gold Certified 14-story Patient Tower, the

Pavilion incorporates the most environmentally ingenious engineering, aesthetics and design,

including central skylights and a large terrarium “tube” filled with plants that stretch to the

meditative green roof gardens above.

Shaw Technology and Learning Center Power House High | Chicago, Illinois

The renovation of this historic building built in 1905 to provide electricity and heat to the massive

Sears, Roebuck & Company, houses 460 students. A LEED-Platinum Certified project, the

curriculum will use the renovated building’s sustainable features to enhance lessons on the

environment, clean technologies and sustainability.

BMO Institute for Learning | Brookfield, Wisconsin

This 55,000 square foot facility provides space for training in leadership, sales and other aspects of

the banking business. The three-story structure includes a 136-seat auditorium, 13 training rooms,

"breakout" rooms for smaller groups and rooms wired and outfitted for online or computer-based

training. Indoor air quality and occupant comfort were primary concerns driving the commissioning

process.

Page 23: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

SCOTT BEGLINGER, RD continued

IBC ENGINEERING SERVICES , INC.

Engberg Anderson Design Partnership | Milwaukee, Wisconsin

This 20,000 square foot renovation of an 85-year old industrial building into modern office space is

LEED-Gold certified. The design team created a healthful working environment that is not only

energy and resource efficient, but also serves as a learning laboratory for green principles.

Northeast Library Renovation | Washington, DC

First opened in 1932, this $10 million renovation will provide state-of-the-art library services, while

retaining the building's historic character. Work will include restoration of original woodwork; new

MEP systems; improved lighting; increased space for library programs; a larger meeting room; quiet

study rooms; new restrooms; a new elevator; roof repairs; new flooring; and new and restored

furnishings and fixtures.

Westlawn Gardens | Milwaukee, Wisconsin

This $100 million revitalization transforms Wisconsin’s largest public housing project from a place

for the city's poorest families to a mix of sustainable housing units for low- and moderate-income

families and seniors. A blend of colors, textures and approaches were used to mix 950 units of

apartments, townhouses, bungalows, and condos, including 14 “healthy homes.”

Duke University : Marine Science and Conservation Genetics Center

A new research facility for Duke University’s Nicholas School of the Environment and Earth

Sciences, this $6.5 million project will house a 20-seat molecular biology research laboratory; a 16-

seat teaching lab designed for molecular-based coursework, as well as office space and meeting

areas. In addition to maximizing green design elements, the Center will serve as a demonstration

project for construction methods that anticipate sea level rise.

PROFESSIONAL REFERENCES

William Hartzel

Project Manager

Housing Authority of the City of MKE

809 North Broadway

Milwaukee, Wisconsin 53202

(414) 286-5678

[email protected]

Brian Scotty, AIA

Principal

Quorum Architects

3112 W. Highland Blvd.

Milwaukee, Wisconsin 53208

(414) 265-9265

[email protected]

Brad Roeder, RA

Senior Project Architect

Bell Architects, PC

1228 9th Street NW

Washington, DC 20001

(202) 549-7570

[email protected]

AVAILABILITY (July 2013 – May 2016)

Scott’s schedule will clear substantially

within the next three months. As the

Project Manager, we expect him to be

able to devote 90% of his time to this

project.

Currently in design:

Onalaska Visitors Center

Genoa National Fish Hatchery

Currently under construction:

DC Northeast Library

Duke University Marine Lab

Page 24: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES , INC.

BRIAN M. KUHN, QCxP, LEED® AP

MEP Project Manager

EDUCATION AND REGISTRATION

BS Aviation Administration

Lewis University, Romeoville, Illinois

LEED® Accredited Professional,

USGBC

Member, Building Commissioning

Association (BCA)

Accredited Qualified Commissioning

Process Professional

An accomplished engineering designer Brian’s experience includes a variety of

projects, from feasibility studies to the 200,000 square foot office and

warehouse expansion.

With a background in construction, strong communications skills and a

commitment to sustainable design Brian brings a strong knowledge of building

systems, building codes, and LEED/sustainable concepts to every project.

SELECT PROJECT EXPERIENCE

Zablocki VA Medical Center

Multiple Projects

Milwaukee, Wiscosnin

Cree Office / Warehouse Expansion

Sturtevant, Wisconsin

Main Street Redevelopment

West Union, Iowa

Hansberry College Prep

Chicago, Illinois

Schultz Aquatic Center

Milwaukee, Wisconsin

Milwuakee Intermodal

Milwaukee, Wisconsin

Middleton VA Memorial Hospital

Multiple Projects

Madison, Wisconsin

Victoria Wellens Center

Saukville, Wisconsin

M & I Sustainable Prototype

New Berlin, Wisconsin

Lapham Park Revitalization

Milwaukee, Wisconsin

East Library Renovation

Washington, DC

Duke University

Marine Science and Conservation Genetics Center

Dunham, North Carolina

Page 25: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

DOUGLAS M. SAUER, PE ELECTRICAL ENGINEER

EDUCATION AND REGISTRATION Bachelor of Science: Electrical and Electronic Engineering, South Dakota State University WI PE REGISTRATION: 25945-6

Professional Engineer: Illinois, South Dakota Instructor (2000-present) Senior Level Electrical Engineering Milwaukee School of Engineering (MSOE)

With nearly 40 years of design and project management experience, Doug

specializes in electrical lighting and power distribution design for a broad range

of projects, including commercial, municipal, and healthcare projects. His

breadth of experience includes energy conservation studies, underground

electrical distribution system design, and interior and exterior lighting design.

Doug specializes in electrical lighting and power distribution design. On this

project, Doug will ensure that all electrical issues affected by the system

replacements are addressed.

SELECT PROJECT EXPERIENCE

Hansberry College Prep Chicago, Illinois Northeast Neighborhood Library Washington, DC the House at Wingspread Racine, Wisconsin Great River Road Interpretive Center Genoa, Wisconsin

Crab Orchard National Wildlife Refuge Headquarters

Marion, Illinois

Duke University

Pilkey Marine Science & Conservation Genetics Center

Durham, North Carolina

Foss Swim Schools

Lakeview, Libertyville, Lincoln Park, and

South Barrington, Illinois

Clock Shadow Building

Milwaukee, Wisconsin

Gateway Technical College: IDIQ Contract

Kenosha, Burlington, Elkhorn, Racine

• Racine Campus Boiler Plant Upgrade

• AHU Chiller/Boiler Upgrade

• Atrium Re-lighting

• Learning Success Center

• North Building Addition

• Administration & Conference Center: HVAC Upgrade

• The Center for Bioscience and Information

Technology: Switchgear Replacement

• Pike Creek Horticulture Center Renovation

• Culinary Arts Expansion

• South Building Electrical Upgrade

• Student Services Building

• Generator Replacement

• Learning Success Center

• Solar PV Panel Installation

• iMET (Integrated Manufacturing and Engineering

Technology) Center

• Apprentice Training Center

• Conference Center Upgrades

• Horizon Center Advanced Propulsion Lab Addition

Page 26: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

DAVID SCHAEFER ELECTRICAL DESIGNER

EDUCATION AND REGISTRATION Associate Degree, Waukesha Area Technical College, Architectural Design/Construction Technology

Mr. Schaefer is an electrical designer with more than 18 years of professional

experience. He specializes in electrical power distribution, emergency power

systems, lighting and fire alarm systems. He is an electrical designer and has

extensive experience with commercial, government and universities.

SELECT PROJECT EXPERIENCE

City of Milwaukee, Calvin Moody Park, Milwaukee, Wisconsin

New Community Building

Park Renovation

Madison College, Site Lighting, Portage, Wisconsin

Medical College of Wisconsin, Milwaukee, Wisconsin

Human Anatomy

Active Learning Center

MEB Commons Area

University of Wisconsin, School of Freshwater Science, Milwaukee, Wisconsin

University of Wisconsin Hospital & Clinics, Madison, Wisconsin

American Family Children’s Hospital, Vertical Expansion

American Family Children’s Hospital, Diagnostics Pavilion

Milwaukee Art Museum, Calatrava Addition, Milwaukee, Wisconsin

University of Wisconsin, Chazen Art Museum, Museum Addition, Madison, Wisconsin

Children’s Hospital of Wisconsin, Milwaukee, Wisconsin o NICU Renovation o New West Parking Structure Addition o New Medical Office Building o West Patient Tower o Clinics Building Renovations o Hospital and Clinics Building Elevator Upgrades

Elkhorn High School, Classroom and Gymnasium Addition, Elkhorn, Wisconsin

Aspirus Wausau Hospital LDRP, Wausau, Wisconsin

Columbia St. Mary’s Hospital – Milwaukee County Campus, Temporary Heliport, Milwaukee, Wisconsin

Columbia St. Mary’s Hospital – Ozaukee County Campus, Hospital Addition, Mequon, Wisconsin

Department of Military Affairs, Fleet Maintenance Facility Renovation, Whitewater, Wisconsin

General Mitchell International Airport, New Southwest Maintenance Building, Milwaukee, Wisconsin

Monroe Medical Center, Hospital Addition, Monroe, Wisconsin

Ozaukee County, New YMCA, Mequon, Wisconsin

St. Clare Hospital, Baraboo, Wisconsin

Page 27: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

JOHN FRY, RD Senior Electrical Engineer

EDUCATION AND REGISTRATION

Architectural Technology

Milwaukee Area Technical College

Registered Designer of Electrical

Engineering Systems

State of Wisconsin 1013-7

With more than 25 years of design and project management experience,

John specializes in electrical lighting and power distribution design for a

broad range of projects, including commercial, industrial, municipal, and

healthcare projects. His breadth of experience includes energy conservation

studies, underground electrical distribution system design, and interior and

exterior lighting design.

SELECT PROJECT EXPERIENCE

Gateway Technical College

Racine, Wisconsin

Stair and Plaza Renovation

Student Center Renovation

Student Commons Improvements

Tunnel Improvements

3rd Floor Renovation

Demonstration Kitchen

Learning Success Center

Sturtevant, Wisconsin

iMET (Integrated Manufacturing and Engineering

Technology) Center

Burlington, Wisconsin

Patient Simulation Classroom

Elkhorn, Wisconsin

North Building Addition

Student Services Modifications

Student Support Addition

Kenosha, Wisconsin

AHU Replacement

New Electrical Service

General Mitchell International Airport

Milwaukee, Wisconsin

Baggage Claim

Concourse E

College Avenue Tunnel

Diesel Fueling System

Runway Area Safety Improvements

Milwaukee County Dept. of Transit and Public Works

Milwaukee, Wisconsin

David F. Schulz Aquatic Center

Courthouse Renovations

Fond du Lac Building Transportation Building

Kinnickinnic Transportation Building

Kenosha Metra Station Kenosha, Wisconsin Beloit Transfer Station Beloit, Wisconsin Crab Orchard National Wildlife Refuge Headquarters Marion, Illinois Northeast Library Renovation Washington, DC

Page 28: Statement of Qualifications District Green Infrastructure ... · green revolution. IBC Engineering Services is extremely proud to be ... • Nine Springs Wastewater Treatment Plant,

IBC ENGINEERING SERVICES, INC.

PROJECT REFERENCES

Clock Shadow Building – Milwaukee, Wisconsin Owner’s Name: Fix Development – Juli Kaufmann Address/City/State/Zip: 538 South 2nd Street, Milwaukee, Wisconsin 53204 Phone: N/A Email: [email protected] Ryerson Woods Welcome Center – Deerfield, Illinois Owner’s Name: Lake County Forest Preserves Address/City/State/Zip: 1899 West Winchester Road, Libertyville, IL 60048 Phone: 847-367-6640 Email: [email protected] Tobias Henson Apartments Rain Water Reuse – Washington, DC Owner’s Name: Urban Green, LLC. – Mark James Address/City/State/Zip: 1717 Pennsylvannia Avenue NW, #1025, Washington DC 20006 Phone: 202-559-9068

Email: [email protected]