APPENDIX A FFY 2018-2021 State Transportation Improvement Program
INTERIM PROJECT INDEX (as of 07/12/2017)
In County, Project Number Order All Dollar Amounts are in $1,000’s. Some Dollar Amounts and Percentages may be rounded.
Kansas STIP FFY 2018 - 2021 Appendix A Page 87
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Allen CountyU-2308-01 PEDBI 2017$194 $194
U230801 $144 74.19%TA
$50 25.80%U0370
Name: Pedestrian Safety Improvements in the City of Iola
Location:
Scope:
KDOT 0.5Allen Route: Total Length (Miles): Letting Type: NHS Project: County:
Improvement of sidewalks to access school
City of Iola
Kansas STIP FFY 2018 - 2021 Appendix A Page 88
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Anderson CountyC-4839-01 BRRPL 2017$335 $335
$67 20.00%C0002
C483901 $268 79.99%STP
Name: Bridge Replacement in Anderson County
Location:
Scope:
NKDOT 0.2Anderson Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Martin Creek Bridge at the Anderson/Allen County Line
KA-2380-02 FUNDS 2017$390 $390
$390 100.00%K
Name: Provide funds to Anderson County
Location:
Scope:
NONE 0.0Anderson Route: Total Length (Miles): Letting Type: NHS Project: County:
Provide funds to Anderson County
Provide funds to Anderson County
KA-2846-01 GRSU 2016 2017$575$59 $634
$59 100.00% $575 100.00%K
Name: Intersection Improvement in Garnett
Location:
Scope:
YLOCAL 0.5U059Anderson Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct Left Turn Lanes
Garnett US-59 & Home Run Dr
Kansas STIP FFY 2018 - 2021 Appendix A Page 89
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Atchison CountyC-4797-01 SG 2016 2017$462$47 $509
C479701 $462 100.00%HSIP
Name: Signing in Atchison County
Location:
Scope:
NKDOT 171.0Atchison Route: Total Length (Miles): Letting Type: NHS Project: County:
Signing
Various Major Collectors
KA-3522-01 FUNDS 2017$744 $744
$744 100.00%K
Name: State route removal of K-74 in Atchison County
Location:
Scope:
NNONE 3.4K074Atchison Route: Total Length (Miles): Letting Type: NHS Project: County:
Remove State Route K-74 from the State Highway System
K-74: The beginning of K-74 (near Potter) east to the K-74/US-73 junction
KA-4251-01 GRSU 2017$1,969 $1,969
$1000 50.77%K
$969 49.22%U0040
Name: Reconstruction in the city of Atchison
Location:
Scope:
YKDOT 0.6U073Atchison Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruction
US-73 from U Street to 274th Street South-bound Lanes only
TE-0435-01 LNDBT 2017$1,072 $1,072
T043501 $845 78.86%TA
$227 21.13%U0040
Name: Streetscape in Atchison
Location:
Scope:
NKDOT 0.3Atchison Route: Total Length (Miles): Letting Type: NHS Project: County:
Downtown streetscape improvements
800 Block of Commercial Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 90
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Barber CountyKA-4410-01 O-LAY 2017$3,550 $3,550
$3550 100.00%K
Name: Part to Host 4 KA-4412-01 (FY 2016 1R Project)
Location:
Scope:
NKDOT 16.2U281Barber Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-281 in Barber County Beginning at Junction US-160/US-281 thence North to the Barber/Pratt County Line
KA-4411-01 MILOV 2017$5,152 $5,152
$5152 100.00%K
Name: Part to Host 4 KA-4412-01 (FY 2016 1R Project)
Location:
Scope:
NKDOT 13.2U160Barber Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-160 in Barber County Beginning at the East EWS of Bridge #041 thence East to the Barber/Harper County Line
KA-4579-01 CRRPR 2017$55 $55
$55 100.00%K
Name: Surfacing on US-160 in Barber County
Location:
Scope:
NKDOT 12.0U160Barber Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-160 in Barber County beginning at the Comanche/Barber County Line thence East 12 Miles
Kansas STIP FFY 2018 - 2021 Appendix A Page 91
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Barton CountyC-4702-01 BRRPL 2017$875 $875
$175 20.00%C0005
C470202 $700 80.00%STP
Name: Bridge Replacement in Barton County
Location:
Scope:
NKDOT 0.3Barton Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
2.7 miles East of Great Bend
U-0598-01 MILOV 2017$642 $642
$300 46.73%KLINK
$342 53.26%U0280
Name: Road Improvements in Great Bend
Location:
Scope:
YLOCAL 0.8U281Barton Route: Total Length (Miles): Letting Type: NHS Project: County:
Surface Restoration
Great Bend KLINK: US-281 from 2nd Street to 10th Street and 19th Street to 24th Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 92
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Bourbon CountyKA-4597-01 MILOV 2017$261 $261
$261 100.00%K
Name: Repair on K-3 in Bourbon County
Location:
Scope:
NKDOT 3.0K003Bourbon Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-3 in Bourbon County Beginning at the Crawford/Bourbon County Line thence North to East Junction K-39
TE-0445-01 BR 2017$744 $744
T044501 $595 80.00%TA
$149 19.99%U0210
Name: Bridge Relocation and Restoration in Fort Scott
Location:
Scope:
KDOT 0.0Bourbon Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Relocation and Restoration
Long Shoals Historic Parker Truss
U-0476-01 PEDBI 2017 2017$498$1 $499
$1 100.00%U0210
Name: Sidewalk and pedestrian improvements in Fort Scott
Location:
Scope:
KDOT 0.0Bourbon Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct sidewalk and pedestrian improvements
City of Fort Scott
Kansas STIP FFY 2018 - 2021 Appendix A Page 93
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Brown CountyKA-4478-01 HTSCR 2017$380 $380
$380 100.00%K
Name: K-246 in Brown County (1R Project)
Location:
Scope:
NKDOT 5.6K246Brown Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-246 in Brown County Beginning at Junction US-75/K-246 thence East to the West City Limits of Morrill (Entire Route)
Kansas STIP FFY 2018 - 2021 Appendix A Page 94
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Butler CountyU-0940-01 MILOV 2017$328 $328
$164 50.00%KLINK
$164 50.00%U0180
Name: Road improvements in the city of El Dorado
Location:
Scope:
YLOCAL 0.4K254Butler Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-254 from Jones to Summit
U-2296-01 GRSU 2017$4,456 $4,456
$1500 33.66%STATE
$2956 66.33%U0050
Name: Road improvements in Augusta
Location:
Scope:
NKDOT 0.8C0319Butler Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruction
NE of Frisco and Dearborn to 15th and Ohio
Kansas STIP FFY 2018 - 2021 Appendix A Page 95
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Chase CountyC-4835-01 BRRPL 2017$532 $532
$106 20.00%C0009
C483501 $426 80.00%STP
Name: Bridge Replacement in Chase County
Location:
Scope:
NKDOT 0.2Chase Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge on Local Road .5 miles South and .7 miles West of Wonsevu over Middle Creek
Kansas STIP FFY 2018 - 2021 Appendix A Page 96
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Chautauqua CountyKA-4497-01 SEAL 2017$112 $112
$112 100.00%K
Name: US-166B in Chautauqua County (1R Project)
Location:
Scope:
NKDOT 3.8U166BChautauqua Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-166B in Chautauqua County Beginning at West Junction US-166 thence East to the West City Limits of Sedan
KA-4498-01 SEAL 2017$183 $183
$183 100.00%K
Name: K-99 in Chautauqua County (1R Project)
Location:
Scope:
NKDOT 5.9K099Chautauqua Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-99 in Chautauqua County Beginning at the State Line thence North to South Junction US-166/K-99
Kansas STIP FFY 2018 - 2021 Appendix A Page 97
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Cherokee CountyKA-3050-01 GRSU 2017 2017$619$22 $641
$21 95.00% $588 95.00%K
$1 5.00% $31 5.00%U0060
Name: Reconstruction in Baxter Springs
Location:
Scope:
NKDOT 0.4U069ACherokee Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruction
US-69A from 3rd Street to 9th Street
KA-4148-01 GRSU 2017 2017$650$135 $785
$135 100.00% $650 100.00%K
Name: Street improvements in Baxter Springs
Location:
Scope:
NLOCAL 0.4Cherokee Route: Total Length (Miles): Letting Type: NHS Project: County:
Pavement and entrance widening
5th St, approximately 0.5 mile east of US-166
KA-4603-01 MILOV 2017$381 $381
$381 100.00%K
Name: Repair on US-69 in Cherokee County
Location:
Scope:
NKDOT 2.2U069Cherokee Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-69 in Cherokee County Beginning at the Oklahoma/Kansas State Line thence North to Junction US-166
KA-4604-01 MILOV 2017$1,251 $1,251
$1251 100.00%K
Name: Repair on K-66 in Cherokee County
Location:
Scope:
NKDOT 5.4K066Cherokee Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-66 in Cherokee County Beginning at Junction K-66/US-400 thence East to the State Line
Kansas STIP FFY 2018 - 2021 Appendix A Page 98
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Clark CountyKA-4552-01 GDFC 2017 2017$540$1 $541
$1 100.00% $540 100.00%K
Name: Emergency Guardrail repair in Clark County
Location:
Scope:
NNEGOT 18.4Clark Route: Total Length (Miles): Letting Type: NHS Project: County:
Emergency Guardrail Repair
Emergency Guardrail Repair at various location on U.S.160 and K-34 in Clark County
Kansas STIP FFY 2018 - 2021 Appendix A Page 99
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Cloud CountyKA-3998-01 BRRPR 2016 2017$429$39 $468
$39 100.00% $429 100.00%K
Name: Bridge repair in Cloud County
Location:
Scope:
NKDOT 0.0K009Cloud Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge repair
Bridge #029 & #026 on K-9 in Cloud County
KA-4610-01 MILOV 2017$1,176 $1,176
$1176 100.00%K
Name: Repair on K-28 in Cloud County
Location:
Scope:
NKDOT 14.9K028Cloud Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-28 in Cloud County Beginning at the West County Line thence East to Junction K-9/K-28
TE-0414-01 PEDBI 2017 2017$618$1 $619
$1 100.00%U0150
Name: Ped/Bike Path in Concordia
Location:
Scope:
KDOT 0.0Cloud Route: Total Length (Miles): Letting Type: NHS Project: County:
Construction of multiuse trail
Multiuse trail in Concordia
Kansas STIP FFY 2018 - 2021 Appendix A Page 100
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Coffey CountyC-4845-01 BRRPL 2017$706 $706
$141 20.00%C0016
C484501 $565 80.00%STP
Name: Bridge Replacement in Coffey County
Location:
Scope:
NKDOT 0.2Coffey Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge 3.5 miles North and 1.0 mile East of Gridley on Fauna Road over North Big Creek
TE-0446-01 LNDBT 2017 2017$1,112$1 $1,113
$1 100.00%STATE
T044601 $563 50.63%TA
$549 49.36%U0302
Name: Downtown Streetscape in the City of Lebo
Location:
Scope:
KDOT 0.1Coffey Route: Total Length (Miles): Letting Type: NHS Project: County:
Streetscape Improvements
Downtown on Broadway Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 101
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Comanche CountyC-4841-01 BRRPL 2017$868 $868
$174 19.99%C0017
C484101 $695 80.00%STP
Name: Bridge Replacement in Comanche County
Location:
Scope:
NKDOT 0.2Comanche Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge 1.5 miles West and 6.8 miles South of Protection on Local Road 1 over Bluff Creek
Kansas STIP FFY 2018 - 2021 Appendix A Page 102
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Cowley CountyKA-4225-01 GRSU 2017$725 $725
$725 100.00%K
Name: Roadway reconstruction in Winfield
Location:
Scope:
NLOCAL 0.0Cowley Route: Total Length (Miles): Letting Type: NHS Project: County:
Roadway reconstruction
12th St west of K-360
KA-4460-01 MILOV 2017$2,890 $2,890
$2890 100.00%K
Name: US-160 in Cowley County (FY 2016 1R Project)
Location:
Scope:
NKDOT 29.3U160Cowley Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-160 in Cowley County Beginning at the East City Limits thence East to the Cowley County Line
U-0681-01 BRRPL 2017$2,293 $2,293
U068101 $1000 43.61%STP
$1293 56.38%U0640
Name: Bridge Replacement in the City of Winfield
Location:
Scope:
NKDOT 0.2Cowley Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
1 mile West of Main Street (US-77) on Fourteenth Avenue (Riverside Avenue) over Walnut River
U-0752-01 MILOV 2017$577 $577
$288 50.00%KLINK
$288 50.00%U0030
Name: Road improvements in Arkansas City
Location:
Scope:
NLOCAL 0.6U077Cowley Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-77 from the intersection with US-166 south to the Arkansas River Bridge
Kansas STIP FFY 2018 - 2021 Appendix A Page 103
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
U-0813-01 MILOV 2017$633 $633
$300 47.41%KLINK
$333 52.58%U0640
Name: Road improvements in the city of Winfield
Location:
Scope:
YLOCAL 1.2U160Cowley Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-160 from Loomis Street to College Street and US-77 from 6th Avenue to Manning Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 104
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Crawford CountyKA-4534-01 INTER 2017 2017$68$7 $74
$7 100.00% $68 100.00%STATE
Name: Relocate and install permanent traffic signal.
Location:
Scope:
YKDOT 0.0U069Crawford Route: Total Length (Miles): Letting Type: NHS Project: County:
Relocate signal pole in SE Quadrant.
US-69 at US-160 (SE Quadrant)
KA-4602-01 MILOV 2017$779 $779
$779 100.00%K
Name: Repair on K-3 in Crawford County
Location:
Scope:
NKDOT 11.5K003Crawford Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-3 in Crawford County Beginning at Junction K-47 thence North to the Crawford/Bourbon County Line
TE-0406-01 PEDBI 2017$5,250 $5,250
T040601 $660 12.57%TA
$4590 87.42%U0570
Name: Street widening & multi-use path in Pittsburg
Location:
Scope:
KDOT 0.9Crawford Route: Total Length (Miles): Letting Type: NHS Project: County:
Street widening & construction of multi-use path
South Rouse Ave in Pittsburg
U-0699-01 MILOV 2017$610 $610
$300 49.15%KLINK
$310 50.84%U0570
Name: Road Improvements in Pittsburg
Location:
Scope:
NLOCAL 1.4K126Crawford Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-126 from KCS Overpass to Free King Highway
Kansas STIP FFY 2018 - 2021 Appendix A Page 105
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
U-2309-01 PEDBI 2017$232 $232
U230901 $186 79.99%TA
$46 20.00%U0570
Name: Safe Routes Improvements in the City of Pittsburg
Location:
Scope:
KDOT 0.5Crawford Route: Total Length (Miles): Letting Type: NHS Project: County:
Sidewalk Improvements
3 School Locations
Kansas STIP FFY 2018 - 2021 Appendix A Page 106
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Dickinson CountyKA-4572-01 SEAL 2017$255 $255
$255 100.00%K
Name: Surfacing on K-15 in Dickinson County
Location:
Scope:
NKDOT 8.0K015Dickinson Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-15 in Dickinson County beginning at Junction K-15/K-4 thence North to Junction K-15/1400 Avenue
KA-4573-01 SEAL 2017$157 $157
$157 100.00%K
Name: Surfacing on K-15 in Dickinson County
Location:
Scope:
NKDOT 5.0K015Dickinson Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-15 in Dickinson County beginning at Marion/Dickinson County Line thence North to Junction K-15/K-4
Kansas STIP FFY 2018 - 2021 Appendix A Page 107
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Doniphan CountyC-4799-01 SG 2016 2017$392$47 $439
C479901 $392 100.00%HSIP
Name: Signing in Doniphan County
Location:
Scope:
NKDOT 211.0Doniphan Route: Total Length (Miles): Letting Type: NHS Project: County:
Signing
Major Collectors
Kansas STIP FFY 2018 - 2021 Appendix A Page 108
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Edwards CountyKA-3267-01 PAVRC 2017 2017 2017 2017$5,515$500$10$320 $6,345
A326701 $4412 80.00%ACNHP
$320 100.00% $10 100.00% $500 100.00% $1103 20.00%K
Name: Roadway reconstruction in Edwards County
Location:
Scope:
YKDOT 1.3U056Edwards Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruction
US-56: Through the City of Kinsley
U-0478-01 PEDBI 2017 2017$233$1 $234
U047801 $186 80.00%TA
$1 100.00% $47 20.00%U0284
Name: Sidewalk and pedestrian improvements in Kinsley
Location:
Scope:
KDOT 0.0Edwards Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct sidewalk
City of Kinsley
Kansas STIP FFY 2018 - 2021 Appendix A Page 109
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Elk CountyC-4846-01 BRRPL 2017$401 $401
$80 20.00%C0025
C484601 $321 80.00%STP
Name: Bridge Replacement in Elk County
Location:
Scope:
NKDOT 0.2Elk Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge 4.0 miles West and 2.9 miles North of Howard on Road 11 over Rock Creek
C-4847-01 SG 2016 2017$191$22 $213
C484701 $191 100.00%HSIP
Name: Signing in Elk County
Location:
Scope:
NKDOT 74.0Elk Route: Total Length (Miles): Letting Type: NHS Project: County:
Signing
Major Collectors
Kansas STIP FFY 2018 - 2021 Appendix A Page 110
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Ellis CountyC-4848-01 SG 2016 2017$213$31 $244
C484801 $213 100.00%HSIP
Name: Signing in Ellis County
Location:
Scope:
NFORCE 169.0Ellis Route: Total Length (Miles): Letting Type: NHS Project: County:
Signing
Major and Minor Collectors
KA-4541-01 PATCH 2017$101 $101
$101 100.00%K
Name: Patching on I-70 in Ellis County
Location:
Scope:
YKDOT 31.2I070Ellis Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
I-70 in Ellis County from Ellis/Trego County Line to the Ellis/Russell County Line
KA-4553-01 FLOOD 2017$26 $26
$26 100.00%K
Name: I-70 in Ellis County at I-70 & Ellis Ave.
Location:
Scope:
YNONE 0.0I070Ellis Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
I-70 & Ellis Ave on I-70 in Ellis County
Kansas STIP FFY 2018 - 2021 Appendix A Page 111
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Ellsworth CountyC-4833-01 BRRPL 2017$390 $390
$78 19.99%C0027
C483301 $312 80.00%STP
Name: Bridge Replacement in Ellsworth County
Location:
Scope:
NKDOT 0.2Ellsworth Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge on Local Road 314 over Loss Creek
KA-4461-01 MILOV 2017$970 $970
$970 100.00%K
Name: K-141 in Ellsworth County (FY 2016 1R Project)
Location:
Scope:
NKDOT 13.5K141Ellsworth Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-141 in Ellsworth County Beginning at Junction K-4/K-141 thence North to Junction K-141/K-140
KA-4462-01 MILOV 2017$402 $402
$402 100.00%K
Name: K-111 in Ellsworth County (FY 2016 1R Project)
Location:
Scope:
NKDOT 5.3K111Ellsworth Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-111 in Ellsworth County Beginning at the North City Limits of Kanopolis thence North to Junction K-156
Kansas STIP FFY 2018 - 2021 Appendix A Page 112
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Finney CountyU-0218-01 PEDBI 2017 2017$274$1 $275
$1 100.00%U0631
Name: Sidewalk and pedestrian improvements in City of Holcomb
Location:
Scope:
KDOT 0.0Finney Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct sidewalk and pedestrian improvements
City of Holcomb (Safe Routes to School)
U-0926-01 CONC 2017$751 $751
$300 39.93%KLINK
$451 60.06%U0240
Name: Road improvements in Garden City
Location:
Scope:
NLOCAL 0.2K156Finney Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-156 from West of Crestway Drive to East of Crestway Drive
Kansas STIP FFY 2018 - 2021 Appendix A Page 113
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Ford CountyKA-3234-03 GRSU 2017 2017$340$30 $370
$30 100.00% $340 100.00%K
Name: Intersection improvements in Ford County
Location:
Scope:
YKDOT 0.2U050Ford Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct a right turn lane
US-50/Davis St intersection, near Spearville
KA-4047-01 INTER 2017$1,170 $1,170
$600 51.27%K
$570 48.72%U0170
Name: Intersection Reconstruction in Dodge City
Location:
Scope:
YKDOT 0.4U050Ford Route: Total Length (Miles): Letting Type: NHS Project: County:
Add left turn lane, Mill & Overlay
Dodge City: US-50 and Fairway Drive Intersection
TE-0449-01 LNDBT 2017$209 $209
T044901 $154 73.74%TA
$55 26.25%U0170
Name: Heritage District Beautification Project in Dodge City
Location:
Scope:
KDOT 0.3Ford Route: Total Length (Miles): Letting Type: NHS Project: County:
Beautification
5th Avenue to 1st Avenue near the railroad tracks
Kansas STIP FFY 2018 - 2021 Appendix A Page 114
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Franklin CountyKA-4053-01 INTER 2017$441 $441
$397 90.00%K
$44 10.00%U0540
Name: Geometric Improvement on K-68 in Ottawa
Location:
Scope:
NKDOT 0.1K068Franklin Route: Total Length (Miles): Letting Type: NHS Project: County:
Intersection Improvement
Ottawa: Intersection of K-68 and Main Street
TE-0413-01 PEDBI 2017 2017$314$1 $315
$1 100.00%U0540
Name: Ped/Bike Infrastructure in Ottawa
Location:
Scope:
KDOT 0.0Franklin Route: Total Length (Miles): Letting Type: NHS Project: County:
Construction of sidewalk and bicycle lanes
East 15th Street in Ottawa
Kansas STIP FFY 2018 - 2021 Appendix A Page 115
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Grant CountyKA-4279-01 STUDY 2017$30 $30
$30 100.00%K
Name: Ditch erosion study on K-25
Location:
Scope:
NNONE 0.7K025Grant Route: Total Length (Miles): Letting Type: NHS Project: County:
Ditch erosion study
K-25: Ditch on west side southwest of Ulysses
Kansas STIP FFY 2018 - 2021 Appendix A Page 116
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Gray CountyU-2311-01 PEDBI 2017$266 $266
U231101 $200 75.30%TA
$66 24.69%U0102
Name: Sidewalks in the City of Cimarron
Location:
Scope:
KDOT 0.0Gray Route: Total Length (Miles): Letting Type: NHS Project: County:
Sidewalks
City of Cimarron
Kansas STIP FFY 2018 - 2021 Appendix A Page 117
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Greenwood CountyC-4836-01 BRRPL 2017$943 $943
$189 19.99%C0037
C483601 $754 80.00%STP
Name: Bridge Replacement in Greenwood County
Location:
Scope:
NKDOT 0.2Greenwood Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge 3.4 miles West and 5.0 miles North of Eureka on County Road 200 over East Branch Fall River
Kansas STIP FFY 2018 - 2021 Appendix A Page 118
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Hamilton CountyKA-3896-01 BRRPL 2017 2017 2017 2017$1,745$24$49$250 $2,068
A389602 $1396 80.00%ACNHP
$250 100.00% $49 100.00% $349 19.99%K
Name: Bridge Replacement in Hamilton County on US-50
Location:
Scope:
YKDOT 0.0U050Hamilton Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge #019 on US-50 Located 0.86 Miles West of the K-27 West Junction
KA-3897-01 BRRPL 2017 2017 2017 2017$1,745$24$49$250 $2,068
A389702 $1396 80.00%ACNHP
$250 100.00% $49 100.00% $349 19.99%K
Name: Bridge Replacement in Hamilton County on US-50
Location:
Scope:
YKDOT 0.0U050Hamilton Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge #010 on US-50 Located 7.49 Miles East of the Hamilton County/State Line
Kansas STIP FFY 2018 - 2021 Appendix A Page 119
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Harper CountyKA-4591-01 CRRPR 2017$78 $78
$78 100.00%K
Name: Surfacing on US-160 in Harper County
Location:
Scope:
NKDOT 12.0U160Harper Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-160 in Harper County beginning 0.07 miles east of the Barber/Harper County Line thence east to 0.549 miles west of RS 302
Kansas STIP FFY 2018 - 2021 Appendix A Page 120
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Harvey CountyKA-4524-01 TRSGN 2017 2017$112$20 $132
$20 100.00% $112 100.00%STATE
Name: K-196 At Grade Crossing ITS Flashing Beacon
Location:
Scope:
NKDOT 0.5K196Harvey Route: Total Length (Miles): Letting Type: NHS Project: County:
Queue Detection and Warning System
K-196 Railroad Grade Crossing
Kansas STIP FFY 2018 - 2021 Appendix A Page 121
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Haskell CountyC-4822-01 FLOOD 2016 2017$453$59 $512
$91 19.99%C0041
C482201 $363 80.00%ER
Name: Emergency Relief on County Road CC in Haskell County
Location:
Scope:
NKDOT 0.0Haskell Route: Total Length (Miles): Letting Type: NHS Project: County:
Road and Bank Erosion Repair
0.1 miles northwest of US-56 on County Road CC
KA-1008-07 GRSU 2015 2017 2015$5,210$20$190 $5,476
$20 100.00%K
Name: US-83/US-56 intersection in Haskell County
Location:
Scope:
YKDOT 0.3U083Haskell Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruct intersection
US-83/US-56 intersection near City of Sublette
Kansas STIP FFY 2018 - 2021 Appendix A Page 122
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Jefferson CountyKA-3217-01 SPECL 2016 2016 2017 2017$295$1$1$150 $447
$150 100.00% $1 100.00% $1 100.00% $295 100.00%K
Name: Bank stabilization in Jefferson County
Location:
Scope:
YKDOT 0.0K004Jefferson Route: Total Length (Miles): Letting Type: NHS Project: County:
Bank stabilization
K-4: 1 mile northeast of Meriden
KA-4618-01 MILOV 2017$2,163 $2,163
$2163 100.00%K
Name: Repair on K-16 in Jefferson County
Location:
Scope:
NKDOT 16.0K016Jefferson Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-16 in Jefferson County Beginning at the West County Line thence East to West Junction K-4/K-16 and then East Junction K-4/K-16 thence North East to Junction US-59/K-16
Kansas STIP FFY 2018 - 2021 Appendix A Page 123
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Jewell CountyKA-4486-01 1.5OL 2017$1,026 $1,026
$1026 100.00%K
Name: K-128 in Jewell County (1R Project)
Location:
Scope:
NKDOT 15.3K128Jewell Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-128 in Jewell County Beginning at the Mitchell/Jewell County Line thence North to West Junction US-36/K-128
KA-4487-01 1.5OL 2017$118 $118
$118 100.00%K
Name: K-228 in Jewell County (1R Project)
Location:
Scope:
NKDOT 0.4K228Jewell Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-228 in Jewell County - Entire Route
KA-4488-01 1.5OL 2017$1,099 $1,099
$1099 100.00%K
Name: K-128 in Jewell County (1R Project)
Location:
Scope:
NKDOT 15.9K128Jewell Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-128 in Jewell County Beginning at East Junction US-36/K-128 thence North to the Kansas/Nebraska State Line
KA-4611-01 MILOV 2017$689 $689
$689 100.00%K
Name: Repair on K-28 in Jewell County
Location:
Scope:
NKDOT 8.0K028Jewell Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-28 in Jewell County Beginning at Junction K-28/K-148 thence East to the East County Line
Kansas STIP FFY 2018 - 2021 Appendix A Page 124
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Kingman CountyU-0572-01 MILOV 2017$437 $437
$300 68.63%KLINK
$137 31.36%U0400
Name: Road improvements in Kingman
Location:
Scope:
YLOCAL 0.6U054Kingman Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling, Patching, and Overlay
US-54 from Lincoln St to Chariton Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 125
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Labette CountyKA-4576-01 SEAL 2017$309 $309
$309 100.00%K
Name: Surfacing on K-101 in Labette County
Location:
Scope:
NKDOT 10.0K101Labette Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-101 in Labette County beginning at Junction K-101/US-166 thence North to Junction K-101/US-160
Kansas STIP FFY 2018 - 2021 Appendix A Page 126
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Lyon CountyKA-4419-01 BRRPR 2017 2017$286$25 $311
$25 100.00% $286 100.00%K
Name: Bridge Repair (118) on I-35 in Lyon County
Location:
Scope:
YKDOT 0.0I035Lyon Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Repair - Steel Fatigue Repair
Bridge Number 118 (Neosho River) on I-35 Located 3.69 Miles East of K-99, just East of Junction US-50
Kansas STIP FFY 2018 - 2021 Appendix A Page 127
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Marion CountyKA-3595-01 ITS 2017$12 $12
$12 100.00%K
Name: City of Marion speed monitor trailer
Location:
Scope:
NNONE 0.0Marion Route: Total Length (Miles): Letting Type: NHS Project: County:
Monitor traffic speeds to improve safety
Marion, KS
TE-0444-01 LNDBT 2017$968 $968
T044401 $716 73.92%TA
$253 26.07%U0346
Name: Revitalization in the City of Marion
Location:
Scope:
KDOT 0.3Marion Route: Total Length (Miles): Letting Type: NHS Project: County:
Revitalization
Main Street (K-256) from 1st Street to 5th Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 128
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Marshall CountyTE-0440-01 PEDBI 2017$118 $118
T044001 $87 74.07%TA
$31 25.92%U0470
Name: Crosswalk Improvements in the City of Marysville
Location:
Scope:
KDOT 0.3Marshall Route: Total Length (Miles): Letting Type: NHS Project: County:
Crosswalk Improvements
City of Marysville south of Walnut on US-77
U-0580-01 MILOV 2017$553 $553
$300 54.20%KLINK
$253 45.79%U0470
Name: Road improvements in Marysville
Location:
Scope:
YLOCAL 0.9U036Marshall Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling and Overlay
US-36 from Fourth Street to Seventeenth Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 129
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
McPherson CountyTE-0443-01 PEDBI 2017$1,427 $1,427
T044301 $1102 77.25%TA
$324 22.74%U0480
Name: Multi-use trail in the City of McPherson
Location:
Scope:
KDOT 1.5McPherson Route: Total Length (Miles): Letting Type: NHS Project: County:
Multi-Use Trail
Avenue A at Thunderbird St East to Centennial Dr then North to South Front St
U-0678-01 MILOV 2017$157 $157
$78 50.00%KLINK
$78 50.00%U0480
Name: Road improvements in the city of McPherson
Location:
Scope:
YLOCAL 0.3U056McPherson Route: Total Length (Miles): Letting Type: NHS Project: County:
Mill and overlay
US-56 (Kansas Avenue) from Maxwell Street to Eby Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 130
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Meade CountyU-0567-01 MILOV 2017$422 $422
$300 71.07%KLINK
$122 28.92%U0191
Name: Road improvements in Fowler
Location:
Scope:
NLOCAL 0.3K098Meade Route: Total Length (Miles): Letting Type: NHS Project: County:
Mill and Overlay
K-98 from East 6th Street south to Union Pacific Railroad
Kansas STIP FFY 2018 - 2021 Appendix A Page 131
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Mitchell CountyKA-4485-01 1.5OL 2017$311 $311
$311 100.00%K
Name: K-128 in Mitchell County (1R Project)
Location:
Scope:
NKDOT 3.6K128Mitchell Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-128 in Mitchell County Beginning at Junction US-24/K-128 thence North to the Mitchell/Jewell County Line
U-0473-01 PEDBI 2017 2017$274$1 $275
$1 100.00%U0080
Name: Sidewalk and pedestrian improvements in City of Beloit
Location:
Scope:
KDOT 0.0Mitchell Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct sidewalk and pedestrian improvements
City of Beloit
Kansas STIP FFY 2018 - 2021 Appendix A Page 132
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Montgomery CountyKA-1717-01 GRSU 2017 2017$870$130 $1,000
$130 100.00% $870 100.00%K
Name: Local roadway improvements in Coffeyville
Location:
Scope:
NLOCAL 0.6Montgomery Route: Total Length (Miles): Letting Type: NHS Project: County:
Roadway improvements
14th, 15th and Willow Streets near Acme Foundry in Coffeyville
KA-2374-02 GRSU 2016 2017$815$10 $825
$10 100.00% $815 100.00%K
Name: US-169 Highway Improvement in Montgomery County
Location:
Scope:
YKDOT 0.1U169Montgomery Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruct the SKO Railroad crossing
US-169 at the SKO Railroad crossing approx. 3 miles south of the North Junctions of US-169/US-160
U-0330-01 SU 2017$767 $767
$500 65.14%KLINK
$267 34.85%U0130
Name: Road Improvements in Coffeyville
Location:
Scope:
YLOCAL 2.0U166Montgomery Route: Total Length (Miles): Letting Type: NHS Project: County:
Pavement Repair and Overlay
US-166 from West City Limits to Buckeye Street
U-0565-01 MILOV 2017$509 $509
$300 58.98%KLINK
$209 41.01%U0360
Name: Road improvements in Independence
Location:
Scope:
YLOCAL 0.9U075Montgomery Route: Total Length (Miles): Letting Type: NHS Project: County:
Mill and Overlay
US-75 from Chestnut Street to Oak Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 133
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Morris CountyC-0371-01 GRSU 2017$507 $507
$51 10.00%C0064
C037101 $456 90.00%HRRR
Name: Road safety improvements in Morris County
Location:
Scope:
NKDOT 0.0Morris Route: Total Length (Miles): Letting Type: NHS Project: County:
Safety improvements
Various locations
Kansas STIP FFY 2018 - 2021 Appendix A Page 134
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Ness CountyU-0581-01 MILOV 2017$400 $400
$300 74.99%KLINK
$100 25.00%U0399
Name: Road improvements in Ness City
Location:
Scope:
NLOCAL 0.1U283Ness Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-283 from Main Street to Chestnut Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 135
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Norton CountyKA-4550-01 FLOOD 2017$47 $47
$47 100.00%K
Name: US-283 North of West K-9 Juntion
Location:
Scope:
NNONE 0.1U283Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
US-283 North of West K-9 Juntion
KA-4550-02 FLOOD 2017$10 $10
$10 100.00%K
Name: K-9 2.96 mi East of Decatur/Norton County Line
Location:
Scope:
NNONE 0.1K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
Structure (526) East of Decatur/Norton County Line
KA-4550-03 FLOOD 2017$7 $7
$7 100.00%K
Name: K-9 5.87 mi East of Decatur/Norton County Line
Location:
Scope:
NNONE 0.2K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
Structure (527) East of Decatur/Norton County Line
KA-4550-04 FLOOD 2017$54 $54
$54 100.00%K
Name: K-9 6.942 mi East of Decatur/Norton County Line
Location:
Scope:
NNONE 1.5K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
6.942 mi East of Decatur/Norton County Line thence East 1.5 mi
Kansas STIP FFY 2018 - 2021 Appendix A Page 136
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-4550-05 FLOOD 2017$29 $29
$29 100.00%K
Name: K-9 1.36 mi West of West Jct US-283/K-9
Location:
Scope:
NNONE 0.1K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
Structure #533: K-9-Located 1.36 mi West of West Junction US-283/K-9
KA-4550-06 FLOOD 2017$25 $25
$25 100.00%K
Name: K-9 West of West K-9/US-283 Juntion
Location:
Scope:
NNONE 0.0K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
Structure #534 on K-9 West of West K-9/US-283 Juntion
KA-4550-07 FLOOD 2017$19 $19
$19 100.00%K
Name: K-9 East of East K-9/US-283 Juntion
Location:
Scope:
NNONE 0.1K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
Structure #536 on K-9 East of East K-9/US-283 Juntion
KA-4550-08 FLOOD 2017$12 $12
$12 100.00%K
Name: K-9 East of East K-9/US-283 Juntion
Location:
Scope:
NNONE 0.6K009Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Flood Repair Damage
Structure #537 on K-9 East of East K-9/US-283 Juntion
Kansas STIP FFY 2018 - 2021 Appendix A Page 137
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-4575-01 SEAL 2017$557 $557
$557 100.00%K
Name: Surfacing on K-383 in Norton County
Location:
Scope:
YKDOT 13.6K383Norton Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-383 in Norton County beginning at the Decatur/Norton County Line thence East 13.618 Miles to West Junction US-36/K-383
Kansas STIP FFY 2018 - 2021 Appendix A Page 138
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Osage CountyC-4844-01 BRRPL 2017$484 $484
$97 20.00%C0070
C484401 $387 79.99%STP
Name: Bridge Replacement in Osage County
Location:
Scope:
NKDOT 0.2Osage Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge on W 157th Street over Switzler Creek
Kansas STIP FFY 2018 - 2021 Appendix A Page 139
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Pawnee CountyU-0805-01 CONC 2017$452 $452
$300 66.35%KLINK
$152 33.64%U0410
Name: Road improvements in the city of Larned
Location:
Scope:
YLOCAL 0.1U056Pawnee Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-56 from intersection of Main Street/US-56 east 450 feet
Kansas STIP FFY 2018 - 2021 Appendix A Page 140
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Phillips CountyKA-4306-01 GDFC 2017 2017$132$6 $138
$6 100.00% $125 95.23%K
$6 4.76%K
Name: Guardrail Replacement on US-36 in Phillips County
Location:
Scope:
YKDOT 0.0U036Phillips Route: Total Length (Miles): Letting Type: NHS Project: County:
Guardrail Replacement
US-36 in Phillips County
Kansas STIP FFY 2018 - 2021 Appendix A Page 141
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Pottawatomie CountyC-4813-01 SG 2016 2017$323$48 $371
C481301 $323 100.00%HSIP
Name: Signing in Pottawatomie County
Location:
Scope:
NFORCE 219.0Pottawatomie Route: Total Length (Miles): Letting Type: NHS Project: County:
Signing
Major Collectors
C-4834-01 BRRPL 2017$647 $647
$129 19.99%C0075
C483401 $518 80.00%STP
Name: Bridge Replacement in Pottawatomie County
Location:
Scope:
NKDOT 0.2Pottawatomie Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge .5 mile East of Westmoreland on Dutch Hollow Road over Rock Creek
KA-4594-01 SPECL 2017$160 $200
$170 100.00%K
Name: Bank stabilization in Pottawatomie County
Location:
Scope:
NKDOT 0.1K013Pottawatomie Route: Total Length (Miles): Letting Type: NHS Project: County:
Bank stabilization
Located approximately 0.123 miles south of Bridge #020 (Cedar Creek) on K-13 in Pottawatomie County
Kansas STIP FFY 2018 - 2021 Appendix A Page 142
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Reno CountyKA-4580-01 CRRPR 2017$86 $86
$86 100.00%K
Name: Surfacing on US-50 in Reno County
Location:
Scope:
YKDOT 16.7U050Reno Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-50 in Reno County beginning at the Reno/Stafford County Line thence East 16.68 Miles
U-0477-01 PEDBI 2017 2017$260$1 $261
U047701 $200 76.88%TA
$1 100.00% $60 23.11%U0350
Name: Sidewalk and pedestrian improvements in Hutchinson
Location:
Scope:
KDOT 0.0Reno Route: Total Length (Miles): Letting Type: NHS Project: County:
Construct sidewalk and pedestrian improvements
City of Hutchinson
Kansas STIP FFY 2018 - 2021 Appendix A Page 143
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Republic CountyKA-4429-02 SLIDE 2017$108 $108
$108 100.00%K
Name: US-36 in Republic County
Location:
Scope:
YKDOT 0.2U036Republic Route: Total Length (Miles): Letting Type: NHS Project: County:
Slope Repair
US-36 in Republic County beginning 2.794 Miles East of the West County Line thence East 0.23 Miles (North Side)
Kansas STIP FFY 2018 - 2021 Appendix A Page 144
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Rice CountyC-4854-01 SG 2016 2017$111$20 $131
C485401 $111 100.00%HRRR
Name: Signing and Pavement Marking in Rice County
Location:
Scope:
NKDOT 37.0Rice Route: Total Length (Miles): Letting Type: NHS Project: County:
Signing and Pavement Marking
Major and Minor Collectors
KA-4577-01 CRRPR 2017$85 $85
$85 100.00%K
Name: Surfacing on K-14 in Rice County
Location:
Scope:
NKDOT 10.8K014Rice Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-14 in Rice County beginning at North Lyons City Limit thence North to Junction K-14/K-4
TE-0420-01 LNDBT 2017 2017$745$1 $746
$1 100.00%U0322
Name: Streetscape in Little River
Location:
Scope:
KDOT 0.0Rice Route: Total Length (Miles): Letting Type: NHS Project: County:
Improvements to downtown area
Downtown Little River
Kansas STIP FFY 2018 - 2021 Appendix A Page 145
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Rooks CountyKA-3973-01 SPECL 2017$180 $180
$180 100.00%K
Name: Site cleanup of KDOT Stockton sub area office
Location:
Scope:
NONE 0.0Rooks Route: Total Length (Miles): Letting Type: NHS Project: County:
Site cleanup and remediation requirements requested by KDHE.
KDOT Stockton sub area office, City of Stockton
Kansas STIP FFY 2018 - 2021 Appendix A Page 146
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Russell CountyKA-4054-01 GRSU 2016 2017$2,674$245 $2,919
$233 95.00% $1417 53.01%K
$12 5.00% $1256 46.98%U0590
Name: Reconstruction in the city of Russell
Location:
Scope:
NKDOT 0.5U281Russell Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruction
US-281/Fossil St. from Dorrance St. north to Wichita Ave/US-40 B
KA-4232-01 BRRPR 2017 2017$406$37 $443
$37 100.00% $406 100.00%K
Name: Bridge repair in Russell County
Location:
Scope:
YKDOT 0.0I070Russell Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge repair
I-70: Bridges #024 and #025, located 8.54 miles east of the I-70/US-40B junction
Kansas STIP FFY 2018 - 2021 Appendix A Page 147
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Saline CountyKA-3596-01 ITS 2017$78 $78
$78 100.00%K
Name: City of Salina Traffic Signal Timing
Location:
Scope:
NNONE 0.0Saline Route: Total Length (Miles): Letting Type: NHS Project: County:
Time traffic signals to make traffic flow more efficient
Salina, Kansas
Kansas STIP FFY 2018 - 2021 Appendix A Page 148
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Seward CountyKA-3054-01 INTER 2017 2017$2,070$153 $2,223
$153 100.00%U0440
Name: Intersection improvements in Liberal
Location:
Scope:
YKDOT 0.0U054Seward Route: Total Length (Miles): Letting Type: NHS Project: County:
Intersection improvements
Intersection of US-54 and Clay Street
Kansas STIP FFY 2018 - 2021 Appendix A Page 149
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Sheridan CountyKA-3248-01 MILOV 2017 2017$5,952$190 $6,142
$190 100.00% $5952 100.00%K
Name: Surfacing in Sheridan County
Location:
Scope:
NKDOT 15.5U024Sheridan Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
US-24: Hoxie east to the county line
Kansas STIP FFY 2018 - 2021 Appendix A Page 150
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Sherman CountyKA-4326-01 GDFC 2016 2017$525$25 $550
$25 100.00% $525 100.00%K
Name: Guardfence Replacement
Location:
Scope:
YKDOT 5.6I070Sherman Route: Total Length (Miles): Letting Type: NHS Project: County:
Guardfence Replacement
10 locations along I-70 in Sherman County
Kansas STIP FFY 2018 - 2021 Appendix A Page 151
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Sumner CountyKA-4050-01 GRSU 2017$1,630 $1,630
$1125 69.02%K
$505 30.97%U0620
Name: Reconstruction in the city of Wellington
Location:
Scope:
NKDOT 0.8U081Sumner Route: Total Length (Miles): Letting Type: NHS Project: County:
Reconstruction
US-81 from 1,000' South of Harvey St, North 4,000'
KA-4469-01 MILOV 2017$1,905 $1,905
$1905 100.00%K
Name: K-49 in Sumner County (FY 2016 1R Project)
Location:
Scope:
NKDOT 14.1K049Sumner Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-49 in Sumner County Beginning at Junction US-160 thence North to the Sumner/Sedgwick County Line
KA-4530-01 MTSPC 2017 2017$965$88 $1,052
$88 100.00% $965 100.00%K
Name: US-81 in Sumner County
Location:
Scope:
NNEGOT 0.0U081Sumner Route: Total Length (Miles): Letting Type: NHS Project: County:
Interim Jetty Repair
West bank of the Ninnescah River, adjacent to US-81 located 1.4 mi. North of Junction US-81/K-55. Just West of KTA
Kansas STIP FFY 2018 - 2021 Appendix A Page 152
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Thomas CountyKA-3129-01 BRRPR 2015 2017$423$77 $500
$77 100.00% $423 100.00%K
Name: Bridge repair on US-83 in Thomas County
Location:
Scope:
YKDOT 0.0U083Thomas Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge repair
US-83: Bridge in Thomas County, located at the I-70/US-83 junction
KA-4525-01 GDFC 2017$27 $27
$27 100.00%K
Name: I-70 in Thomas County Rail Repair
Location:
Scope:
YKDOT 0.0I070Thomas Route: Total Length (Miles): Letting Type: NHS Project: County:
Replace Damaged Guardrail
Under Bridge #029 (overpass County Road F) on I-70 in Thomas County Approximately 1.39 Miles North West of Junction US-83
KA-4544-01 PATCH 2017$41 $41
$41 100.00%K
Name: Surfacing on I-70 in Thomas County
Location:
Scope:
YKDOT 8.9I070Thomas Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
I-70 in Thomas County Beginning at Exit 53 thence East 9 Miles to Exit 62
U-0751-01 MILOV 2017$691 $691
$300 43.42%KLINK
$391 56.57%U0134
Name: Road improvements in the city of Colby
Location:
Scope:
NLOCAL 1.2K025Thomas Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling and Overlay
K-25 from I-70 North 1.15 miles
Kansas STIP FFY 2018 - 2021 Appendix A Page 153
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Trego CountyKA-4543-01 PATCH 2017$39 $39
$39 100.00%K
Name: I-70 in Trego County
Location:
Scope:
YKDOT 30.6I070Trego Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
I-70 in Trego County Beginning at the Gove/Trego County Line thence East 30.594 Miles to the Trego/Ellis County Line
Kansas STIP FFY 2018 - 2021 Appendix A Page 154
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Wabaunsee CountyKA-4415-01 LT 2016 2017$49$5 $54
$5 100.00% $49 100.00%K
Name: Replace Mast Tower in Wabaunsee County
Location:
Scope:
YKDOT 0.0I070Wabaunsee Route: Total Length (Miles): Letting Type: NHS Project: County:
Replace High Mast Light Tower
I-70 at the Rest Area near Paxico
Kansas STIP FFY 2018 - 2021 Appendix A Page 155
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Washington CountyKA-4464-01 MILOV 2017$301 $301
$301 100.00%K
Name: K-148 in Washington County (FY 2016 1R Project)
Location:
Scope:
NKDOT 3.5K148Washington Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-148 in Washington County Beginning at Junction K-148/US-36 thence North to Junction K-148/K-234
KA-4465-01 MILOV 2017$1,363 $1,363
$1363 100.00%K
Name: K-148 in Washington County (FY 2016 1R Project)
Location:
Scope:
NKDOT 7.5K148Washington Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-148 in Washington County Beginning at Junction K-148/K-234 thence North to the Kansas/Nebraska State Line
KA-4467-01 MILOV 2017$32 $32
$32 100.00%K
Name: K-234 in Washington County (FY 2016 1R Project)
Location:
Scope:
NKDOT 0.3K234Washington Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-234 in Washington County Beginning at Junction K-148/K-234 thence West to the Hanover City Limits
KA-4468-01 MILOV 2017$78 $78
$78 100.00%K
Name: K-243 in Washington County (FY 2016 1R Project)
Location:
Scope:
NKDOT 0.9K243Washington Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-243 in Washington County Beginning at Junction K-148/K-243 thence East to Pony Express Station
Kansas STIP FFY 2018 - 2021 Appendix A Page 156
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Wilson CountyC-4831-01 BRRPL 2017$1,270 $1,270
$270 21.28%C0103
C483101 $1000 78.71%STP
Name: Bridge Replacement in Wilson County
Location:
Scope:
NKDOT 0.2Wilson Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Replacement
Bridge 2.9 miles West of Neodesha on Granby Road over Fall River
Kansas STIP FFY 2018 - 2021 Appendix A Page 157
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Woodson CountyKA-4600-01 SEAL 2017$546 $546
$546 100.00%K
Name: Repair on K-105 in Woodson County
Location:
Scope:
NKDOT 10.4K105Woodson Route: Total Length (Miles): Letting Type: NHS Project: County:
Surfacing
K-105 in Woodson County Beginning at the Beginning of the Route thence North to Junction US-54/K-105 (Entire Route)
Kansas STIP FFY 2018 - 2021 Appendix A Page 158
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
Statewide CountyC-4505-17 BR 2017$8,600 $8,600
$8600C450517 100.00%STP
Name: Statewide Local Bridge Load Rating Program
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Local Bridge Load Rating Program
Statewide
C-4906-01 STUDY 2017$388 $388
$153C490601 39.47%ACSTP
$78 19.99%C0106
$157C490601 40.52%STP
Name: Statewide Underwater Bridge Inspection
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Underwater Bridge Inspection
Statewide
K-2686-18 SPECL 2017$175 $175
$175K268618 100.00%DBE
Name: Disadvantaged Business Enterprise Program
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Statewide Support Services
Statewide FY 2018
K-6869-18 PE 2017$100 $100
$100 100.00%K
Name: District Wide, District 1
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
PE Activities associated with 1R Project Development
District Wide, District 1
Kansas STIP FFY 2018 - 2021 Appendix A Page 159
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
K-6870-18 PE 2017$100 $100
$100 100.00%K
Name: District Wide, District 2
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
PE Activities associated with 1R Project Development
District Wide, District 2
K-6871-18 PE 2017$10 $10
$10 100.00%K
Name: District Wide, District 3
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
PE Activities associated with 1R Project Development
District Wide, District 3
K-6872-18 PE 2017$50 $50
$50 100.00%K
Name: District Wide, District 4
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
PE Activities associated with 1R Project Development
District Wide, District 4
K-6873-18 PE 2017$65 $65
$65 100.00%K
Name: District Wide, District 5
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
PE Activities associated with 1R Project Development
District Wide, District 5
Kansas STIP FFY 2018 - 2021 Appendix A Page 160
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
K-6874-18 PE 2017$15 $15
$15 100.00%K
Name: District Wide, District 6
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
PE Activities associated with 1R Project Development
District Wide, District 6
K-8685-02 PE 2017$50 $50
$50 100.00%K
Name: Statewide plan review of roundabouts
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Consultant review of roundabout plans for locals
Statewide
K-8941-18 ROW 2017$12 $12
$12 100.00%K
Name: Dist Maint Project For R/W and Easements, Statewide
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
District Maintenance Project For R/W Maintenance
Statewide District Maintenance Project For Purchase of R/W and Easements
K-9520-18 SPECL 2017$100 $100
$100 100.00%K
Name: Statewide
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Includes engineering surveys, right of way perpetuation, and restoration of section corners
Statewide
Kansas STIP FFY 2018 - 2021 Appendix A Page 161
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
K-9807-18 SHHWP 2017 2017$5$40 $45
$40 100.00% $5 100.00%K
Name: Administration of the Scenic Byway Program FY 2017
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Administration of the Scenic Byway Program
Statewide - Scenic Byway Program FY 2017
KA-0432-17 LT 2017 2017$947$77 $1,024
$77A043217 100.00% $947 100.00%HSIP
Name: Highway Lighting Projects
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Master Lighting Project for Federal Fiscal Year 2017
Statewide Highway Lighting Master Project
KA-0433-17 SG 2017 2017$8,360$2,280 $10,640
$2280A043317 100.00% $8360 100.00%HSIP
Name: Signing Projects
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Statewide signing projects for Fiscal Year 2017
Statewide
KA-1169-18 SPECL 2017$175 $175
$150A116918 85.71%OJT
$25A116918 14.28%STP
Name: Annual Training for Women & Minorities
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
7-week skill training sessions for women and minorities in highway construction
Central Kansas: for Calendar Year 2018
Kansas STIP FFY 2018 - 2021 Appendix A Page 162
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-1833-18 ADMIN 2017$460 $460
$460 100.00%K
Name: ITS Operating and Maintenance Budget
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Fiscal Year 2018 Statewide ITS Operating and Maintenance Budget
Statewide
KA-2210-01 SPECL 2017 2017$157$2 $159
$2 100.00% $157 100.00%STATE
Name: School Zone signing and pavement marking
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
School Zone signing and pavement marking
Statewide
KA-2237-03 SPECL 2017$60 $60
$60 100.00%K
Name: Statewide: Dam Inspections and Reports
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Inspect selected dams
Statewide: Dam Inspections and Reports
KA-2375-16 STUDY 2017$80 $80
$80 100.00%K
Name: Passing Lane Improvement Evaluation on US-400
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Passing Lane Improvement Evaluation
Various Locations on US-400 that were studied under Project No. 400-106 KA-2375-01 and selected for construction under subsequent projects
Kansas STIP FFY 2018 - 2021 Appendix A Page 163
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-3917-01 SHHWP 2015 2017$785$300 $1,085
$157 20.00%OTHER
A391701 $628 80.00%TA
Name: Implementation of the Kansas Byways Interpretive Plan
Location:
Scope:
OTHER 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Update existing kiosks, construct an additional kiosk and provide interpretive boards
Various locations of eleven Scenic and Historic Byways
KA-4200-01 PE 2017$150 $150
$150 100.00%K
Name: Assist with the CMS Replacement Project
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Assist with the CMS Replacement Project
Assist with the CMS Replacement Project
KA-4221-01 ITS 2017$80 $80
$80 100.00%K
Name: Evaluation of sign and camera control software
Location:
Scope:
NNEGOT 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Define requirements of new software
Statewide
KA-4235-25 SPECL 2017 2017$3,948$275 $4,224
A423525 $3948 100.00%HSIP
Name: Regional Truck Parking Information Management System
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Systems development and implementation of a regional Truck Parking Information Management System (TPIMS).
Various rest area locations in the State of Kansas
Kansas STIP FFY 2018 - 2021 Appendix A Page 164
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-4359-01 PE 2017$1,300 $1,300
$1300 100.00%K
Name: Statewide Sign and Light Tower Inspection
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Obtain consultants to inspect structures
Statewide
KA-4371-01 PE 2017$500 $500
$500 100.00%K
Name: AASHTOWare Concrete Bridge Rating Model Creation
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Load Rating model
Bridge Load Rating for Bridges Statewide
KA-4372-01 PE 2017$500 $500
$500 100.00%K
Name: AASHTOWare Steel Bridge Rating Model Creation
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Bridge Load Rating model
Bridge Load Rating for Bridges Statewide
KA-4452-01 STUDY 2017$170 $170
$170 100.00%K
Name: Consultant for measuring openings for over & unders
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Measure approximately 864 structure openings for over and under clearances for Douglas, Johnson, Leavenworth, Lyon, Miami, Sedgwick, Shawnee and Wyandotte counties Metro Area
Over and under clearances in Douglas, Johnson, Leavenworth, Lyon, Miami, Sedgwick, Shawnee and Wyandotte counties Metro Areas
Kansas STIP FFY 2018 - 2021 Appendix A Page 165
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-4475-01 402RS 2017$25 $25
$25 100.00%K
Name: Traffic Signal and Lighting Foundation Design
Location:
Scope:
OTHER 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Foundation design review for signals and lights
Statewide
KA-4496-01 INTER 2017 2017 2017 2017$2,402$87$109$218 $2,817
$218 9.09%K
$218 100.00% $109 100.00% $87 100.00% $2184 90.90%LOCAL
Name: Intersection improvement for casino access US400/69
Location:
Scope:
YKDOT 0.2U069Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Intersection Improvement
Cherokee/Crawford Co. at North Jct. US-400 & US-69
KA-4529-01 PE 2017$110 $110
$110 100.00%K
Name: Kansas Highway Research Analyst
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Provide statistical analysis services for the Traffic Safety Section.
Statewide
KA-4533-01 PE 2017$10 $10
$10 100.00%K
Name: Traffic Study Review
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Traffic Study Review
Statewide
Kansas STIP FFY 2018 - 2021 Appendix A Page 166
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-4549-18 SPECL 2017$55 $55
$55 100.00%STATE
Name: Washburn University Summer Transportation Institue Prog
Location:
Scope:
NNONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Washburn University Summer Transportation Institue Program
Washburn University
KA-4593-01 STUDY 2017$200 $200
$200A459301 100.00%ACSTP
Name: Review FY 2018 Federal Aid 1R Safety Improvements
Location:
Scope:
NONE 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Review of Safety Improvements for Fiscal Year 2018 Federal Aid 1R Projects
Statewide
KA-4595-01 MILLG 2017$20 $20
$20 100.00%K
Name: Milling in the Northwest District
Location:
Scope:
YKDOT 92.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling
Various Locations in the Northwest District
KA-4599-01 MILLG 2017$89 $89
$89 100.00%K
Name: Milling for Samples at Various Locations in District 5
Location:
Scope:
NKDOT 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling
Various Locations in District 5
Kansas STIP FFY 2018 - 2021 Appendix A Page 167
Fund Category
Work Type
Project Number
WP Est Amount
WP EstObligation
Amount
Proj WP Obligation
FFY
Preliminary Engineering Right of Way Utilities Const + Const Engineering
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
WP Est Amount
Proj WP Obligation
FFY
WP EstObligation
Amount
Federal Agreement
Number
Remaining FFY 2017 Projected Obligations
Total Project Est
Amt
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
WP Fund Pro Rata
KA-4617-01 MILLG 2017$83 $83
$83 100.00%K
Name: Milling for Samples at Various Locations in District 6
Location:
Scope:
KDOT 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling
Various Locations in District 6
KA-4625-01 MILLG 2017$8 $8
$8 100.00%K
Name: Milling for Samples at Various Locations in District 4
Location:
Scope:
NKDOT 0.0Statewide Route: Total Length (Miles): Letting Type: NHS Project: County:
Milling
Various Locations in District 4