ETDM: 14057 State Road (S.R.) 61 (U.S. 319) FPID’s 22049622201 and 21974722201 Crawfordville Highway Conceptual Design and Environmental Reevaluation May 6, 2014

Transcript of State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East...

Page 1: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

State Road (S.R.) 61 (U.S. 319) FPID’s 220496‐2‐22‐01 and 219747‐2‐22‐01

Crawfordville Highway Conceptual Design and Environmental Reevaluation 

May 6, 2014

Page 2: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057PROJECT LOCATION/LIMITS

Project Limits: S.R. 61 (U.S. 319) from S.R. 30 

(U.S. 98) in Wakulla County to South of the Four Points Intersection in  Leon County  (23.5 miles)

BEGIN PROJECT

END PROJECT

N

Type 2 Categorical Exclusion was approved on August 1996

Presently not on Strategic Intermodal System (SIS) 

Hurricane Evacuation Route

Segments North of Rivers Road to the Four Points Intersection (End Project) have been constructed

Page 3: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

BEGIN PROJECT

END PROJECT

N

3 Focus Areas:1. S.R. 30 (U.S. 98) to the 

intersection of C.R. 61 in Wakulla  County (6.7 miles)

2. From the intersection of C.R. 61 to Leon County line in Wakulla County (9 miles) 

3. From the Wakulla County line to beginning of the four lane South of Rivers Road  in Leon County ( 4.25 miles)

4. Focus Project Length is approx. 20 miles

PROJECT LOCATION/LIMITS

Page 4: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

PURPOSE

• Purpose for performing the Study:• Evaluate/Update Studies conducted during the earlier 

PD&E Study to determine the preferred alternative  

• The proposed improvements to Crawfordville Highway are needed to:• improve mobility• relieve traffic congestion• improve traffic circulation• improve pedestrian and bicycle connectivity      • provide for and ensure public safety while protecting the 

environment 

Page 5: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

PROJECT CORRIDOR

SEGMENT 6FPID 219881‐2

SEGMENT 2FPID 220495‐6

SEGMENT 1FPID 220495‐5

SEGMENT 7FPID 219881‐1

SEGMENT 3FPID 220495‐3

SEGMENT 4FPID 220495‐7

SEGMENT 5FPID 220495‐8

Focus Areas:1. 7 Segments

2. Two Alternate Alignments

ALTERNATE 2 

Alternate 2 is similar to Alternate 1 except it includes the one‐way pair within Segment 3

ALTERNATE 1 Alternate 1 follows the existing 

alignment with shifts to the left and right to accommodate the typical section.

Page 6: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

SEGMENT 1FPID 220495‐5

Segment 1: From SR 30 (US 98) to North of AlaskaWay

Segment is Being Advanced, R/W Funded for 2014/15/16 Design Plans Being Updated, Currently at 90%

SEGMENT 2FPID 220495‐6

Segment 2: From North of Alaska Way to LostCreek Bridge

30% Design Plans Completed in 2007

Urban Typical Section Design Speed is 45 MPH Provides Two 12’ lanes in each direction Provides 4’ Bike Lane and 6‘ sidewalk in each direction

PROJECT SEGMENTS

Page 7: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

SEGMENT 2FPID 220495‐6

SEGMENT 1FPID 220495‐5

Alternate 1: Urban Typical Section

Limits From Lost Creek Bridge to South of East Ivan Road Design Speed = 45 MPH Provides two 12’ lanes in each direction Provides 4’ Bike Lane and 6‘ Sidewalk in each direction

SEGMENT 3FPID 220495‐3

ALTERNATE 1 

Segment 3: From Lost Creek Bridge to South of East Ivan Road

100% Design Plans Completed in 2006

PROJECT SEGMENTS

Page 8: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

SEGMENT 2FPID 220495‐6

SEGMENT 1FPID 220495‐5

SEGMENT 3FPID 220495‐3

ALTERNATE 1

ALTERNATE 1

Alternate 1, Option 1: Crawfordville Town Plan UrbanTypical Section

Limits  From Harvey Mill Road to Wakulla Arran Road Design Speed = 45 MPH Provides two 11’ lanes and 5’ bike lanes in each direction Provides 6’ Sidewalk in each direction Provides 8’ Parking in each direction 14’ Median Width*

* Does not meet current FDOT criteria

ALTERNATE 1, Option 1 

Segment 3: From Lost Creek Bridge to South of East Ivan Road

PROJECT SEGMENTS

Page 9: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

SEGMENT 2FPID 220495‐6

SEGMENT 1FPID 220495‐5

SEGMENT 3FPID 220495‐3

Segment 3: From Lost Creek Bridge to South of East Ivan Road

Limits From Harvey Mill Road to Wakulla Arran Road Design Speed = 45 MPH Provides two 11’ lanes in each direction Provides 4’ bike lane and 6’ sidewalk in each direction 19.5’ Median Width

Alternate 1, Option 2: Urban Typical SectionALTERNATE 1 

ALTERNATE 1

ALTERNATE 1, Option 2 

PROJECT SEGMENTS

Page 10: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

Alternate 1, Option 1: Crawfordville Town Plan UrbanTypical Section

PROJECT SEGMENTS

Alternate 1, Option 2: Urban Typical Section

Typical Section Options ‐ From Harvey Mill Road to Wakulla Arran Road

On‐going Coordination with Agencies

Page 11: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

ALTERNATE 2 

Segment 3: From Lost Creek Bridge to South of East Ivan Road

Alternate 2: One‐Way Pair Typical Section From North of Harvey Mill Road to North of Azalea Drive

From North of Azalea Drive to South of East Ivan Road From Lost Creek Bridge to North of Harvey Mill Road

Urban Typical Section

PROJECT SEGMENTS

Page 12: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057HARVEY MILL ROAD

BEGIN ONE‐WAY PAIREND 4‐LANE URBAN SECTION BEGIN 4‐LANE URBAN SECTION

END ONE‐WAY PAIR

AZALEA DRIVE

OCHLOCKNEE STREET

CRAWFORDVILLE HIGHWAY

PROJECT SEGMENTS

Page 13: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

Alternate 2: One‐Way Pair Typical Section From North of Harvey Mill Road to North of Azalea Drive Design Speed 45 MPH Provides two 12’ lanes in each direction Provides 4’ bike lane and 6’ sidewalk in each direction

Ochlocknee Street Crawfordville Hwy.

PROJECT SEGMENTS

Page 14: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

SEGMENT 2FPID 220495‐6

SEGMENT 1FPID 220495‐5

SEGMENT 3FPID 220495‐3

SEGMENT 4FPID 220495‐7

Segment 4: From South of East Ivan Road toNorth of SR 267

100% Design Plans Completed in 2010 Segment to be Advanced, R/W Funded for 2017/18/19 Binding Wetland Jurisdictional DeterminationSEGMENT 5

FPID 220495‐8

Segment 5: From North of SR 267 to South ofLeon County Line

100% Design Plans Completed in 2010 Segment to be Advanced, R/W Funded for 2016/17/18 Binding Wetland Jurisdictional Determination

SEGMENT 6FPID 219881‐2

Segment 6: From Leon County Line to LL WallaceRoad

45% Design Plans Completed in 2011 Ponds are designed to Meet Current Permitting 

Regulations

SEGMENT 7FPID 219881‐1

Segment 7: From LL Wallace Road to beginning of the four lane South of Rivers Road 

45‐60% Design Plans Completed 2006 Drainage Design will not Meet Current Permitting 

Regulations

PROJECT SEGMENTS

Page 15: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

SEGMENT 2FPID 220495‐6

SEGMENT 1FPID 220495‐5

SEGMENT 3FPID 220495‐3

SEGMENT 4FPID 220495‐7

SEGMENT 5FPID 220495‐8

SEGMENT 6FPID 219881‐2

SEGMENT 7FPID 219881‐1

Rural Typical Section for Segments4, 5, 6 & 7

Design Speed 70 MPH Provide two 12’ lanes and 5‐ paved shoulder in each 

direction

PROJECT SEGMENTS

Page 16: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

Component Schedule

Original PD&E 1996

Conceptual Design and Environmental 

ReevaluationNow underwayComplete in 2015

Right‐of‐Way Funded for only Segments 1, 4 & 5

Construction Not funded

SCHEDULE

Page 17: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

Task Schedule

Traffic Analysis Now – May 2014

Engineering Analysis  Now – Oct. 2014

Environmental Analysis Now – June 2015

Alternatives Public Meeting June 2014

Public Hearing March 2015

Final Conceptual Plans September 2014

Location Design Concept Acceptance June 2015

SCHEDULE

Page 18: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

Public MeetingTuesday, June 175:30 p.m. – 6:30 p.m. (EDT)Crawfordville United Methodist Church

SCHEDULE

Page 19: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057

April Williams, P.E.Project ManagerFDOT District ThreeEnvironmental Management Office1074 Highway 90 EastChipley, FL [email protected]: (850) 330‐1625

CONTACT INFORMATION

Ian SatterPublic Information DirectorFDOT District Three1074 Highway 90 EastChipley, FL [email protected]: (850) 330‐1205

Page 20: State Road (S.R.) 61 (U.S. 319) - CRTPAcrtpa.org › files › 89338709.pdf1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330‐1625 CONTACT INFORMATION

ETDM: 14057