Controlling Flow and Flames™ State of the art equipment Controlling Flow and Flames EC Service center Asian Service center Technical Support 24h World-wide service World-wide sales network European HQ

Transcript of State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324...

Page 1: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

Controlling Flow and Flames™

State of the art equipment Controlling Flow and Flames™

EC Service center Asian Service center Technical Support 24h World-wide service World-wide sales network European HQ

Page 2: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

2

Index

Index ......................................................... 2 Manufacturer of cargo tank ventilation equipment ....................... 3

Rules & Regulations ............................... 4 Information on rules & regulations ..... 5

EC MED 96/98 Council Directive ........ COMMISSION DIRECTIVE 2008/67/EC ...................................... 5 COMMISSION DIRECTIVE 2009/26/EC ...................................... 5

IMO MSC.1/Circ.1324 ............................ Our staff at work .................................... 6

The engineers questionnaire ............ 6 The engineers at final testing .......... 7 High Velocity Valves: ....................... 8

For your Engineers............................... 12 Test equipment for adjustment and verification of opening pressure ......... 12 Documentation & Certificates ............ 12

90101 Test Bench ........................... 13 90102 Test Box ............................... 14

Documentation & Certificates ............ 15 90001 in 3D & below ready for shipment ........................................... 16 Flame arresters: ............................... 18 Pressure-vacuum valves: ................ 19

Our achievements ................................. 20 Certificates: ...................................... 20 Contact: ............................................ 22

Page 3: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

3

We at Bay Valves are proud to presents the latest generation state of the art equipment - Controlling Flow and Flames™ In the following we will briefly introduce ourselves and our product range as well as briefly up-date you on the latest changes to the rules and regulations.

Manufacturer of cargo tank ventilation equipment BAY Valves is based in Nyborg – Denmark, close to the place of the invention of the High Velocity valve in the year 1971. Denmark has since then established itself as an expert community and knowledge centre within Cargo tank ventilation - Especially within the specific field of High velocity valves. A highly skilled group of engineers with extensive knowledge within Fluid Dynamic i.e. High Velocity valves are continuously striving for excellence - Improving on safety and functionality. The advantage of the High Velocity valves HI Jet ISO II is that it is absolutely non-hammering and performs opening and closing according to the international fire testing standard EN 12874 and the latest amendment to ISO 15364:2007 which both requires a maximum of 0,5 hz - Equal to a 2 seconds cycle from the valve is closed to open and closed again. Furthermore the HI Jet ISO II has been simultaneously tested to the European standard EN 12874 and gas group IIB (MESG 0,5 for chemicals) at the independent German Notified body (Wheel-mark approved) Institut Für Sicherheitstechnik - IBExU. With regard to functionality, the superiority relates to the adjustable setting which allows the valve setting (opening pressure) to be changed according to the authorities or charterers changing requirement e.g. from 1400 mm to 1700 mm WG for oil tankers or even from 2000 mm WG and above for chemicals - Simply by turning a nut, which can even be done in service. Other products for the marine and off-shore industry as well as the petro-chemical industry e.g. flame arresters, pressure-vacuum valves, detonation arresters etc. is available from stock. Should you require more information, or wish to discuss any issue related to cargo tank ventilation, pressure-vacuum release and devices to prevent the passage of flames, please do not hesitate to contact the undersigned. Yours Sincerely, BAY Valves ApS

Søren Bay Jensen Managing Director & Partner

Page 4: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

4

Rules & Regulations

1.1 System Design.

SOLAS 74 chapter II-2 REG 59 Venting, purging, gas-freeing and ventilation.

IMO MSC/CIRC 731 Revised factors to be taken into consideration when designing cargo tank venting and gas-freeing arrangements.

USCG CFR 46 part 39 –Vapour control system.

ADNR 2003 Transport of Hazardous Material / Dangerous Goods on the river Rhein.

ISO 15364:2000

Ships and marine technology – Pressure/vacuum valves for cargo tanks.

1.2 Test Standards

IMO MSC/CIRC 677 Revised standards for the design, testing and locating of Devices to prevent the Passage of Flames into cargo tanks in tankers.

IMO MSC/CIRC 1009 Amendments to the revised standards for the design, testing and locating of Devices to prevent the Passage of Flames into cargo tanks in tankers.

CEN European Standard EN 12874 Flame arresters – Performance requirements, test methods and limits for use.

Page 5: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

5

Information on rules & regulations

EC MED 96/98 Council Directive

COMMISSION DIRECTIVE 2008/67/EC of 30 June 2008 amending Council Directive 96/98/EC on marine equipment Into force date: 21st of July 2009 Implements the EN 12874:2001 fire test standard. The IMO MSC Circ 677 - “Revised standards for the design, testing and location of Devices to prevent the passage of flames into cargo tanks on tankers” is still in force. But with regard to the actual fire testing, the weak wording of “Non-hammering” has been replaced by the more accurate 0,5 hz requirement of the EN 12874. This is a major improvement which reaches beyond improved standards for fire-testing since it also inflicts the actual performance of the valves.

COMMISSION DIRECTIVE 2009/26/EC of 6 April 2009 amending Council Directive 96/98/EC on marine equipment Into force date: 06 of April 2010 Implements the latest version of the ISO 15364. The ISO 15364 standard with its intentions, was back in 2002 long needed in order to secure equipment more suited to the specific application. The 2007 version continues in the footsteps of the 2001 version, it is a brush-up, and does likewise not bring any revolution to the industry. -----------------------------------------------------------------------------------------------------------------------------------

IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 Into force date: 2009, but needs to be complied with latest 01 January 2013 AMENDMENTS TO THE REVISED STANDARDS FOR THE DESIGN, TESTING AND LOCATION OF DEVICES TO PREVENT THE PASSAGE OF FLAME INTO CARGO TANKS IN TANKERS (MSC/CIRC.677, AS AMENDED BY MSC/CIRC.1009) Caters for clarification on the requirements to the flame arrester type and limitations Clarification to ensure that the Maximum Experimental Safe Gap (MESG) value for the medium to be used to test the device is appropriate for the product certified to be carried in the tanks. Gas group - IIA / IIB / IIC MESG - 0,9 / 0,65 / 0,5 APPLICABLE: ships constructed on or after 1 January 2013 and to ships constructed before 1 January 2013, no later than the first scheduled dry-docking carried out on or after 1 January 2013 NOTE: Please contact us for any clarification on the above.

Page 6: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

6

Our staff at work The engineers questionnaire According to SOLAS 74 II Reg. 59 a system for cargo tank ventilation can be either a common or an individual one which in both cases has to be protected by a Device to prevent the passage of flame as specified in IMO MSC/Circ 677/1009. A common system consists of a branch line from each cargo or slop tank connected to a common venting line. An individual system is equipped with approved equipment on each tank in order to secure full flow capacity, breathing capabilities and full cargo segregation. The system in question has been either informed or estimated as having the following characteristic: INFORMED ESTIMATE INFORMED ESTIMATE IMO Designation IMO II Cargo tanks 18 Cargo Gas-group IIB Slop tanks 2 MESG 0,65 Other tanks USCG VCS YES Gas-freeing covers 20 Common Gas freeing blower Individual YES Setting – pressure 2000 mm wg Cargo Segregation ALL Setting Vacuum - 350 mm wg Loading rate 500 m3/h Material AISI 316 Un-loading rate 500 m3/h Flange DIN PN 10 Please feel free to return this page only, which will be identified by the quotation No. listed at the top of the page. For corrections or comments just mark with- or in writing in the text box below. IMO Designation: III II I Cargo segregation: Gas Group: IIA IIB IIC Loading rate: MESG: 0.90 0,65 0,50 Un-loading rate: Setting Pressure: Cargo Density: Setting Vacuum: USCG VCS: Yes/No Flange standard: Gas freeing blower: N m3/h Material: Please change accordingly:

Date: Name: Company:

Comments:

Page 7: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

7

The engineers at final testing

The final adjustment and testing is done prior to Class inspection. Below is the class verified test scheme which follows all deliveries.

Page 8: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

8

High Velocity Valves:

High Velocity Valve approved according to IMO MSC/Circ 677 and 1009 implementing the International Standard ISO 15364.

Approved by leading Classification Societies and EC Notified bodies according to MED 96/98 and later amendments.

“Mini slip technology” secures close to zero VOC loss during breathing/voyage

Adjustable setting Integrated gas freeing cover.

Industry’s highest constant net clearance between moving parts and valve housing –

Suitable for freezing, sticking and crystallizing cargo. Exchangeable wear parts.

Upgrading on-site to higher gas-groups.

Non-oscillating (frequency less than 0,5 hz / ISO 15364:2007)

Controlled blow-down, securing instant pressure drop to safety level 30% below

setting in order to allow loading at a high capacity and at the same time avoiding a boil-off of cargo.

Page 9: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

9

Application: Cargo- & Slop tanks

Units: 20 Size: 100 Flange standard: DIN PN 10 Material-Housing: Stainless steel AISI 316 Material-Inner parts: Stainless steel AISI 316 Setting – Pressure: 2000 mm wg Setting – Vacuum: - 350 mm wg Loading Rate: 550 m3/h Capacity – SOLAS: 722 m3/h Pressure Capacity: 1700 Nm3/h @ 2000 mm WG Un-loading rate: 380 m3/h Vacuum Capacity: 850 Nm3/h @ 700 mm WG Drawing: 90001 Flow curve -pressure 90001-1202-100-020 Flow curve- vacuum 90001-1202-100-002 Gas group: IIB MESG: 0,65 Features: High velocity valve, non-hammering

Non-oscillating (frequency less than 0,5 hz / ISO 15364:2007) Controlled blow-down, securing instant pressure drop to safety level 30% below setting in order to allow loading at a high capacity and at the same time avoiding a boil-off of cargo.

Test standard: IMO MSC/Circ 677/1009/ ISO 15364 & EN 12874 High-end features: Adjustable setting – Integrated gas freeing cover. Industry’s

highest constant net clearance between moving parts and valve housing – Suitable for freezing, sticking and crystallizing cargo. Exchangeable wear parts. Upgrading on-site to higher gas-groups.

Page 10: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

10

Description: High velocity valve with integrated gas freeing unit

Designation: Drawing No.: 90001

HI Jet ISO II 1202

A B C D Dc Dn E F G n d SIZE 415 260 115 185 145 65 190 275 215 4 18 65 510 320 145 200 160 80 230 340 265 8 18 80 635 400 180 220 180 100 290 425 335 8 18 100 790 500 225 250 210 125 360 525 410 8 18 125 950 600 270 285 240 150 435 635 500 8 22 150 1200 750 300 340 295 200 500 800 600 8 22 200 1300 900 400 395 350 250 600 1000 780 12 22 250 1500 1000 500 445 400 300 750 1200 900 12 22 300 1900 1200 600 565 515 400 1000 1500 1200 16 26 400

70001 Pressure side high velocity valve

70002 Valve housing

70003 Vacuum side weight loaded valve

70004 Vacuum side flame screen

70005 Gas freeing unit

Available in all material combinations e.g. from Cast iron to Duplex stainless steel. Approved according to IMO MSC / Circ 677/1009 implementing ISO 15364. Type examination according to MED 96/98 latest 2002/75 EC provided by Bureau Veritas under Cert. No. 19876/AO EC

Page 11: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

11

PRESSURE SIDE – HIGH VELOCITY VALVE

Valve setting: Lowest setting: Valve capacity: Conditions: 20 Kpa 10 Kpa 1700 Nm3/h @ 20 Kpa Standard air 21°C / 1013 hPa

Applicable rules Valve data Data√ IMO MSC/Circ 677/1009 Name HI Jet ISO II√ ISO 15364 No. 1202 Signature / Stamp√ MED 96/98 Size 100√ SOLAS 74 Restrictions: Lenght [m] Bends [No]√ API 2000 DN > 80 No restrict. No restrict.√ API 520 DN 80 30 11

DN 80 40 0MESG 0,5

0

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

0 250 500 750 1000 1250 1500 1750 2000 2250

Pressure [kPa]

Flow [Nm3 / h]

Document type: Document No.: Notified Body: Certificate No.: Flow diagram 90001-1202-100-020 DNV To be informed

Page 12: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

12

For your Engineers Test equipment for adjustment and verification of opening pressure

90101 Test bench

Documentation & Certificates 90102 Test box

Page 13: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

13

90101 Test Bench

Page 14: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

14

90102 Test Box

Page 15: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

15

Documentation & Certificates SCOPE OF SUPPLY:

- Name plate.

- Paint Inside : Phenolic epoxy (NA for AISI 316 and higher grade)

- Paint outside : Phenolic epoxy (NA for AISI 316 and higher grade)

- All required sizing calculations and engineering activities.

- Supply of drawings and documents according documentation requirements.

- MED Type Examination certificate – latest amendment.

- Quality control, testing and inspection.

- Surface preparation and painting.

- Packing and preservation for 6 months outdoor offshore storage.

- Required calibration and test certificates.

- Extended guarantee 48 month

Flag: EC Classification Society: DNV Certificate 1: EC- MED 96/98 Type Examination Certificate -DNV Guarantee: 48 month from delivery Documentation: Type Approval Certificate

Vendor’s Certificate of Compliance/Final Inspection Clearance

Class Certificate of Inspection (DNV)

Area Classification Certifications

Performance Test Results (as applicable)

Major Material Test Certificates

PMI

QC Punch List detailing any incomplete work

Complete Detailed Packing List

Page 16: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

16

90001 in 3D & below ready for shipment

Page 17: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

17

The High velocity valves is our single most important product in Controlling Flow & Flames™ But other products are of course available - some of which are presented in the following.

DN 600 P-V valve and DN 600 Flame arrester for mast riser system

Page 18: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

18

Flame arresters: Drawing No.: 90003 Date: 14/11/2013 Page 18 of 22 Description: Flame arrester Designation: FLAF

1215

A D Dc Dn N De SIZE 105 200 160 80 8 18 80 105 220 180 100 8 18 100 125 285 240 150 8 22 150 150 340 295 200 8 22 200 205 400 350 250 12 22 250 250 445 400 300 12 22 300 380 565 515 400 16 26 400 470 670 620 500 20 26 500 560 780 725 600 20 30 600 560 895 840 700 20 30 700

Available in all material combinations e.g. from Cast iron to Duplex stainless steel. Approved according to IMO MSC / Circ 677 Type examination according to MED 96/98 latest 2002/75 EC provided by Bureau Veritas under Cert. No.19876/AO EC

1 Lifting eye bolt

2 Cover

3 Housing

4 Flame screen holder

5 Flame screen

Page 19: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

19

Pressure-vacuum valves:

Drawing No.: 90005 Date: 14/11/2013 Page 19 of 22 Description: Pressure vacuum valve Designation: VAPV

1225

A B C D F Dc Dn N De SIZE 215 115 95 185 70 145 65 4 18 65 265 145 115 200 85 160 80 8 18 80 335 180 145 220 110 180 100 8 18 100 410 225 180 250 135 210 125 8 18 125 480 270 215 285 165 240 150 8 22 150 550 300 240 340 180 295 200 8 22 200 760 500 375 445 250 400 300 12 22 300 950 600 450 565 360 515 400 16 26 400 950 600 520 615 400 565 450 20 26 450 950 600 520 780 440 725 600 20 30 600

1 Check lift

2 Cover

3 Vacuum side disc

4 Vacuum side seat

5 Housing

Available in all material combinations e.g. from Cast iron to Duplex stainless steel. Approved according to IMO MSC / Circ 677 Provided fitted with a flame arrester at Outlet Type approval according to MED 96/98 latest 2002/75 EC provided by Bureau Veritas under Cert. No. 19876/AO EC

6 Pressure side disc

7 Pressure side seat

8 Check lift

Page 20: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

20

Our achievements Certificates:

Page 21: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

21

Page 22: State of the art equipment Controlling Flow and Flames · 2020. 11. 5. · IMO MSC.1/Circ.1324 (Amendment to IMO MSC/Circ. 677 (1009)) of 10 June 2009 . Into force date: 2009, but

22

Contact:

Your needs? As Manufacturer, we appreciate dialogue with our customers and value the experience gathered during daily use of the equipment. Following this brief presentation of our company, we would therefore appreciate your feed-back - Does our products fulfil your needs, can we improve on the design in general and / or adapting some features to fit your application?

How can we be of assistance?

Contact! BAY Valves ApS DK-5800 Nyborg, Denmark [email protected]

Tel. +45 7022 1892 Fax. +45 7014 1892