State-of-Practice on the Use of Geosynthetics in Roadway Applications Mark H. Wayne, Ph.D., P.E. Tensar International [email protected]

Transcript of State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade...

Page 1: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

State-of-Practice on the Use of

Geosynthetics in Roadway

Applications

Mark H. Wayne, Ph.D., P.E.

Tensar International

[email protected]

Page 2: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

30+ YEARS

Foundation & Pavement

Optimization

Page 3: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

FEDERAL HIGHWAY ADMINISTRATION

Page 4: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Why Geogrids?

Page 5: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• Construction Platform

• Paved Road

Flexible Pavement Design

Page 6: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

BEFORE Subgrade Stabilization Geogrid

Traffic Course Geogrid

12” PennDOT 2A Mod.

12” PennDOT 2A Mod.

Page 7: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

AFTER

Page 8: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

SEPARATION

Page 9: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.
Page 10: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Interface Immobilization

Page 11: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

A Sieve Analysis of Tennis Balls… Particle Size Distribution

0

20

40

60

80

100

0.0010.010.1110100

Grain Size (mm)

% F

iner b

y W

eig

ht

65 mm Uniform Diameter

Page 12: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

… and also Marbles

Particle Size Distribution

0

20

40

60

80

100

0.0010.010.1110100

Grain Size (mm)

% F

iner b

y W

eig

ht

13 mm Uniform Diameter

5x

65 mm

Page 13: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Subgrade Particles Cannot Infiltrate Aggregate

Fill Just as Marbles Cannot Infiltrate Tennis

Balls, Provided They Don’t Move.

Page 14: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Filter Criteria

• For Clayey Subgrades:

• For Silty Subgrades:

5 D

DRatio Piping

s

f

85

15

5 D

DRatio Piping

s

f

85

15

25 D

DRatio Size Average

s

f

50

50

Page 15: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

So if Water is Present and Filter

Criteria are Not Satisfied…

• (1) Consider an Alternative (i.e. Sandier) Aggregate Fill, at Least for the First Lift.

• (2) Consider a Nonwoven Geotextile Beneath the Geogrid, but Only if the Subgrade is Not Silty.

Page 16: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

AGGREGATE INTERACTION

FHWA Aperture Size Criteria

Aperture size > D50 of Aggregate Fill

and < 2D85 of Aggregate Fill

Page 17: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.
Page 18: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

UNPAVED ROAD DESIGN

Full Scale Testing Required to Calibrate and Validate

Page 19: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.
Page 20: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.
Page 21: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.
Page 22: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.
Page 23: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• FHWA Separation Criteria (Piping Ratio) ▫ D15 fill = 0.15mm

▫ D85 subgrade = 0.35mm

▫ D15/D85 = 0.43<5 OK

• Average Size Ratio ▫ D50fill = 3mm

▫ D50subgrade=0.1mm

▫ D50fill/D50subgrade=30 not < 25 but close and still worked fine for

the SM used in this study.

• FHWA Aperture Size Criteria (Interaction) ▫ Aperture size > D50 of GAB (3mm) and < 2D85 of GAB

▫ TX130S – 22 mm >3 mm OK and < 2*18 or 36mm OK

▫ BX1100 – 25mm/33mm > 3mm OK and < 2*18 or 36mm OK

Page 24: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

PAVED ROAD DESIGN

AASHTO ‘93

MEPDG

Page 25: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

AASHTO STANDARD PRACTICE

Page 26: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Roadbed Adjustment Reliability Adjustment

On site performance equation

AASHTO 93

Page 27: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

PAVED ROAD DESIGN

Converted to a layer depth using coefficients. SN = a1D1 + a2D2m2 + a3D3m3 + …

Page 28: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

PAVED ROAD DESIGN

Page 29: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

MEPDG Output*

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

0 2 4 6 8 10 12 14 16

AC Thickness (in)

All

iga

tor C

ra

ck

ing

%

SG Mr = 30 ksiSG Mr = 30 ksiSG Mr = 25 ksiSG Mr = 25 ksi

SG Mr = 20 ksiSG Mr = 20 ksi

SG Mr = 15 ksiSG Mr = 15 ksi

SG Mr = 8,000SG Mr = 8,000

SG Mr = 3,000SG Mr = 3,000

*Courtesy Applied Research Associates, Inc.

Page 30: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Service Life*

*Courtesy Applied Research Associates, Inc.

Page 31: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Performance vs. Index Property

0

2

4

6

8

10

12

14

16

18

0 5 10 15 20 25 30 35

Tra

ffic

Be

ne

fit

Ra

tio

(T

BR

)

Tensile strength at 5% strain (kN/m)

Page 32: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• Full-Scale Testing

Performance Evaluation

Page 33: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• Full-Scale Testing

Performance Evaluation

Page 34: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Biaxial Geogrid Performance

0

2

4

6

0

2

4

6

0.000 0.001 0.002 0.003 0.004

TBRSN

Subgrade Vertical Strain

SN TBR

Page 35: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Geogrid Performance

2

7

6 8 10 12 14 16 18

TIF

Base Course Thickness (in.)

4-in. AC 6-in. AC 8-in. AC

Page 36: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• Use of Performance Based Testing

Flexible Pavement Design

SN = a1D1 + a2D2m2 + a3D3m3 + …

Page 37: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Flexible Pavement Design

MSL Aggregate thickness (in.)

Subgrade Resilient Modulus, Mr (psi)

5,000 7,500 10,000

6 0.273 0.270 0.266

8 0.247 0.243 0.240

10 0.231 0.228 0.224

12 0.216 0.213 0.210

14 0.205 0.203 0.200

16 0.197 0.195 0.193

18 0.191 0.189 0.187

Page 38: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• Optimize Pavement Foundation

▫ Design Stabilization Platform

▫ This is a Stabilization Layer

• Optimize Pavement

▫ Design Base Course Stabilization Layer

▫ Full Scale Testing for Support

Summary

Page 39: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

• Laboratory Performance Testing

▫ T307 Resilient Modulus

• Construction QC/QA

▫ Intelligent Compaction

▫ Dynamic/Static Plate Load Testing

Future Practice

Page 40: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

T307 Triaxial Cell

Page 41: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

T307 Resilient Modulus

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

0 10 20 30 40 50 60 70 80 90

Bulk Stress (psi)

Resil

ien

t M

od

ulu

s,

Mr

(psi)

CONTROL

TX5

Power

(CONTROL)Power (TX5)

Page 42: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

T307 Quick Shear

0

20

40

60

80

100

120

140

160

0 1 2 3 4 5 6

Axial Strain, %

Axia

l S

tress, p

si

Control

TX5

Page 43: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

IOWA STATE UNIVERSITY Civil, Construction & Environmental Engineering ks indicates changes in support conditions due to

changes in pavement foundation materials.

Soft

Stiff

Medium

Silty Clay Sand Crushed

Limestone

Courtesy Iowa State University

Page 44: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

IOWA STATE UNIVERSITY Civil, Construction & Environmental Engineering

Dis

tan

ce

(m

)

0

20

40

60

80

100

120

140

160

180

Pass 1 2 3 4 5 6 7 8

Lane12345

Localized

Wet Area

Cohesive

Subgrade

ks shows compaction progress and soft area.

Courtesy Iowa State University

Page 45: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

IOWA STATE UNIVERSITY Civil, Construction & Environmental Engineering

RICM and PLT Seminar – David J. White 45 11/6/2012

Page 46: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

IOWA STATE UNIVERSITY Civil, Construction & Environmental Engineering

Courtesy GeoMatters

Automated in situ measurement technologies are

setting new standards for quality assessment.

This equipment is US Patent Pending disclosed in U.S. Provisional Patent Application No. 61/621,059, filed April 11,

2012. A South American application will claim priority back to the pending U.S. provisional patent application.

Automated testing to assess:

• Modulus of subgrade reaction

• In situ resilient modulus

• Confining stress dependent

cyclic modulus

APLT

Number of Load Cycles

0 200 400 600 800 1000

In S

itu

Re

silie

nt

Mo

du

lus

(p

si)

0

2000

4000

6000

8000

10000

12000

Pe

rma

ne

nt

De

form

ati

on

(in

ch

es

)

0.0

0.2

0.4

0.6

0.8

1.0

Page 47: State-of-Practice on the Use of Geosynthetics in Roadway ......2012/11/06  · BEFORE Subgrade Stabilization Geogrid Traffic Course Geogrid 12” PennDOT 2A Mod. 12” PennDOT 2A Mod.

Questions?