State of NevadaRenewable Energy Tax Abatement Application
AFN:Facility Information K Road Moapa Solar Facility
Date of Submittal to NSOE: February 5, 2013
X
City:
Phone:APN:
Taxation District where facility is located: Clark County
x
Process Heat from Solar Energy
Transmission that is interconnected to a renewable energy or geothermal facilityTransmission that contributes to the capability of the electrical grid to accommodate and transmit electricity produced from Nevada renewable energy facilities and/or
Solar PV
415-799-4090
Nevada FacilityType of Facility (please check all that are relevant to the facility)
Solar ThermalWindBiomassWaterpowerFuel Cells
Federal Employer ID number (FEIN, EIN or FID): 27-2995257.
NAICS Code: 22114 (Solar Electric Power Generation)
Type of Incentives (Please check all that the company is applying for on this application)Sales & Use Tax Abatement Property Tax Abatement
Company Information ( Legal name of company under which business will be transacted in Nevada.)
Company Name: K Road Moapa Solar LLC
Department of Taxation's Tax Payer ID number: NV Business license # NV20101561376
Description of Company's Nevada Operations: K Road Moapa Solar is developing and will own and operate the K Road Moapa Solar Facility on the Moapa River Indian Reservation, approximately 30 miles northeast of Las Vegas.
Annual Net Production Capacity of the Facility in MWh (or other appropriate unit): ~500,000 MWh in year 1
Net Output Production Capacity of the Facility in MW: 250 MW
Percentage of Company's Market Inside Nevada: Power from the K Road Moapa Solar Facility will be sold to the Los Angeles Department of Water and Power.Mailing Address: 1 Embarcadero Center, Suite 360
San Francisco, CA 9411
Name Plate Production Capacity of the Facility: 250 MW
Geothermal
1 Last Revised ______
State of NevadaRenewable Energy Tax Abatement Application
AFN:
Estimated total capital investment: Approximately $420 million
123456789
Purpose of the Filing with FERC: Market based rate application
Filing Date OR Anticipated filing Date: 2013
List All the county(s), Cities, and Towns where the facility will be locatedMoapa River Indian ReservationBLM land in Clark County, NV (portion of generation tie-line)
Anticipated date or time range for the start of construction: June 2013
Are you required to file any paper work with the PUC and/or FERC?
If yes, Purpose of the Filing with PUC: UEPA filing with PUCN for the ½ mile portion of the generation tie-line which is on BLM land, between the Reservation boundary and Crystal Substation.
Size of the total Facility Land (acre): 2,000 acres permitted for development by Bureau of Indian Affairs (BIA)
City: The closest city is Moapa, NV
If yes,
Anticipated date or time range for the commencement of operation of the facility: Approximately February 2014 for the first 20 MW block. Full COD in 2015.Address of the Real Property for the Generation Facility: The facility will be built on currently undeveloped land on the Moapa River Indian Reservation in Clark County, Nevada.
Filing Date OR Anticipated filing Date: Initial Application filed June 11, 2012. Order issued 9/4/12.
Anticipated first date of purchasing tangible personal property for the project: May 2013
Percent of total estimated capital investment expended in Nevada: 100%
2 Last Revised ______
State of NevadaRenewable Energy Tax Abatement Application
AFN:
1
2
3
4
5
6
7
8
9 Facility Information Form
10 Employment Information, construction, and permanent employee salary schedules
11 Supplemental Information Form
12 Taxation Reporting Forms (Summary Sheet and Schedules 1 through 8)
13 Names and contact information for construction company, contractors, subcontractors
14
15 Confidential Information Identification Form
For Expansion Applications, Copy of the most recent assessment schedule and tax bill from the County Assessor's Office or the Department of Taxation
CHECKLIST - PLEASE ATTACH:
Letter from the utility or company describing the highlights of PPA, LOI, or MOU. SeeAttachment 5.
Website link to company profile. See Attachment 7.
Copy of the Current Nevada State Business License. See Attachment 8.
Copy of the Business Plan for the Nevada Facility. See Attachment 5.
Description of the Technology and Complete Facility including generation, transmission or distribution, the physical point at which the ownership of energy is transferred and nature of the connection to the transmission grid. See Attachment 3.
Complete and legal description of the location of the proposed facility, including a regional facility map that identifies the location, county boundaries and state boundaries of the proposed facility or a reference to any such map of appropriate scale. See Attachment 2.
Description of any natural or nonrenewable resources that will be affected by or required to be used in the construction or operation of the proposed facility, including statement of any areas of mitigation, controversy, issue or concern. See Attachment 3.
Summary of the PUC and FERC Dockets if any PUC and FERC filing have started. SeeAttachment 4.
3 Last Revised ______
Sta
te o
f Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
t App
licat
ion
AFN
:
Perm
it or
Aut
horiz
atio
n Ti
tle
Issu
ing
Age
ncy
Proj
ect C
ircum
stan
ce R
equi
ring
Perm
it or
Aut
horiz
atio
nSt
eps
to O
btai
n Pe
rmit
App
licat
ion
Dat
e
App
rova
l Dat
e or
Exp
ecte
d A
ppro
val D
ate
I. Fe
dera
l Per
mits
or A
utho
rizat
ions
Fina
l Env
ironm
enta
l Im
pact
Sta
tem
ent
BIA
NE
PA
revi
ewC
ompl
eted
NO
I Feb
ruar
y 20
11FE
IS M
arch
201
2
Fede
ral R
ecor
d of
Dec
isio
nD
OI B
LMN
EP
A re
view
, app
rova
l of L
ease
with
Tr
ibe,
app
rova
l of B
LM R
OW
Com
plet
edN
OI F
ebru
ary
2011
RO
D J
une
21,
2012
DO
I BLM
NE
PA
revi
ew, a
ppro
val o
f Lea
se w
ith
Trib
e, a
ppro
val o
f BLM
RO
WC
ompl
eted
NO
I Feb
ruar
y 20
12A
ugus
t 10,
201
2
Con
stru
ctio
n G
ener
al P
erm
it
EP
AN
atio
nal P
ollu
tant
Dis
char
ge E
limin
atio
n S
yste
m re
quire
sper
mitt
ing
for
cons
truct
ion
activ
ities
that
dis
turb
one
or
mor
e ac
res.
EP
A re
gula
tes
in th
is c
ase
beca
use
of tr
ibal
land
.
Com
plet
ed. S
WP
PP
will
be
upda
ted
to
supp
ort t
he p
erm
it fo
r eac
h ph
ase
of
cons
truct
ion.
Nov
-12
Nov
-12
ESA
Sec
tion
7 C
onsu
ltatio
n
US
FWS
End
ange
red
Spe
cies
Act
con
sulta
tion
Com
plet
edN
OI F
ebru
ary
2011
Bio
logi
cal
Opi
nion
Mar
ch
2012
Sect
ion
106
Con
sulta
tion
SH
PO
Cul
tura
l Res
ourc
es c
onsu
ltatio
nC
ompl
eted
NO
I Feb
ruar
y 20
11N
ovem
ber 8
, 20
11
Sect
ion
404
Perm
itU
SA
CE
Fill
to W
ater
s of
the
US
Com
plet
edP
CN
File
d A
ugus
t 201
2S
epte
mbe
r 17,
20
12
Sect
ion
401
Wat
er Q
ualit
y C
ertif
icat
ion
EP
AG
rant
ed v
ia E
PA
und
er S
ectio
n 40
4 P
erm
itC
ompl
eted
PC
N F
iled
Aug
ust 2
012
Sep
tem
ber 1
7,
2012
II. S
tate
of N
evad
a Pe
rmits
or A
utho
rizat
ions
PU
CN
Por
tion
of g
ener
atio
n tie
-line
off
the
Res
erva
tion,
1/2
mile
bet
wee
n R
eser
vatio
n bo
unda
ry a
nd C
ryst
al
Sub
stat
ion
Com
plet
edIn
itial
App
licat
ion
June
201
2O
rder
issu
ed
Sep
tem
ber 2
012
Tem
pora
ry G
roun
dwat
er D
isch
arge
Per
mit
ND
EP
Qua
lity
of R
etur
n W
ater
to A
quife
rC
ompl
eted
9-A
ug-1
2A
ugus
t 13,
201
2Pe
rman
ent G
roun
dwat
er D
isch
arge
Per
mit
ND
EP
Qua
lity
of R
etur
n W
ater
to A
quife
rP
endi
ng Is
suan
ceN
DO
T Tr
affic
Con
trol
Per
mit
ND
OT
Sta
te R
equi
rem
ent t
o m
inim
ize
traffi
c im
pact
sW
ill b
e su
bmitt
ed p
rior t
o fu
ll co
nstru
ctio
nSp
ecia
l Use
Per
mit
ND
OW
Han
dlin
g of
thre
aten
ed a
nd e
ndan
gere
d sp
ecie
s on
sta
te re
gula
ted
land
List
of R
equi
red
Perm
its o
r Aut
horiz
atio
ns fo
r the
Pro
pose
d Fa
cilit
y
UEP
A
Rig
ht o
f Way
Gra
nt
4
Sta
te o
f Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
t App
licat
ion
AFN
:
III. C
ount
y Pe
rmits
or A
utho
rizat
ions
Dus
t Con
trol P
erm
itC
lark
C
ount
yC
ount
y R
equi
rem
ent f
or c
onst
ruct
ion
of
off-r
eser
vatio
n po
rtion
s of
the
acce
ss
road
.
Aug
ust 9
, 201
2A
ugus
t 23,
201
2
Gra
ding
Per
mit
Cla
rk
Cou
nty
Roa
d im
prov
emen
ts o
n of
f-res
erva
tion
porti
on o
f acc
ess
road
.
IV. C
ity P
erm
its o
r Aut
horiz
atio
ns
4
State of NevadaRenewable Energy Tax Abatement Application
AFN:
Vendor 1 TBD (Surveying)Tax ID
ContactMailing Address
Vendor 2 Las Vegas Paving (Earthwork)Tax ID 88-0072823
Contact Dan Fitzgerald
Mailing Address 4420 S. Decatur Blvd,Las Vegas, NV 89103
E-Mail [email protected]
Vendor 3 Western Foundations & Shoring, Inc.(Pile Boring)
Tax ID 95-3866043Contact Kanda Caloca
Mailing Address P O Box 1939, Lakeside, CA 92040E-Mail [email protected]
Vendor 4HT Solar Power
[A Division of Highway Technologies, Inc.] (Pile Driving)
Tax ID 045-076-608Contact Ted Ott
Mailing Address 2295 S. Lipan St., Denver, CO 80223E-Mail [email protected]
Vendor 5 Swinerton(Modules, Inverters, DAS, Racking)
Tax ID 94-1499330Contact Karen Gauthier
Mailing Address 16798 West Bernardo Dr.,San Diego, CA 92127
E-Mail [email protected]
Vendor 6 Sachs Electric Company(Solar Field)
Tax ID 43-0911363Contact Scott Wilkinson
Mailing Address 1572 Larkin Williams Rd.Fenton, MO 63026
E-Mail [email protected]
Contractors and Subcontractors List
NOTE: Project contractors, subcontractors, and other entities including owner that will be purchasing goods and equipment for the construction of the Facility are entitled to claim or receive the
sales and use tax abatement
5
State of NevadaRenewable Energy Tax Abatement Application
AFN:
Vendor 7 Dashiell Corp. (Substation/Gen-Tie)
Tax ID 20-3699713Contact Tom Luongo
Mailing Address 1100 Regency Pkwy, Cary NC 27518E-Mail [email protected]
Vendor 8 PAR Electrical Contractors, Inc.(Substation/Gen-Tie)
Tax ID 44-0591890Contact James Skinner
Mailing Address 4415 N Andrews Street,N Las Vegas, NV 89030
E-Mail [email protected]
Vendor 9 EPC Services Company(Substation/Gen-Tie)
Tax ID 81-0535947Contact John Satchell - CFO
Mailing Address 3521 Gabel Road, Billings, MT 59102E-Mail [email protected]
Vendor 10 American Fence Company, Inc.Tax ID 86-0109542
Contact Paul MartinezMailing Address P. O. Box 19040, Phoenix, AZ 85005
E-Mail [email protected]
Vendor 11 k RoadTax ID
ContactMailing Address
5
State of NevadaRenewable Energy Tax Abatement Application
AFN:
Employment Information
Full Time Part Time
456
94.3%
$32.81
183
172
4 0
$40.87
0
$0.00
List Benefits Included (medical, dental, vision, flex spending account, etc):Various vendors will provide construction labor on the project. Names of those vendors are included in this application. Benefits for construction employees and their dependents will be determined by vendors and will be required to meet or exceed the requirements of NRS 701A.365(1)(d)(4)(I)&(II) and Regulation of the Nevada Energy Commissioner R094-10 Sec. 24(5). Compliance with these requirements is mandatory for vendors and will be so stated in the contracts entered into with vendors.
Name of Insurer:
Average hourly wage of current permanent employees, excluding managements and administrative employees
TBD, depends on vendor.
Health insurance for construction employees and an option for dependents must be offered upon employment
Number of anticipated permanent employees who will be employed as of the end of its first fourth-quarter of new operations or expansion?
Number of permanent employees who were employed prior to the expansion?
Cost of Total Benefit Package: TBD Cost of Health Insurance for Construction Employees: TBD
Employment
Percentage of anticipated construction employees who will be Nevada Residents?
Employee Benefit Program for Construction Employees
New Operations or Expansion
Number of anticipated construction employees who will be employed during the entire construction phase (FTE)?
Number of anticipated construction employees who will be employed during the second-quarter of construction?
Average anticipated hourly wage of construction employees, excluding management and administrative employees:
CONSTRUCTION EMPLOYEES
Number of anticipated second-quarter construction employees who will be Nevada Residents?
Average anticipated hourly wage of permanent employees, excluding management and administrative employees:
PERMANENT EMPLOYEES
6
State of NevadaRenewable Energy Tax Abatement Application
AFN:
(a) (b) (c) = (a)+(b) (e) = (c) x (d) (f) =�(e) / �(c)
# Job Title
# of Nevada Employees
(FTE)
# of Non-Nevada Employees
(FTE)
Total # of Employees
(FTE)
Total Hourly Wage per category ($)
Average Hourly Wage ($)
1 Earthwork 17 1 18 $40.00
2 Boring 13 1 14 $48.17
3 Post Install 39 3 42 $26.91
4 Racking Install 87 5 92 $18.00
5 Concrete 8 1 9 $18.00
6 Electrical 234 13 247 $36.79
7 Transmission 16 1 17 $45.00
8 Substation 16 1 17 $45.00
430 26 456 $32.81
$29,620,265TOTAL CONSTRUCTION PAYROLL
TOTAL
Construction Employees, excluding Management and Administrative Employees
Construction Employee Schedule
List all anticipated construction employees and associated wages for all persons who will be working on the construction of the facility during the entire construction period.
FULL TIME EMPLOYEES
7
State of NevadaRenewable Energy Tax Abatement Application
AFN:
(a) (b) (c) = (a)+(b) (e) = (c) x (d) (f) =�(e) / �(c)
# Job Title# of Nevada Employees
# of Non-Nevada Employees
Total # of Employees
Total Hourly Wage per job
title ($)Average Hourly Wage ($)
Construction Employees, excluding Management and Administrative Employees
1 Earthwork 5 1 6 $40.00
2 Boring 5 1 6 $48.17
3 Post Install 18 1 19 $26.91
4 Racking Install 36 2 38 $18.00
5 Concrete 2 1 3 $18.00
6 Electrical 95 6 101 $36.79
7 Transmission 4 1 5 $45.00
8 Substation 4 1 5 $45.00
169 14 183 $32.48
$11,769,318TOTAL CONSTRUCTION PAYROLL
Second Quarter Construction Employee ScheduleList all anticipated construction employees and associated wages for all persons who will be working on the construction of the facility during the second quarter of construction.
FULL TIME EMPLOYEES
TOTAL
8
State of NevadaRenewable Energy Tax Abatement Application
AFN:
( c ) (f) =�(e) / �(c)
# Job Title# of
Employees
Total Hourly Wage per job
title ($)Average Hourly Wage ($)
1 Management and Administrative Employees 0(Management and admin employees will be off-site)
2 Permanent Employees, excluding Management 4 $40.87
and Administrative Employees
4 $40.87
$323,654
Permanent Employee Schedule
List all anticipated permanent employees who will be employed by the Nevada Facility as of the end of its first fourth-quarter of new operations or expansion and the employment per job title will continue next 20 years
FULL TIME EMPLOYEES
TOTAL ANNUAL PAYROLL
TOTAL
9
State of NevadaRenewable Energy Tax Abatement Application
AFN:
Supplemental Information
The facility will not cross state or county boundaries. The energy generated by the facility will be sold and delivered to LosAngeles Department of Water and Power.
The facility will be owned by K Road Moapa Solar, LLC, which is a subsidiary of K Road Power Holdings, LLC (KRPH). KRPH is headquartered in New York, NY. K Road Moapa Solar is headquartered in New York, NY.
Please respond to each question. Answers to the questions will assist Department of Taxation staff in determining whether the facility should be locally or centrally assessed. Other questions will assist staff in understanding whether the reported replacement costs capture all aspects of taxable value.
1) Will you have a possessory interest in any governmentally owned property for this facility? Please describe if yes.
2) Will the facility, including generation, transmission, or distribution cross state or county boundaries? If yes, please describe.
No.
3) Is the facility owned by a subsidiary of a company that is interstate or intercounty in nature? Name and location of the subsidiary company, if yes.
4) At what physical point is the ownership of energy transferred? Describe the location and nature of the connection to the transmission grid.Ownership of energy is transferred at the project's Point of Interconnection to LADWP's transmission facilities, which will be located at or near the high side of the Moapa project collector substation. K Road will build a 500kV generation tie line from the Moapa substation to the Crystal substation. Prior to energization of the facility, K Road will transfer ownership of the line toLADWP, which incorporate the line into its Transmission System.
No.
No.
6) Has your company applied and/or been approved for any abatements or exemptions for this facility or any other facility by the State of Nevada and/or local governments? If yes, list the abatements awarded, name and location of the project, name of the awarder, date of approval, amounts and status of the accounts.
5) Will the facility be eligible for other abatements or exemptions such as pollution control exemptions? Please describe if yes
10
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x Ab
atem
ents
App
licat
ion
AFN
:
Sum
mar
y R
epor
tSc
hedu
les
1 th
roug
h 8
Com
pany
:
Div
isio
n:
Line No. 1
Sch.
1 P
erso
nal P
rope
rty -
Prop
erty
Tax
- To
tal f
rom
Col
. J.
2Sc
h. 2
Rea
l Pro
perty
- Im
prov
emen
ts -
Tota
l fro
m C
ol. F
.
3Sc
h. 3
Rea
l Pro
perty
- La
nd -
Tota
l fro
m C
ol. I
4Sc
h. 4
Ope
ratin
g Le
ases
- To
tal f
rom
Col
. F
5Sc
h. 5
Con
tribu
tions
in A
id o
f Con
stru
ctio
n - T
otal
from
Col
. F
6Sc
h. 6
Firs
t Yea
r Est
imat
ed S
ales
& U
se T
ax -
Tota
l fro
m C
ol. J
30,9
88,7
30.2
4$
7Sc
h. 7
Sec
ond
Year
Est
imat
ed S
ales
& U
se T
ax -
Tota
l fro
m C
ol. J
645,
994.
53$
8Sc
h. 8
Thi
rd Y
ear E
stim
ated
Sal
es &
Use
Tax
- To
tal f
rom
Col
. J-
$
Dep
artm
ent U
se
Onl
ySc
hedu
le
Tota
l Est
imat
ed R
CN
LD o
r Tra
nsac
tion
Cos
t
11
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x Ab
atem
ents
App
licat
ion
AFN
:
Prop
erty
Tax
: Per
sona
l Pro
pert
y Sc
hedu
le 1
Com
pany
Nam
e:__
____
____
____
____
____
____
____
____
__
Div
isio
n:__
____
____
____
____
____
____
____
____
____
____
_
Inst
ruct
ions
:
AB
CD
EH
IJ
Pers
onal
Pro
pert
y Ite
miz
ed D
escr
iptio
nG
/L A
ccou
nt
No.
(if
appl
icab
le)
Purc
hase
d by
Fa
cilit
y O
wne
r (FO
) C
ontr
acto
r (C
) Su
bcon
trac
tor (
SC)
Dat
ePu
rcha
sed
(if
appl
icab
le)
Dat
e R
ecei
ved
or
Estim
ated
Dat
e of
Rec
eipt
in
Nev
ada
Estim
ated
To
tal
Acqu
isiti
on
Cos
t
Estim
ated
Life
of
Per
sona
l Pr
oper
ty
Estim
ated
Ac
quis
ition
Cos
t Le
ssD
epre
ciat
ion
Gra
nd T
otal
(3) T
he to
tal e
stim
ated
cos
t rep
orte
d in
Col
. H s
houl
d in
clud
e es
timat
ed o
r act
ual c
osts
of i
nsta
llatio
n an
d co
sts
of tr
ansp
orta
tion
per N
AC
361
.135
1 an
d N
AC
361
.135
5.
Cos
ts o
f ins
talla
tion
incl
ude
the
cost
s of
dire
ct la
bor,
dire
ct o
verh
ead
and
the
capi
taliz
ed e
xpen
se o
f int
eres
t or i
mpu
ted
char
ges
for i
nter
est w
hich
are
nec
essa
ry to
m
ake
the
prop
erty
ope
ratio
nal.
(5)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
(1) L
ist e
ach
item
of p
erso
nal p
rope
rty s
ubje
ct to
pro
perty
tax
in C
ol A
. P
ursu
ant t
o N
RS
361
.030
, per
sona
l pro
perty
incl
udes
sto
cks
of g
oods
on
hand
; any
veh
icle
not
in
clud
ed in
the
defin
ition
of v
ehic
le in
NR
S 3
71.0
20; a
ll m
achi
nes
and
mac
hine
ry, a
ll w
orks
and
impr
ovem
ents
, and
all
prop
erty
of w
hate
ver k
ind
or n
atur
e no
t inc
lude
d in
the
term
"rea
l est
ate"
as
that
term
is d
efin
ed in
NR
S 3
61.0
35.
(2) F
or e
ach
item
in C
ol. A
, com
plet
e th
e re
ques
ted
info
rmat
ion
in C
ol. B
and
Col
. D (i
f app
licab
le),
Col
. C a
nd C
ol. D
thro
ugh
Col
. J.
(4) U
se th
e P
erso
nal P
rope
rty M
anua
l pub
lishe
d by
the
Dep
artm
ent o
f Tax
atio
n to
det
erm
ine
the
Cos
t Les
s D
epre
ciat
ion
in C
olum
n (J
). S
elec
t the
Life
Sch
edul
e th
at is
cl
oses
t to
the
estim
ated
life
of t
he p
erso
nal p
rope
rty li
sted
in C
ol. I
. S
ee h
ttp://
tax.
stat
e.nv
.us.
The
n se
lect
: Pub
licat
ions
/Loc
ally
Ass
esse
d P
rope
rties
/Per
sona
l P
rope
rty M
anua
l.
12
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
ts A
pplic
atio
nA
FN:
Prop
erty
Tax
: Rea
l Pro
pert
y Im
prov
emen
ts
Sche
dule
2C
ompa
ny N
ame:
____
____
____
____
____
____
____
____
____
Div
isio
n:__
____
____
____
____
____
____
____
____
____
____
_
Inst
ruct
ions
:
AB
CF
Rea
l Pro
pert
y Im
prov
emen
ts It
emiz
ed D
escr
iptio
nG
/L A
ccou
nt N
o.
(if a
pplic
able
)Es
timat
ed D
ate
of
Com
plet
ion
Estim
ated
Tot
al
Con
stru
ctio
nC
ost
Gra
nd T
otal
(5)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
(1) L
ist e
ach
item
of r
eal p
rope
rty im
prov
emen
ts s
ubje
ct to
pro
perty
tax
in C
ol A
. P
ursu
ant t
o N
RS
361
.035
, rea
l pro
perty
in
clud
es a
ll ho
uses
, bui
ldin
gs, f
ence
s, d
itche
s, s
truct
ures
, ere
ctio
ns, r
ailro
ads,
toll
road
s an
d br
idge
s, o
r oth
er im
prov
emen
tsbu
ilt o
r ere
cted
upo
n an
y la
nd, w
heth
er s
uch
land
is p
rivat
e pr
oper
ty o
r pub
lic p
rope
rty; a
s w
ell a
s m
obile
or m
anuf
actu
red
ht
dt
lt
Pl
lll
dS
hd
l3
(2) F
or e
ach
item
in C
ol. A
, com
plet
e th
e re
ques
ted
info
rmat
ion
in C
ol. B
(if
appl
icab
le),
and
Col
. C th
roug
h C
ol. F
.
(3) T
he to
tal e
stim
ated
cos
t rep
orte
d in
Col
. F s
houl
d in
clud
e es
timat
ed o
r act
ual c
osts
of l
abor
, mat
eria
ls, s
uper
visi
on,
cont
ract
ors’
pro
fit a
nd o
verh
ead,
arc
hite
cts’
pla
ns a
nd s
peci
ficat
ions
, eng
inee
ring
plan
s, b
uild
ing
perm
its, s
ite p
repa
ratio
n co
sts,
sal
es ta
xes
and
insu
ranc
e; c
osts
of b
uyin
g or
ass
embl
ing
land
suc
h as
esc
row
fees
, leg
al fe
es, r
ight
of w
ay c
osts
, de
mol
ition
, sto
rm d
rain
s, ro
ugh
grad
ing
or o
ther
land
impr
ovem
ent c
osts
, yar
d im
prov
emen
ts in
clud
ing
sept
ic s
yste
ms,
sig
ns,
land
scap
ing,
pavi
ng, w
alls
, yar
d lig
htin
g; o
ff-si
te c
osts
incl
udin
g ro
ads,
util
ities
, par
k fe
es, j
uris
dict
iona
l hoo
kup,
tap-
in, i
mpa
ct
(4) U
se S
ched
ule
3 to
repo
rt la
nd; S
ched
ule
4 to
repo
rt op
erat
ing
leas
es; a
nd S
ched
ule
5 to
repo
rt co
ntrib
utio
ns in
aid
of
13
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x Ab
atem
ents
App
licat
ion
AFN
:
Prop
erty
Tax
: Rea
l Pro
pert
y La
nd
Sche
dule
3
AB
CD
EF
GH
I
Line
#
Cou
nty
City
or T
own
Tax
Dis
tric
t
1 2 3 4 5 6 7 8 9 10 11 12G
rand
Tot
al
Com
pany
:___
____
____
____
____
____
____
____
____
Div
isio
n: _
____
____
____
____
____
____
____
____
___
Brie
f Des
crip
tion,
Siz
e of
th
e La
nd (a
cre)
, Dat
e Ac
quire
d
Ow
ned
(O)
Leas
ed (L
) R
ente
d (R
td)
Sho
w th
e re
ques
ted
data
for a
ll la
nd, o
wne
d or
leas
ed, i
n N
evad
a.
G/L
Acc
ount
N
umbe
r(if
appl
icab
le)
Purc
hase
Pr
ice
(if
appl
icab
le)
Asse
ssor
's
Taxa
ble
Valu
eAs
sess
or's
Par
cel
Num
ber (
APN
)
Whe
re S
ituat
ed
14
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x Ab
atem
ents
App
licat
ion
AFN
:
Prop
erty
Tax
: Ope
ratin
g Le
ases
Sche
dule
4C
ompa
ny N
ame:
____
____
____
____
____
____
____
____
____
Div
isio
n:__
____
____
____
____
____
____
____
____
____
____
_
Inst
ruct
ions
:
AB
CE
FG
HI
Ope
ratin
g Le
ase
Item
ized
Des
crip
tion
G/L
Acc
ount
N
o. (i
f ap
plic
able
)
Rea
l or
Pers
onal
Pr
oper
ty?
Less
or's
R
epla
cem
ent
Cos
t Per
Uni
t
Estim
ated
To
tal
Rep
lace
men
t C
ost
Annu
al
Leas
e pa
ymen
tLe
ase
Year
s R
emai
ning
Res
idua
l Va
lue
Gra
nd T
otal
(5)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
(1) L
ist e
ach
oper
atin
g le
ase
for r
eal o
r per
sona
l pro
perty
. Des
igna
te w
heth
er th
e le
ase
is fo
r rea
l or p
erso
nal p
rope
rty in
Col
. C.
(2) F
or e
ach
item
in C
ol. A
, com
plet
e th
e re
ques
ted
info
rmat
ion
in C
ol. B
(if
appl
icab
le),
and
Col
. C th
roug
h C
ol. F
.
(3) T
he to
tal e
stim
ated
cos
t rep
orte
d in
Col
. E a
nd C
ol. F
sho
uld
cont
ain
the
cost
s ap
prop
riate
to re
al o
r per
sona
l pro
perty
. Fo
r def
initi
ons,
ple
ase
refe
r to
Sch
edul
e 1
for p
erso
nal p
rope
rty a
nd S
ched
ule
2 fo
r Im
prov
emen
ts.
(4) R
epor
t the
Ann
ual L
ease
Pay
men
t in
Col
. G; t
he te
rm o
f the
leas
e in
Col
. H; a
nd a
ny re
sidu
al v
alue
at t
he e
nd o
f the
leas
e te
rm in
Col
. I.
15
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
ts A
pplic
atio
nA
FN:
Prop
erty
Tax
: Con
trib
utio
ns in
Aid
of C
onst
ruct
ion
Sche
dule
5C
ompa
ny N
ame:
____
____
____
____
____
____
___
Div
isio
n:__
____
____
____
____
____
____
____
____
Inst
ruct
ions
:
AB
CD
EF
Con
trib
utio
ns in
Aid
of C
onst
ruct
ion
(CIA
C)
Item
ized
Des
crip
tion
G/L
Acc
ount
No.
(if
app
licab
le)
Rea
l or P
erso
nal
Prop
erty
?N
umbe
r of U
nits
Rep
lace
men
tC
ost P
er U
nit
Estim
ated
Tota
lR
epla
cem
ent
Cos
t
Gra
nd T
otal
(1) L
ist a
ll co
ntrib
utio
ns in
aid
of c
onst
ruct
ion
(CIA
C).
CIA
C is
def
ined
in N
AC
361
.260
as
prop
erty
whi
ch h
as b
een
cont
ribut
ed to
a u
tility
by
a pr
ospe
ctiv
e cu
stom
er o
r whi
ch h
as b
een
cons
truct
ed b
y th
e ut
ility
and
pai
d fo
r by
the
pros
pect
ive
cust
omer
for w
hich
no
reim
burs
emen
t is
requ
ired
to b
e m
ade
by th
e ut
ility
to
the
pros
pect
ive
cust
omer
as
a pr
ereq
uisi
te to
obt
aini
ng s
ervi
ce.
(2) F
or e
ach
item
in C
ol. A
, com
plet
e th
e re
ques
ted
info
rmat
ion
in C
ol. B
(if
appl
icab
le),
and
Col
. C th
roug
h C
ol. F
.
(3) T
he to
tal e
stim
ated
cos
t rep
orte
d in
Col
. E a
nd C
ol. F
sho
uld
cont
ain
the
cost
s ap
prop
riate
to re
al o
r per
sona
l pro
perty
.Fo
r def
initi
ons,
ple
ase
refe
r to
Sch
edul
e 1
for p
erso
nal p
rope
rty a
nd S
ched
ule
2 fo
r Im
prov
emen
ts.
(4)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
16
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
ts A
pplic
atio
nA
FN:
Sale
s an
d U
se T
ax
Firs
t Yea
r of E
ligib
le A
bate
men
tSc
hedu
le 6
Com
pany
Nam
e:__
K R
oad
Moa
pa S
olar
____
____
____
____
____
____
____
____
__D
ivis
ion:
____
____
____
____
____
____
____
____
____
____
___
Inst
ruct
ions
:
AB
CD
EF
GH
Pers
onal
Pro
pert
y or
Mat
eria
ls a
nd
Supp
lies
Item
ized
Des
crip
tion
G/L
Acc
ount
N
o. (i
f ap
plic
able
)
Purc
hase
d by
Fa
cilit
y O
wne
r (FO
) C
ontr
acto
r (C
) Su
bcon
trac
tor (
SC)
Dat
e Pu
rcha
sed
Dat
e of
Po
sses
sion
Tota
lTr
ansa
ctio
n C
ost
Cou
nty
and
App
licab
le
Sale
s Ta
x R
ate
Estim
ated
Sal
es
Tax
Paid
or t
o be
Pa
id
Sol
ar P
anel
sS
win
erto
nst
artin
g ~
May
201
3st
artin
g ~
June
20
13$2
09,3
05,6
888.
10%
$16,
953,
761
Inve
rters
Sw
iner
ton
sam
esa
me
$54,
000,
828
8.10
%$4
,374
,067
SC
AD
AS
win
erto
nsa
me
sam
e$2
,564
,250
8.10
%$2
07,7
04S
ecur
ityS
win
erto
nsa
me
sam
e$1
,086
,744
8.10
%$8
8,02
6S
ubst
atio
nS
win
erto
nsa
me
sam
e$5
,584
,742
8.10
%$4
52,3
64Tr
ansm
issi
on L
ine
Sw
iner
ton
sam
esa
me
$14,
232,
631
8.10
%$1
,152
,843
DC
/ A
C C
olle
ctio
nS
win
erto
nsa
me
sam
e$4
4,91
6,95
38.
10%
$3,6
38,2
73Fe
nce
Sw
iner
ton
sam
esa
me
$1,3
26,1
938.
10%
$107
,422
Foun
datio
nsS
win
erto
nsa
me
sam
e$8
,611
,353
8.10
%$6
97,5
20O
&M
Bui
ldin
gS
win
erto
nsa
me
sam
e$2
97,8
238.
10%
$24,
124
Rac
king
Sw
iner
ton
sam
esa
me
$40,
510,
202
8.10
%$3
,281
,326
Equ
ipm
ent R
enta
lS
win
erto
nsa
me
sam
e$1
39,5
098.
10%
$11,
300
Gra
nd T
otal
$30,
988,
730
(9)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
(1) C
olum
n A
: Lis
t eac
h ite
m o
f per
sona
l pro
perty
or m
ater
ials
and
sup
plie
s su
bjec
t to
sale
s an
d us
e ta
x (p
leas
e in
clud
e le
ases
. R
efer
to N
RS
Cha
pter
372
for t
axab
le e
vent
s.
(2) C
olum
n B
: For
eac
h ite
m in
col
umn
A, l
ist a
pplic
able
acc
ount
nom
ber.
(3) C
olum
n C
: Lis
t the
Fac
ility
Ow
ner,
Con
tract
or o
r Sub
cont
ract
or th
at w
ill be
pur
chas
ing
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s su
bjec
t to
sale
s an
d us
e ta
x.
(4) C
olum
n D
: Lis
t the
dat
e th
e pe
rson
al p
rope
rty o
r mat
eria
ls a
nd s
uppl
ies
wer
e pu
rcha
sed.
(5) C
olum
n E:
Lis
t the
dat
e th
at p
osse
ssio
n of
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s w
ill be
take
n.
(6) C
olum
n F:
Lis
t the
cos
t of t
he p
erso
nal p
rope
rty o
r mat
eria
ls a
nd s
uppl
ies.
(7) C
olum
n G
: Lis
t the
cou
nty
whe
re p
osse
ssio
n w
ill be
take
n an
d th
e ap
plic
able
sal
es ta
x ra
te o
f tha
t cou
nty.
Fin
d th
e ap
prop
riate
sal
es/u
se ta
x ra
te o
n th
e D
epar
tmen
t of T
axat
ion'
s w
ebsi
te a
t ht
tp://
tax.
stat
e.nv
.us.
The
n sc
roll
to "Q
uick
Lin
ks" a
nd s
elec
t "S
ales
/Use
Tax
Rat
e M
ap".
(8) C
olum
n H
: Mul
tiply
Col
umn
F by
the
Sale
s Ta
x R
ate
in C
olum
n G
.
17
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
ts A
pplic
atio
nA
FN:
Sale
s an
d U
se T
ax
Seco
nd Y
ear o
f Elig
ible
Aba
tem
ent
Sche
dule
7
Com
pany
Nam
e:__
K R
oad
Moa
pa S
olar
____
____
____
____
____
____
____
____
__
Div
isio
n:__
____
____
____
____
____
____
____
____
____
____
_
Inst
ruct
ions
:
AB
CD
EF
GH
Pers
onal
Pro
pert
y or
Mat
eria
ls a
nd
Supp
lies
Item
ized
Des
crip
tion
G/L
Acc
ount
N
o. (i
f ap
plic
able
)
Purc
hase
d by
Fa
cilit
y O
wne
r (FO
) C
ontr
acto
r (C
) Su
bcon
trac
tor (
SC)
Dat
ePu
rcha
sed
Dat
e of
Po
sses
sion
Tota
l Tr
ansa
ctio
n C
ost
Cou
nty
and
Appl
icab
le
Sale
s Ta
x R
ate
Estim
ated
Sal
es
Tax
Paid
or t
o be
Pa
idS
olar
Pan
els
$08.
10%
$0In
verte
rs$0
8.10
%$0
SC
AD
A$0
8.10
%$0
Sec
urity
$08.
10%
$0S
ubst
atio
nS
win
erto
nE
arly
201
4E
arly
201
4$5
,584
,742
8.10
%$4
52,3
64Tr
ansm
issi
on L
ine
Sw
iner
ton
Ear
ly 2
014
Ear
ly 2
014
$1,4
83,6
138.
10%
$120
,173
DC
/ A
C C
olle
ctio
nS
win
erto
nE
arly
201
4E
arly
201
4$8
65,2
848.
10%
$70,
088
Fenc
e$0
8.10
%$0
Foun
datio
ns$0
8.10
%$0
O&
M B
uild
ing
$08.
10%
$0R
acki
ng$0
8.10
%$0
Equ
ipm
ent R
enta
lS
win
erto
nE
arly
201
4E
arly
201
4$4
1,60
18.
10%
$3,3
70
Gra
nd T
otal
$645
,995
(9)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
(3) C
olum
n C
: Lis
t the
Fac
ility
Ow
ner,
Con
tract
or o
r Sub
cont
ract
or th
at w
ill b
e pu
rcha
sing
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s su
bjec
t to
sale
s an
d us
e ta
x.(4
) Col
umn
D: L
ist t
he d
ate
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s w
ere
purc
hase
d.
(5) C
olum
n E
: Lis
t the
dat
e th
at p
osse
ssio
n of
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s w
ill be
take
n.
(1) C
olum
n A
: Lis
t eac
h ite
m o
f per
sona
l pro
perty
or m
ater
ials
and
sup
plie
s su
bjec
t to
sale
s an
d us
e ta
x (p
leas
e in
clud
e le
ases
. R
efer
to N
RS
Cha
pter
372
for t
axab
le e
vent
s.(2
) Col
umn
B: F
or e
ach
item
in c
olum
n A
, lis
t app
licab
le a
ccou
nt n
ombe
r.
(6) C
olum
n F:
Lis
t the
cos
t of t
he p
erso
nal p
rope
rty o
r mat
eria
ls a
nd s
uppl
ies.
(7) C
olum
n G
: Lis
t the
cou
nty
whe
re p
osse
ssio
n w
ill be
take
n an
d th
e ap
plic
able
sal
es ta
x ra
te o
f tha
t cou
nty.
Fin
d th
e ap
prop
riate
sal
es/u
se ta
x ra
te o
n th
e D
epar
tmen
t of T
axat
ion'
s w
ebsi
te a
t ht
tp://
tax.
stat
e.nv
.us.
The
n sc
roll
to "Q
uick
Lin
ks" a
nd s
elec
t "S
ales
/Use
Tax
Rat
e M
ap".
(8) C
olum
n H
: Mul
tiply
Col
umn
F by
the
Sal
es T
ax R
ate
in C
olum
n G
.
18
Stat
e of
Nev
ada
Ren
ewab
le E
nerg
y Ta
x A
bate
men
ts A
pplic
atio
nA
FN:
Sale
s an
d U
se T
ax
Third
Yea
r of E
ligib
le A
bate
men
tSc
hedu
le 8
Com
pany
Nam
e:__
____
____
____
____
____
____
____
____
__D
ivis
ion:
____
____
____
____
____
____
____
____
____
____
___
Inst
ruct
ions
:
AB
CD
EF
GH
Pers
onal
Pro
pert
y or
Mat
eria
ls a
nd
Supp
lies
Item
ized
Des
crip
tion
G/L
Acc
ount
N
o. (i
f ap
plic
able
)
Purc
hase
d by
Fa
cilit
y O
wne
r (FO
) C
ontr
acto
r (C
) Su
bcon
trac
tor (
SC)
Dat
ePu
rcha
sed
Dat
e of
Po
sses
sion
Tota
l Tr
ansa
ctio
n C
ost
Cou
nty
and
Appl
icab
le
Sale
s Ta
x R
ate
Estim
ated
Sal
es
Tax
Paid
or t
o be
Pa
idS
olar
Pan
els
$08.
10%
$0In
verte
rs$0
8.10
%$0
SC
AD
A$0
8.10
%$0
Sec
urity
$08.
10%
$0S
ubst
atio
n$0
8.10
%$0
Tran
smis
sion
Lin
e$0
8.10
%$0
DC
/ A
C C
olle
ctio
n$0
8.10
%$0
Fenc
e$0
8.10
%$0
Foun
datio
ns$0
8.10
%$0
O&
M B
uild
ing
$08.
10%
$0R
acki
ng$0
8.10
%$0
Equ
ipm
ent R
enta
l$0
8.10
%$0
Gra
nd T
otal
$0
(8)
Atta
ch a
dditi
onal
she
ets
as n
eces
sary
.
(3) C
olum
n C
: Lis
t the
Fac
ility
Ow
ner,
Con
tract
or o
r Sub
cont
ract
or th
at w
ill b
e pu
rcha
sing
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s su
bjec
t to
sale
s an
d us
e ta
x.(4
) Col
umn
D: L
ist t
he d
ate
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s w
ere
purc
hase
d.
(5) C
olum
n E
: Lis
t the
dat
e th
at p
osse
ssio
n of
the
pers
onal
pro
perty
or m
ater
ials
and
sup
plie
s w
ill be
take
n.
(1) C
olum
n A
: Lis
t eac
h ite
m o
f per
sona
l pro
perty
or m
ater
ials
and
sup
plie
s su
bjec
t to
sale
s an
d us
e ta
x (p
leas
e in
clud
e le
ases
. R
efer
to N
RS
Cha
pter
372
for t
axab
le e
vent
s.(2
) Col
umn
B: F
or e
ach
item
in c
olum
n A
, lis
t app
licab
le a
ccou
nt n
ombe
r.
(6) C
olum
n F:
Lis
t the
cos
t of t
he p
erso
nal p
rope
rty o
r mat
eria
ls a
nd s
uppl
ies.
()
yp
ppy
ppp
pht
tp://
tax.
stat
e.nv
.us.
The
n sc
roll
to "Q
uick
Lin
ks" a
nd s
elec
t "S
ales
/Use
Tax
Rat
e M
ap".
(7) C
olum
n H
: Mul
tiply
Col
umn
F by
the
Sal
es T
ax R
ate
in C
olum
n G
.
19
State of NevadaRenewable Energy Tax Abatement Application
AFN:
1 Contractors and subcontractors list2 Hourly Wage information3 Equipment transaction information other than total estimated sales tax
This application includes confidential and proprietary trade secret and economic
information as defined by Nevada law. Prohibitions on the public disclosure of such
information is provided in the Uniform Trade Secrets Act (NRS Chapter 600A), NRS
49.325, NRS 360.247, NRS 360.250, NRS 361.044, NRS 372.750, NRS 703.190, NRS
793.196, NRS 239.010 et. seq., NRS 241.020, and Regulation of the Nevada Energy
Commissioner R094‐10; NAC 239.699 and NAC 360.182. The confidential and
proprietary trade secret and economic information has been obscured in the
redacted version of this application.
This Application contains confidential information: Yes __X__ No
If yes, please identify any information in the within Application or documents submitted herewith, which Applicant considers confidential or trade secret information. Further, identify: (1) the applicable statutory authority or agreement preventing public disclosure of the information; and (2) Applicant’s rationale underlying non-disclosure of the information or document(s).
Applicant acknowledges that the burden of demonstrating confidentiality or trade secret status lies with the Applicant, and Applicant agrees to defend and indemnify the State and its agencies for honoring such designation. Notwithstanding, Applicant understands that the over-inclusive designation of information or documents as confidential or trade secret may cause the Nevada State Office of Energy to conduct further inquiry of the Applicant into the confidentiality of the information, potentially delaying submission of the Application to the Nevada Energy Director.
Material for which confidentiality is claimed :
Basis for claims of confidentiality :
21