STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION IN THE MATTER OF AN ORDER APPROVING ADVISORY COMMITTEE RECOMMENDATIONS PURSUANT TO INDIANA CODE CHAPTER 8-1-26. ) ) ) ) APPROVED: ORDER OF THE COMMISSION Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”) to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee (“Advisory Committee”) reviews those recommendations and recommends civil penalties in the Case. The Cases received pursuant to Ind. Code ch. 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations. Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is directed to prepare and send notice to the parties advising them of the determination. Any approved civil penalties are due within 90 days of the date of this Order unless payment arrangements are made with the Secretary of the Commission. Any approved trainings must be completed no later than 180 days from the date of this Order or the alternative civil penalty noted in the attached recommendation is due. IT IS SO ORDERED. HUSTON, FREEMAN, KREVDA, OBER, AND ZIEGNER CONCUR APPROVED: I hereby certify that the above is a true and correct copy of the Order as approved. Mary M. Schneider Secretary of the Commission

Transcript of STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the...

Page 1: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

STATE OF INDIANA

INDIANA UTILITY REGULATORY COMMISSION

IN THE MATTER OF AN ORDER

APPROVING ADVISORY COMMITTEE

RECOMMENDATIONS PURSUANT TO

INDIANA CODE CHAPTER 8-1-26.

)

)

)

)

APPROVED:

ORDER OF THE COMMISSION

Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory

Commission’s Pipeline Safety Division (“Division”) to find violations of said chapter. Upon

review of those findings, the Indiana Underground Plant Protection Advisory Committee

(“Advisory Committee”) reviews those recommendations and recommends civil penalties in the

Case.

The Cases received pursuant to Ind. Code ch. 8-1-26 and ripe for Commission action are

attached hereto and collectively referred to as the Advisory Committee Recommendations.

Pursuant to statute, the Advisory Committee has submitted their recommendations to the

Commission. The Commission UPHOLDS the findings of violations by the Pipeline Safety

Division and APPROVES the recommendations of the Advisory Committee as listed on the

attached pages. The Assistant General Counsel to the Division is directed to prepare and send

notice to the parties advising them of the determination.

Any approved civil penalties are due within 90 days of the date of this Order unless

payment arrangements are made with the Secretary of the Commission.

Any approved trainings must be completed no later than 180 days from the date of this

Order or the alternative civil penalty noted in the attached recommendation is due.

IT IS SO ORDERED.

HUSTON, FREEMAN, KREVDA, OBER, AND ZIEGNER CONCUR

APPROVED:

I hereby certify that the above is a true

and correct copy of the Order as approved.

Mary M. Schneider

Secretary of the Commission

RJoyner
Date
RJoyner
Date
RJoyner
Original
RJoyner
Checkmark Box
RJoyner
Checkmark
RJoyner
Checkmark
RJoyner
Checkmark
RJoyner
Checkmark
RJoyner
Checkmark
Page 2: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Randall Industries, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20877

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 3: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Sub Terra Solutions, LLC

Other Party: Indiana Natural Gas Corporation

Case Number: 20482

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 4: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: G H & C Concrete Company

Other Party: Vectren Energy Delivery

Case Number: 20964

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 5: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jeff Ellrich

Other Party: Northern Indiana Public Service Company

Case Number: 21017

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 6: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Kokosing Construction Co., Inc.

Other Party: Citizens Gas

Case Number: 20832

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information: already completed 3/12/20

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 7: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: S P E Utility Contractors LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21123

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 8: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: T N Solutions, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20807

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 9: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vera Cruz Tree Service

Other Party: Northern Indiana Public Service Company

Case Number: 20910

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 10: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Mike Heppner

Other Party: Vectren Energy Delivery

Case Number: 21061

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 11: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Price Electric Inc.

Other Party: Vectren Energy Delivery

Case Number: 21057

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(other)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 12: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jacquie Mix

Other Party: Vectren Energy Delivery

Case Number: 21072

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 13: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Trademark Utility Systems, LLC

Other Party: Vectren Energy Delivery

Case Number: 21073

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $3,000; can complete training instead of paying $3,000 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: failed to train in Case 13709

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 14: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Property Pros Land Management LLC

Case Number: 20758

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 15: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Kokopelli Asphalt

Case Number: 20936

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 16: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Wilson Water & Sewer Service, Inc.

Case Number: 20941

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 17: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: R T Moore, Co.

Case Number: 20942

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 18: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: J I Obeniel Construction LLC

Case Number: 20951

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 19: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: City of Bedford

Case Number: 20958

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 20: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Wes Green

Case Number: 21056

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 21: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Robert Hendrick

Case Number: 21058

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 22: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Asplundh Construction Corp.

Case Number: 21101

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 23: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Hawpatch Fence & Railing LLC

Case Number: 21103

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 24: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Northern Pipeline Construction Company

Case Number: 21107

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 25: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Hasse Construction Co., Inc.

Case Number: 21110

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 26: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Carlisle Utility Contractors, Inc.

Case Number: 21112

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 27: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Walsh & Kelly

Case Number: 21113

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 28: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Ironclad Excavating, Inc.

Case Number: 21114

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 29: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Bruns Septic Service Inc.

Case Number: 21120

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 30: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Ness Contracting, LLC

Case Number: 21125

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 31: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Sturgeon's Light Excavation

Other Party: Northern Indiana Public Service Company

Case Number: 20913

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 32: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Hartco Cable, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20914

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 33: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Rod's Quality Concrete, Inc.

Other Party: Citizens Gas

Case Number: 20094

Date of Advisory Meeting: 6/16/2020

Date of Damage: 4/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 34: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Direct Sat USA

Other Party: Northern Indiana Public Service Company

Case Number: 20891

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 35: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Oles Engineering Corp.

Other Party: Citizens Gas

Case Number: 20445

Date of Advisory Meeting: 6/16/2020

Date of Damage: 6/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information: Excavator turned off gas valve, this should ONLY be done

by operator qualified personnel. There was yellow paint and

a meter within the excavation area. Excavators should be

mindful of evidence of unmarked underground facilities.

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 36: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Delaware & South Towing Service Inc.

Other Party: Citizens Gas

Case Number: 20266

Date of Advisory Meeting: 6/16/2020

Date of Damage: 5/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 37: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Farmer's Fencing LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20559

Date of Advisory Meeting: 6/16/2020

Date of Damage: 6/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 38: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jerry Horsley Construction Co Inc.

Other Party: Citizens Gas

Case Number: 20629

Date of Advisory Meeting: 6/16/2020

Date of Damage: 6/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 39: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Brian's Tree Service Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20778

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 40: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: J & R Fence & Deck LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20795

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 41: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Desabatine Brothers Excavating

Other Party: Northern Indiana Public Service Company

Case Number: 20802

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 42: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dunkley Farms & Excavating

Other Party: Vectren Energy Delivery

Case Number: 20713

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 43: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Cory Barnhart Construction

Other Party: Vectren Energy Delivery

Case Number: 20719

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 44: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Great Lakes Superior Services, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20854

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 45: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: L Nolt & Sons LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20881

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 46: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Quamtech Communications

Case Number: 20815

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 47: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Next Generation Communications, Inc.

Case Number: 20855

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 48: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Intren, LLC

Case Number: 20862

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 49: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Plumb Doctor LLC

Other Party: Citizens Gas

Case Number: 20829

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 50: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: John Creel

Other Party: Ohio Valley Gas Corp

Case Number: 20843

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

20266

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 51: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Snedegar Construction, Inc.

Other Party: Midwest Natural Gas Corporation

Case Number: 21084

Date of Advisory Meeting: 6/16/2020

Date of Damage: 6/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 52: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: J E Reedy, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20574

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/1/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 53: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Site Works LLC

Other Party: Citizens Gas

Case Number: 20830

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 54: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Next Generation Communications, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20819

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 55: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Simplicity Contracting, Inc.

Other Party: Citizens Gas

Case Number: 20825

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 56: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Rainmaker Irrigation, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21089

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 57: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: C S U, Inc.

Other Party: Citizens Gas

Case Number: 21039

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 58: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: B Stevens Service, LLC

Other Party: Community Natural Gas Inc

Case Number: 20712

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 59: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Cazares Construction, LLC.

Other Party: Citizens Gas

Case Number: 20827

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 60: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Brown Construction

Other Party: Citizens Gas

Case Number: 20835

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 61: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: J B Landscaping & Nursery, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20901

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 62: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Feutz Contractors, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20923

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 63: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Superior Concrete Constructors, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20946

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 64: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: American Development & Excavating

Other Party: Vectren Energy Delivery

Case Number: 20950

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 65: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Bayer's Plumbing, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20960

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 66: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: First Class Decks & Construction

Other Party: Northern Indiana Public Service Company

Case Number: 21011

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 1,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: Excavator squeezed off the damaged gas line and intended to

self-repair and returned to the site with repair materials. The crew also indicated

the excavator has self-repaired in the past.

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 67: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Shorty's Sewer Service Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21020

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 68: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Wheatcraft Tree & Lawn LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21023

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: already completed 10/23/19

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 69: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dave Kessel Construction

Other Party: Northern Indiana Public Service Company

Case Number: 21087

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 70: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Dashiell Contracting

Case Number: 21046

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 71: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Oles Engineering Corp.

Case Number: 21048

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 72: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Joink LLC

Case Number: 21051

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 73: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Gaunt & Son Asphalt, Inc.

Case Number: 21052

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 74: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Atlas Excavating, Inc.

Case Number: 21053

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 75: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Miller Pipeline, LLC

Case Number: 21065

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Miller

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 76: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Glidden Fence Company, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21059

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 77: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fieldstone Enterprises, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21098

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 78: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Gatlin Plumbing & Heating, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21106

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 79: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Ray Zimmerman

Other Party: Northern Indiana Public Service Company

Case Number: 20895

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 80: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Exterior View, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21007

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 81: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Kelly Landscaping

Other Party: Citizens Gas

Case Number: 21036

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 82: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Weber Concrete Construction

Other Party: Vectren Energy Delivery

Case Number: 21047

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,000

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 83: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Goodman Construction Co., Inc.

Other Party: Vectren Energy Delivery

Case Number: 21064

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: Excavator paid the fine in Case 16608 rather than taking

the mandatory training. Because they have not yet

trained, penalty will again be mandatory training.

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 84: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Da-Mar Enterprises, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21088

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 85: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Bergman Concrete Construction Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21102

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 86: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Abe's Lawncare

Other Party: Northern Indiana Public Service Company

Case Number: 21104

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 87: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Roberts Construction

Other Party: Northern Indiana Public Service Company

Case Number: 21105

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 88: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fas-Pak, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21111

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 89: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Herrman & Goetz, Inc. DBA H & G Services, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21115

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 90: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Goodman Networks

Other Party: Northern Indiana Public Service Company

Case Number: 21117

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 91: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dave's Excavating

Other Party: Vectren Energy Delivery

Case Number: 20962

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 92: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Larson-Danielson Construction Company, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21013

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 93: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: J E Reedy, Inc.

Other Party: Citizens Gas

Case Number: 21041

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 94: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: T S W Utility Solutions, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21045

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 95: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: David Branham

Other Party: Vectren Energy Delivery

Case Number: 18855

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2018

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 96: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Tim Ferrends

Other Party: Vectren Energy Delivery

Case Number: 20753

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 97: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Chris Hardy

Other Party: Vectren Energy Delivery

Case Number: 20759

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 98: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Kevin Conyers

Other Party: Vectren Energy Delivery

Case Number: 20955

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 99: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Ben Shinneman

Other Party: Northern Indiana Public Service Company

Case Number: 21022

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 100: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Citizens Gas

Other Party: Hope Plumbing

Case Number: 20826

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 101: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Indiana American Water Co. DBA Indiana American

Case Number: 21015

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 102: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Meade, Inc.

Case Number: 21019

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 103: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: F B I Buildings, Inc.

Case Number: 21021

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 104: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Sikma Plumbing, Inc.

Case Number: 21024

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 105: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Millennium Contractors, LLC

Case Number: 21055

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 106: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: David Schadek

Case Number: 21096

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 107: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: James H Drew Corp.

Case Number: 21100

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 108: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lawyer Excavation

Other Party: Vectren Energy Delivery

Case Number: 20965

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 109: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Calumet Civil Contractors, Inc.

Other Party: Citizens Gas

Case Number: 21034

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 110: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: White Construction, Inc.

Other Party: Citizens Gas

Case Number: 21035

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 111: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Buttz Excavating, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21049

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 112: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Straight Up Irrigation LLC

Other Party: Vectren Energy Delivery

Case Number: 21070

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 113: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Elmer's Service, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21124

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 114: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Donald Long

Other Party: Indiana Natural Gas Corporation

Case Number: 20842

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 115: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Charles Kirgan

Other Party: Northern Indiana Public Service Company

Case Number: 20898

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 116: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Shay Hendress

Other Party: Vectren Energy Delivery

Case Number: 20956

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 117: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Mark Stuckey

Other Party: Vectren Energy Delivery

Case Number: 20966

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 118: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jay Krager

Other Party: Northern Indiana Public Service Company

Case Number: 21008

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 119: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Gary Urbanchock

Other Party: Northern Indiana Public Service Company

Case Number: 21009

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 120: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: William Broaddus

Other Party: Vectren Energy Delivery

Case Number: 21071

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 121: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Gary Hursey

Other Party: Northern Indiana Public Service Company

Case Number: 21094

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 122: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Brenda Velasquez

Other Party: Northern Indiana Public Service Company

Case Number: 21097

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 123: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Cruz Aguilar

Other Party: Northern Indiana Public Service Company

Case Number: 21116

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 124: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Kyle Coates

Other Party: Northern Indiana Public Service Company

Case Number: 21122

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 125: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Nacey Pubbla Garcia

Other Party: Northern Indiana Public Service Company

Case Number: 21126

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 126: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Charlie Correll

Other Party: Vectren Energy Delivery

Case Number: 20935

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 127: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Ed Patton Construction, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20944

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 128: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: L N R Companies, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20949

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 129: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Newby Excavating

Other Party: Vectren Energy Delivery

Case Number: 20952

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 130: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: DeBra-Kuempel, LLC

Other Party: Vectren Energy Delivery

Case Number: 20961

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 131: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: City of Logansport

Other Party: Northern Indiana Public Service Company

Case Number: 21006

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 132: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Kayser Sawing & Drilling, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20428

Date of Advisory Meeting: 6/16/2020

Date of Damage: 5/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 133: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Regency Home Estates

Other Party: Northern Indiana Public Service Company

Case Number: 20788

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 134: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Gary Spurgeon

Other Party: Northern Indiana Public Service Company

Case Number: 20847

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 135: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Guzman Construction

Other Party: Vectren Energy Delivery

Case Number: 20959

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 136: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Mike Fleenor

Other Party: Midwest Natural Gas Corporation

Case Number: 20968

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/1/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 137: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Carr Electrical & Mechanical Contractors

Other Party: Ohio Valley Gas Corp

Case Number: 20970

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 138: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Millennium Events

Other Party: Northern Indiana Public Service Company

Case Number: 20978

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 139: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Exterior Service LLC

Other Party: Northern Indiana Public Service Company

Case Number: 20678

Date of Advisory Meeting: 6/16/2020

Date of Damage: 6/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 140: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Ironclad Excavating, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21130

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 141: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Greg Traicoff

Other Party: Northern Indiana Public Service Company

Case Number: 20987

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 142: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Merritt Contracting, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21068

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 143: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Eric Laudeman

Case Number: 20844

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 144: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Citizens Gas

Other Party: Midwest Mole, Inc.

Case Number: 21030

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 145: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Carlisle Utility Contractors, Inc.

Case Number: 21131

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 146: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Michels Corp.

Case Number: 21132

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 147: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: M & W Accubor

Case Number: 21135

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 148: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Meade, Inc.

Case Number: 21177

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 149: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: J B I Construction

Other Party: Vectren Energy Delivery

Case Number: 20610

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 150: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Calumet Civil Contractors, Inc.

Other Party: Ohio Valley Gas Corp

Case Number: 20969

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 151: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fredericks Inc.

Other Party: Vectren Energy Delivery

Case Number: 21060

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 152: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: C S U, Inc.

Case Number: 21253

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 153: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: James H Drew Corp.

Case Number: 21255

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 154: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Blankenberger Brothers, Inc.

Case Number: 21256

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 155: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Bayer's Plumbing, Inc.

Case Number: 21260

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 156: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Deig Brothers

Case Number: 21261

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 157: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Miller Pipeline, LLC

Case Number: 21262

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Miller

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 158: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Feutz Contractors, Inc.

Case Number: 21264

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 159: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Meade, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20534

Date of Advisory Meeting: 6/16/2020

Date of Damage: 6/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 160: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Mister Quik Home Services

Case Number: 20597

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 161: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Meade, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20793

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 162: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Meade, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 20906

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: Training added where the excavator hasn't trained since

2015 and had three tolerance zone violations within a

month of this case.

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 163: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Clark Landscaping

Case Number: 20937

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 164: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Dave O'Mara Contractor, Inc.

Case Number: 21080

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 165: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Meade, Inc.

Case Number: 21210

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 166: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Actin, Inc.

Case Number: 21214

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 167: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Jerry Powell Excavation

Case Number: 21223

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 168: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Royalty Construction Company, Inc.

Case Number: 21250

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 169: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Spalding Contractors, Inc.

Other Party: Citizens Gas

Case Number: 21027

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 170: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dotlich Trucking & Excavation, Inc.

Other Party: Citizens Gas

Case Number: 21029

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 171: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: First Class Decks & Construction

Case Number: 21180

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 172: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Lewis Septic Services

Case Number: 21183

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 173: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: D & B Plumbing LLC

Case Number: 21190

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 174: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Meade, Inc.

Case Number: 21191

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 175: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Rieth-Riley Construction Co., Inc.

Case Number: 21194

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 176: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Land Construction Corp.

Case Number: 21202

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 177: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Austgen Equipment, Inc.

Case Number: 21204

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 178: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Northern Indiana Public Service Company

Other Party: Michigan City Water Works

Case Number: 21206

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 179: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Pat McGraw Excavating, Inc.

Other Party: Aurora Utilities

Case Number: 20967

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 180: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Robert Hendrick

Other Party: Vectren Energy Delivery

Case Number: 21077

Date of Advisory Meeting: 6/16/2020

Date of Damage: 8/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 181: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: City of Princeton

Case Number: 21227

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 182: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Blankenberger Brothers, Inc.

Case Number: 21232

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 183: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Brummett Pools Inc.

Case Number: 21233

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 184: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Draper Construction Company LLC

Case Number: 21237

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 185: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Indiana Reclamation & Excavating, Inc.

Case Number: 21238

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 186: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Dave's Excavating

Case Number: 21241

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 187: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery

Other Party: Geotill Inc.

Case Number: 21244

Date of Advisory Meeting: 6/16/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 188: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Hydaker Wheatlake Co.

Other Party: Vectren Energy Delivery

Case Number: 20765

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 189: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: New Song Church

Other Party: Northern Indiana Public Service Company

Case Number: 20790

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 190: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee

Recommendation to IURC

Respondent: Shipshewana United Methodist Church

Other Party: Northern Indiana Public Service Company

Case Number: 20893

Date of Advisory Meeting: 6/16/2020

Date of Damage: 7/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 191: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

20580_RecommendationForm Respondent: Capitol City Fence

Other Party: Vectren Energy Delivery

Case Number: 20580

Date of Advisory Meeting: 7/21/2020

Date of Damage: 7/1/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: No one-year "reset" benefit because the respondent did

not satisfy the penalties in Cases 15084 and 17945.

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 192: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21069_RecommendationForm Respondent: Daystar Directional Drilling, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21069

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 193: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21074_RecommendationForm Respondent: Greenwell Plumbing, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21074

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 194: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21075_RecommendationForm Respondent: Ragle, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21075

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 195: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21078_RecommendationForm Respondent: Vitality Construction Group LLC

Other Party: Vectren Energy Delivery

Case Number: 21078

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 196: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21083_RecommendationForm Respondent: Greene County Excavating LLC

Other Party: Midwest Natural Gas Corporation

Case Number: 21083

Date of Advisory Meeting: 7/21/2020

Date of Damage: 6/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 197: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21153_RecommendationForm Respondent: Clark Excavation & Utility

Other Party: Citizens Gas

Case Number: 21153

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 198: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21225_RecommendationForm Respondent: J C Smith Excavating Inc.

Other Party: Vectren Energy Delivery

Case Number: 21225

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 199: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21245_RecommendationForm Respondent: Blue Bird Fence Company

Other Party: Vectren Energy Delivery

Case Number: 21245

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 200: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21252_RecommendationForm Respondent: Town of Cloverdale

Other Party: Vectren Energy Delivery

Case Number: 21252

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 201: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21259_RecommendationForm Respondent: Ace Roofing & Construction

Other Party: Vectren Energy Delivery

Case Number: 21259

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 202: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21263_RecommendationForm Respondent: Hummel Electric, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21263

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 203: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21268_RecommendationForm Respondent: Oak Creek Remodeling

Other Party: Vectren Energy Delivery

Case Number: 21268

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 204: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21301_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Rex Construction Company, Inc.

Case Number: 21301

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 205: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21302_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Gordon Engineering

Case Number: 21302

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 206: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21304_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Northern Pipeline Construction Company

Case Number: 21304

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 207: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21307_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Fort Wayne City Utilities

Case Number: 21307

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 208: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21311_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Crosby Excavating, Inc.

Case Number: 21311

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 209: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21316_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Northern Pipeline Construction Company

Case Number: 21316

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 210: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21326_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Comparet & Co.

Case Number: 21326

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 211: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21327_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Town of Geneva

Case Number: 21327

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 212: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21328_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Meade Industries, Inc.

Case Number: 21328

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 213: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21330_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Ritschard Brothers, Inc.

Case Number: 21330

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 214: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21334_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Eby Construction, LLC

Case Number: 21334

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 215: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21336_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Simplicity Contracting, Inc.

Case Number: 21336

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 216: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21343_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Unlimited Shade Tree Farm

Case Number: 21343

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 217: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21348_RecommendationForm Respondent: Northern Indiana Public Service Company

Other Party: Glover Cable Construction LLC

Case Number: 21348

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 218: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21355_RecommendationForm Respondent: Edge Construction LLC

Other Party: Vectren Energy Delivery

Case Number: 21355

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 219: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21368_RecommendationForm Respondent: W E Simmons & Sons

Other Party: Vectren Energy Delivery

Case Number: 21368

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 220: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

19893_RecommendationForm Respondent: Dan Cristiani Excavating Co., Inc.

Other Party: Midwest Natural Gas Corporation

Case Number: 19893

Date of Advisory Meeting: 7/21/2020

Date of Damage: 3/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 221: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

19982_RecommendationForm Respondent: Town of Lapel

Other Party: Filson Earth Work Co., Inc.

Case Number: 19982

Date of Advisory Meeting: 7/21/2020

Date of Damage: 3/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 222: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21082_RecommendationForm Respondent: J E Reedy, Inc.

Other Party: Community Natural Gas Inc

Case Number: 21082

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 223: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21090_RecommendationForm Respondent: S & M Consulting, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21090

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 224: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21109_RecommendationForm Respondent: Dimension Fence, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21109

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: already completed 11/12/19

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 225: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21134_RecommendationForm Respondent: Dennis Mills

Other Party: Northern Indiana Public Service Company

Case Number: 21134

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 226: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21136_RecommendationForm Respondent: Infrasource Construction, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21136

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 227: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21138_RecommendationForm Respondent: R Davis & Sons, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21138

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 228: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21140_RecommendationForm Respondent: S/T Bancroft Electric, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21140

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 229: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21151_RecommendationForm Respondent: Calumet Civil Contractors, Inc.

Other Party: Citizens Gas

Case Number: 21151

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 230: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21157_RecommendationForm Respondent: Mainstream Fiber Networks, LLC

Other Party: Indiana Utilities Corporation

Case Number: 21157

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 231: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21170_RecommendationForm Respondent: Citizens Energy Group - Gas

Other Party: Citizens Gas

Case Number: 21170

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 232: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21246_RecommendationForm Respondent: Paul Ruff

Other Party: Vectren Energy Delivery

Case Number: 21246

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/15/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 233: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21265_RecommendationForm Respondent: Carin Moskovitz

Other Party: Vectren Energy Delivery

Case Number: 21265

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 234: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21267_RecommendationForm Respondent: Sean Rogester

Other Party: Vectren Energy Delivery

Case Number: 21267

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(prior)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 235: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21300_RecommendationForm Respondent: Hoosierland Excavating

Other Party: Northern Indiana Public Service Company

Case Number: 21300

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 236: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21356_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Ferguson Electric

Case Number: 21356

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 237: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21359_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: The Hoosier Co., Inc.

Case Number: 21359

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 238: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21362_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Q C Communications, Inc.

Case Number: 21362

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 239: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21367_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Internattional Inc.

Case Number: 21367

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 240: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21371_RecommendationForm Respondent: Nikki Ball

Other Party: Vectren Energy Delivery

Case Number: 21371

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 241: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21379_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Internattional Inc.

Case Number: 21379

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 242: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21380_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Miller Pipeline, LLC

Case Number: 21380

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 243: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21383_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Lineal Contracting

Case Number: 21383

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 244: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21388_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Hendrixson Concrete & Construction, LLC

Case Number: 21388

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 245: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21393_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: G & G Construction

Case Number: 21393

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 246: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21394_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Lankford Excavating, LLC

Case Number: 21394

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 247: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21395_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: City of Vincennes

Case Number: 21395

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 248: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21401_RecommendationForm Respondent: Vectren Energy Delivery

Other Party: Patton Plumbing LLC

Case Number: 21401

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-18(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☒ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 249: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

20639_RecommendationForm Respondent: Jerry Spaw

Other Party: Northern Indiana Public Service Company

Case Number: 20639

Date of Advisory Meeting: 7/21/2020

Date of Damage: 6/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 250: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21026_RecommendationForm Respondent: Josea Rivas

Other Party: Citizens Gas

Case Number: 21026

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 251: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21031_RecommendationForm Respondent: B W I Contractors, LLC

Other Party: Citizens Gas

Case Number: 21031

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 252: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21033_RecommendationForm Respondent: Donald Acheson

Other Party: Citizens Gas

Case Number: 21033

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 253: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21038_RecommendationForm Respondent: Kent Allen Roberts

Other Party: Citizens Gas

Case Number: 21038

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 254: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21095_RecommendationForm Respondent: Benjamin Jennett

Other Party: Northern Indiana Public Service Company

Case Number: 21095

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 255: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21108_RecommendationForm Respondent: Brad Weir

Other Party: Northern Indiana Public Service Company

Case Number: 21108

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 256: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21119_RecommendationForm Respondent: Christopher Barbour

Other Party: Northern Indiana Public Service Company

Case Number: 21119

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 257: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21129_RecommendationForm Respondent: Terri Jorden

Other Party: Northern Indiana Public Service Company

Case Number: 21129

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 258: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21144_RecommendationForm Respondent: Kenneth Blankenship

Other Party: Northern Indiana Public Service Company

Case Number: 21144

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 259: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21145_RecommendationForm Respondent: Shawn Ball

Other Party: Northern Indiana Public Service Company

Case Number: 21145

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 260: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21147_RecommendationForm Respondent: Jeff Stephenson

Other Party: Citizens Gas

Case Number: 21147

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 261: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21149_RecommendationForm Respondent: H I S Constructors, Inc.

Other Party: Citizens Gas

Case Number: 21149

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 262: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21150_RecommendationForm Respondent: Padilla Guillero

Other Party: Citizens Gas

Case Number: 21150

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/9/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 263: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21152_RecommendationForm Respondent: Harmon Construction, Inc.

Other Party: Citizens Gas

Case Number: 21152

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 264: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21156_RecommendationForm Respondent: Earl Peters

Other Party: Community Natural Gas Inc

Case Number: 21156

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 265: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21162_RecommendationForm Respondent: Harmon Construction, Inc.

Other Party: Citizens Gas

Case Number: 21162

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 266: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21166_RecommendationForm Respondent: Weber Concrete Construction

Other Party: Citizens Gas

Case Number: 21166

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 267: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21192_RecommendationForm Respondent: Crosby Excavating, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21192

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 268: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21205_RecommendationForm Respondent: Miller Pipeline, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21205

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Miller

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 269: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21208_RecommendationForm Respondent: Mt. Carmel Stabilization Group, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21208

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 270: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21231_RecommendationForm Respondent: Weber Concrete Construction

Other Party: Vectren Energy Delivery

Case Number: 21231

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 271: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21315_RecommendationForm Respondent: Mt. Carmel Stabilization Group, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21315

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 272: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21320_RecommendationForm Respondent: E & B Paving, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21320

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 273: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21341_RecommendationForm Respondent: Crosby Excavating, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21341

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 274: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21358_RecommendationForm Respondent: Miller Pipeline, LLC

Other Party: Vectren Energy Delivery

Case Number: 21358

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Miller

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 275: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21366_RecommendationForm Respondent: Miller Pipeline, LLC

Other Party: Vectren Energy Delivery

Case Number: 21366

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Miller

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 276: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21376_RecommendationForm Respondent: E & B Paving, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21376

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 277: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

20363_RecommendationForm Respondent: A J Hetrick Enterprises LLC

Other Party: Vectren Energy Delivery

Case Number: 20363

Date of Advisory Meeting: 7/21/2020

Date of Damage: 6/7/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 278: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21044_RecommendationForm Respondent: Techno Drill, LLC

Other Party: Vectren Energy Delivery

Case Number: 21044

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 279: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21063_RecommendationForm Respondent: Arborworx LLC

Other Party: Vectren Energy Delivery

Case Number: 21063

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 280: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21067_RecommendationForm Respondent: Bell & Bell Demolition, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21067

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 281: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21091_RecommendationForm Respondent: R B Trucking & Towing LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21091

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 282: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21163_RecommendationForm Respondent: Alonso Calzada Concrete LLC

Other Party: Citizens Gas

Case Number: 21163

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 283: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21165_RecommendationForm Respondent: Lazer Excavating Company

Other Party: Citizens Gas

Case Number: 21165

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information: already completed 12/12/19

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 284: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21167_RecommendationForm Respondent: B Davis Remodeling LLC

Other Party: Citizens Gas

Case Number: 21167

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 285: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21174_RecommendationForm Respondent: Roger Chrismore

Other Party: Northern Indiana Public Service Company

Case Number: 21174

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 286: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21182_RecommendationForm Respondent: Dewey's Excavating, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21182

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 287: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21184_RecommendationForm Respondent: Melody Lane Mobile Home Park

Other Party: Northern Indiana Public Service Company

Case Number: 21184

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 288: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21187_RecommendationForm Respondent: A T & T

Other Party: Northern Indiana Public Service Company

Case Number: 21187

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,500

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 289: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21200_RecommendationForm Respondent: Wilson Construction & Renovation LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21200

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/8/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 290: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21209_RecommendationForm Respondent: Sturgeon's Light Excavation

Other Party: Northern Indiana Public Service Company

Case Number: 21209

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 291: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21212_RecommendationForm Respondent: Blade Cutters, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21212

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 292: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21213_RecommendationForm Respondent: Brent Koehn

Other Party: Northern Indiana Public Service Company

Case Number: 21213

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 293: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21216_RecommendationForm Respondent: Insight Homes LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21216

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 294: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21218_RecommendationForm Respondent: Legacy Home Builders, LLC

Other Party: Sycamore Gas Company

Case Number: 21218

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/10/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 295: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21298_RecommendationForm Respondent: T & J Landscape Services LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21298

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 296: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21299_RecommendationForm Respondent: Prarie Contractors, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21299

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 297: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21306_RecommendationForm Respondent: Niblock Excavating, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21306

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 298: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21309_RecommendationForm Respondent: Waubee Lake Mobile Home Park

Other Party: Northern Indiana Public Service Company

Case Number: 21309

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 299: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21310_RecommendationForm Respondent: H & G Underground Utilities, LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21310

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 300: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21342_RecommendationForm Respondent: P S I Irrigation

Other Party: Northern Indiana Public Service Company

Case Number: 21342

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 301: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21344_RecommendationForm Respondent: Meade Industries, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21344

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 302: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21370_RecommendationForm Respondent: J B I Construction

Other Party: Vectren Energy Delivery

Case Number: 21370

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 303: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21377_RecommendationForm Respondent: Lan Concrete Technology LLC

Other Party: Vectren Energy Delivery

Case Number: 21377

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 304: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21378_RecommendationForm Respondent: Reed & Sons Construction, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21378

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 305: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

20768_RecommendationForm Respondent: Wills Excavating, Inc.

Other Party: Vectren Energy Delivery

Case Number: 20768

Date of Advisory Meeting: 7/21/2020

Date of Damage: 7/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 306: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21079_RecommendationForm Respondent: Boyd Leach

Other Party: Vectren Energy Delivery

Case Number: 21079

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/31/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 307: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21127_RecommendationForm Respondent: Chris Ghezzi

Other Party: Northern Indiana Public Service Company

Case Number: 21127

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 308: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21133_RecommendationForm Respondent: Kickin Grass

Other Party: Northern Indiana Public Service Company

Case Number: 21133

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 309: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21146_RecommendationForm Respondent: Aaron Hough

Other Party: Citizens Gas

Case Number: 21146

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(a)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 310: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21160_RecommendationForm Respondent: George Sisler

Other Party: Citizens Gas

Case Number: 21160

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions: Warren

Additional Information:

APPROVED: /for Scott Sontag

Scott Sontag Vice Chairman

Page 311: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21173_RecommendationForm Respondent: Blake Karabin

Other Party: Northern Indiana Public Service Company

Case Number: 21173

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/1/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 312: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21175_RecommendationForm Respondent: Michael Miller

Other Party: Northern Indiana Public Service Company

Case Number: 21175

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 313: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21176_RecommendationForm Respondent: Chris Ponsky

Other Party: Northern Indiana Public Service Company

Case Number: 21176

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/2/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 314: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21181_RecommendationForm Respondent: Selge Construction Co., Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21181

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☒ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $3,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 315: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21188_RecommendationForm Respondent: Isaiah Strickland

Other Party: Northern Indiana Public Service Company

Case Number: 21188

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 316: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21198_RecommendationForm Respondent: Kristel Wolf

Other Party: Northern Indiana Public Service Company

Case Number: 21198

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/7/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 317: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21199_RecommendationForm Respondent: Michael Weathers

Other Party: Northern Indiana Public Service Company

Case Number: 21199

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/7/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 318: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21211_RecommendationForm Respondent: Walsh & Kelly

Other Party: Northern Indiana Public Service Company

Case Number: 21211

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/12/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 319: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21257_RecommendationForm Respondent: Mike Miller

Other Party: Vectren Energy Delivery

Case Number: 21257

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 320: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21266_RecommendationForm Respondent: Kim Tidler

Other Party: Vectren Energy Delivery

Case Number: 21266

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/14/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 321: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21297_RecommendationForm Respondent: Brian Gross

Other Party: Northern Indiana Public Service Company

Case Number: 21297

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/16/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 322: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21312_RecommendationForm Respondent: Johnathan Miller

Other Party: Northern Indiana Public Service Company

Case Number: 21312

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 323: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21318_RecommendationForm Respondent: Blanca Bretado

Other Party: Northern Indiana Public Service Company

Case Number: 21318

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/21/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 324: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21319_RecommendationForm Respondent: Aaron Baker

Other Party: Northern Indiana Public Service Company

Case Number: 21319

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/22/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 325: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21329_RecommendationForm Respondent: Tren Bradford

Other Party: Northern Indiana Public Service Company

Case Number: 21329

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 326: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21338_RecommendationForm Respondent: John Oliver

Other Party: Northern Indiana Public Service Company

Case Number: 21338

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 327: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21339_RecommendationForm Respondent: Brian Shedrow

Other Party: Northern Indiana Public Service Company

Case Number: 21339

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 328: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21340_RecommendationForm Respondent: Aaron McCormick

Other Party: Northern Indiana Public Service Company

Case Number: 21340

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/29/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 329: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21347_RecommendationForm Respondent: Christine Venter

Other Party: Northern Indiana Public Service Company

Case Number: 21347

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 330: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21364_RecommendationForm Respondent: Ryan Coffey

Other Party: Vectren Energy Delivery

Case Number: 21364

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 331: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21381_RecommendationForm Respondent: Hancock County Highway Department

Other Party: Vectren Energy Delivery

Case Number: 21381

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 332: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21391_RecommendationForm Respondent: Blackmore Construction LLC

Other Party: Vectren Energy Delivery

Case Number: 21391

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/26/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $ 4,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 333: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21178_RecommendationForm Respondent: Martec

Other Party: Northern Indiana Public Service Company

Case Number: 21178

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 334: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21195_RecommendationForm Respondent: 1 Creative Construction Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21195

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 335: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21215_RecommendationForm Respondent: Homestead Lawn & Landscape, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21215

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 336: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21217_RecommendationForm Respondent: Kankakee Valley REMC

Other Party: Northern Indiana Public Service Company

Case Number: 21217

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/13/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 337: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21220_RecommendationForm Respondent: High Power Technical Services, Inc.

Other Party: Sycamore Gas Company

Case Number: 21220

Date of Advisory Meeting: 7/21/2020

Date of Damage: 8/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 338: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21228_RecommendationForm Respondent: Burden Construction

Other Party: Vectren Energy Delivery

Case Number: 21228

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 339: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21229_RecommendationForm Respondent: Payton & Son Concrete, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21229

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/3/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 340: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21230_RecommendationForm Respondent: Pro-Dig Septic, LLC

Other Party: Vectren Energy Delivery

Case Number: 21230

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/6/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 341: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21234_RecommendationForm Respondent: Professional Concrete Cutting & Drilling LLC

Other Party: Vectren Energy Delivery

Case Number: 21234

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: already completed 8/8/19

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 342: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21235_RecommendationForm Respondent: Independent Land Surveying, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21235

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/4/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 343: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21239_RecommendationForm Respondent: All American Home Improvement LLC

Other Party: Vectren Energy Delivery

Case Number: 21239

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/5/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 344: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21254_RecommendationForm Respondent: Ikes Sewer Service

Other Party: Vectren Energy Delivery

Case Number: 21254

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 345: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21258_RecommendationForm Respondent: B M B, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21258

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/11/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☒ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 346: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21303_RecommendationForm Respondent: Ismael Salazar LLC

Other Party: Northern Indiana Public Service Company

Case Number: 21303

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/17/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 347: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21308_RecommendationForm Respondent: Sowles Well Service

Other Party: Northern Indiana Public Service Company

Case Number: 21308

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/18/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 348: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21313_RecommendationForm Respondent: Austin Allen

Other Party: Northern Indiana Public Service Company

Case Number: 21313

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 349: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21314_RecommendationForm Respondent: Ameri-Dream Fence & Deck

Other Party: Northern Indiana Public Service Company

Case Number: 21314

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 350: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21324_RecommendationForm Respondent: Haskins Underground, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21324

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 351: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21325_RecommendationForm Respondent: Shrock Construction, Inc.

Other Party: Northern Indiana Public Service Company

Case Number: 21325

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 352: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21332_RecommendationForm Respondent: C & E Excavating

Other Party: Northern Indiana Public Service Company

Case Number: 21332

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 4,500

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 353: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21335_RecommendationForm Respondent: Judy Hamsher

Other Party: Northern Indiana Public Service Company

Case Number: 21335

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☒ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 354: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21345_RecommendationForm Respondent: Forte Waterproofing

Other Party: Northern Indiana Public Service Company

Case Number: 21345

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/30/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 355: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21363_RecommendationForm Respondent: Dashiell Contracting

Other Party: Vectren Energy Delivery

Case Number: 21363

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/19/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☒ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 356: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21372_RecommendationForm Respondent: Timberland Home Center, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21372

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/23/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 357: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21385_RecommendationForm Respondent: Lynn's Transport & Service

Other Party: Vectren Energy Delivery

Case Number: 21385

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/24/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 358: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21389_RecommendationForm Respondent: Gradex, Inc.

Other Party: Vectren Energy Delivery

Case Number: 21389

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/25/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(1)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☒ Civil penalty of $ 5,000

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 359: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21396_RecommendationForm Respondent: Robert Sharp

Other Party: Vectren Energy Delivery

Case Number: 21396

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/27/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☒ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 360: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

21397_RecommendationForm Respondent: Dan Morley

Other Party: Vectren Energy Delivery

Case Number: 21397

Date of Advisory Meeting: 7/21/2020

Date of Damage: 9/28/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

☐ Warning letter (Special instructions:)

☐ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☒ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information:

APPROVED: /for Ben Warren

Ben Warren Chairman

Page 361: STATE OF INDIANA INDIANA UTILITY REGULATORY …Ind. Code ch. 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission’s Pipeline Safety Division (“Division”)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

20401_RecommendationForm Respondent: J & D Basement Systems Northwest

Other Party: Northern Indiana Public Service Company

Case Number: 20401

Date of Advisory Meeting: 7/21/2020

Date of Damage: 5/20/2019

The IURC Pipeline Safety Division finds the following violation(s):

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

☒ Warning letter (Special instructions:)

☒ Clearance Zone

☐ Damaging Lines

☐ Dig Tickets

☐ Demolitions

☐ Failure to Plan

☐ Potholing

☐ Probing

☐ Self-Repair

☐ Using Stakes/ Post Hole Diggers

☐ White Lining

☐ Training or $5,000 civil penalty if fail to complete training

☐ Civil penalty of $1,000

☐ Civil penalty of $1,500; can complete training instead of paying $1,500 penalty

☐ Civil penalty of $

☐ No ticket escalation - additional civil penalty of $1,000

☐ Other

Abstentions:

Additional Information: already completed 2/11/20

APPROVED: /for Ben Warren

Ben Warren Chairman