STATE OF IDAHO - Vice President and Chief Financial...

61
BOISE STATE UNIVERSITY REQUEST FOR PROPOSAL RFP ST16-108 PeopleSoft Development Staff Augmentation Issue Date: 3/29/17

Transcript of STATE OF IDAHO - Vice President and Chief Financial...

Page 1: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

BOISE STATE UNIVERSITY

REQUEST FOR PROPOSAL

RFP ST16-108

PeopleSoft Development Staff Augmentation

Issue Date: 3/29/17

Page 2: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

TABLE OF CONTENTS

1. RFP ADMINISTRATIVE INFORMATION...............................................................................................32. SUBMISSION - PROCESS, FORMAT AND REQUIREMENTS.............................................................73. CONTRACT.......................................................................................................................................... 154. SPECIAL TERMS AND CONDITIONS................................................................................................175. BUSINESS INFORMATION.................................................................................................................206. SCOPE OF WORK............................................................................................................................... 217. PROPOSAL REVIEW AND EVALUATION.........................................................................................248. COST PROPOSAL AND BILLING PROCEDURE...............................................................................279. RESOURCE REQUEST PROCESS.....................................................................................................2910. CONFIDENTIALITY AND NON-DISCLOSURE.................................................................................3211. TERMINATION OF CONTRACT........................................................................................................34

ATTACHMENT 1--SIGNATURE PAGE....................................................................................................35ATTACHMENT 2- QUESTION FORM......................................................................................................36ATTACHMENT 3--REFERENCE FORM...................................................................................................37ATTACHMENT 4--COST PROPOSAL.....................................................................................................38ATTACHMENT 5--OFFEROR RESPONSE FORM...................................................................................39

EXHIBIT A SAMPLE RESOURCE REQUEST FORM..............................................................................40

Page

Page 3: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

1.1 RFP Administrative Information

RFP Title: PeopleSoft Development Staff Augmentation

RFP Project Description: Assemble a pool of Contractors who can assist/augment Boise State PeopleSoft development resources in urgent and general development tasks.

RFP Lead: Name: Shannan ThomasTitle: Senior BuyerMailing address: 1910 University Drive Boise, ID 83725-1210Street address: 960 Broadway Ave Suite 300 Boise, ID 83706Email address: [email protected]: 208-426-1549Fax: 208-426-1152

Pre-Proposal via Phone Conference:

Tuesday, 4/11/17, 9:30 am Mountain Time (limited to two (2) phone lines per Offeror)

Deadline To Receive Questions:

4/24/17, 11:59:59 pm Mountain Time

Anticipated Release of Answers to Questions:

4/28/17

RFP Closing Date: 5/15/17, 5 pm Mountain Time

RFP Opening Date: 10:00 a.m. Mountain Time work day following RFP closing. Contact RFP Lead for details.

Interviews: If required, will be scheduled during evaluation period.

Anticipated contract award:

6/1/16

Validity of Proposal: Bid Proposals are to remain valid for one hundred twenty (120) calendar days after the scheduled closing date. Proposals submitted with a shorter validity period will be found nonresponsive and will not be considered.

Initial Term of Contract and Renewals:

The initial term of the Contract will be for one (1) year, commencing the date of award (the “Initial Term”). The University may extend the Contract, by written notice, to all awarded Contractors, for up to four (4) additional one (1) year terms, which extension will be considered a renewal of the Contract on the same terms and conditions (each, a “Renewal Term”). In the event an ongoing Resource Request is continuing and not completed upon termination or expiration of the Initial Term or any applicable Renewal Term, the contract shall remain in full force and effect until all outstanding Resource Requests are completed, provided no new Resource Requests may be proposed or accepted after the Initial Term and any applicable Renewal Terms have ended.

RFP ST16-108 Page 3 of 44 Issued 3/29/17

Page 4: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

1.2. Background Information - Boise State University periodically has PeopleSoft development needs to fill via staff augmentation. With this RFP, the University intends to identify several consultants or consulting firms (“Contractors”) with whom the University may engage as the need arises.

1.3 Scope - The University intends to qualify a pool of Contractors who have agreed to the Boise State University Terms and Conditions and who can respond quickly to technical IT needs with little time spent on additional contract negotiation.

Pricing and other contractual matters will be established prior to the actual need to allow for expedient engagement between the University and the Contractor. Upon identification of a need, Boise State will use the “Resource Request” processes identified in this solicitation to fill the University’s need.

The University anticipates engaging with the selected Contractors on a variety of PeopleSoft development projects, tentatively including, but not limited to, upgrading to PeopleSoft Campus Solutions 9.2, Time and Labor Troubleshooting and maintenance and improvement of payroll processing.

The University is seeking Offerors with technical expertise in the following: PeopleSoft 9.2 PeopleSoft CS Technical PeopleSoft HCM Technical PeopleSoft Payroll PeopleSoft Time and Labor Other Enterprise Applications

1.4 Staff and Support - Boise State University (“University”) employs full-time and part-time development staff responsible for implementing, supporting, and maintaining a number of University systems. Over the years, the University has partnered with a variety of Contractors to augment the development team for project work as well as production support.

1.5 Current Environment - Boise State’s current PeopleSoft environments are:

Campus Solutions 9.0 - Boise State went live with PeopleSoft HRCS 9.0 in Fall 2008. In 2012-2013, Boise State went through an extensive “refresh” of the Campus Solutions system to remove many customizations and rely on delivered functionality where possible. At this time, the University also separated its Human Resource and Campus Solutions systems and went live with PeopleSoft Campus Solutions 9.0. Campus Solutions 9.0 is currently utilized by all faculty and students, as well as staff in departments all across campus. The University is currently preparing to upgrade to PeopleSoft Campus Solutions 9.2.

Human Capital Management (HCM) 9.0 - As mentioned above, Boise State has been live with PeopleSoft 9.0 since Fall 2008, and specifically live with PeopleSoft Human Capital Management 9.0 since the split from Campus Solutions in February 2013.

One significant challenge for Boise State is the current payroll process. The University desires to follow Oracle’s direction for upgrades, including a possible future upgrade to

RFP ST16-108 Page 4 of 44 Issued 3/29/17

Page 5: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

the cloud.

Oracle Financials Cloud - The University implemented the Oracle Financials Cloud in the Summer of 2016.

1.6 Categories and Award - The University will offer two categories of awards for this solicitation: the “General Category” and the “Urgent Category.”

1.6.1 General Category - The ”General Category” will including PeopleSoft 9.2, Campus Solutions, Human Capital Management, Campus Solutions Environment Upgrade, PeopleSoft Payroll Processes Supporting Maintenance/Improvement, PeopleSoft Time and Labor, Other Enterprise Applications and Other PeopleSoft Projects.

When the University has a need for work in the General Category, the University will issue to each Contractor awarded in the General Category a “Resource Request” (See Section 9, Resource Request Process, for details) containing a scope of work and timeline. Each contractor will then submit a completed Resource Request form, offering their most qualified resource(s), and a Proposal for review by the University. The University will review responses and award to the contractor whose terms and conditions regarding price, availability, support services and delivery are the most advantageous to the University. The University reserves the right to contract outside this RFP/Contract if it determines, in its sole discretion, that none of the awarded General Category contractors can fulfill the needs of the University.

1.6.2 Urgent Category - Additionally, the University has elected to include “Urgent” Categories for Payroll, Time and Labor and Campus Solutions issues that require immediate attention. These are critical systems that have wide-reaching effects for which the University has limited, on-site employee resources. Contractors awarded in the Urgent Categories must be available to assist the University within 24 hours.

For each of the Urgent Categories, the University will award to a “Primary Contractor” and “Secondary Contractor.” The Primary Contractor will be the first contractor called in the case of one of these urgent situations. If for some reason, the Primary Contractor cannot complete the work as requested and within the required timeframe, the University will call the Secondary Contractor. The University reserves the right to award an Urgent Resource Request to another Contractor or to contract outside this RFP/Contract if the Primary and Secondary Contractors are unable to complete the requested work within the prescribed timeframe.

RFP ST16-108 Page 5 of 44 Issued 3/29/17

Page 6: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

1.6.3 The University intends to award to approximately five (5) Contractors in the General Category and approximately two (2) Contractors (Primary and Secondary) in each of the Urgent Categories. However, at the University’s discretion, the number of awarded Contractors may vary slightly, depending on quantity and quality of Offeror responses. Offerors can submit a Proposal for one or all of the categories mentioned. The University may award each category to a distinct Contractor, or may award several or all categories to the same Contractor or Contractors. The solicitation will be evaluated and awarded as per Section 7, Proposal Review and Evaluation. Follow the instructions in Sections 2 (Submission – Process, Format and Requirements) and 6 (Scope of Work) to respond to the solicitation.

RFP ST16-108 Page 6 of 44 Issued 3/29/17

Page 7: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2. SUBMISSION – PROCESS, FORMAT AND REQUIREMENTS

2.1 Pre-Proposal Conference and Questions and Answers

2.1.1 A non-mandatory pre-proposal conference will be held at the location and time as indicated in Section 1 of this RFP. This will be your opportunity to ask questions of the University staff. All interested parties are invited to participate. Those choosing to participate must pre-register via email with the RFP lead to receive meeting details. This conference will be used to explain, clarify, or identify areas of concern in the RFP. Conference attendance is at the Offeror’s own expense. Those asking questions during the pre-proposal conference will be asked to submit those questions to the University in writing by the designated “Deadline to Receive Questions” period as indicated in Section 1 of this RFP. For simplicity’s sake, Offerors are strongly encouraged to submit just one, final set of questions after the pre-proposal conference but prior to the question deadline, rather than multiple sets of questions. Any oral answers given by the University during the pre-proposal conference are to be considered unofficial.

2.1.2 All questions must be submitted to the RFP Lead by the date and time noted in Section 1. Questions must be submitted using Attachment 2 “Offeror Questions” via email to the RFP Lead at the address listed above. Official answers to all questions will be posted on the University’s website as an amendment as indicated in Section 1 of this RFP.

2.1.3 Questions regarding the Boise State University Standard Contract Terms and Conditions, found at (https://vpfa.boisestate.edu/process/procurement/BoiseStateStandardTerms.pdf), and incorporated into this RFP by reference, must be submitted by the deadline to receive questions from the Offeror, stated in Section 1 of the RFP. The University will not negotiate these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:

2.1.3.1 The term or condition in question; 2.1.3.2 The rationale for the specific requirement being unacceptable to the

Offeror (define the deficiency); 2.1.3.3 Recommended verbiage for the University’s consideration that is

consistent in content, context, and form with the University’s requirement that is being questioned; and

2.1.3.4 Explanation of how the University’s acceptance of the recommended verbiage is fair and equitable to both the University and the Offeror.

2.1.4 Proposals received that qualify the offer based upon the University accepting other terms and conditions not found in the RFP or which take exception to the University’s terms and conditions will be found non-responsive, and no further consideration of the Proposal will be given.

2.1.5 Any Offeror proposed modifications will be incorporated into the contract only if specifically accepted by University in an amendment to the RFP or otherwise as expressly accepted in writing by the University.

RFP ST16-108 Page 7 of 44 Issued 3/29/17

Page 8: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.1.6 From the date of release of this RFP until Intent to Award Letter is issued, all contact and requests for information shall be directed to the RFP Lead, only. Regarding this solicitation, all contact with other personnel employed by or under contract with the University is restricted. During the same period, no prospective Contractor shall approach personnel employed by, or under contract to the University, on any other related matters. An exception to this restriction will be made for Contractors who, in the normal course of work under a current and valid contract with the University, may need to discuss legitimate business matters concerning their work with the contracting agency. Violation of these conditions may be considered sufficient cause by the University to reject an Offeror’s bid or Proposal, irrespective of any other consideration.

2.1.7 Proposals should be submitted on the most favorable terms an Offeror can propose, from both a price and technical standpoint as well as with regard to legal terms and conditions. The University reserves the right to accept any part of a Proposal, or reject all or any part of any Proposal received, without financial obligation, if the University determines it to be in the best interest of the University to do so.

2.1.8 No verbal Proposals or verbal modifications will be considered. An Offeror may modify its Proposal in writing prior to the RFP closing time. A written modification must include the date and signature of the Offeror or its authorized representative.

2.1.9 All data provided by the University in relation to this RFP represents the best and most accurate information available at the time of RFP preparation. Should any data later be discovered to be inaccurate, such inaccuracy will not constitute a basis for contract rejection by an Offeror or contract amendment.

2.1.10 All Proposal concepts and material submitted become the property of the University and will not be returned to Offeror unless the solicitation is canceled by the University (State Code § 67-9215). Award or rejection of a Proposal does not affect this right. Proposals and supporting documentation may be available for public inspection upon written request following the announcement of a Contract award, except for information specifically labeled on each separate page as a “Trade Secret” under the Idaho Public Records Act, Section Title 74, Chapter 1, Idaho Code (“the Act”). Alternatively, information may be specifically labeled “exempt” from public records under another exemption found in the Act. Information specifically labeled as Trade Secret or otherwise exempt may be protected from disclosure, but only to the extent consistent with the Act or otherwise applicable federal or state law or regulation. Accordingly, the University cannot guarantee its confidentiality.

2.1.11 An appeal by an Offeror of a bid specification, a non-responsiveness determination, or the award is governed by the Boise State University Purchasing Appeals Process, and must be filed in accordance with that process, which can be found on the Internet at https://vpfa.boisestate.edu/purchasing/vendor-information/

RFP ST16-108 Page 8 of 44 Issued 3/29/17

Page 9: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.1.12 Proposal opening will be held at the location and time as indicated in Section 1 of this RFP. All Offerors, authorized representatives and the general public are invited, at their own expense, to be present at the opening of the Proposals. During the Proposal opening only the names of the Offerors will be provided.

2.2 Proposal Format

2.2.1 These instructions describe the format to be used when submitting a Proposal. The format is designed to ensure a complete submission of information necessary for an equitable analysis and evaluation of submitted Proposals. There is no intent to limit the content of Proposals. Evaluation points may be deducted from the Offeror’s possible score if the following format is not followed.

2.2.2 Any qualified Offeror may submit a Proposal. All Offerors are qualified unless disqualified. Those Offerors presently on the General Service Administration’s (GSA) “list of parties excluded from federal procurement and non-procurement programs” may be disqualified. Information is available on the Internet at: https://www.sam.gov/portal/SAM/##11

2.2.3 Offerors must adhere to all requirements of this RFP to be considered responsive. The determination of whether a Proposal is responsive is a determination made solely by the University. The University reserves the right to waive any non-material variation that does not violate the overall purpose of the RFP, frustrate the competitive bidding process, or afford any Offeror an advantage not otherwise available to all Offerors.

2.2.4 Proposals must demonstrate that Offerors have the ability to complete the described functions of this RFP.

2.2.5 Sections of the format may be listed with an Evaluated Requirement.

Evaluation Code - The codes and their meanings are as follows:

(M)  Mandatory Specification or Requirement - failure to comply with any mandatory specification or requirement may at the sole discretion of the University render Offeror’s Proposal non-responsive and no further evaluation will occur. Offeror is required to respond to each mandatory specification with a statement outlining its understanding and how it will comply.

(ME) Mandatory and Evaluated Specification - failure to comply/respond may render Offeror’s Proposal non-responsive and no further evaluation will occur. Offeror is required to respond to this specification with a statement outlining its understanding and how it will comply. Points will be awarded based on predetermined criteria.

(E) Evaluated Specification - a response is desired and will be evaluated and scored. If not available, respond with “Not Available” or other response that identifies Offeror’s ability or inability to supply the item or service. Failure to respond will result in zero (no) points awarded for this item.

RFP ST16-108 Page 9 of 44 Issued 3/29/17

Page 10: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.2.6 In order to be considered for award, the sealed Proposal must be delivered to the location and attention of the buyer specified in Section 1 of the RFP, no later than the date and time specified in Section 1. No late Proposals will be accepted. A Proposal received at the office designated in this RFP after the RFP closing date and time will not be accepted.

2.2.7 The Proposals must be addressed to the RFP Lead and clearly marked “CONTRACT PROPOSAL – RFP ST16-108 PeopleSoft Development Staff Augmentation”.

2.2.8 All costs incurred in the preparation and submission of a Proposal in response to this RFP, including, but not limited to, Offeror’s travel expenses to attend the pre-proposal conference, Proposal opening and presentation or negotiation sessions, shall be the sole responsibility of Offerors and will not be reimbursed by the University.

2.3 Submission Requirements

2.3.1 (M) Signature Page - The Proposal must be submitted with the University–supplied signature page in the form provided, without modification. The Signature Page (Attachment 1) must contain an original, handwritten signature and be returned with the relevant RFP documents. PHOTOCOPIED SIGNATURES or FACSIMILE SIGNATURES are NOT ACCEPTABLE. Failure to include a signed, complete, unmodified, original University Signature Page will result in a finding that the Proposal is non-responsive, and no further consideration will be given to the Proposal.

2.3.2 Each Proposal must be submitted with one (1) original and one (1) copy of the

Business and Scope of Work Proposal and one (1) original and one (1) copy of the Cost Proposal (Attachment 4).

2.3.3 Electronic copy - In addition, Offerors must submit one (1) electronic copy of the Proposal on USB flash drive device (thumb drive). Word or Excel format is required. The only exception will be for financials or brochures. The USB drive format and content must be the same as the manually submitted Proposal. The electronic version must NOT be password protected or locked in any way. Please attach the USB device to the original version of the Business and Scope of Work Proposal. The USB device must contain the original electronic copy in Word or Excel format, as well as the redacted version as requested in Section 2.3.5, 2.3.6 and 2.3.7 of the solicitation. The electronic file name of the redacted version should contain the word “redacted.”

RFP ST16-108 Page 10 of 44 Issued 3/29/17

Page 11: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.3.4 Public Records - The Idaho Public Records Law, Idaho Code Sections 74-101 through 74-126, allows the open inspection and copying of public records. Public Records include any writing containing information relating to the conduct or administration of the public's business prepared, owned, used, or retained by a State Agency or a local agency (political subdivision of the state of Idaho) regardless of the physical form or character. All, or most, of the information contained in your response will be a Public Record subject to disclosure under the Public Records Law. The Public Records Law contains certain exemptions. One exemption potentially applicable to part of your response may be for Trade Secrets.

2.3.5 Trade Secrets - Trade secrets include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy. If you consider any material that you provide in your Bid, Proposal or Quotation to be a Trade Secret, or otherwise protected from disclosure, you MUST so indicate by marking as “exempt” EACH PAGE containing such information. Marking your entire Bid, Proposal or Quotation as exempt is not acceptable or in accordance with the Solicitation or the Public Records Law and WILL NOT BE HONORED. In addition, a legend or statement on one (1) page that all or substantially all of the response is exempt from disclosure is not acceptable or in accordance with the Public Records Law and WILL NOT BE HONORED.

Prices that you provide in your Bid, Proposal or Quotation are not a Trade Secret. The State, to the extent allowed by law and in accordance with these Solicitation Instructions, will honor a designation of nondisclosure. Any questions regarding the applicability of the Public Records Law should be addressed to your own legal counsel PRIOR TO SUBMISSION of your Bid, Proposal or Quotation.

2.3.6 Redacted Response - If your Bid, Proposal or Quotation contains information that you consider to be exempt, you must also submit an electronic redacted copy of the Proposal with all exempt information removed or blacked out. The State will provide this redacted Bid, Proposal or Quotation to requesters under the Public Records Law, if requested. Submitting Offerors must also:

2.3.6.1 Identify with particularity the precise text, illustration, or other information contained within each page marked “exempt” (it is not sufficient to simply mark the entire page). The specific information you deem “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise be clearly distinguished from other text or other information and be specifically identified as “exempt.”

RFP ST16-108 Page 11 of 44 Issued 3/29/17

Page 12: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.3.6.2 List of Redacted Exempt Information - Provide a separate document with your Bid, Proposal or Quotation entitled “List of Redacted Exempt Information,” which provides a succinct list of all exempt material noted in your Bid, Proposal or Quotation. The list must be in the order in which the material appears in your Bid, Proposal or Quotation, identified by Page#, Section#/Paragraph#, Title of Section/Paragraph, specific portions of text or other information; or in a manner otherwise sufficient to allow the University to determine the precise material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure.

2.3.6.3 Offeror shall indemnify and defend the University against all liability, claims, damages, losses, expenses, actions, attorney fees and suits whatsoever for honoring a designation of exempt or for the Offeror’s failure to designate individual documents as exempt. The Offeror’s failure to designate as exempt any document or portion of a document that is released by the University shall constitute a complete waiver of any and all claims for damages caused by any such release. If the University receives a request for materials claimed exempt by the Offeror, the Offeror shall provide the legal defense for such claim.

2.3.7 No Redacted Information - Alternately, if there is no redacted information in the Proposal, please note that with the Proposal.

2.3.8 The Proposal must be separated into two (2) distinct sections: 1) Business and Scope of Work Proposal and 2) Cost Proposal.

2.3.8.1 The Business and Scope of Work Proposal must be sealed, identified “Business

and Scope of Work Portion of Proposal – RFP ST16-108 PeopleSoft Development Staff Augmentation” and include a cover letter (see Section 2.3.11) and all other documentation related to this response, except the Cost Proposal.

2.3.8.2 The Cost Proposal must be sealed and identified “Cost Proposal – RFP ST16-108 PeopleSoft Development Staff Augmentation.” The only document that should be included with this section is the Cost Proposal itself, Attachment 4.

2.3.9 Include in the Business and Scope of Work Proposal a table of contents; adequately identify the contents of each section, including page numbers of major subsections. The Table of Contents is not evaluated, and is for reference purposes only.

2.3.10 Include in the Business and Scope of Work Proposal an executive summary, which provides a condensed overview of the contents of the Business and Scope of Work Proposal submitted by the Offeror, which shows an understanding of the services to be performed. The Executive Summary is not evaluated, and is for summary purposes only.

RFP ST16-108 Page 12 of 44 Issued 3/29/17

Page 13: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.3.11 (M) Cover Letter - The Business and Scope of Work Proposal must include a cover letter on the Offeror’s official letterhead, the Offeror’s name, mailing address, telephone number, facsimile number, and name of Offeror’s authorized agent including an email address. The cover letter must identify the RFP Title, RFP number and all materials and enclosures being forwarded collectively as the response to this RFP. The cover letter must be hand signed, in ink, by an individual authorized to commit the Offeror to the work proposed. In addition, the cover letter must include:

2.3.11.1 Identification of the Offeror’s corporate or other legal entity. Offerors must include their tax identification number. The Offeror must be a legal entity with the legal right to contract.

2.3.11.2 A statement indicating the Offeror’s acceptance of and willingness to comply with the requirements of the RFP and attachments, as may be amended.

2.3.11.3 A statement of the Offeror’s compliance with affirmative action and equal employment regulations.

2.3.11.4 A statement that the Proposal was arrived at independently by the Offeror without collusion, consultation, communication, or agreement with any other Offeror as to any matter concerning pricing.

2.3.11.5 A statement that Offeror has not employed any company or person other than a bona fide employee working solely for the Offeror or a company regularly employed as its marketing agent, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the contractor or a company regularly employed by the contractor as its marketing agent, any fee, commission, percentage, brokerage fee, gifts or any other consideration contingent upon or resulting from the award of this contract. The Offeror must affirm its understanding and agreement that for breach or violation of this term, the University has the right to annul the contract without liability or, in its discretion, to deduct from the contract price the amount of any such fee, commission, percentage, brokerage fee, gifts or contingencies.

2.3.11.6 A statement naming the firms and/or staff responsible for writing the Proposal.

2.3.11.7 A statement that Offeror is not currently suspended, debarred or otherwise excluded from federal or state procurement and non-procurement programs.

2.3.11.8 A statement affirming the Proposal will be firm and binding for the term of Validity of Proposal, as stated in Section 1, RFP Administrative Information.

2.3.12 The University will not accept any documents submitted after the Solicitation closing date. The University will not accept any additional proposed modifications to the Terms and Conditions or terms that conflict with the Terms and Conditions other than questions submitted in accordance with 2.1.2 and 2.1.3. If Offeror attempts to submit additional documents and/or proposed agreements, and conditions its Proposal upon the University’s acceptance of those additional documents and/or proposed agreements, its Proposal will be deemed non-responsive and given no further consideration.

RFP ST16-108 Page 13 of 44 Issued 3/29/17

Page 14: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

2.3.13 (M) RFP Amendment - If the RFP is amended, including through the question and answer process, the Offeror must acknowledge each amendment with a signature on the acknowledgement form provided. Failure to return a signed copy of the amendment acknowledgement form with the Proposal may result in the Proposal being found non-responsive. See the Boise State University Purchasing website (http://vpfa.boisestate.edu/purchasing/) and “Bidding Opportunities” for any amendments and the required amendment confirmation document.

RFP ST16-108 Page 14 of 44 Issued 3/29/17

Page 15: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

3. CONTRACT

3.1 The RFP, all attachments, appendices, and amendments, the successful Offeror’s Proposal submitted in response to the RFP and any Resource Requests together comprise the Contract (hereinafter referred to as the “Contract”) and will be formalized by the creation of a Purchase Order (PO) that ties these documents together.

3.2 Boise State Standard Contract Terms and Conditions and the University’s “Solicitation Instructions to Vendors” are incorporated by reference into and shall apply to this solicitation and any contract resulting from this solicitation. Offerors are encouraged to review these documents at the following website. 

https://vpfa.boisestate.edu/purchasing/ (then select “Vendor Information”)

3.3 All terms should be reviewed carefully by each prospective Offeror as the successful Offeror is expected to comply with those terms and conditions.

3.4 Where Offeror agreements and assumptions specified in the Offeror’s response, differ from the Terms and Conditions, or the terms and conditions of this Solicitation, the Terms and Conditions and the terms and conditions of this Solicitation shall apply and supersede, unless such different terms are expressly agreed to by the University in writing.  Where Offeror agreements and assumptions supplement the Terms and Conditions or the terms of this Solicitation, the supplemental terms and conditions shall apply only if specifically accepted by the University in writing.  Where unsolicited supplemental documents, including unsolicited pricing sheets, are submitted, the University reserves the right to deem the Proposal non-responsive if the supplemental documents conflict with the specifications of this solicitation.  Supplemental documents shall be considered as reference materials only, and nothing contained within a supplemental document shall be deemed as accepted by the University, unless accepted by the University in writing.  Offerors are cautioned against the use of supplemental documents.  Conflicting supplemental documents may lead to the response being deemed non-responsive, and no consideration of the response given.  It is recommended that Offerors review the Boise State University Solicitation Instructions to Vendors, Section 18 at the following website.

https://vpfa.boisestate.edu/purchasing/ (then select “Vendor Information”)

To the extent the terms of such agreements, once accepted by the University, conflict with terms and conditions of this RFP, any conflict or inconsistency shall be resolved in accordance with Section 37 of the Boise State University Standard Contract Terms and Conditions.

3.5 The Contract represents the entire agreement between the Contractor and University

and supersedes all prior negotiations, representations, understandings, or agreements, either written or oral.

3.6 Finalization of the Contract documents may require additional time for review from the Office of Information Technology and Office of General Counsel.

3.7 The Contract is not effective until Purchasing has issued a purchase order specifying a commencement date (the “Effective Date”), and that date has arrived or passed. The

RFP ST16-108 Page 15 of 44 Issued 3/29/17

Page 16: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

Contractor will not provide or render services to the University under this Contract until the Effective Date. The University may determine, in its sole discretion, not to reimburse the Contractor for products provided or services rendered prior to the Effective Date.

RFP ST16-108 Page 16 of 44 Issued 3/29/17

Page 17: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

4. SPECIAL TERMS AND CONDITIONS

4.1 Warranties - Notwithstanding any other term in the Boise State University Standard Contract Terms and Conditions, Boise State University Solicitation Instructions to Vendors, and/or the Offeror’s Proposal, the following warranties shall apply to the Contract. Offeror represents and warrants that:

4.1.1. The required service(s) are fit for the particular purpose of providing the requirements specified within the Contract, and all amendments to the Contract as agreed to and accepted by both the University and the Contractor.

4.1.2 Contractor will perform all services required pursuant to the Contract in a professional manner, and with high quality.

4.2 Trademarks - Boise State University’s registered trademarks, as well as other names, seals, logos, college colors and other indicia (“University Marks”) that are representative of the University may be used solely with permission of Boise State University. Notwithstanding the foregoing, the University logo may be used in the RFP response for illustrative purposes only. No use may be made of University Marks in any document which implies any association with or endorsement of the services of the Offeror or any other third party.

4.3 Rights to Information - The University shall own and retain all rights to information, techniques, processes and data developed, documented, derived, stored, installed or furnished by the University under the Contract.

4.4 Compliance with Laws - The Contractor must comply with all federal, state and local laws and regulations, statutes, codes, and regulations governing the appropriate data security of information and the privacy and protection of educational records, individually identifiable health information, protected health information, and personally identifiable information , including but not limited to the Family Education Rights and Privacy Act (FERPA) and the Health Insurance Portability and Accountability Act of 1996, codified at 42 USC § 1320d through d-8 (HIPAA).

4.5 Data Security of Information - Student educational records are protected by the FERPA. For purposes of this agreement only, University designates Contractor as a “school official” for the University under FERPA, as that term is used in FERPA and its implementing regulations. As such, Contractor will comply with FERPA and will not make any disclosure of University students’ educational records to third parties without prior notice to, and consent from, University, or as otherwise permitted by law. In addition, any access or disclosures of student educational records made by Contractor or its employees or agents must comply with University’s definition of legitimate educational purpose. If Contractor or any employees or subcontractors of Contractor violates this section, Contractor will immediately provide notice of the violation to University. In addition, Contractor agrees to keep private and to secure any information that is considered either Individually Identifiable Health Information (“IIHI”) or Protected Health Information (“PHI”) as promulgated in 45 CFR Part 164, Subparts A & E (“HIPAA Privacy Regulations”) and 45 CFR Part 164, Subparts A,C & E (“HIPAA Security Regulations”) or education records under FERPA. Contractor agrees to only use and disclose PHI (i) received from, (ii) used, created, received, maintained or disclosed by University or (iii) otherwise associated with University (collectively, “University PHI”) as

RFP ST16-108 Page 17 of 44 Issued 3/29/17

Page 18: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

required to perform the services outlined in the applicable Resource Request and provided such use complies with all applicable laws and regulations. Contractor will not use or further disclose University PHI other than as permitted hereunder and will use appropriate safeguards to prevent the use or disclosure of University PHI. Contractor agrees to promptly notify the University’s HIPAA Compliance Officers of any use not permitted by hereunder or of any disclosure, including theft or misappropriation, of University PHI, education records or other Confidential Information within 24 hours of when such misuse, theft, or misappropriation becomes known to Contractor. In addition, Contractor agrees to notify University of its corrective actions to cure any breaches of this Section, FERPA, HIPAA, or the HIPAA Privacy Regulations as soon as possible and agrees to cooperate with University during any and all investigations associated with any breaches of this section. Contractor understands that University may terminate any Resource Request immediately without liability to University if Contractor actions are not successful in remedying a breach. In the event any breach of any of these obligations by Contractor or any of its subcontractors, agents, officials, or employees, Contractor must assume total financial liability incurred by such breach and any required notifications. Contractor shall indemnify, hold harmless and defend University, the State of Idaho and the Idaho State Board of Education from and against any claims, damages, or other harm related to such breach, misuse, theft, or misappropriation. University may also report the problem to the Secretary of Health and Human Services. Contractor shall require any of its agents or subcontractors who receive University PHI, education records or other confidential information to be bound by the same restrictions and conditions set forth herein. Contractor agrees to comply with § 164.524 (Access of Individuals to PHI), 164.526 (Amendment of PHI) and 164.528 (Accounting of Disclosures of PHI) of the HIPAA Privacy Regulations. Contractor agrees to make its internal practices, books, and records relating to the use and disclosure of University PHI available to the Secretary of Health and Human Services or University, as reasonably requested, for purposes of determining Contractors compliance with the HIPAA Privacy Regulations. After Contractor has completed working with or using University PHI, education records or Confidential Information, Contractor agrees to return or destroy all University PHI, education records or Confidential Information if feasible, and if not feasible, Contractor agrees to continue to protect such information from wrongful uses and disclosures. If Contractor decides to destroy University PHI, education records or Confidential Information under this Agreement, Contractor will maintain a record of the proper destruction of such information and provide University with notice and certification of proper destruction of such information.

4.6 Harmful Code - Any software and any media used must contain no computer instructions, circuitry or other technological means (“Harmful Code”) whose purpose is to disrupt, damage or interfere with University’s use of its computer and telecommunications facilities for their commercial, test or research purposes. Harmful Code shall include, without limitation, Viruses, Worms, Trap Doors, Trojan Horses, bombs, and any other instrumentality that will cause the Software to cease to operate or to fail to conform to its specifications upon (i) use by more than the licensed number of users or (ii) termination or expiration of this Contract; unless otherwise expressly provided herein. Licensor shall indemnify Boise State and hold Boise State University harmless from all claims, losses, damages and expenses, including attorneys’ fees and allocated cost of internal counsel, arising from the presence of Harmful Code in or with the Software or contained on media delivered by Licensor.

RFP ST16-108 Page 18 of 44 Issued 3/29/17

Page 19: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

4.7 Idaho Executive Orders, Idaho Technology Authority Standards - The Contractor warrants that at all times, for the term of the Contract, Contractor will comply with all posted and applicable, active Idaho Executive Orders as posted at http://gov.idaho.gov/mediacenter/execorders/.  Contractor further warrants that at all times for the term of the Contract, Contractor’s offered property as defined by Idaho Code will comply with all applicable Idaho Technology Authority Standards as posted at http://ita.idaho.gov/resources.html/.

4.8 Compliance with University Policies - Contractor will comply with all applicable University policies, available at https://policy.boisestate.edu/, and any policies that may be posted at any University facility or venue where Contractor may be present, including University Policy #7005 “Background Investigations” regarding criminal background checks of contractors and volunteers. Registered sex offenders may not be assigned to the University.

4.9 Independent Contractors - The University intends to hire Contractors as Independent Contractors.  

4.10 Insurance - The Contractor and its sub-contractors (if allowed) are required to carry the types and limits of insurance shown at https://rmi.boisestate.edu/, specifically http://rmi.boisestate.edu/wp-content/uploads/2014/11/CertificateInsRqmts_3rdParty.pdf on the Boise State University Office of Risk Management and Insurance web page.

Contractor is required to provide the University with a Certificate of Insurance prior to physically arriving on campus or within ten (10) days of Contract signing, whichever happens first.

RFP ST16-108 Page 19 of 44 Issued 3/29/17

Page 20: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

5. BUSINESS INFORMATION

5.1 (ME) Experience and Qualifications – In a page or less, please describe your knowledge, qualifications and experience in providing services similar to those required in this RFP. Include business history, description of current service area, and customer base. Specifically, discuss experience in other higher education institutes within the last three (3) years. Additionally, provide information about what percentage of your business is constituted by higher education.

5.2 (E) References – At its discretion, the University may check references for the top scoring Offerors, and additional points may be awarded. For evaluation purposes, using Attachment 3, “References,” provide company names, contact names, phone numbers, addresses and emails for at least three (3) professional references from universities (preferred) or companies or agencies with knowledge of the Offeror’s experience that is similar in nature to the services being requested here and are within the last three (3) years from the date of this RFP. The University will determine whether the reference concerns products or services that are similar in nature to this RFP.

RFP ST16-108 Page 20 of 44 Issued 3/29/17

Page 21: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

6. SCOPE OF WORK

6.1 Instructions - Use the attached Offeror Response Form (Attachment 5) as part of your response to the RFP to detail your company’s experience in the following areas. Do not alter the template. Please use Arial 11 font to respond to ensure that all Offerors are allowed the same amount of space for response and to offer the evaluators a reasonable amount of information to score. Your complete response must fit on the Attachment 5 form.

For each of the following specifications, the Proposal should address methodologies, pertinent time lines, personnel and other relevant information. Responses will be evaluated on the methodologies discussed and the completeness of the response to each of the services listed below.

To bid on this category you must respond to these Specifications:

General Category

Urgent – Payroll

Category

Urgent – Time & Labor

Category

Urgent – Campus

Solutions Category

6.2 PS 9.2 E6.3 PS HCM E6.4 PS CS Upgrade E6.5 PS Campus Solutions

E ME

6.6 PS Payroll Process Maintenance

E ME

6.7 PS Time & Labor E ME6.8 Other Enterprise Applications

E

6.9 Other PS Project E E E E6.10 Anything Else E E E E

Offerors can submit a Proposal for any or all of the Categories. For offerors to be considered for an award in any category, they must complete the Offeror Response Form for that section, per the Table above.

Consideration in the General Category - For Offerors to be considered for an award in the General Category, Offerors must complete one Offeror Response Form for each of the specifications listed in RFP Sections 6.2 – 6.10 (a total of nine (9) Offeror Response Forms will need to be submitted to be considered for the General Category). If an Offeror has experience in several of the General Categories specifications, but not all, the Offeror is still strongly encouraged to submit a response. For a specification for which an Offeror has had little or no experience, please complete the form describing any experience, or noting that the Offeror has had no experience in this category. Offeror should submit an Offeror Response Form for all noted specifications to be considered for that category.

For Consideration in an Urgent Category – -For Offerors to be considered for the Urgent Campus Solutions Category, they must complete one Offeror Response Form for each of the specifications listed in RFP Sections 6.5, 6.9 and 6.10.

-For Offerors to be considered for the Urgent Payroll Category, they must complete one Offeror Response Form for each of the specifications listed for RFP Sections 6.6, 6.9 and 6.10.

-For Offerors to be considered for the Urgent Time & Labor Category, they must complete one Offeror Response Form for each of the specifications listed in RFP Sections 6.7, 6.9 and 6.10.

RFP ST16-108 Page 21 of 44 date of issuance

Page 22: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

As indicated in the table, all Offerors, whether responding to the General or Urgent Categories, are asked to respond to Sections 6.9 and 6.10 (“Other PeopleSoft Project” and “Anything Else.”)

See Section 1.6 for descriptions and details of the General and Urgent Categories.

Please note that for several specifications listed below, additional information besides what is listed on the Offeror Response Form is requested.

Offerors will indicate which categories they are bidding on by completing proposed costs for those categories on the Cost Proposal (Attachment 4). For instance, if an Offeror is only interested in bidding on the General Category, they would only provide pricing in the General Category row on the Cost Proposal. Alternatively, if the Offeror is interested in bidding on all the categories, they would provide pricing in all the rows for all the categories listed on the Cost Proposal.

If your company has consulted for the University previously, do not use that experience in the Offeror Response Form. Choose institutions (preferred) or companies besides Boise State to use as the basis for your answer to these questions.

6.2 PeopleSoft 9.2 – Using the Offeror Response Form (Attachment 5), please describe your consultants’ technical experience with PeopleSoft 9.2.

6.3 PeopleSoft HCM - Using the Offeror Response Form (Attachment 5), please describe your consultants’ technical experience with PeopleSoft HCM

6.4 PeopleSoft Campus Solution Environment Upgrade - Using the Offeror Response Form (Attachment 5), please describe your technical experience upgrading a University’s PeopleSoft Campus Solution environment.

Additionally, include the number of upgrades have you been a part of and discuss the level of customization.

6.5 PeopleSoft Campus Solutions - Using the Offeror Response Form (Attachment 5), please describe your consultants’ technical experience with PeopleSoft Campus Solutions.

6.6 PeopleSoft Payroll Processes Supporting Maintenance/Improvement - Using the Offeror Response Form (Attachment 5), please describe your technical experience supporting maintenance and/or improvement of an institution’s payroll processes.

6.7 PeopleSoft Time and Labor – Using the Offeror Response Form (Attachment 5) please describe your technical experience with Time and Labor.

6.8 Other Enterprise Applications - Boise State has several other enterprise applications that integrate with PeopleSoft (i.e. Hobsons, OrgSync, Blackboard, etc). Using the Offeror Response Form (Attachment 5), please describe a project you have worked on with integrations to or from PeopleSoft.

Additionally, be sure to include the name of the system(s) you integrated with PeopleSoft.

6.9 Other PeopleSoft Project -Using the Offeror Response Form (Attachment 5) please describe a PeopleSoft project that your company/consultants have been involved in that went particularly well or that you were particularly proud of.

6.10 Optional - If there is anything else that you feel is applicable that you would like to bring to the attention of Boise State regarding any of the aforementioned specifications, please provide your response to this section on no more than one type-written page. Please use Arial 11 font

RFP ST16-108 Page 22 of 44 date of issuance

Page 23: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

to respond to ensure that all Offerors are allowed the same amount of space for response and to offer the evaluators a reasonable amount of information to score.

6.11 Resumes - If more information is required to help with the evaluation/award process, resumes may be requested from, and may be evaluated for, the top scoring Offerors. The University is looking for Contractors who have consultants with experience that closely matches that requested in this RFP and who would provide the best service to the University. If resumes are requested, additional points may be awarded.

RFP ST16-108 Page 23 of 44 date of issuance

Page 24: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

7. PROPOSAL REVIEW AND EVALUATION

7.1 The objective of the University in soliciting and evaluating Proposals is to ensure the selection of a firm or individual that will produce the best possible results for the funds expended.

7.2 Upon opening the responses, the Boise State University Purchasing Department will inspect the Proposal for responsiveness. The Proposal will be evaluated first as either “pass” or “fail,” based on compliance with Mandatory (M) and Mandatory/Evaluated (ME) requirements. All Proposals that meet the Mandatory and Mandatory/Evaluated requirements will continue in the evaluation process. Proposals not meeting the Mandatory and Mandatory/Evaluated requirements may be found non-responsive.

7.3 An evaluation team will be established to confidentially and independently score the Proposals. The Purchasing Department will compile individual scores. At its discretion, and as part of the evaluation process, the University may award points for references and request and score resumes and online or other electronic style interviews from the top several scoring Offerors. The team will discuss and finalize their scoring with the Purchasing Department. The apparent successful Offeror’s response may be forwarded to a representative(s) of the Office of Information Technology and/or General Counsel to confirm that the Proposal is acceptable within the University’s infrastructure and policies. Additionally, the evaluation team may consult with subject matter experts to review and advise on any portion of the response.

7.4 The criteria described below will be used to evaluate and score the Proposals for the purpose of ranking them in relative position based on how fully each Proposal meets the requirements of this RFP. Particular emphasis will be placed on the Offeror’s understanding of the RFP, quality of service delivered, and the description of how the activities will be performed.

7.5 The scores for each category named in the Evaluation Criteria (Section 7.12), will be normalized. Excepting cost, the Proposal with the highest raw score per category will receive all available points for the category. Other Proposals will be assigned a portion of the maximum available points, using the formula:

(Raw score of Proposal being evaluated / highest raw score) x total possible category points.

7.6 The Cost evaluation will be based on the cost listed for each category to which the Offeror is responding.

The scores for the Cost Proposal will be normalized as follows: The Proposal with the lowest category cost proposed will receive all the cost points as assigned in that category. Other Proposals will be assigned a portion of the maximum score using the formula:

Lowest cost / other Proposal cost x total possible cost points.

The Cost Proposal will be opened for the top several scoring Offerors, only.

If evaluated interviews are conducted, Cost Proposals will only be opened for offerors progressing to that stage of the evaluation; Cost Proposals will not be opened for offerors not scoring high enough to earn an evaluated interview.

7.7 Interviews - At the discretion of the University, interviews may be required. If the University chooses to conduct interviews, Offerors who do not make the evaluated interview portion of the evaluation may not be further evaluated. The Cost Proposal for Offerors who do not score high enough to make it to the interview portion of the evaluation may not be opened or considered.

7.8 Interviews, if required, will be conducted before the Notice of Intent to Award is issued.

Interviews will be via web conference or phone, set up by the Offeror and provided at no cost to RFP ST16-108 Page 24 of 44 date of issuance

Page 25: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

the University. It is possible that an Offeror will have only a couple of days of notice that they have been selected for an interview, so it’s suggested that the Offeror have the ability to quickly set up a web conference or phone call and be prepared to discuss their qualifications and any other questions as posed by the University.

The interview becomes an official part of the response. At its discretion, the University will choose either “Evaluated” or “Pass/Fail” interviews, as detailed below.

7.8.1 (E) Evaluated interviews - At the discretion of the University, several of the highest scoring Offerors may be contacted for an interview. Outcomes of the interviews may result in adjustment of points awarded, as the evaluation committee deems appropriate. Failure to successfully discuss qualifications and answer other questions, or failure to meet other requirements of this solicitation, may result in rejection of the Proposal.

7.8.2 (E) Pass/Fail interview - Alternatively, the University reserves the right to require an interview of only the top scoring Offeror. If this option is chosen, the evaluation is strictly Pass/Fail for the apparent successful Offeror. If the apparent successful Offeror fails, then the next highest scoring Offeror will be considered the apparent successful Offeror and the interview process may be repeated.

7.9 For those Proposals making it to the interviews, the total evaluation points will be summed with the cost points and interview points (if evaluated interviews are conducted) and the Proposals will be ranked by final total score.

7.10 Award(s) will be made to the responsive, responsible Offeror whose Proposal receives the highest number of points.

7.11 Offeror will be notified of the result of the solicitation process in writing. Written notification will be sent to the authorized signer designated on the Signature Page.

7.12 Evaluation Criteria:

Technical Proposal:

Mandatory (M, ME) Submission Requirements Met Pass/FailExperience and Qualifications (Section 5.1) 100 pointsScope of Work (Section 6, Attachment 5)      650 points

Cost Proposal:

Cost Proposal (Section 8, Attachment 4) 250 points

Total Points 1000 points

Possible additional points (at the discretion of the University and/or if required for evaluation):

Interviews (Section 7) 50 additional pointsReferences (Section 5.2) 50 additional pointsResumes (Section 6.11) 50 additional points

7.13 Response checklist reminder -This checklist is not intended as a complete list of requirements to respond to this RFP, but merely as a reminder of some of the required items. Failure to submit any of the following items or late submission of any of the following items may result in disqualification of your Proposal. Mail your hard copy response to the buyer to be received by the closing time and date as specified in Section 1.1.

Section 2:RFP ST16-108 Page 25 of 44 date of issuance

Page 26: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

Proposal received by due date stated in Section 1 or any subsequent amendment Signature Page with original handwritten signature (Attachment 1) One (1) original and one (1) copy of Proposal Electronic version Redacted version / Trade Secrets (or note there are none) Business and Scope of Work Proposal and Cost Proposal submitted separately Cover Letter Proposed modifications to Terms and Conditions Supplemental document or agreements Amendment Confirmation(s)

Section 5: Experience and Qualifications (limited to one page) References (Attachment 3)

Section 6: Scope of Work (Attachment 5, Offeror Response Form)

Section 8: Cost Proposal (Attachment 4)

RFP ST16-108 Page 26 of 44 date of issuance

Page 27: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

8. COST PROPOSAL AND BILLING PROCEDURE

Pricing will be evaluated using a cost model that offers the University the best possible value at the most competitive rate.

8.1 (ME) Use the format established in Attachment 4 as your response to the Cost Proposal of this RFP. Altering the format may result in a finding that your Proposal is non-responsive.

8.2 All costs associated with the specifications of the RFP must be included in the mandatory Cost Proposal. Specifically, Offeror must provide a firm/fixed, fully-burdened (with all direct and indirect costs), not-to-exceed, Maximum Hourly Rate which must include, but is not limited to, all direct and indirect operating, administrative and personnel expenses such as: travel, lodging, meals, other miscellaneous travel expenses, overhead, salaries, profit, supplies, quality improvement, out of pocket expenses and/or any other expenses related to this project.

8.3 Work related expenses - The University expects that the majority of contractor-completed work will be accomplished remotely. On the rare occasion where on-site work is required, the University will note that in the Resource Request. The Maximum Hourly Rate for On-site Work must be firm/fixed and fully burdened as specified in section 8.2.

8.4 All prices must be FOB Boise State University.

8.5 OFFERORS ARE NOT ALLOWED TO DIRECT BILL EXPENSES OR TO RECEIVE ADVANCE PAYMENTS FOR SERVICES NOT RENDERED.

8.6 Maximum Hourly Rate for Off-Site Work - Maximum Hourly Rates will be considered for work

that is to be completed off-site (remotely). Unless otherwise agreed upon, resources proposed under this rate structure must reside in and be lawfully able to work in the United States and will be expected to work eight hours a day (8am to 5pm Mountain Time) five days a week (Monday through Friday). Work schedules may be addressed in the RR and may be adjusted on an overall or case-by-case basis. Resources may be asked to work weekends, or alternate schedules. These resources will be provided access to relevant applications. Resources must provide their own workspace, computer, phone, and broadband internet connection.

8.7 Maximum Hourly Rate for On-Site Work - Occasionally, a project may require that a Contractor work on-site at Boise State University. This will be noted in the Resource Request. The proposed Maximum Hourly Rate for On-Site Work must be firm fixed and fully burdened to include all travel related expenses, including but not limited to travel, lodging and food. Unless otherwise agreed upon, resources proposed under this rate structure must reside in and be lawfully able to work in the United States and will be expected to work on the Boise State University’s main campus in Boise, ID, Monday – Thursday from 8am -5pm or as specified in the RR. Work schedules may be addressed in the RR and may be adjusted on an overall or case-by-case basis. Resources may be asked to work weekends, or alternate schedules. These resources will be provided a workspace on campus, a Wired or WiFi network connection, and access to relevant applications. Resources must provide their own laptop and cell phone.

8.8 Annual Price Adjustment - Contractors will be allowed to adjust their pricing (as originally proposed on the cost sheet) on an annual basis, to coincide with contract extension and the anniversary date of the contract. Costs must not exceed two percent (2%) over the previous year’s costs without nullifying the Contract. Unless otherwise mutually agreed to in writing, annual rate adjustments shall only apply to new RR signed after the annual rate adjustments go into effect, and shall not apply to existing RRs.

8.9 Unless otherwise, previously agreed upon, or otherwise noted in the Resource Request, for projects expected to last less than a month, Boise State expects an invoice at the end of the project. For projects that are expected to exceed a month in duration, the University will expect monthly invoices.

RFP ST16-108 Page 27 of 44 date of issuance

Page 28: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

8.10 Invoices may only be submitted after the satisfactory completion and acceptance by the University Project Lead of any service or deliverable provided.

8.11 At a minimum, the invoice must include:

Contractor and/or consultant name University contact name Purchase Order (PO) number. Resource Request (RR) Number All services delivered during the billing period, including resource name(s), dates and hours

worked, brief description of work completed and the total charge for each resource. Total amount billed for the time period.

Invoices received without the required documentation may be returned to the Contractor for their resubmission with the correct documentation.

8.12 Invoice Submission - Unless otherwise specified, invoices are to be submitted:

Via mail to:Accounts PayableBoise State University1910 University DriveBoise, ID 83725-1248

Or via email to:[email protected]

RFP ST16-108 Page 28 of 44 date of issuance

Page 29: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

9. RESOURCE REQUEST PROCESS

9.1 Resource Request (RR) - Is the written instrument as detailed and authorized by this Solicitation that shall be used to communicate the needed service or services to the Contractors, evaluate responses, and select and bind the awarded Contractor to the provision of that service. Each RR is a binding document issued by the University per the requirements of the Agreement, detailing, at a minimum, the scope of work required, and requiring Contractor to submit a response regarding Contractor’s ability to provide the requested service, along with pricing for providing the service. The price contained in the RR may be less than, but cannot exceed, the pricing as proposed by the vendor on the Cost Sheet. If pricing was changed per the Annual Price Adjustment, the price contained in the RR may be less than, but cannot exceed, the price agreed to in the Annual Price Agreement. Each RR incorporates all requirements contained in the Agreement created between the University and the Contractor upon award. Where a conflict between the Agreement and the RR exists, particularly in regards to Terms and Conditions, the Agreement shall prevail.

A SAMPLE version of a Resource Request is attached as Exhibit A. Based upon its needs, the University reserves the right to change or update this form through the term of the contract.

9.2 Resource Requests shall not offer for sale or provide the University any hardware or software (i.e., personal computers, file servers, laptops, personal computer packages software, etc.). Contractor may recommend the use of tools such as hardware and software.

9.3 Resource Request Response – Contractors awarded in the General Category must respond to written correspondence regarding a Resource Request opportunity within the time frame provided in the RR, generally not less than three (3) days.

Contractors awarded in the Urgent Category must respond to any Resource Request within 24 hours. If a response is not received within 24 hours from the Primary Contractor in the Urgent Category, the University may move on to working with the Secondary Contractor in the Urgent Category. The Contractor shall provide clear, understandable, timely and accurate written information to the University. Time is of the essence with respect to the obligations to be performed under a RR; therefore, the parties shall strictly comply with all timelines for performance.

9.4 All “General Category” Contractors to whom an Agreement was awarded for a role/skill/position shall be required to respond to any RR issued by the University for the requested Service. Such response shall include a description of Contractor’s ability to provide the requested Service or a reason as to why the Contractor is unable to propose a resource for the University’s consideration.

9.5 Contractor must identify any information or resources needed, if any, from the University, in order to perform any of the Services.

9.6 Transition of Service - Upon completion of Services provided under a Resource Request, Contractor shall work with the University to ensure a smooth transition of service.

9.7 The University reserves the right, with mutual consent, to amend an active RR to better meet the needs of the University, or the needs of a Contractor.

9.8 Hourly Service Rates may not be changed during an active project (open RR) without the mutual consent of the University and the Contractor.

9.9 Maximum Hourly Service Rates may not be amended via a Resource Request

RFP ST16-108 Page 29 of 44 date of issuance

Page 30: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

9.10 The right is reserved by the University to amend the Resource Request form at any time during the term of the Agreement to enhance the efficiency of the form.

9.11 Reassignment of Contractor Employees - The University shall have the right, after having consulted with the Contractor, to require the Contractor to remove from the contracted service any Contractor employee or subcontractor found in good faith to be unacceptable to the University. The University will not be responsible for any costs incurred by the Contractor in replacing the employee or subcontractor. Furthermore, any Contractor who does not comply with the background check requirements of this solicitation (see Section 4.8) may be found in breach of contract and their resource may be immediately removed from the project.

9.12 Resource Availability - The University expects, and Contractor is to make every effort to ensure, that the proposed resource will be available for the duration of the service or project described in the Resource Request. Replacement of the resource would be an exceedingly rare circumstance and would only be acceptable in circumstances such as a medical situation, separation from the company or similarly critical situation.

9.13 University Project Lead - Shall mean that person appointed by the University, to administer the Resource Request and contracted service per the Resource Request, on behalf of the University. The Project Lead shall be the primary person of contact between the University and the Contractor. The University shall retain the right to change the Project Lead.

9.14 University Acceptance of Deliverables - The University Project Lead shall be the single point of contact for acceptance of any and all deliverables required by a RR, unless authority is delegated in writing by the University Project Lead.

9.15 Contractor Point of Contact - For any Resource Request awarded, Contractor shall provide to the University Project Lead, the name and contact information for the Contractor Point of Contact assigned to administer the RR. Failure to keep the University Project Lead current with all contact information is a breach of contract, and may result in the cancellation of the RR, at the sole discretion of the University Project Lead. Contractors are to make every effort to ensure that the Contractor Point of Contact remains in place for the duration of a RR.

9.16 The Contractor’s Point of Contact shall be the single point of contact for delivery of any and all deliverables required by a RR, unless authority is delegated in writing to and accepted by the University Project Lead.

9.17 Resource Request Change Requests - Contractor shall respond to a written change request initiated by the University requesting changes to an awarded RR within five (5) business days of receipt, advising the University of any cost and schedule impacts. When there is a cost impact, either an increase or a decrease, the Contractor shall advise the University in writing of the increase or decrease involved and any schedule impact. The University Project Lead has sole right and authority, once a RR is awarded and a Contractor Point of Contact is assigned, to accept and authorize a change by the Contractor of the Contractor assigned Point of Contact.

9.18 Ownership of work product and intellectual capital - All work products produced under a Resource Request shall be the sole property of the University. The University shall have all ownership rights to all software development or software modifications, as well as associated documentation designed, developed, or installed in meeting the requirements of a RR. All data, technical information, materials gathered, originated, developed, prepared, used, or obtained in the performance of the RR, including, but not limited to, all reports, surveys, plans, charts, literature, brochures, mailings, recordings (video and/or audio), pictures, drawings, analyses, graphic representations, developed software computer programs (including a full copy of the source code of programs) and accompanying documentation and print-outs, notes and memoranda, written procedures and documents, regardless of the state of completion, that are prepared for or are a result of the services required to meet a RR, shall be and remain the property of the University, and

RFP ST16-108 Page 30 of 44 date of issuance

Page 31: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

shall be delivered to the University within 30 days of the completion of the project or service, or within seven (7) work days of a written request.

9.19 Early Termination of a Resource Request - Upon early termination of a Resource Request for any or no reason, all data, technical information, materials gathered, originated, developed, prepared, used, or obtained in the performance of the RR, including, but not limited to, all reports, surveys, plans, charts, literature, brochures, mailings, recordings (video and/or audio), pictures, drawings, analyses, graphic representations, developed software computer programs and accompanying documentation and print-outs, notes and memoranda, written procedures and documents, regardless of the state of completion, that are prepared for or are a result of the services required to meet a RR, shall be delivered to the University within 30 days of termination.

9.20 Remedial Action - If any of the Services do not conform to the Resource Request requirements, the University shall consult with the Contractor and may at its sole discretion require any of the following remedial actions, taking into account the nature of the deficiency: (1) require the Contractor to take corrective action to ensure that performance conforms to the RR; (2) reduce payment to reflect the reduced value of services received; (3) require the Contractor to subcontract all or part of the service at no additional cost to the University; (4) terminate the RR with full refund of all monies paid or (5) pursue any other remedies available to the University under this Contract or otherwise provided by law.

RFP ST16-108 Page 31 of 44 date of issuance

Page 32: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

10. CONFIDENTIALITY AND NON-DISCLOSURE

10.1 Confidential Information - Confidential Information shall mean the relationship between the Parties and any proprietary information of the University not publicly known, including but not limited to, any and all discoveries, developments, designs, improvements, inventions, concepts, works of authorship, derivative works, blueprints, structures, software, processes, computer programs, know-how, data, techniques, formulae, marketing and business plans and outlines, strategies, budgets, forecasts, projections, financial statements, costs, fee schedules, customer and consultant lists and information or data, client and supplier lists, client and prospective client databases, access codes and similar security information and procedures, techniques, methodologies  and performance strategies, technical or business information, data table designs, member, employee, or employer data, personally identifiable information, specific processing center operations; and/or technical information, notes, extracts, abstracts, analyses or other materials prepared by the recipient which are copies or derivative works of the Confidential Information and all patents, copyrights, maskworks, trade secrets and other proprietary rights thereto whether or not specifically labeled or designated as confidential or proprietary by the University, or in respect of which Contractor has received notice of its proprietary and confidential nature.

All Confidential Information shall be and remain the property of the University.  

10.2 Confidentiality – Contractor shall not disclose to any third person, firm or corporation, any information considered by the University to be confidential, except for Confidential Information shared by Contractor to its employees on a need to know basis, solely for the limited purpose of fulfilling the requirements of this solicitation or a Resource Request.

10.3 Contractor shall only use Confidential Information for the University’s benefit and/or during the term of the Agreement and/or applicable Resource Request.

10.4 Contractor shall use at least the same degree of care in safeguarding the Confidential Information of the University as it uses for its own confidential and proprietary information, but in any case using no less than a reasonable degree of care.

10.5 Contractor shall not disclose the Confidential Information to any third party without the written permission of the University and entry of an appropriate confidentiality agreement.

10.6 Theft of Confidential Information - If there is theft or misappropriation of the University’s Confidential Information which is due to the negligence or intentional misconduct of Contractor or due to the Contractor’s failure to comply with applicable provisions of HIPAA, FERPA or corresponding regulations, Offeror shall provide the University written notice of theft or misappropriation within 24 hours of when theft or misappropriation becomes known to Offeror. In the event of a breach of any of the Contractor’s data security obligations or other event requiring notification under applicable State and Federal law, the Contractor must assume total financial liability incurred by such breach and subsequent notifications. In addition the Contractor must assume responsibility to indemnify, hold harmless and defend Boise State University, its officials, and employees from and against any claims, damages, or other harm related to such theft or misappropriation. Boise State will have six (6) months from the date of receipt of written Notice from Offeror of the theft or misappropriation to provide written notice to the Offeror of its intent to terminate, and to terminate, this Contract. If the University elects to terminate this Contract pursuant to this section, Offeror will have no right to cure the breach of this Contract in order to prevent Boise State from terminating the Contract.

10.7 Return of Confidential Information upon Termination - Within 30 days of termination of the Contract, Contractor shall return to the University all copies of the Confidential Information or other materials incorporating Confidential Information in the possession of Contractor or its

RFP ST16-108 Page 32 of 44 date of issuance

Page 33: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

employees, including but not limited to all Confidential Information as defined in Section 10.1 regardless of the state of completion, that are prepared for or may have been accumulated by Contractor, and/or are a result of the services required to meet a Resource Request.

At no additional cost to University, Contractor agrees to:

10.7.1 Return all data that is the property of the University in a reasonable format specified by the University;

10.7.2 Return all property in any form belonging to the University;

10.7.3 Return all Confidential Information that may have been received from the University. Provide the ability for University to electronically retrieve data and documents from Contractor’s system, as this data is owned by University.

10.7.4 Deliver to Boise State, within 6 weeks, all data and documents from Contractor’s system that pertain to Boise State. This data must be delivered in an electronic format.

10.7.5 The University will verify receipt of that data.

10.8 Notwithstanding termination, the restrictions on disclosure and use of confidential information arising under the Contract shall continue to be effective after the date of termination.

RFP ST16-108 Page 33 of 44 date of issuance

Page 34: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

11. TERMINATION OF CONTRACT

11.1 Termination shall be in accordance with the Termination section(s) in the Boise State University Standard Contract Terms and Conditions (https://vpfa.boisestate.edu/purchasing/vendor-information/) and in accordance with the additional termination information below.

11.2 Other Reasons for Termination - The University may terminate the Agreement or any active Resource Request immediately (without providing any notice or right to cure) upon written notice to Contractor, if at any time: (a) judicial interpretation of federal or state laws, regulations, or rules renders fulfillment of the Agreement infeasible or impossible; (b) Contractor’s license or certification required by law is suspended, not renewed, or is otherwise not in effect at the time service is provided; or (c) Contractor fails to comply with any applicable law, regulation, or rule or applicable University policy. Upon termination for default, the University shall be entitled to reimbursement from Contractor for losses incurred as a result of the Contractor's breach.

11.3 Upon Termination of the contract or any Resource Request, Contractor shall promptly discontinue all work, unless the termination notice directs otherwise.

11.4 Work in Progress at Termination - Contractor will advise University of the extent to which performance has been completed and deliver any work in progress. Contractor will be paid for all satisfactorily performed work and expenses incurred through the date of termination, including charges for materials ordered by Contractor that cannot be returned for a full refund. University will pay (i) in full for all completed and accepted services and work products to the extent they were satisfactorily performed in the University’s sole discretion. University may take over the services and/or may award another party to complete the services per the Resource Request.

11.5 Contract Termination Transition Plan - If an Agreement with Contractor is terminated for any reason, Contractor shall work with Boise State to minimize disruption of services to the University. Upon termination, Contractor shall provide to the University, a draft Contract Termination Transition Plan that describes how Contractor will provide for an orderly and controlled transition of Contractor’s responsibilities to the University or to another Contractor contracted under the resulting Agreements from this Solicitation.

11.6 Contractor Bankruptcy - If the existence of the Contractor is terminated by bankruptcy or any other cause, all program, fiscal and other records related to a Resource Request shall become the property of the University, and the Contractor shall immediately deliver such records to the University Project Lead.

11.7 Survival of Terms - Any termination, cancellation, or expiration of the Agreement notwithstanding, provisions which are intended to survive and continue shall survive and continue.

11.8 Obligations of Parties at expiration or Termination - Upon expiration or termination of the Contract, the obligations of the parties to each other shall come to an end, except those provisions which are intended to survive and continue, which shall include, but shall not be limited to, provisions relating to confidentiality, indemnification, and insurance requirements contained in the Contract.

RFP ST16-108 Page 34 of 44 date of issuance

Page 35: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

ATTACHMENT 1 - SIGNATURE PAGE

THIS SHEET MUST BE FILLED OUT, SIGNED AND RETURNED WITH PROPOSAL. THIS SIGNATURE PAGE MAY NOT BE MODIFIED AND MUST BE HAND SIGNED IN BLUE INK. MODIFICATIONS TO THIS PAGE WILL DEEM THE ENTIRE QUOTE NON-RESPONSIVE AND NO FURTHER CONSIDERATION WILL BE GIVEN.

BY SUBMISSION OF THIS PROPOSAL TO BOISE STATE UNIVERSITY, THE UNDERSIGNED HEREBY OFFERS TO SELL TO BOISE STATE UNIVERSITY THE SPECIFIED PROPERTY AND/OR SERVICES, IF THIS PROPOSAL IS ACCEPTED WITHIN A REASONABLE TIME FROM DATE OF CLOSING, AT THE PRICE SHOWN IN OUR PROPOSAL AND UNDER ALL THE SPECIFICATIONS, TERMS AND CONDITIONS CONTAINED IN, OR INCORPORATED BY REFERENCE, INTO THE BOISE STATE UNIVERSITY’S RFP, AS MAY BE AMENDED PRIOR TO THE DATE HEREOF IN ACCORDANCE WITH THE TERMS OF THE SOLICITATION.

AS THE UNDERSIGNED, I ALSO CERTIFY I AM AUTHORIZED TO SIGN THIS PROPOSAL FOR THE OFFEROR AND THE PROPOSAL IS MADE WITHOUT CONNECTION TO ANY PERSON, FIRM, OR CORPORATION MAKING A PROPOSAL FOR THE SAME GOODS AND/OR SERVICES AND IS IN ALL RESPECTS FAIR AND WITHOUT COLLUSION OR FRAUD.

NO LIABILITY WILL BE ASSUMED BY BOISE STATE UNIVERSITY FOR AN OFFEROR’S FAILURE TO OBTAIN THE TERMS AND CONDITIONS IN A TIMELY MANNER FOR USE IN THE RESPONSE TO THIS RFP OR ANY OTHER FAILURE BY THE OFFEROR TO CONSIDER THE TERMS AND CONDITIONS IN THE RESPONSE TO THE RFP.

Failure to comply with these requirements may result in disqualification and your entire response will be deemed nonresponsive.

Return Original bid response to RFP lead and mailing address listed in Section 1.1.

Please complete the following information:

OFFEROR (Company Name)_____________________________________________________

ADDRESS____________________________________________________________________

CITY _________________________ STATE _______________ ZIP CODE _______________

TOLL-FREE #___________________________ PHONE #_____________________________

FAX #_________________________________ EMAIL________________________________

FEDERAL TAX ID / SSN #______________________________________________________

SIGNATURE PAGE MUST BE SIGNED & RETURNED FOR PROPOSAL TO BE CONSIDERED.

_________________________________________ ________________________________Signature Date

_________________________________________ ________________________________Please type or print name Title

RFP ST16-108 Page 35 of 44 date of issuance

Page 36: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

ATTACHMENT 2 - OFFEROR QUESTIONS

PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME IN YOUR QUESTIONS.

ADD ROWS BY HITTING THE TAB KEY WHILE WITHIN THE TABLE AND WITHIN THE FINAL ROW.

The following instructions must be followed when submitting questions using the question format on the following page.

1. THIS FORM, AND THIS FORM ONLY IS TO BE USED. 2. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.3. Questions must be received on time or will be rejected and not considered.4. Enter the RFP section number that the question is for in the “RFP Section” field (column 2). If the question is a general question not related to a specific RFP section, enter “General” in column 2. If the question is in regards to a Term and Condition or a Special Term and Condition, state the section number in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment A”) in the “RFP Section” (column 2), and the attachment page number in the “RFP page” field (column 3).5. Do not enter text in column 5 (Answers). This is for the University’s use only.6. Once completed, this form is to be emailed per the instructions in the RFP. The email subject line is to state the RFP number followed by “Questions.”

PeopleSoft Development Staff Augmentation, RFP ST16-108 Questions are due by 5:00 PM MT, per the date listed in Section 1. Administrative Information.

Question #

RFPSection

RFPPg

Question Response

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

RFP ST16-108 Page 36 of 44 date of issuance

Page 37: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

ATTACHMENT 3 – REFERENCE FORM

Offeror must provide company names, contact names, phone numbers, addresses and emails for at least three (3) professional references from universities (preferred) or companies or agencies with knowledge of the Offeror’s experience that is similar in nature to the services being requested here and are within the last three (3) years from the date of this RFP.

Offeror Name:

Reference 1:Reference Company Name:Reference Contact Name:Contact Phone:Contact Email:Project Dates (Start-End):Title/Description of Project:Other Offeror comments on this Project:

Reference 2:Reference Company Name:Reference Contact Name:Contact Phone:Contact Email:Project Dates (Start-End):Title/Description of Project:Other Offeror comments on this Project:

Reference 3:Reference Company Name:Reference Contact Name:Contact Phone:Contact Email:Project Dates (Start-End):Title/Description of Project:Other Offeror comments on this Project:

RFP ST16-108 Page 37 of 44 date of issuance

Page 38: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

ATTACHMENT 4 - Cost Proposal (ME)

Use only this sheet to submit costs and do not alter the format

Fill out only the rows for the roles for which you would like to be considered. Do not propose a rate for a category for which you do not wish to be considered.

Proposed rates must be firm/fixed, fully burdened, not-to-exceed, hourly rates.

Offeror Name:_________________________________

Category: Maximum Hourly Rate for Off-Site Work (Not to Exceed):

Maximum Hourly Rate for On-Site Work (Not to Exceed):

General Category

URGENT – Payroll (available within 24 hours)

URGENT – Time and Labor (available within 24 hours)

URGENT – Campus Solutions (available within 24 hours)

RFP ST16-108 Page 38 of 44 date of issuance

Page 39: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

ATTACHMENT 5 - Offeror Response Form

Offeror Name:RFP Section name and number (ie Section 6.4, PeopleSoft 9.2)Product Name/Modules/Versions used:Name/Location where project completed:Size of Organization:Dates of Project:# Years worked with this product:Offeror’s Role:

Using Arial 11 Font, provide a brief overview of the project and your company’s participation (limited to the space remaining on this page). Be sure to discuss any challenges and the final outcome of the project.

RFP ST16-108 Page 39 of 44 date of issuance

Page 40: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

Exhibit A: SAMPLE Resource Request (RR) - Boise State University

ST16-108 PeopleSoft Development Staff Augmentation

All Contractors to whom an Agreement was awarded for the below specified Category shall be required to respond to any RR issued by the University by the time and date listed in the “Step 1, Response Due” field below.

Boise State University will provide the information requested in the green fields below. Contractors are to provide the information requested in the blue fields below.

Please submit the RR and each resume as separate attachments.

Pricing may not at any time exceed the Maximum Hourly Rate proposed by Contractor in the solicitation or any mutually agreed upon amendment. Hourly Service Rates may not be changed during an active project (open RR) without mutual consent of the University and Contractor.

All pricing is fully burdened. The fully-burdened, not-to-exceed, Maximum Hourly Rate must include, but is not limited to, all direct and indirect operating, administrative and personnel expenses such as: travel, lodging, meals, other miscellaneous travel expenses, overhead, salaries, profit, supplies, quality improvement, out of pocket expenses and/or any other expenses related to this project. The travel burdened hourly service rate may not exceed the listed Maximum Hourly Service Rate.

Step 1: Boise State University Request for Consulting ServicesUniversity Project Lead Name University Project Lead Phone University Project Lead Email

Category, Project Title Location (On or Off Site) Estimated Total Hours

Estimated Start / Finish Date Response Due Requisition NumberStart: %Date%End: %Date%NOTE:

%Date% by 5:00 PM MDT

Expected Work Hours / CommentsStandard work week consists of a forty (40) hour work week, typically delivered Monday - Thursday or Monday – Friday, depending on work location, and excludes travel time.

Mandatory Qualifications Please submit only resources who meet these mandatory qualifications.

Scope of WorkTask Name Work Start Finish

RFP ST16-108 Page 40 of 44 date of issuance

Page 41: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

Step 2: Contractor ResponseCompany Name Contractor Contact Name Contractor Contact Phone/Email

Hourly Rate Proposed Proposed Start / Finish Date RR Proposed Total Cost

Additional Contractor InformationContractors are to respond below to the University's Scope of Work, demonstrating their understanding of the requirement. Identify any information/resources needed from the University in order to perform any services. The Scope of Work Response and the Hourly Rate Proposed will be evaluated and compared to the Maximum Hourly Rate in the response, interviews may be conducted, and a resource selected to provide the service.

Contractor is to make every effort to ensure that the proposed resource will be available for the duration of the RR.

Resource InformationIn the field below, provide the following information for the proposed resource:

1. Name2. Resume, including:

Years of experience Industries in which individual has worked PeopleSoft Modules with which individual has worked

3. How the individual meets the Mandatory Qualifications4. How the individual’s experience allows them to deliver the Scope of Work

Value Add OptionsPlease discuss any value add options that your company can offer for this project. Include any additional costs or changes in project timeline.

RFP ST16-108 Page 41 of 44 date of issuance

Page 42: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

Step 3: Boise State University Award Information The University will complete the following information once a resource has been selected to fulfill the RR.

Boise State University Purchase Order Number, Not-to-Exceed AmountBoise State will issue a purchase order, including an amount not to be exceeded without prior written consent from University.Purchase Order Number Not-To-Exceed Amount (without written consent)

SignaturesBy signing below, the parties understand that each RR is a binding document issued by the University per the requirements of the Agreement, detailing, at a minimum, the scope of work required, and requiring Contractors to submit a response regarding Contractor’s ability to provide the requested service, along with pricing for providing the service. Each RR incorporates all requirements contained in the Agreement created between the University and the Contractor upon award. Where a conflict between the Agreement and the RR exists, particularly in regards to terms and conditions, the Agreement shall prevail.

Additionally, by signing below, the Contractor states that, per RFP Section 4.8, Compliance with University Policies, proposed resource has passed a criminal background check within the past twelve (12) months preceding this assignment.

ContractorAuthorizing Signature Company Name

Printed Name Title Date

Boise State UniversityAuthorizing Signature

Printed Name Title Date

RFP ST16-108 Page 42 of 44 date of issuance

Page 43: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

Appendix: PeopleSoft Development Staff Augmentation Resource Request InstructionsThe Resource Request (RR) is the document that the University will use to communicate its need for PeopleSoft Development Staff Augmentation to the Contractors. This form describes the scope of work and/or deliverables required by the University. Contractors must respond by the date listed in the “Step 1, Response Due” field.

The “Award Sheet” list contains the Contractor awarded for all the Categories.

For needs in the General Category, the RR will be completed electronically and emailed to all awarded Contractors for a Category.

For needs in the Urgent Category, the RR will be completed electronically and emailed to the Primary Contractor for that category. If the Primary Contractor does not respond within 24 hours (per the RFP requirements) the University will email the RR to the Secondary Contractor in that category.

Instructions to University PersonnelThe University will:

Determine the Category Determine if the resource is required to work on site, or if the project can be completed with an off-site

resource. Determine the estimated time line Determine the estimated total hours required for the project. Describe the needs of the project and what is expected from the Contractor in the “Scope of Work” and

“Expected Milestones/Deliverables” boxes. Enter a complete description of its requirement containing sufficient information for the Contractor to fully

understand the University’s requirement, and fully submit a response to the RR offering its solution to meeting the requirement.

Enter all known deliverables. Enter all known, specific IT skill requirements to satisfactorily complete the RR. Email the completed RR to all Contractors awarded in the Category.

Instructions to ContractorsContractors must respond to the RR by the time and date listed in the “Response Due” field in Step 1. At a minimum, the Contractor should respond back to the University that they are unable to acquire a resource for the requested Category. Otherwise, the Contractor will complete all the information under “Contractor,” attach resume(s) for proposed resource(s), and return pages 1-3 and resumes to the University Project Lead via email.

If there is something on the RR that is unclear to the Contractor, the Contractor should email the University Project Lead as soon as possible to request a clarification. The question and clarification will be sent out to all Contractors for that Category as soon as possible, so that all Contractors have the same information.

Boise State will evaluate the Contractor-returned RRs in relation to the Maximum Hourly Rate in each Contractor agreement.

The University will also evaluate the Contractor-returned RRs according to IC § 67-9211 (3), which states the following:(3) Where a contract for property has been awarded to two (2) or more bidders in accordance with this section, a state agency shall make purchases from the contractor whose terms and conditions regarding price, availability, support services and delivery are most advantageous to the agency.

RFP ST16-108 Page 43 of 44 date of issuance

Page 44: STATE OF IDAHO - Vice President and Chief Financial Officervpfa.boisestate.edu/.../biddocs/ST16-108...Staff_Augme…  · Web viewThe University desires to follow Oracle’s direction

The University will use a documentable method of evaluating the RRs in accordance with IC § 67-9211 (3), meaning Boise State will evaluate the RRs according to the criteria listed in IC § 67-9211 (3).

Depending on the University’s need, multiple Contractors may be selected to fulfill a RR.

Contractor(s) SelectionOnce the University has evaluated and selected the Contractor to fulfill a RR, the RR(s) from the selected Contractor(s) will be completed. The University will enter the “RR NOT TO EXCEED AMOUNT” in the appropriate section of the RR. This dollar amount is to equal the dollar amount found in the Contractor’s response to the “RR PROPOSED TOTAL COST” field and may not be exceeded without prior written consent from the University.

A copy of the completed RR form will be given to the Contractor for signature. The Contractor will sign and return the form, and the University will complete its signature portion of the RR. A fully executed RR form will be returned to the Contractor.

Boise State University will respond back to all Contractors who submitted a Proposal for a RR, announcing which Contractor was chosen to fulfill the RR.

Everything should now be in order for the University to begin using the services of the Contractor.

Purchasing NotesSince Contractor may request a review of the selection process used by Boise State, the University, will retain proof that, with impartiality and fairness and in accordance with IC § 67-9211 (3), it performed due diligence in its selection of the Contractor to fulfill the RR. The Purchasing Department of Boise State University retains the right to cancel any RR and require a re-evaluation should any department be found to not be performing due diligence in evaluating RRs.

RFP ST16-108 Page 44 of 44 date of issuance