Standard Operation Procedure for IAM Swap Project BTS3900AL(DC)+TP48200A Swap Outdoor Macro Site(V3...

download Standard Operation Procedure for IAM Swap Project BTS3900AL(DC)+TP48200A Swap Outdoor Macro Site(V3 11-4-2013)

of 18

Transcript of Standard Operation Procedure for IAM Swap Project BTS3900AL(DC)+TP48200A Swap Outdoor Macro Site(V3...

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Standard Operation Procedure for IAM Swap

    Project BTS3900AL swap outdoor Macro Site

  • No Tool name Specification standards Quantity Picture

    1 SiteMaster 1

    2Sitemaster

    dummy load100W 1

    3 Test MS

    1.lock frequency

    2.support 2G call,3G call,

    SMS and data service

    1

    4 Jumper toolsRothenberger(1/2)/

    Huaxing(1/2)

    5 Marking Pen 2

    6 Multimeter 1

    7 Hammer 1

    8 Spanner 13mmOpen/13mm 2

    9 Spanner 16mmOpen/16mm 2

    10 Spanner 18mmOpen/18mm 2

    11 Hydraulic 1

    12 Ladder 1

    13Adjustable

    Wrench12"/300mm 4

    14 Socket Spanner one Set.include 18mm 1

    15Phillips

    screwdriver#2*150 2

    16Straight

    Screwdriver2*50mm 2

    17 large wrench >60mm 2

    18 File 100~150mm 1

    19 brush 1

    20 cable cutter 1

    Standard Installation Tools

  • 21NSN Wire

    Punchdown

    Tool

    support for NSN DDF 1

    22Huawei Wire

    Punchdown

    Tool

    support for Huawei DDF

    23 Hand-Saw 1

    24 Paper Knife 2

    25 Cut Pliers 3

    26 Crimp pliers

    hexagon/PROSKIT/6PK-

    230PA

    3P1 255/213/068/038/321

    1

    27 Wire stripper 1

    28 Pliers 1

    29 RJ45 crimping

    tool

    EXPHD-22L

    5.5~38mm1

    30 Percussion Drill 1000W 1

    31 Heat gun 1

    32 Light 1

    33 Safety belt 2

    34 Safety helmet 4

    35 Camera 1

    36 angle display 1

    37 Tape Measure 100m 1

    38 compass BrandSUUNTO 1

    39 pulley 1

    40 rope 100M 1

  • Step 3:Destmantle 2G BTS and PS.

    `

    BTS3900AL swap outdoor Macro Site Procedures

    Step 1: Move old 3G cabinet and battery to aside with AC power . Pre-install BTS3900AL and TP48200A on the position of 3G BTS equipment

    Then power on PS and BTS3900AL using temporary power and commissioning.

    Step 2:Druing swap, firstly swap 3G ,then 2G. Finally dismantle 3G equipment and 3G battery .

  • Time Time

    Time Time

    Time Time

    Time Time

    Time Time

    Time Time Time Time

    Put TP4200A

    Cabinet on the old

    3G Battery position

    Prepare TP48200A Power

    cable, ground cable ,battery

    cable

    Prepare Power systme

    alarm cable form PS alarm

    unit to BBU UFLP

    Install PSUs

    8

    Unpack and Check

    Materials

    1. Disconnect 3G battery cable

    and RF jumper tie

    2.Move old 3G BTS cabinet to

    side of I-beam(with AC Power)

    and battery to ground

    3.Connect battery cable with old

    BTS

    1 Power on BBU using

    temporary power

    2. Make pre-

    commissioning

    Identify old 2G &3G RF

    jumper ,then mark them

    using color ring

    3.2 4.3 5.3 6.2

    1)Pre-Install BTS PGND cable

    to grounding bar

    2)put power cables ( DCDU

    to new TP48200A

    Install alarm cable from

    UFLP to BBU UPEUStart Time:_____________

    1 2 7

    3.1 6.1

    Put new MBTS

    Cabinet on the old

    3G position

    Prepare 2G and 3G RF

    jumpers after test using

    Sitemaster and make

    color ring4.2 5.2

    (IAM&Huawei SingleRAN project) Outdoor Macro Site BTS3900AL Implementation Checklist_Pre-installation V2.0

    Site Name___________________________

    4.1 5.1

    Prepare new power cable for

    3G&2G transmission

    equipment from new ps(if it use

    DC power)

    Install new transmission

    cable from 3G&2G

    Transmission to new

    MBTS(if the old cann't be

    reused)

    Start Finish

  • 12

    3

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    1

    2

    3

    4

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    1

    2

    3

    4

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    Proce

    dure

    1Drill the

    hole on

    the old

    2

    3

    4

    Fix MBTS base on the MBTS U-beam.

    Install MBTS and Rectifier cabinet on the U-beam.

    when face to equipments, BTS3900AL(DC) is in left,TP48200A in in right

    BTS3900AL swap outdoor Macro Site Procedures

    SN Task Description Operator Operation Time

    3Install MBTS and TP48200A

    cabinetABCD minutes

    Materials

    Packing list

    Flat-head

    screwdriverClaw hammer

    Notes

    Ensure that old 3G still work with AC power during moving before swap,if the old AC

    power cable is not enough ,need put new AC power cable for old 3G before moving.

    Tools

    Procedure

    Disconnect 3G battery cable and RF jumper tie

    Move old 3G BTS cabinet to side of I-beam (with AC Power) and move battery to ground

    Connect battery cable with old 3G BTS

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    2 Move old 3G equipment ABCD minutes

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    0 Check environment before

    installationAB 10minutes

    Procedure

    Check and confirm the installation positions of the equipment and cables in the equipment

    room according to engineering design documents such as the survey report.

    Check the onsite installation environment .

    Arrange for installation member.

    Notes

    Tools

    Materials

    TSSR

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    1 Check materials and Unpack CD 15 minutes

    Procedure

    Unpack the equipment, and then check the total number of goods in the packing case according

    to the attached packing list and whether the packing cases are intact.

    Unpack the packing case, and then check the type and number of equipment in the case

    according to the packing list.

    Notes

    Check the materials carefully and confirm the quantity of materials

    Tools

    Flat-head

    screwdriverClaw hammer

    Materials

    Packing list

    Move direction

    Old 3G

    equipment

    Old 3G cabinet

    Old 3G battery

    MBTS Base

  • 1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    4

    5

    6

    1

    2

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    4

    Materials

    Multi Transceiver (850nm) Single Transceiver(1310nm)

    Multi optical jumper(Orange) Single optical jumper(Yellow)

    E1 cable

    Tools

    Phillips screwdriver

    Notes

    If there is just 2G BTS or both 2G and 3G are used E1 transmission, need to

    Swap E1 transmission cable from old BTS to new MBTS.

    Procedure

    Check the transmission cable fristly ,if it's enough for new MBTS, no need

    to install and route new .Otherwise , install new transmission cable for new

    Check the WMPT board on the BBU cabinet. If have, install multi

    transceiver(850nm ) into GTMUb FE1 and UTRP2 FE/GE0 interface

    ,then connect two interface using multi optical jumper(Orange).

    Insert single transceiver(1310nm) to UTRP FE/GE 1 interface and install

    single optical jumper(Yellow) From UTRP GE interface to ODF.

    If there is no WMPT board on the BBU , need to insert single transceiver

    (1310nm) and connect UMPT GE interface with ODF using single

    optical jumper(Yellow)

    Attach temporary label on FE/GE optical fiber.

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    4.1 Install transmision cables B 20 minutes

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    4.2Install PGND&Power

    cablesABCD 25minutes

    Precedure

    Make OT terminal of the PGND and power cable .

    Connect PGND cable between grounding bar of BTS3900AL and Grounding

    busbar.(TP48200A grounding bar with busbar )

    Connecting the power cable between TP48200A and 3G TGBT

    Connecting the power cable from TP48200A TO new MBTS

    Materials

    Bolts MBTS U-Beam

    Rectifier U-Beam

    Percussion Drill Wrench

    Notes

    Before pre-installation, ensure that get the demission for 3G I-beam and prepare U-beam for

    MBTS base and Rectifier. For details of MBTS base and Rectifier ,see the quick guide.

    Tools

    U -Beam old I -Beam

    MBTS base

    TP48200A U-Beam TP48200A and MBTS Installation

    3G TGBT

    2G&3G Co- transmission

    Swap 2G And 3G E1

    DDF

    2G E1 cable

    3G E1

    2*63A

    2*125A

  • 12

    3

    4

    1 2 3

    1 2

    3 4

    1

    2

    3

    1

    2

    3

    4

    RTN(+)_0 2*125A black

    NEG(-)_0 2*125 A blue 1 2 3

    RTN(+)_1 free 3 4 6

    NEG(-)_1 free

    RTN(+)_2 2*63A black 1 2

    NEG(-)_2 2*63A blue 3 4

    5 6

    1

    2

    3

    1

    2

    INPUT0

    INPUT1

    INPUT2

    Materials

    16mm^2 cable

    Wire Punchdown

    Tool

    Notes

    cable 16mm^2 black blue

    Tools

    Procedure

    4 pairs DC cable for TP48200A to BTS3900AL(DC)

    MUST turn on two breakers for cooling system

    MUST use breaker for BTS3900AL as picture showing

    BTS3900AL swap outdoor Macro Site Procedures

    SN Task Description Operator Operation Time

    5Install BTS Rectifier alarm

    cablesA 15 minutes

    Notes

    15 minutes

    Procedure

    connnect alarm cable from TP48200A ALM1~4 to BTS3900AL BBU UPEU EXT-ALM0,

    ALM5~6 to EXT-ALM1

    White cable tie -GT-150I-

    300*3.6mm

    BTS3900AL swap outdoor Macro Site Procedures

    SN Task Description Operator Operation Time

    5 Install alarm cables A

    Note

    PGND cables and signal cables cannot be bound . A certain distance must be

    reserved between them to prevent interference from each other.

    The power cable must be separately bundled and cannot be bundled together with other cables

    anywhere. Multiple power cables must be bundled when routed.

    If the length of the power cable is insufficient, replace the cable rather than adding connectors

    joints to lengthen the cable.

    Tools/Meter

    Cross screwdriver wrench

    Materials

    Naked Crimping Connectors,OT White cable tie -GT-150I-150*3.6mm

    Grounding bar

    2*125A

    BATT1 BATT2

    cooling

  • 34

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    1

    2

    1 2 3

    1 2

    1

    2

    3

    4

    5

    1

    2

    1 2 3

    3 4 6

    1 2

    1

    2

    3

    4

    5

    1

    2

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    Materials

    Tools

    USB Flash Laptop

    Notes

    10 minutes

    Procedure

    Power on BBU usning temporary power firstly

    Insert 2G USB flash to GTMU USB interface ,download 2G data.(for 3G ,insert WMPT USB

    interface )

    Check the USB flash status. For detials ,see the guide of USB commissioning .

    After commissioning , login GTMU and UMTS and check the boards status.

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    7 Install PSUs C

    Tools/Meter

    Materials

    Procedure

    Check the old jumper connector firstly. Ensure that jumper connector near

    BTS is DIN bend male, near feeder is DIN male or female.The feeder

    connector is DIN female or male near BTS .

    If some sites use other type connectors. Both DIN-Male and DIN-Female

    cant match with the feeder connectors. Dismental old BTS feeder

    connector, make new DIN-Female feeder connector to match new jumper

    Lead cable to the BTS3900AL installing position,make 2 labels,One on the

    feeder another on the top of the cabinet.

    Note

    Protect the connector of jumper before swap.

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    6.1 Install and route 3G &2G RF

    jumpers

    AB

    Materials

    PSU

    Phillips screwdriver

    Notes

    The output current of each PSU is 50A . The number of PSUs depends on actual capacity

    requirments for the TP48200A

    Tools

    Procedure

    Insert the PSU into the empty positon.

    Secure the bolts in both sides of the PSU with screwdriver

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    6.2 Install PSUs CD 10 minutes

    Materials

    White cable tie -GT-150I-150*3.6 mm

    Tools

    Wire Punchdown

    Tool

    USB commissioning

    2G

    3G

    Commissioning check

  • 12

    3

    4

    5

    1

    2

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    Materials

    PSU

    Phillips screwdriver

    Notes

    Tools

    Procedure

    Check the label to identification and mark old feeder before Swap

    After start swap 2G, power off A RFU, Call the OMC and check the Cell number

    Then Power off B RFU ,check the Cell number with OMC

    Mark the sector for old 2G RF jumper

    BTS3900AL swap outdoor Macro Site Procedures8 Install PSUs C 10 minutes

  • Time Time Time Time Time Time

    Time

    Time Time Time Time

    Time

    1. Power off 2G RFU

    2. Swap 2G RF

    jumper

    1. Check MBTS BBU and

    MRFU 900 boards Leds

    2. Call OMC to confirm that

    3G is up

    2G Call test with call list

    1. Swap 2G transmission

    equipment power to new

    Rectifier

    2. Install battery

    3. Check RCU

    (If broken ,need change new

    one)

    4.Dismantle old 3G equipment

    10.2

    Cleaup

    10.1

    Label

    Finish Time:_____________6 7 8 9

    1.Power off 3G AC

    breaker

    2.Power on new PS

    using old 3G AC

    breaker

    3.Power on new BBU

    &2G /3G RFU

    Confirm Swap time with

    OMC

    1.Swap old 3G optical

    transmission cable to new

    BBU UPTR board GE1

    interface

    2. Call OMC to confirm

    optical transmission status

    1. Power off old 3G

    2. Cut over 3G RF jumper to

    new MBTS

    (RFU 2100)

    1. Check MBTS BBU

    and RFU 2100 boards

    Leds

    2. Call OMC to

    confirm that 3G is up

    3G Call test with call

    list

    (IAM&Huawei SingleRAN project) Outdoor Macro Site BTS3900AL Implementation Checklist_ Swap V2.0

    Site Name:__________________

    Start Time:_____________

    0 1 2 3 4 5

    Start

    Finish

    Half an hour

    before swap

    2G&3G Outage

    Duration

    3G Outage Duration

    (2G still work)

    2G Outage

    Duration

    3G up time

    2G up time 2G Down time

    Swap time 2G up time

  • 12

    3

    4

    5

    6

    1

    2

    3

    1 2 3

    4 5 6

    1 2

    1

    2

    2

    2

    3

    1 2 3

    3 4 6

    1 2

    1

    2

    3

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    Materials

    Optical fibre jumper

    Procedure

    Connect transmission optical cable from ODF to new BBU UPTR board

    GE1 interface

    If there is no optical transmission, need to connect E1 cable from DDF to

    E1/T1 interface of GTMU and WMPT for 2G &3G transmission

    Then call the OMC to confirm that transmission is ok or not.

    Notes

    1. If old 3G optical cable length is enough , it's better reuse it.

    2. If transmission is not ok, check the optical transceiver and cables firstly. Ensure

    that TX and RX cable is right and Transceiver is right.

    Tools

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Operation

    Time2

    Swap 3G transmission to new

    MBTSAB 20minutes

    Materials

    Note

    Tools/Meter

    A 5minutes

    Precedure

    At first, make sure the condition for Swap be ready.

    Then call the OMC and confirm to start Swap

    Materials

    16mm^2 AC cable

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    1 Call OMC to Confirm Swap

    time

    Multimeter

    Note

    If there is spare AC breaker in TGBT for new PS,don't power off the 3G

    equipment and Power on new PS and MBTS directly.

    all cable out of cabinet should in PVC pipes

    Tools/Meter

    Precedure

    Half an hour before swap, power off old 3G AC breaker

    Connect AC power cable for new Recitifer after dismantle old 3G AC power

    cables

    AC cable 16mm^2(live:brown blcak,grey nature:blue)

    Power on new Rectifier after testing using multi-meter

    Power on new BBU and 2G RFU(900M) ,3G RFU(2100M)

    BTS3900AL swap outdoor Macro Site Procedures

    No. Task Description Operator Duration

    0

    Power on new Rectifier &new

    MBTS half an hour before

    swap

    ABCD 30minutes

    BTS3900AL

    ODF

    Single Optical jumper

    (Yellow)

    1

    Old 3G AC breaker

    MBTS DC breaker

    BBU &RFU

    breaker

    2

    3

    OLD 3G BTS

    AC input

  • 12

    3

    1

    2

    1 2 3

    3 4 6

    1 2

    1

    2

    3

    1

    2

    1 2 3

    3 4 6

    1 2

    1

    2

    3

    4

    1

    2

    3

    4

    5

    1 2 3

    1 2

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    6 Swap 2G RF jumper CD 15minutes

    Test phone

    Materials

    Tools/Meter

    Precedure

    After 3G is up , use the test MS to test CS services, PS services, and SMS

    services.

    Record test result on the test table and sign after finishing test

    Note

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    5 3G Call test with call list CD 10minutes

    Materials

    Note

    If 3G is not up , check hardware connection firstly and then do troubleshooting

    with OMC.

    Tools/Meter

    AB 10minutes

    Precedure

    Check MBTS BBU and RFU 2100 boards Leds ,and ensure that there is no

    any alarm for new MBTS.

    Call OMC to confirm that 3G is up

    Materials

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    4Check MBTS boards Leds and

    service status

    Tools/Meter

    Wrench

    Precedure

    At first, Power off the 3G RFU .

    Then,disconnect old jumper after dismantle Old BTSs combiner and arrester

    .

    Connect new jumper,and fix the feeder.

    Note

    Before swap, ensure that check the feeder connector type. If arrester and

    feeder connector together ,need to change feeder conncetor during swap.

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    3 Swap 3G RF jumper CD 15minutes

  • 12

    3

    4

    1

    2

    3

    4

    5

    1 2 3

    1 2

    1

    2

    3

    1

    2

    1 2 3

    3 4 6

    1 2

    1

    2

    3

    4

    1

    2

    3

    4

    5

    1 2 3

    1 2

    Procedure

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation Time

    9.1 Replace transmission

    equipment to new Retifier

    AB 15minutes

    Test phone

    Materials

    Tools/Meter

    Precedure

    After 2G is up , use the test MS to test CS services, PS services, and SMS

    services.

    Record test result on the test table and sign after finishing test

    Note

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    8 2G Call test with call list CD 10minutes

    Materials

    Note

    If 2G is not up , check hardware connection firstly and then do troubleshooting

    with OMC.

    Tools/Meter

    AB 10minutes

    Precedure

    Check MBTS BBU and MRFU 900 boards Leds ,and ensure that there is no

    any alarm for new MBTS.

    Call OMC to confirm that 2G is up

    Materials

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    7Check MBTS boards Leds and

    service status

    Before power off 2G PS, ensure that swap 2G transmission equipment power

    from old PS to new PS after MBTS is up.

    Tools/Meter

    wrench

    Precedure

    Powr off old 2G RF boards

    Connect new RF jumper with feeder.

    Note

  • 12

    3

    4

    5

    1

    2

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    4

    5

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    4

    Notes

    Tools

    Philip's type

    Screwdriver

    Materials

    battery connetor

    Notes

    Procedure

    Rotate the adjustment screw before installing the RCU. Ensure that the

    adjustment screw rotates smoothly before installing the RCU.When inserting the RCU into the antenna,ensure that two ports match each

    otherConnect the female connector ofAntenna Interface Standards Group

    (AISG) cable to the male connectorof the RCU without removing theprotectiveConnect the other connector ofthe AISG cable to the TMA

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation

    Time9.3-B Install new RCU CD -

    Materials

    If the new TMA jumper connector isn't suitable for antenna interface and feeder

    interface, need to replace the jumper connector so that the jumper can connect with

    antenna and feeder.

    Tools

    Adjustable

    wrench

    CD 30minutes

    Procedure

    For Huawei 3G equipment ,no need to Swap TMA and RCU except broken

    For non-Huawei 3G equipment, need to Swap TMA and RCU.

    Dismantle old RCU and TMA ,then install new TMA and RCU.

    Make the waterproof after connecting new RCU and TMA .

    Make the lable for TMA and RCU jumper.

    collect RCU serial number and feedback it to Huawei

    Notes

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation

    Time9.3-A Swap TMA & RCU

    Procedure

    Install batteries in TP48200A cabinet, pay attention to the positive and

    negative pole of the battery.

    Then connect cables per 2 batteries with battery connetor.

    Connect batteries output cable to battery circuit breaker in the top of cabinet.

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation

    Time9.2 Install battery CD 15minutes

    Materials

    Phillips screwdriver

    Tools

    Check the transmission equipment position. If it's in the old BTS

    cabinet ,the transmssion equipment must be replaced to new PS

    cabinet .otherwise , no need to replace it .

    Then Dismantle 3G transimission equipment if 3G transimission

    equipment is in old 3G BTS Cabinet.

    Install 3G transimission equipment in the new Retifier cabinet

    (TP48200A)

    Then connect 3G transimission equipment power cable using new

    power cable.

    UMTS2100 GSM900

    R C U

    R C U

    TMA

  • 51 2 3

    3 4 6

    1 2

    3 4

    5 6

    1

    2

    3

    4

    5

    1 2 3

    3 4 6

    1 2

    1

    2

    3

    4

    1

    2

    3

    1 2 3

    1 2

    3 4

    1

    2

    3

    4

    5

    6

    1

    2

    3

    4

    1 2 3

    4 5 6

    1 2

    5 6

    Materials

    Tools/Meter

    Cleaner

    Note

    No packing boxes or boards are placed at random on the installation

    field.No cable ties or other sundries are left on the floor or in the cabinets.

    The equipment room should be neat and tidy. . Spare parts should be

    arranged in a tidy way after installation.

    Precedure

    Collect the tools and extra cables on site.

    Clear up the equipment room and the outdoors.

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    10.2 clean up CD 20minutes

    Materials

    Labels White cable tie

    Label tie

    When attaching labels to the power cable and PGND cable, Bundle a

    label tie 20 mm away from each connector.Bundle a label tie 20 mm away from each connector at one end of the

    signal cable. Attach a label with the text area to the right, labeled To: .All the label need comply with labeling standard and requirement.

    Tools

    Cable Cutter Paper knife

    Precedure

    Make the label and bundle for cables

    Note

    BTS3900AL swap outdoor Macro Site ProceduresNo. Task Description Operator Duration

    10.1 label AB 20minutes

    Materials

    Adjustable

    wrench

    Notes

    Tools

    Dismantle old 3G equipment ABCD -

    Notes

    Tools

    BTS3900AL swap outdoor Macro Site ProceduresSN Task Description Operator Operation

    Time9.4

    Procedure

    Dismantle old 3G cabinet ,then put them on the spare ground.

    Materials

    Adjustable

    wrench

  • 12

    3

    4

    5

    1

    2

    1 2 3

    3 4 6

    1 2

    3 4

    5 6

    BTS3900AL swap outdoor Macro Site Procedures

    SN Task Description Operator Operation Time

    0 Self-Inspection ABCD 15 minutes

    Procedure

    Check the power system hardware installation based on Power System Hardware Installation Quality

    Checklist after finishing installation. If have some problems, need record it and feedback.

    Then finish BTS hardware installation based on BTS3900AL Hardware Installation Quality Checklist.

    And check installation promble.

    For details, see the Hardware Installation Quality Checklist.

    Notes

    Tools

    Camera

    Materials

    Quality Checklist

    Process Graph