Distribution Staking and Line Design Course

REA Tanzania

Page 2: Staking Course1

Welcome

During my 15 years of overseas experience I have designed and built more than 1,000 kilometers

of distribution line in 12 countries.

That is a lot of walking

Page 3: Staking Course1

Welcome

My name is Md Maruf Hasan

I will be your instructor for this course.

Page 4: Staking Course1

Welcome

Assisting me is Osman Hussein

&

Hussein Shamdas

Page 5: Staking Course1

Rules of the Course

• Attendance is taken daily

• No cell phone use - turn them off

• Phones may be used during breaks

• There will be quizzes/examinations

• There will be field exercises

Page 6: Staking Course1

Quizzes will be graded

• Points are given for correct answers

• Partial correct answers are awarded points

• Incorrect answers receive negative points (do not guess)

• Quiz points for the course are accumulative

Page 7: Staking Course1

What you will need

• Wear comfortable work shoes

• Bring a hat

• Bring a memory stick if you want copies of material

Page 8: Staking Course1

Pole Ground Line

Pole Length

m

Pole Class

Rated Breaking Strength*-

Nt

Ground line location**

m

9 Medium 6,300 1.5

11 Medium 7,700 1.8

12 Medium 8,000 2

13 Medium 10,000 2

* Load at 0.6m below pole top that breaks pole at the ground line**Distance from pole butt in meters.

Page 9: Staking Course1

Conductor Ruling Span

Page 10: Staking Course1

Ruling and Limit Spans for 33kV lines

Conductor Code Name

Ruling Spanm

Limit spansm

Hare 90 105Hare 50* 71Rabbit 120 145Rabbit 50* 71Gopher 120 145Gopher 50* 71Shrike 175 210Shrike 50* 71Periwinkle 50 71

Slide 10/82

* When used with underbuild LV line or in areas where LV underbuild may be anticipated in the near future.

Page 11: Staking Course1

Conductor Uplift

Page 12: Staking Course1

Conductor

ACSR

(Aluminum Conductor Steel Reinforced)

APPLICATIONS

Used as bare overhead transmission cable and as primary and secondarydistribution cable. ACSR offers optimal strength for line design. Variable steelcore stranding enables desired strength to be achieved without sacrificingampacity.

Page 13: Staking Course1

Conductor

AAAC

(All Aluminum Alloy Conductor)

APPLICATIONS

Used as bare overhead conductor for primary and secondary distribution.

Designed utilizing a high-strength aluminum alloy to achieve a high strength-to-weight ratio; affords better sag characteristics.

Aluminum alloy gives AAAC-6201 higher resistance to corrosion than ACSR.

Page 14: Staking Course1

LV Cables

Triplex

Page 15: Staking Course1

Conductor

Automatic splice

Page 16: Staking Course1

Conventional Meter

Page 17: Staking Course1

Meter

Page 18: Staking Course1

Line Material

These are galvanized washers

- Curved Square Washer

- Square Washer

- Round Washer

Page 19: Staking Course1

Line Material

Anchor Shackle

Page 20: Staking Course1

Line Material

Eyenut

Page 21: Staking Course1

Line Material

Curved Lock Nut

Page 22: Staking Course1

Line Material

Eyebolt (Oval Eyebolt)

Page 23: Staking Course1

Line Material

Machine Bolt

Page 24: Staking Course1

Line Material

Preformed Deadend

Page 25: Staking Course1

Line Material

Distribution Cutout

Page 26: Staking Course1

Line Material

Lightning/Surge Arrester

Page 27: Staking Course1

IntroductionPart I - Line Design

This course deals with Line Design in the field through the use of a methodology called ‘Staking’

Page 28: Staking Course1

What is Staking?

The process of staking takes the task of line design from the office to the field. Using tables, illustrations and guidelines the staking engineer is able to construct a safe, reliable, and economical distribution line.

Page 29: Staking Course1

Why is it called Staking?

Stakes, usually made of wood, are used to make the location of the structures.

Page 30: Staking Course1

Staking

The staking of a distribution line consists of the selection of the various physical components, including conductors, poles, pole-top assemblies, guys, anchors, etc. that comprise distribution structures.

Page 31: Staking Course1

Staking

Staking though, is not simply the placement of wooden stakes in the ground.

Staking is the a complete engineering evaluation of the choice of each structure and its location prior to driving the first stake

Page 32: Staking Course1

Staking

This is a Stake

Page 33: Staking Course1

Construction Unit

A construction or assembly unit is a specific component that is installed as part of the building block to construct an entire distribution structure. Each assembly drawing is made of materials and has stated limitations of design

Page 34: Staking Course1

Construction Drawing

• Dimensions of the components of the assembly.

• Design limits and recommendations.

• Bill of materials required for construction.

Page 35: Staking Course1

Construction Drawing• C1 0° - 5°• C2 5° - 30° Rabbit 50 mm2

• C2 5° - 15° Dog 100 mm2

• C2 5° - 10° Wolf 150 mm2

• C3 25° - 60°• C4/2C7 60° - 150°• C7 Horizontal Deadend• C8 Double Deadend

Page 36: Staking Course1

Construction Drawing

This is a 3Ø assembly. It is designed to support conductor from 0° to 5°. It is designated as C1.

The pole is not part of the unit

Page 37: Staking Course1

Construction as Built

Page 38: Staking Course1

Construction Drawing

This is a 3Ø vertical assembly. It is designed to support conductor from 30° to 60°. It is designated as C3.

Page 39: Staking Course1

Construction Drawing

This is a guy (stay) assembly. It is designed to support a pole at angles or deadends. It is designated as E1.

Page 40: Staking Course1

Construction Drawing

This is an anchor assembly. It is designed to work in conjunction with a guy (stay) at angles or deadends. It is designated as F1.

Page 41: Staking Course1

Construction Safety

• Adequate clearance & separation between conductors.

• Clearances to meet TANESCO requirements for jumpers, and climbing and working space.

• Clearances to permit safe hot line work.

Page 42: Staking Course1

Construction Safety

• High impulse strength for the outer phases through the use of wood crossarms.

• Minimal radio and TV interference by providing generous separation of phase associated hardware from grounded conductors and/or hardware.

Page 43: Staking Course1

Staking Sheet

• A staking sheet should be prepared to fully describe the construction for the proposed line.

• Typically, a staking sheet will include as a minimum the following data:

Page 44: Staking Course1

Staking Sheet

• Name of job

• Name of staking technician

• Date when staked

• Sheet number

• GPS points

• Construction Assemblies

• Span lengths

• Conductor size & type

• Line angle

Page 45: Staking Course1

Staking Sheet

Desingned by:

Substaton: Substation Feeder:

Date Ground

Map grid No(s) Lead Cap

Sheet No. of M. kVA

Column Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 20SKETCH OF WORK

Qty Qty Qty.

PROJECT: AREA Kilombero/Mbozi STAKING SHEETBuilt by:

GPS. No.

POLES PRIMARY SECONDARY GUYS ANCHOR Xfmr.Removal

UnitObservations

and notesSize/ Class

Angle Back Span

UnitCond Size

Back Span

Unit UnitCond Size

Unit Unit Qty. Unit Qty.

LCDP in Tanzania,

Misc Units

Unit Qty

Page Totals

Removal Units

Item

Condcutor

21

Item

New Units

New Units

Item

Poles

Page 46: Staking Course1

Staking SheetPole Numbering

Page 47: Staking Course1

Staking SheetPole Numbering

 Example: EC-EH-22-5-Bad

EC EH 22 5 B a d 

Substation Feeder Pole no. Tap LV lv lv

 Substation – A two-letter designation is assigned to all 11 kV and 33 kV substations.  Feeder – A two-letter designation is assigned to all 11 kV and 33 kV substation feeders. 

Page 48: Staking Course1

Staking SheetPole Numbering

Example: EC-EH-22-5-Bad

EC EH 22 5 B a d  Substation Feeder Pole no. Tap LV lv lv  Pole no. – The pole no. is the correlative number of the pole of a particular feeder . If two poles exist at the same location such as a transformer or equipment location where the two poles are physically connected by a platform, then a decimal point and number will be added i.e. EC-EH-22-2.1 and EC-EH-22-2.2. If a pole is inserted at a later date then a decimal point and number will also be added.

Tap (optional) – If there is a primary line tap from a feeder, then a number will be used after the corresponding Pole no. Otherwise the space will be blank. If there is a tap from a tap, again a number designation will be assigned after the corresponding Tap pole number designation.

Page 49: Staking Course1

Staking SheetPole Numbering 

Example: EC-EH-22-5-Bad EC EH 22 5 B a d

  Substation Feeder Pole no. Tap LV lv lv

 LV – An Upper-case letter will be used to designate the secondary feeds from a transformer. Facing north and moving clockwise, the first secondary LV feed will be ‘A’, the next in rotation will be ‘B’ and so forth. lv – A lower-case letter will be used to designate the pole position along the feed. Aa would be the first secondary pole on the A feed. Bb would be the second pole along the B feed, and so forth. lv - Additional lower-case letter(s) will be used to designate a secondary tap or derivation from a secondary feed. Bad indicates that from the third pole of secondary feed B there are four additional poles to arrive at Bad.

 

Page 50: Staking Course1

Staking SheetLine Sketch

• Route of the line to built

• Poles

• Guys and Anchors

• Transformers

• Taps

• Sectionalizing Devices

• Secondary Line

• Open Points

Page 51: Staking Course1

Staking SheetLine Sketch

These symbols are used when preparing the sketch on the staking sheet.

Page 52: Staking Course1

Staking Sheet

Page 53: Staking Course1

Staking Sheet

Page 54: Staking Course1

Staking Sheet

Page 55: Staking Course1

Staking Sheet to Material List

Use interactive UniCalc

Page 56: Staking Course1

Staking Crew Equipment

• Hammer, 1 kg. • Spray Paint

• Nails, 6” MS • Back Pack

• Nails, 3” Concrete • Theodolite & Tripod

• Bottle Caps • Tape 10 m & 100 m

• Pencils & Markers • Staking Template

• Traffic Cones • Staking Form Holder

• Safety Vests • Measuring Stick 10 m

• Hats • Hand Level

• Machete • Water Thermos