    Western Light Rail Transit

    Planning and

    Environmental Assessment

    Recommended Corridor

    Transportation CommitteeJuly 10, 2013

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    2/32

    2

    Overview

    1. Study Background2. Study Findings

    3. What we Heard

    4. Dominion to Cleary Station5. Two new Stations

    6. Lincoln Fields to Baseline

    7. Next Steps

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    3/32

    Study Context

    (2008 TMP)

    3

    Baseline

    Tunneys PastureBayview

    Lincoln Fields

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    4/32

    Study Area

    Bayview Station LRT operational 2018

    Tunneys Pasture Station LRT operational 2018

    Baseline Station / Algonquin Campus

    4

    O-Train

    Queensway

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    5/32

    Corridors Considered Initially (15)

    5

    O-Train

    Holland

    Island Park

    Kirkwood

    Tweedsmuir/HydroBroadview

    Churchill

    Woodroffe

    Richmond

    Rochester Field

    Cleary

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    6/32

    Council Direction:

    June 27, 2012

    The City presented details and preliminary

    analysis of 15 corridors

    Council was not satisfied

    Identified that clear interests of the community

    must be considered and reflected

    Directed to align with City, NCC planninginitiatives

    6

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    7/32

    Understanding the Carling Options

    Compromises the network and operations

    Would require continued bus service in the

    north, including using the Sir John A

    Macdonald Parkway for the foreseeable future

    2 3 times the cost of other options

    Potentially very visually intrusive 7.1 km underground is impractical

    7

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    8/32

    Carling via O-Train

    8

    Not Recommended for Further Analysis

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    9/32

    Preferred Corridor

    Richmond Underground

    9

    Lincoln Fields

    New Orchard

    Cleary

    Dominion

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    10/32

    Consultations

    3 Public Open Houses

    4 Community Meetings

    8 Public, Business and AgencyConsultation Group Meetings

    15key meetings with the NCC includingtwo presentations to the Board of

    Directors

    10

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    11/32

    What we Heard

    11

    Protect the Byron Corridor

    Protect the Sir John A Macdonald

    Parkway

    Maintain access to the waterfront and

    pathway system along the Parkway and

    Pinecrest Creek Corrdior

    Address noise and safety concerns

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    12/32

    Modificationsto date

    Buried 700 m from Rochester Field to

    Cleary Station

    Natural Ventilation Options

    Moved Dominion Station

    Covered Cleary Station

    12

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    13/32

    Dominion to Clearyaerial view

    13

    Cleary Station

    Dominion Station

    Rochester Field

    Sir John A Macdonald Pkwy

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    14/32

    Berm

    14

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    15/32

    Natural Ventilationoption

    15

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    16/32

    Natural Ventilationview from the pathway looking east

    16

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    17/32

    Improvementsbefore

    17

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    18/32

    Improvementsafter

    18

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    19/32

    19

    Dominion Stationtoday

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    20/32

    Dominion Stationaerial view

    20

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    21/32

    21

    Rochester Fieldaerial view

    Richmond Road

    Sir John A Macdonald Pkwy

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    22/32

    Rochester Fieldview looking east

    22

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    23/32

    Cleary Stationview from the Continental

    23

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    24/32

    New Orchard Stationaerial view

    24

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    25/32

    New Orchard Stationview from Byron looking east

    25

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    26/32

    Lincoln Fields to Baseline

    stage 1

    26

    Queensway

    Lincoln Fields

    Baseline

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    27/32

    Lincoln Fields to Baseline

    stage 2

    27

    Baseline

    Lincoln Fields

    Queensway

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    28/32

    Iris Stationpreferred option

    28

    Shallow Trench

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    29/32

    Next Steps

    29

    Reducing the height of the berm

    Covering the remaining 500 m through

    Rochester Field

    Identifying likely construction techniques,

    staging and implementation and impactsduring construction.

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    30/32

    Next Stepscontinued....

    30

    Revisiting the Dominion, Cleary and NewOrchard Stations

    Minimizing impacts on adjacent communities

    Pathway connectivity and access to thewaterfront along the Parkway corridor

    Pathway connectivity through the Pinecrest

    Creek Corridor

    Developing a tree mitigation plan

  • 7/28/2019 Staff Presentation on WLRT - July 10, 2013

    31/32

    Schedule

    July 17 City Council

    Decision included in 2013 TMP

    Functional Design and EA

    Documentation

    31