St. Elizabeths East
Project Overview Updated December 11, 2015
AGENDA
• St. Elizabeths Overview
• Key Project Review
– Infrastructure Update
– Entertainment and Sports Arena
– Phase One Update
– Historic Building Stabilization
– Schedule
• Agency Roles and Next Steps
2
TOTAL PLANNED REDEVELOPMENT
Site Size: 183 acres
East Campus Existing Conditions: Primarily a vacant historic campus, except Gateway DC and the R.I.S.E. Demonstration
Center
Underlying Zoning: StE District
Buildable Envelope: 5 million square feet (multiple parcels)
• Office: 1.8 million SF, including 500,000 SF of “Innovation Hub” space
• Residential: 1,300 units
• Retail: 206,000 SF
• Hospitality: 330,000 SF
• Civic & Educational: 250,000 SF for non-commercial activity centers
3
EXISTING FACILITIES - GATEWAY DC
4
Gateway DC is a city park
and pavilion with fantastic
amenities and opportunities
that allow for a wide range of
magnetic events to occur!
Gateway DC is designed to
provide venues for casual
dining, a farmers market, and
other weekend and
afterhours, community,
cultural and arts events.
EXISTING FACILITIES - R.I.S.E. DEMONSTRATION CENTER
5
The R.I.S.E. Demonstration
Center is a technology and
innovation center that seeks to
bridge the gap between the
innovation field and local
community. The Center features
flexible conference and meeting
areas, as well as a state-of-the-
art Digital Inclusion Center.
INFRASTRUCTURE IMPROVEMENTS
Construction of a new
infrastructure network to provide
a complete street system within
the East Campus, including:
• Urban local roadways
• New wet and dry utilities
• Telecom conduits
• Bicycle/ pedestrian facilities
Network will be constructed in
two phases, with Stage 1
commencing Summer 2016
6
INFRASTRUCTURE – BUILDING DEMO
D.C. Department of General
Services to:
• Cut and cap utilities at the mains
• Abate and demolish Buildings
119 and 124
• Abate and demolish the bridge
between Buildings 119 and 124
• Backfill the sites with structural fill
so that the demolished areas can
be used for parking
• Repair the facade of Building 116
Work scheduled for completion
Summer 2016
7
CT CAMPUS
119
124
STAGE 1/PHASE 1
8
DC WATER TOWER
August 2015 Cancellation Of Previous Solicitation For Infrastructure
Improvements
Early December 2015 65% Plans Completed For DDOT & DOEE Reviews
Late January 2016 Issuance Of Design Build Request For Proposals
(RFP) By DGS For Roads & Utilities
Early March 2016 RFP Due Date For Bids To DGS
Late March 2016 Notice To Proceed (NTP) Issued For 100% Plans
Early July 2016 NTP Issued By DGS For Start Of Construction Of
Roads & Utilities
Summer 2018 Completion Of Construction Of Roads & Utilities For
Stage 1 Phase 1
9
Water Tower Only
December 2015 - Advertise for Bids
April 2016 - Notice to Proceed to Construction Contractor
April 2018 - Construction Complete and Tower in Operation ..
Mitigation Schedule
December 2015 - RFQ for Design Competition Participants; Community
Outreach
February 2016 - Select Four Design Firms to Compete
November 2016 - Present Concepts to CFA and Others
STAGE 1 – PHASE 1 INFRASTRUCTURE SCHEDULE
August 2015 Cancellation Of Previous Solicitation For Infrastructure
Improvements
Early December 2015 65% Plans Completed For DDOT & DOEE Reviews
Late January 2016 Issuance Of Design Build Request For Proposals
(RFP) By DGS For Roads & Utilities
Early March 2016 RFP Due Date For Bids To DGS
Late March 2016 Notice To Proceed (NTP) Issued For 100% Plans
Early July 2016 NTP Issued By DGS For Start Of Construction Of
Roads & Utilities
Summer 2018 Completion Of Construction Of Roads & Utilities For
Stage 1 Phase 1
10
CURRENT 5 YEAR DEVELOPMENT PLAN
11
Anticipated 5-Year Land Use Map
Blue Phase One Development
Residential - Townhomes/Multifamily
Red Phase One Development
Mixed Use
Purple Buildings In-Use
- Gateway DC
- RISE Demonstration Center
Green Events DC’s Planned Washington D.C.
Entertainment and Sports Arena
Phase One Key Features:
Mixed-Use
(Parcel 17)
+30,000 SF of Retail ; 171,000 SF of
Office; 30,000 SF Innovation Greenspace
Townhomes
(Parcel 10/14)
+60 homes Townhomes (30%
affordable); +15 live-work-units
Multi-family
(Parcel 11)
250 units multifamily units (80%
affordable) in 6 historic buildings and one
center amenity building; +14,000 SF
innovation/arts/culture space
Entertainment
(Parcels 9/12)
5,000 seat Entertainment and Sports
Arena for use as a concert/ entertainment
venue, Wizards Training Facility and
arena for Mystics and other sports teams
10
14
11
17
Green
space
12
9
M
Bigger than Basketball – Key Features:
5,000 seat Sports and Entertainment for use as:
• Concert/ entertainment venue
• Wizards Training Facility
• Arena for Mystics and other sports teams
• Community focused arts and culture programs
• Parking and limited secured parking spots for
Monumental
• Adjacent to Metro Station (Congress Heights)
• Located Outside of Phase 1 Area Currently
Under Negotiation
Bigger than Basketball – Bigger than Basketball - Key
Deal Points
• Total construction cost of $55M
• Sources of construction funds: Events DC
$27M, District $23M, Monumental $5M.
• Monumental and affiliated entities will invest
$10 million at the St. Elizabeths East Campus
and in the surrounding community over the
19year lease term which can include
philanthropic investments.
• Events DC will construct facility.
• District to own facility and retain Events DC as
events management company for operations
and management under 19 year lease, at no
costs to the District.
• District’s planned Stage 1 infrastructure
improvements will service the facility.
• Anticipated construction completion Fall 2018
RESIDENTIAL (PARCELS StE- 10, 11 AND 14)
PHASE ONE PLAN
14
RESIDENTIAL VILLAGE AND AFFORDABLE HOUSING
15
Parcel 10/14 Parcel 11
Townhomes
Fee Simple
Multifamily
Ground Lease
+60 homes
(30% affordable)
Parcel 10: 0.8 acres
Parcel 14: 2.0 acres
250 units
(80% affordable)
in 6 historic buildings
and one center
amenity building
Parcel 11: 10.9 acres
Beautifully restored mid-century village is the historic
core of the campus and features a cluster of seven
unique and carefully preserved buildings practically
converted into live-work units and complimented by
newly designed for-sale, townhomes.
INNOVATION AND ARTS
16
Innovation and Arts
Live-Work Play Units*
Arts Incubator Areas*
Innovative Green Space
*Exact locations to be identified
Innovation and technology focused mixed-use building
adjacent to the Metro.
COMMERCIAL AND RETAIL
17
Use Size
Office (green) ~171,000 GSF
Retail (yellow) ~47,000 GSF
Parking Spaces +100 subterranean
Innovation
Greenspace
(blue dashes)
~30,000 SF along
Alabama Ave and at
the Metro Plaza
Modern Commercial Office Building with ample ground-
floor retail and restaurant opportunities for local and
national retailers as well as expansive and flexible office
floorplates above.
COMMERCIAL (PARCEL StE- 17) CONCEPTUAL
18
COMMUNITY BENEFITS
19
STABILIZATION OF 1902 BUILDINGS
20
• $4.5 million allocated to
stabilizing buildings 89, 94, 95
and 100
• Structural Carpentry Repairs
• Demo Lead Based Material
and Lead Abatement
• Roof Repair
• Masonry Repair
• Other – Tree trimming and
removal
BUILDING STABILIZATION/BEAUTIFICATION
21
CURRENT PROJECT SCHEDULE
22
December 2015 Regulatory/Preservation Outreach to Begin
Winter 2016 Phase One Real Estate Development – D.C. Council Review and Approval
Spring 2016 Solicitation Issued for Design-Building Contractor for Stage 1, Phase 1
Infrastructure Improvements
Spring 2016
(*Formal Reviews Summer/Fall
2016)
Design Process to Begin
Events DC’s Entertainment and Sports Arena
Phase One Residential Areas (CT Campus and Townhomes)
DC Water Tower Mitigation Effort
Spring 2016 DC Water Tower Construction to Begin
Summer 2016 Stage 1/Phase 1 Infrastructure Construction Start and Building 119/124
Demolition Complete
Spring 2017 Events DC’s Entertainment and Sports Arena Construction to Start
Spring 2018 DC Water Tower Construction Complete
Spring 2018
Design Process to Begin
Phase One Commercial/Retail Building (Adjacent to Congress Heights
Metro)
Spring/Summer 2018
Construction to Begin
Phase One Residential Areas (CT Campus and Townhomes)
September 2018 Events DC’s ESA Construction Complete
Spring 2019 Phase One Residential Areas (CT Campus and Townhomes) Complete
Spring 2020 Phase One Commercial/Retail Building (Adjacent to Congress Heights Metro)
Complete
Agency Roles and Next Steps
23