1.1 Installed Capacity of SGS & Share from Central Sector :

Installed Capacity

(MW)

State Sector Gen.

Stations (MW)

Central Sector

Share (MW)Total

May/16 2924.7 1125.92 4050.62

May/15 2424.7 1190.92 3615.62

% Increase 20.62% -5.46% 12.03%

1.2 Energy Requirement (Mus) & Transmission Loss (%) :

Energy

Un-Restricted

Requirement (In

MU)

Total Supply

(upto 132 KV)

(In MU)

Transmission

Loss %

May/16 1960.50 1958.71 2.70%

May/15 2044.93 2031.17 3.26%

% Increase -4.13% -3.57% -17.20%

1.3 Peak Demand (MW) :

Demand

Max.Un-Restricted

Demand Met (In

MW)

Max Demand

Met

(In MW)

May/16 3510 3457

May/15 3877 3610

% Increase -9.47% -4.24%

1.4 Generation Capacity Outage :

Planned Outage MU

May/16 8.40

May/15 43.92

Forced Outage MU

May/16 62.38

May/15 136.32

1.5 Generation in Mus :

1. SALIENT FEATURES OF CHHATTISGARH GRID FOR THE

MONTH OF MAY- 2016

Capacity Outage

41883 164.899492 470.346438 296.976 182.704 1114.92593 81.137732

0 0 0 0 0 0

42248 178.617218 446.2204 323.272 251.821 1199.930618 67.736474

164.899492

470.346438

296.976

182.704

1114.92593

81.137732

0 0

0

00 0

178.617218

446.2204323.272

251.821

1199.930618

67.736474

-150

50

250

450

650

850

1050

1250

1450

MU

s

KTPS HTPS DSPMTPS KWB Extn. MTPP#1Total

Thermal

Total

Hydel Gen.

May-15 200 504 335 303 0 1341 12

May-16 213 556 352 301 10 1432 7

Apr-16 242 521 353 305 162 1584 21

200

504

335303

0

1341

12

213

556

352 301

10

1432

7

242

521

353 305

162

1584

210

200

400

600

800

1000

1200

1400

1600

MU

s

Monthly Report May16

HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text
1
HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text
HCL
Typewritten Text

1.6 Demand Met in MW :

Demand Met

Un Restricted Demand

1.7 Water Level of Major Reservoirs for last day of the month in Mtrs :

Demand Met Un Restricted Demand

May-15 3610 3877

May-16 3457 3510

Apr-16 3891 3935

3610

3877

3457 3510

3891 3935

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100M

W

Hasdeo Bango Gangrel

May-15 355.37 338.23

May-16 345.86 340.54

Apr-16 346.67 340.84

355.37

338.23

345.86

340.54

346.67

340.84

330.00

335.00

340.00

345.00

350.00

355.00

360.00

Mtr

Monthly Report May16

HCL
Typewritten Text
2

1

2

3

4

5

6

7

8

9

10

11 Total Interruption in following S/s occurred in MAY-16.

S.No Date Name of the Sub StationTime of occurance

( hh:mm)

Restoration

Time (hh:mm)

1 3-May-16 132 KV PATHALGAON S/S 14:50 15:00

2 4-May-16 132 KV S/S ADBHAR 22:14 22:56

3 17-May-16 220 KV S/S GERWANI 01:55 03:25

4 25-May-16 132 KV S/S BHILAI 10:50 10:58

5 25-May-16 132 KV S/S KURUD (BHILAI) 10:50 10:58

6 26-May-16 132 KV S/S BORJHARA 13:50 14:04

7 26-May-16 132 KV S/S HIRAPOOLING 13:50 14:04

8 26-May-16 132 KV S/S BIRGAON 13:50 14:04

236 number of planned shutdowns of transmission lines & elements in CSPTCL grid availed

in the month of MAY-16.

21 number of force outages of CSPGCL units took place in the month of MAY-16.

2. POWER SUPPLY POSITION & GRID PERFORMANCE DURING THE

MONTH OF MAY-2016.

The maximum demand of Chhattisgarh met during MAY-16 was 3457 MW on dated 19-05-

2016, which is 4.24 % less than the MAY-15 of 3610 MW.

The maximum unrestricted demand during the month was 3510 MW on 19-05-2016 and

minimum demand met was 1653 MW on 21-05-2016 .

The energy requirement for the MAY-16 was 1960.50 MU which was 4.13 % less than the

requirement of 2044.93 MU in MAY-15.

Backing down of generation for about 0.666 MU as per the requirement of the system.

Load Shedding was also excercised during the month of MAY-2016 for 1.79 MU.

Based upon the blockwise frequency recorded in SCADA,Grid Frequency remained in the

IEGC Band of 49.9 to 50.05 Hz for 70.70 % of time during the month. It was above 50.05 Hz

for 25.27 % of time and below 49.90 Hz for 4.03 % of time.

During the month there was no instance of Under Frequency Relay operation reported in

CSPTCL grid as the frequency did not touch 49.2 Hz at all.

157 number of force outages of transmission lines & elements in CSPTCL grid took place in

the month of MAY-16.

Monthly Report May16

HCL
Typewritten Text
3

3.1 Generating Units Commissioned during MAY-2016.

S.No. Name of Project Unit No. Capacity (MW) Date of First Syn. C.O.D

3.2 Transmission Lines/Elements Commissioned during MAY-2016.

S.No. Name of Project Voltage Level Length in Ckt KM No. of Ckt Date of Syn.

400 KV Lines

220 KV Lines

132 KV lines

1LILO of 132 KV DCDS Korba-Mopka Line at

Koni.132 KV 30.46 DCDS Charged on 20.5.2016

240 MVA Transformer at newly constructed 132

KV S/s Koni was charged.132/33 KV -- -- Charged on 21.5.2016

NIL

NIL

NIL

Monthly Report May16

HCL
Typewritten Text
4

S.No. PARTICULAR UNIT May-16

C.S.P.G.C.L GENERATION SCHEDULE & ACTUAL INJECTION (Ex-Bus)

KTPS, Korba East (sch.) MU 185.86

HTPS, Korba West (Sch.) MU 500.15

DSPM, Korba East (Sch.) MU 325.44

Korba West (Extn) (Sch.) MU 286.16

MTPP Tendubhata MU 10.38

C.S.P.G.C.L Gen. SCHEDULE MU 1,307.99

KSTPS, Korba East (inj) MU 187.20

HTPS, Korba West (Inj) MU 503.89

DSPM, Korba East (Inj) MU 324.80

Korba West (Extn) (Inj) MU 284.90

MTPP (FIRM+INFIRM) MU 1.74

HASDEO BANGO HYDEL (Inj) MU 6.52

C.S.P.G.C.L Gen. JMR data (132 KV &

above)U MU 1,309.04

SHP-Gangrel (Inj) MU 0.65

SHP-Sikasar (Inj) MU 0.20

SHP-HTPS Korba West (Mini-Micro) (Inj) MU 0.82

CO-GEN Kawardha plant (inj) MU 0.38

C.S.P.G.C.L Gen. JMR data (33 KV &

Below)MU 2.05

Schedule Energy, Actual Energy Injection & OD(+)/UD(-)

2 CPP/IPP/BIOMASS SCHEDULE & ACTUAL INJECTION

INTER REGIONAL POWER PURCHASE / IMPORT [EX-CG] (SCHEDULED)

Bilateral/Banking via STOA & MTOA (Sch) CSEB STOA MU 110.22

MTOA MU 16.10

PX (Sch)(Collective) CSEB+OAC MU 16.09

2(B)

INTRA REGIONAL POWER

PURCHASE/IMPORT [EX-CG]

(SCHEDULED) via PPA (upto 33 KV)

CSEB MU 0.96

ENERGY BALANCE STATEMENT OF MAY 2016

1

2(A)

Monthly Report May16

HCL
Typewritten Text
5

S.No. PARTICULAR UNIT May-16

ENERGY BALANCE STATEMENT OF MAY 2016

INTER REGIONAL POWER SALE/EXPORT [EX-CG] (SCHEDULED)

STOA MU 0.00

MTOA MU -212.10

Total -212.10STOA MU 0.00

MTOA MU 0.00

Total 0.00

PX (Sch) CSEB+OAC MU -75.93

2(D)TOTAL CPP/IPP/Biomass INJECTION 132

KV & ABOVEV MU 123.88

2(E)TOTAL CPP/IPP/Biomass/RENEWABLE

SOURCE INJECTION 33 KV & BelowMU 0.00

3 CENTRAL SECTOR GENERATION SCHEDULE & ACTUAL INJECTION

3(A) SAIL (BSP) NSPCL SCHEDULE (Ex-CG) MU 144.07

3(B)CEN. SECTOR SCHEDULED ENERGY (EX-

ISGS) MU 733.44

3'(C)CEN. SECTOR SCHEDULED ENERGY (EX-

CG) MU 699.81

3(D)Drawal/Injection from CTU Grid at CG

Periphery (EXCL. BSP)W MU 525.21

4

SCHEDULE POWER INCLUDING BI-LAT.

EXCHANGE (Ex-CG periphery) as per WRPC

Weekly UI Accounts

B MU 698.04

5

NET DRAWL FROM CENTRAL SECTOR

INCL BI-LATERALS as per WRPC Weekly

UI Account

C MU 702.62

6 OD/UD ( + / - ) D=C-B MU 4.58

6(A) Total Overdrawal (+) E 52.36

6(B) Total Underdrawal (-) -47.78

6(C) DSM Rate for UD Rs/Kwh 0.74

6(D) DSM Rate for OD Rs/Kwh 2.71

6(E) NET DSM Rate Rs. 23.20

7CG SUPPLY (EXCL.AUX.CONS) At 132 KV

& ABOVE X=U+V+W MU 1,958.13

8CG CONSUMPTION AT 33KV XMER SIDE +

EHV SalesY MU 1,905.27

9 Z=X-Y MU 52.86

% 2.70%

10 LOAD SHEDDING (Calculated) MU 1.79

11 Requirement MU 1,959.92

TRANSMISSION LOSS OF CG SYSTEM

2'(C) BILATERAL POWER SALE/EXPORT [EX-

CG] (SCHEDULED) via MTOA & STOA

CSEB

OAC

Monthly Report May16

HCL
Typewritten Text
HCL
Typewritten Text
6

5. DEMAND PARTICULARS FOR THE MONTH OF MAY-2016

Demand MW Date Time Frequency

Demand Met (MW) 3457 19-May-16 20:00 49.97

Un restricted Demand (MW) 3510 19-May-16 23:00 50.00

Minimum Demand 1653 21-May-16 17:00 50.08

Break-Up of Generation / Injection at the time of monthly Peak Demand

19/05/2016 (20:00 hrs)

MW %

CSPGCL Thermal 1746 50%

CSPGCL Hydel 83 2%

CPP/IPP's (STOA+PPA) Injection 131 4%

Other Injection 105 3%

CS Share including BSP share in

NSPCL 1255 36%

Net Import / Export 45 1%

OD(+) / UD(-) 93 3%

Demand Met (MW) 3457

CSPGCL Thermal 1746 MW

CSPGCL Hydel83 MWCPP/IPP's (STOA+PPA)

Injection31 MW

Other Injection105 MW

CS Share including BSP share in NSPCL

1255 MW

Net Import / Export 45 MW OD(+) / UD(-)

93 MW

Max. Demand Met (3457 MW)

on 19.05.16 at 20:00 Hrs.

Monthly Report May16

HCL
Typewritten Text
7

May-16Prog. From

01.04.2016May-16

Prog. From

01.04.2016

1 50 46.00 28.84 57.15 77.54 78.08

2 50 39.00 12.66 31.93 34.02 43.62

3 50 46.00 14.35 44.33 38.57 60.56

4 50 46.00 29.26 59.49 78.66 81.27

5 120 108.00 69.88 135.90 78.27 77.36

6 120 99.00 58.17 126.43 65.16 71.97

STN. 440 376.00 213.16 455.23 65.11 70.67

1 250 255.00 172.86 348.40 92.94 95.19

2 250 254.00 179.27 357.00 96.38 97.54

STN. 500 507.00 352.128 705.40 94.66 96.37

1 210 209.00 148.31 290.14 94.92 94.37

2 210 207.00 146.33 281.55 93.65 91.58

3 210 185.00 125.98 247.33 80.63 80.45

4 210 192.00 135.22 258.06 86.55 83.94

STN. 840 837.00 555.83 1077.08 88.94 87.58

4 KWB Extn.1 1 500 458.00 300.89 605.83 80.88 82.76

1 500 349.00 10.08 172.39 2.71 23.55

2 -- -- -- -- -- --

STN.

6 2780 1422.01 2843.55 69.24 69.87

1 40 1.65 9.73

2 40 2.51 9.48

3 40 2.45 6.58

STN. 6.61 25.80

1 2.5 0.19 0.54

2 2.5 0.21 0.75

3 2.5 0.18 0.62

4 2.5 0.09 0.60

STN. 0.67 2.50

1 3.5 0.00 0.00

2 3.5 0.20 0.54

STN. 0.20 0.54

1 850 KW 0.44 0.879

2 850 KW 0.41 0.813

STN. 0.850 1.692

6. ENERGY GENERATED, PLF & MAX. DEMAND OF GENERATING

STATIONS/UNITS FOR THE MONTH OF MAY-2016

Hasdeo Bango1

Hasdeo Thermal

Power Station3

Korba Thermal

Power Station,

Korba East

Dr Shyama

Prasad

Mukherjee TPS

2

Power Station Unit

No.

THERMAL

1

Energy generation (MU) PLF (%)

S.No.

Installed

Capacity

(MW)

Max.

Demand

(MW)

4

Gangrel

Sikasar

KWB

Mini Micro

TOTAL THERMAL

HYDEL

2

3

Marwa Thermal

Power Station5

Monthly Report May16

HCL
Typewritten Text
8

Date Max Min Average

01-May-16 50.20 49.86 50.02 1.04 84.38 14.58

02-May-16 50.25 49.86 50.02 3.13 66.67 30.21

03-May-16 50.16 49.84 50.01 5.21 63.54 31.25

04-May-16 50.28 49.92 50.03 0.00 87.50 12.50

05-May-16 50.14 49.88 50.03 3.13 62.50 34.38

06-May-16 50.13 49.92 50.03 0.00 80.21 19.79

07-May-16 50.09 49.92 50.02 0.00 93.75 6.25

08-May-16 50.39 49.93 50.05 0.00 46.88 53.13

09-May-16 50.12 49.82 50.01 3.13 78.13 18.75

10-May-16 50.14 49.88 50.01 2.08 76.04 21.88

11-May-16 50.17 49.88 50.03 3.13 63.54 33.33

12-May-16 50.14 49.84 50.01 2.08 75.00 22.92

13-May-16 50.13 49.82 50.00 8.33 71.88 19.79

14-May-16 50.08 49.83 49.99 6.25 87.50 6.25

15-May-16 50.11 49.82 50.00 5.21 88.54 6.25

16-May-16 50.12 49.87 50.01 3.13 68.75 28.13

17-May-16 50.11 49.62 50.01 1.04 89.58 9.38

18-May-16 50.14 49.83 50.02 4.17 63.54 32.29

19-May-16 50.12 49.86 50.01 7.29 64.58 28.13

20-May-16 50.17 49.82 50.02 3.13 69.79 27.08

21-May-16 50.14 49.90 50.04 0.00 56.25 43.75

22-May-16 50.21 49.84 50.03 2.08 61.46 36.46

23-May-16 50.25 49.81 50.05 1.04 58.33 40.63

24-May-16 50.24 49.74 50.00 14.58 51.04 34.38

25-May-16 50.16 49.92 50.04 0.00 62.50 37.50

26-May-16 50.11 49.76 49.98 17.71 64.58 17.71

27-May-16 50.10 49.45 49.98 8.33 77.08 14.58

28-May-16 50.18 49.84 50.01 6.25 58.33 35.42

29-May-16 50.20 49.92 50.06 0.00 47.92 52.08

30-May-16 50.10 49.87 50.00 4.17 89.58 6.25

31-May-16 50.12 49.76 49.97 9.38 82.29 8.33

Monthly 50.39 49.45 50.02 4.03 70.70 25.27

% of Time

Freq.was >50.05

Hz

7. FREQUENCY PROFILE DURING MAY-2016

(As per block wise frequency recorded in SLDC Raipur)

FREQUENCY (Hz)% of Time

Freq.was <49.9

Hz

% of Time

Freq.was

between 49.9

to 50.05 Hz

Monthly Report May16

HCL
Typewritten Text
9

Station UNIT #

INSTALLED

CAPACITY

(IN MW)

OUTAGE DATE &

TIMESYN. DATE & TIME

OUTAGE

(HH:MM)LOSS (IN MU) REASON

1 50 NIL NIL NIL NIL NIL

2 50 NIL NIL NIL NIL NIL

3 50 NIL NIL NIL NIL NIL

4 50 NIL NIL NIL NIL NIL

5 120 NIL NIL NIL NIL NIL

6 120 NIL NIL NIL NIL NIL

1 210 NIL NIL NIL NIL NIL

2 210 NIL NIL NIL NIL NIL

3 210 NIL NIL NIL NIL NIL

4 210 NIL NIL NIL NIL NIL

5 500 NIL NIL NIL NIL NIL

1 250 NIL NIL NIL NIL NIL

2 250 NIL NIL NIL NIL NIL

Total 0.000

8.1 PLANNED OUTAGES OF GENERATORS FOR THE MONTH OF MAY-2016

KTPS

HTPS

DSPM

Monthly Report May16

HCL
Typewritten Text
10

StationUnit

No.

INSTALLED

CAPACITY

(IN MW)

NO.OF

TRIPPINGS

OUTAGE DATE &

TIMESYN. DATE & TIME OUTAGE (HH:MM)

GENERATION

LOSS (IN MU)REASON

1 50 1 25/05/16 17:17 27/05/16 10:38 41:21:00 2.068DUE TO OUTAGE OF MILL FAN-1B BRG.

VIBRATION HIGH

2 50 01/05/16 00:00 05/05/16 13:51 109:51:00 5.492 DUE TO TUBE LEAKAGE IN ECO-I STAGE RHS

2 50 14/05/16 23:41 16/05/16 08:18 32:37:00 1.631 DUE TO OUTAGE OF MF 2B

2 50 22/05/16 18:44 25/05/16 00:00 53:16:00 2.663 DUE TO OUTAGE OF MILL FAN 2B

3 50 03/05/16 02:30 06/05/16 01:54 71:24:00 3.570 DUE TO OUTAGE OF MF 3A

3 50 07/05/16 21:08 08/05/16 19:55 22:47:00 1.139 DUE TO CONDENSER TUBE LEAKAGE

3 50 16/05/16 12:26 24/05/16 11:39 191:13:00 9.561 DUE TO OUTAGE OF MILL FAN 3B MOTOR

3 50 24/05/16 20:06 27/05/16 22:56 74:50:00 3.742 DUE TO OUAGE OF MILL FAN 3B MOTOR

4 50 1 01/05/16 00:00 02/05/16 12:14 36:14:00 1.812 DUE TO OUTAGE OF MILL FAN 4B

5 120 1 17/05/16 17:40 17/05/16 19:25 1:45:00 0.210 SYSTEM JERK

6 120 17/05/16 19:50 21/05/16 00:20 76:30:00 9.180 TUBE LEAKAGE

6 120 27/05/16 00:30 27/05/16 03:15 2:45:00 0.330 FURNACE PR.VERY HIGH

1 210 0 NIL NIL NIL NIL NIL

2 210 1 - 01/05/16 02:47 2:47:00 0.5845 Water Wall Tbe Leakage

3 210 1 28/05/16 23:30 30/05/16 02:54 27:24:00 5.754 S/H Tube Leakage

4 210 12/05/16 14:30 13/05/16 23:25 32:55:00 6.913 S/H Tube Leakage

4 210 14/05/16 03:13 14/05/16 03:55 0:42:00 0.147 Unit Auxiliary Transformer problem

5 500 NIL NIL NIL NIL NIL

1 250 15/05/2016 13:11 16/05/2016 9:34 20:23:00 5.096 Water wall tube leakage at 47 mtr

1 250 17/05/2016 17:40 17/05/2016 20:24 2:44:00 0.683 System disturbance (Jerk)

1 250 17/05/2016 20:25 17/05/2016 21:23 0:58:00 0.242 Sudden pr relief valve of G.T. operated

1 250 27/05/2016 16:15 27/05/2016 20:35 4:20:00 1.083

Tripped on Generator protection.Due to heavy

strom and wind, the wall covering sheet fallen

down on conductor of GT-1

2 250 1 20/05/2016 12:32 20/05/2016 14:28 1:56:00 0.483 Turbine tripped on Lub Oil Pressure Low

Total 21 808:42:00 62.383

8.2 FORCED OUTAGES OF STATE GENERATING STATIONS FOR THE MONTH OF MAY-2016

KTPS

HTPS

3

4

DSPM

2

2

4

Monthly Report May16

HCL
Typewritten Text
11

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF MAY-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

1 1-May-16 132 KV RAJIM-KURD CKT. 01/05/2016 10:33 02/05/2016 3:46 17:13:00

2 2-May-16 132 KV BHILAI - SIMGA CKT 04:46 04:56 0:10:00

3 2-May-16 132 KV BISHRAMPUR RLY TRACTION NO. I 14:50 14:55 0:05:00

4 2-May-16 132 KV BARSOOR - KIRANDUL CKT NO. I 22:35 22:45 0:10:00

5 2-May-16 132 KV BARSOOR - KIRANDUL CKT NO. II 22:35 22:50 0:15:00

6 3-May-16 132 KV BAIKUNTHPUR - BISHRAMPUR CKT 14:55 15:20 0:25:00

7 3-May-16 132 KV BAIKUNTHPUR - BISHRAMPUR CKT 15:56 16:50 0:54:00

8 4-May-16 132KV SIMGA - BEMETARA CKT. 00:53 01:09 0:16:00

9 4-May-16 220KV KORBA(W) - DSPM CKT. 16:42 17:27 0:45:00

10 4-May-16 132KV KORBA(E) - CHAMPA CKT. NO. I 17:10 17:35 0:25:00

11 4-May-16 132KV KACHNA - MANDIR HASOUD (MONET) CKT. 04/05/2016 16:25 05/05/2016 8:20 15:55:00

12 4-May-16 220KV KORBA(E) - BUDHIPADAR CKT. NO. II 17:37 19:42 2:05:00

13 4-May-16 132KV KACHNA - MANDIR HASOUD (MONET) CKT. 17:20 17:42 0:22:00

14 4-May-16 220KV RAITA - GURUR CKT. 19:42 20:50 1:08:00

15 4-May-16 132KV GURUR - BHANUPRATAPPUR CKT. 20:35 20:48 0:13:00

16 4-May-16 132KV RAJIM - PARASWANI CKT. 20:38 21:18 0:40:00

17 4-May-16 132KV RAJIM - MAHASAMUND CKT. 20:40 21:24 0:44:00

18 4-May-16 132 JAGDALPUR - NAGARNAR 22:54 23:20 0:26:00

19 5-May-16 220KV RAITA - GURUR CKT. 04/05/2016 21:42 05/05/2016 10:35 12:53:00

20 5-May-16 132 KV RAIGARH - ADBHAR CKT 04/05/2016 22:14 05/05/2016 13:40 15:26:00

21 5-May-16 40 MVA X-MER NO. II AT 220 KV S/S RAIGARH 04/05/2016 22:14 05/05/2016 1:04 2:50:00

22 5-May-16 132 KV BANGO - CHHURI CKT 16:55 17:34 0:39:00

23 5-May-16 220 KV KW - DSPM CKT 17:22 18:04 0:42:00

24 5-May-16 132 KV SIMGA - CENTURY CEMENT CKT 21:15 21:36 0:21:00

25 5-May-16 400 KV MADWA - RAITA CKT 21:53 22:47 0:54:00

26 5-May-16 132 KV DONGARGARH - BALAGHAT CKT 22:00 22:41 0:41:00

27 5-May-16 132 KV MANENDRAGARH - RLY TRACTION NO. I 22:31 22:36 0:05:00

28 5-May-16 220 KV RAITA - GURUR CKT 22:53 23:59 1:06:00

29 5-May-16 220 KV RAITA - GURUR CKT 17:48 22:53 5:05:00

30 7-May-16 220KV CHHURI - BISHRAMPUR CKT. 00:09 00:29 0:20:00

31 7-May-16 220 KV CHHURI-BISHRAMPUR CKT. 00:41 01:14 0:33:00

32 7-May-16 132 KV BAIKUNTHPUR -MANENDRAGARH CKT. 00:25 00:44 0:19:00

33 7-May-16 132 KV BALODABAZAR-LAFARZ CKT. 22..55 CONTD. ---

34 8-May-16 400 KV MADWA - RAITA CKT No.I 20:08 20:50 0:42:00

35 8-May-16 132 KV BALODA LAFARGE CKT 08/05/2016 22:55 09/05/2016 3:40 4:45:00

Monthly Report May16

HCL
Typewritten Text
12

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF MAY-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

36 9-May-16 132 KV BARSOOR - KIRANDUL CKT No.I 13:16 13:37 0:21:00

37 9-May-16 132 KV PATTHALGAON - JASHPUR CKT 17:51 17:55 0:04:00

38 10-May-16 132 KV KOTMIKALA - MANENDRAGARH CKT 13:45 14:14 0:29:00

39 10-May-16 132 KV BANGO - BISHRAMPUR CKT 14:57 15:33 0:36:00

40 12-May-16 132 KV CHAMPA - CHAPLE CKT 13:20 13:39 0:19:00

41 12-May-16 132 KV GHARGHODA - MAHAVEER ENERGY CKT 17:45 18:00 0:15:00

42 12-May-16 63 MVA X-MER AT 132 KV S/S KUHERA 11/05/2016 16:50 12/05/2016 20:35 27:45:00

43 12-May-16 132 KV SIMGA - BHATAPARA CKT 18:57 19:11 0:14:00

44 13-May-16 220 KV GURUR - BHILAI CKT 03:50 04:08 0:18:00

45 13-May-16 132 KV SIMGA - CENTURY CKT 05:59 06:12 0:13:00

46 13-May-16 220 KV KHEDAMARA - URLA CKT 21:23 21:47 0:24:00

47 14-May-16 132KV AKALTARA - ARASMETA CKT. 10:20 10:25 0:05:00

48 14-May-16 220KV KOTMIKALA - ANUPPUR CKT NO. II 11:10 11:58 0:48:00

49 14-May-16 160MVA Xmer NO. I AT 220KV S/S SILTARA 12:05 12:25 0:20:00

50 14-May-16 132KV JAGDAMBACKT. AT220KV S/S SILTARA 12:05 15:47 3:42:00

51 14-May-16 220KV BHILAI - BARSOOR CKT. 17:30 17:50 0:20:00

52 14-May-16 132KV BARSOOR - JAGDALPUR CKT.NO.I 17:21 17:51 0:30:00

53 14-May-16 132KV BARSOOR - JAGDALPUR CKT.NO.II 17:21 17:53 0:32:00

54 15-May-16 132 KV RAIGARH - CHAPLE CKT. 01:55 02:30 0:35:00

55 15-May-16 132 KV CHAPLE - MONET CKT. NO. I 01:58 02:30 0:32:00

56 15-May-16 132 KV CHAPLE - MONET CKT. NO. II 01:58 FAULTY ---

57 15-May-16 132 KV RAIGARH - RR ENERGY CKT. 02:02 03:33 1:31:00

58 15-May-16 132 KV SECTOR-C - BHILAI CKT. 23:35 23:45 0:10:00

59 15-May-16 132 KV SECTOR-C - URLA CKT. 23:35 23:45 0:10:00

60 15-May-16 132 KV BHILAI - GUDHIYARI CKT 15/05/2016 23:34 16/05/2016 0:01 0:27:00

61 15-May-16 132 KV BHILAI - SARONA CKT 15/05/2016 23:34 16/05/2016 0:04 0:30:00

62 16-May-16 132 KV RAIGARH - GHARGHODA CKT 12:23 12:40 0:17:00

63 16-May-16 132 KV BAGBAHRA - PARASWANI CKT 14:53 15:13 0:20:00

64 16-May-16 132 KV KACHNA - MANDIR HASAUD CKT 14:55 18:10 3:15:00

65 16-May-16 132 KV BHATAPARA - MUNGELI CKT 20:01 20:15 0:14:00

66 17-May-16 220 KV RAIGARH - GHARGHODA CKT 01:45 02:26 0:41:00

67 17-May-16 132 KV RAIGARH - MAHAVIR ENERGY CKT 01:45 02:28 0:43:00

68 17-May-16 220 KV RAIGARH - JPL CKT 01:55 03:24 1:29:00

69 17-May-16 220 KV RAIGARH - GERWANI CKT 01:55 03:25 1:30:00

70 17-May-16 132 KV AMBIKAPUR - PATTHALGAON CKT 09:55 10:10 0:15:00

Monthly Report May16

HCL
Typewritten Text
13

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF MAY-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

71 17-May-16 132 KV BISHRAMPUR I/C No.I 10:00 15:10 5:10:00

72 17-May-16 132 KV RLY TRACTION No.I AT 132 KV S/S MANENDRAGARH 15:35 15:44 0:09:00

73 17-May-16 132 KV BANGO - BISHRAMPUR CKT 16:05 16:32 0:27:00

74 17-May-16 132 KV BANGO - MANENDRAGARH CKT 16:16 16:35 0:19:00

75 17-May-16 400 KV BHILAI - KSTPS No.I 17:23 18:28 1:05:00

76 17-May-16 400 KV BHILAI - KWB EXTN. CKT 17:33 18:35 1:02:00

77 17-May-16 220 KV KW - CHHURI CKT No.II 17:32 18:03 0:31:00

78 17-May-16 132 KV CHHURI - DARRI CKT 17:25 18:43 1:18:00

79 17-May-16 220 KV KW - I/C No.I 17/05/2016 17:48 18/05/2016 12:45 18:57:00

80 17-May-16160 MVA XMER No.I AT KEB ( H.T. DUE TO SPARK

OBSERVED)17:40 18:24 0:44:00

81 17-May-16 400 KV KW - MADWA CKT 17:52 18:30 0:38:00

82 17-May-16 132 KV KE - DARRI CKT No.I 17:35 18:19 0:44:00

83 17-May-16 132 KV KE - DARRI CKT No.II 17:35 19:40 2:05:00

84 17-May-16 220 KV KE - CHURRI CKT 17:44 18:26 0:42:00

85 17-May-16 220 KV KW - CHURRI CKT No.II 17:32 18:05 0:33:00

86 17-May-16 220 KV KE KW I/C No.II 17:48 18:13 0:25:00

87 17-May-16 132 KV GHARGHODA - MAHAVIR ENERGY CKT 19:20 19:30 0:10:00

88 17-May-16 132 KV KE - CHAMPA CKT No.II 19:50 20:10 0:20:00

89 17-May-16 132 KV BIRGAON - HIRA POLLING CKT 19:31 19:50 0:19:00

90 18-May-16 500 MVA X-MER AT KWB 17/05/2016 17:38 18/05/2016 17:22 23:44:00

91 19-May-16 132 KV AMBIKAPUR - PATHALGAON CKT 15:25 15:45 0:20:00

92 19-May-16 132 KV CHAPLE - MONET CKT NO. II 15/05/2016 1:58 19/05/2016 16:57 110:59:00

93 20-May-16 132 KV RAJNANDGAON - PULGAON CKT 17:32 18:20 0:48:00

94 20-May-16 132 KV BALOD - GUNDERDEHI CKT 18:45 18:50 0:05:00

95 20-May-16 132 KV BALOD - DALLI RAJHARA CKT 18:45 19:01 0:16:00

96 20-May-16 132 KV THELKADIH - DHAMDHA CKT 17:52 18:20 0:28:00

97 20-May-16 220 KV KEB - BUDHIPADAR CKT NO. II 20:05 CONTD. ---

98 21-May-16 132 KV MANENDRAGARH - RLY TRACTION NO. I 11:23 11:40 0:17:00

99 21-May-16 132 KV MANENDRAGARH - RLY TRACTION NO. I 12:06 12:20 0:14:00

100 21-May-16 400 KV KHEDAMARA(BHILAI) - KW Extn. CKT 16:03 17:58 1:55:00

101 21-May-16 400 KV KHEDAMARA(BHILAI) - NTPC CKT NO. I 16:06 17:14 1:08:00

102 21-May-16 220 KV URLA - RAITA CKT 16:18 18:07 1:49:00

103 21-May-16 220 KV SUHELA - BEMETARA CKT NO. II 16:17 17:00 0:43:00

104 21-May-16 132 KV BHATAPARA - BALODA BAZAR CKT 16:38 16:57 0:19:00

105 21-May-16 400 KV RAITA - KHEDAMARA CKT NO. III 16:33 18:14 1:41:00

Monthly Report May16

HCL
Typewritten Text
14

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF MAY-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

106 21-May-16 132 KV MAHASAMUND - RAJIM CKT 21/05/2016 17:03 22/05/2016 6:15 13:12:00

107 21-May-16 132 KV BHATAPARA - LAFARGE CKT 17:15 17:25 0:10:00

108 21-May-16 132 KV RAIGARH - GHARGHODA CKT 17:16 17:59 0:43:00

109 21-May-16 132 KV BHILAI - SIMGA CKT NO. II 16:09 20:48 4:39:00

110 21-May-16 132 KV SIMGA - CENTURY CKT 16:54 17:37 0:43:00

111 21-May-16 132 KV SIMGA - CHAKARBHATA CKT 21/05/2016 16:16 22/05/2016 0:47 8:31:00

112 21-May-16 220 KV KEB - BUDHIPADAR CKT NO. II(H.T.) 21:13 FAULTY ---

113 22-May-16132 KV RLY TRACTION No.I AT 132 KV S/S

MANENDRAGARH 03:05 03:10 0:05:00

114 22-May-16 132 KV KORBA - CHAMPA CKT No.II 17:10 17:46 0:36:00

115 22-May-16 132 KV SILTARA - KACHNA CKT 17:10 17:26 0:16:00

116 22-May-16 160 MVA XMER No.I & II AT 220 KV S/S SILTARA 17:10 17:15 0:05:00

117 22-May-16 132 KV SILTARA - GODAWARI CKT 17:15 FALUTY. ---

118 22-May-16 220 KV DSPM - KORBA (W) CKT 18:02 18:42 0:40:00

119 22-May-16 132 KV KORBA - CHAMPA CKT No.II 18:30 19:52 1:22:00

120 22-May-16 132 KV KORBA - CHAMPA CKT No.II 20:55 23:16 2:21:00

121 23-May-16 132 KV CHAPLE - CHAMPA CKT 05:45 06:10 0:25:00

122 23-May-16 40 MVA X-MER AT 132 KV S/S BAGBAHARA 09:50 10:20 0:30:00

123 23-May-16 132 KV SARAIPALI - SANKARA CKT 13:56 14:16 0:20:00

124 23-May-16 220 KV KORBA EAST - KORBA EAST I/C NO. II 23/05/2016 14:04 24/05/2016 17:02 26:58:00

125 23-May-16 220 KV MOPKA - CHHURI CKT NO. II 14:02 15:10 1:08:00

126 24-May-16 132 KV RLY TRACTION No.II AT AKALTARA 15:15 16:54 1:39:00

127 25-May-16 220 KV KW - DSPM CKT 07:04 16:16 9:12:00

128 25-May-16 125 MVA XMER-II AT 220 KV S/S BHILAI 10:49 11:20 0:31:00

129 25-May-16 132 KV I/C No.IV AT 132 KV S/S BHILAI 10:50 11:02 0:12:00

130 25-May-16 400 KV RAITA - KHEDAMARA CKT No.II 15:17 16:57 1:40:00

131 25-May-16 400 KV RAITA - KHEDAMARA CKT No.III 15:18 16:53 1:35:00

132 25-May-16 125 MVA XMER No.III AT 220 KV S/S BHILAI 15:16 17:00 1:44:00

133 25-May-16 132 KV URLA - KACHNA CKT 15:12 15:15 0:03:00

134 25-May-16 315 MVA XMER AT 400 KV S/S MADWA 15:17 16:06 0:49:00

135 25-May-16 132 KV RAIGARH - SARANGARH CKT No.I 16:35 17:05 0:30:00

136 25-May-16 132 KV KONDAGAON - KANKER CKT 15:22 15:32 0:10:00

137 26-May-16 160 MVA X-MER NO. I, II & III AT 220 KV S/S URLA 13:50 14:04 0:14:00

138 26-May-16 132 KV URLA - SECTOR -C CKT 13:50 14:51 1:01:00

139 26-May-16 132 KV URLA - SECTOR -C CKT 15:21 17:54 2:33:00

140 26-May-16 132 KV URLA - BIRGAON CKT 16:27 16:37 0:10:00

Monthly Report May16

HCL
Typewritten Text
15

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF MAY-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

141 27-May-16 132 KV RAIGARH - RR ENERGY CKT 06:42 06:59 0:17:00

142 27-May-16 220 KV KWB - DSPM CKT 16:05 19:47 3:42:00

143 27-May-16 220 KV KEB - DSPM CKT 16:17 17:15 0:58:00

144 27-May-16 132 KV PATHALGAON - JASHPUR CKT 16:20 16:25 0:05:00

145 27-May-16 132 KV PATHALGAON - JASHPUR CKT 16:58 17:25 0:27:00

146 27-May-16 160 MVA X-MER NO. I AT 220 KV S/S SILTARA 18:25 19:15 0:50:00

147 28-May-16 132 KV PATHALGAON - JASHPUR CKT 15:00 15:14 0:14:00

148 28-May-16 132 KV PATHALGAON - JASHPUR CKT 15:58 16:12 0:14:00

149 28-May-16 220 KV BHILAI - BARSOOR CKT NO. I 15:14 15:35 0:21:00

150 28-May-16 220 KV BHILAI - BARSOOR CKT NO. I 15:37 16:24 0:47:00

151 28-May-16 132 KV BARSOOR - JAGDALPUR CKT NO. I 15:15 15:23 0:08:00

152 28-May-16 132 KV BARSOOR - JAGDALPUR CKT NO. I 15:37 15:45 0:08:00

153 28-May-16 132 KV BARSOOR - JAGDALPUR CKT NO. II 15:15 15:30 0:15:00

154 28-May-16 132 KV BARSOOR - JAGDALPUR CKT NO. II 15:37 15:47 0:10:00

155 28-May-16 132 KV KANKER - KONDAGAON CKT 15:15 FAULTY ---

156 28-May-16 132 KV BHATAPARA - BALODA BAZAR CKT 16:35 16:50 0:15:00

157 30-May-16 132KV KORBA - CHAMPA CKT. NO. II 11:05 11:17 0:12:00

Monthly Report May16

HCL
Typewritten Text
16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF MAY-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

1 1-May-16 132 KV AKALTARA - RLY TRACTION NO. II 12:05 15:15 3:10:00

2 2-May-16 40 MVA X-MER NO. I AT 132 KV S/S CHAKARBHATA 06:20 10:35 4:15:00

3 3-May-16 40 MVA X-MER NO. II AT 132 KV S/S CHAKARBHATA 06:12 11:06 4:54:00

4 3-May-16 220 KV KW - CHHURI CKT NO. II 11:54 13:40 1:46:00

5 3-May-16 132 KV SILTARA - SKS CKT 16:50 18:30 1:40:00

6 4-May-16 132KV CHAKARBHATA CKT. 06:07 10:13 4:06:00

7 4-May-16 132KV SILTARA - KACHNA CKT. 06:30 09:05 2:35:00

8 4-May-16 160MVA Xmer NO. II AT 220KV S/S DOMA 08:30 17:02 8:32:00

9 4-May-16 132KV KURUD - RAJIM CKT. 09:00 16:34 7:34:00

10 4-May-16 160MVA Xmer NO. II AT 220KV S/S RAIGARH 09:10 17:28 8:18:00

11 4-May-16 40MVA Xmer NO. I AT 132KV S/S GUDHIYARI 09:15 15:10 5:55:00

12 4-May-16 220KV RAITA - URLA CKT. 09:21 12:48 3:27:00

13 4-May-16 40MVA Xmer NO. II AT 132KV S/S SARAIPALI 11:26 12:40 1:14:00

14 4-May-16 132KV SIMGA - BEMETARA CKT. 14:29 19:02 4:33:00

15 5-May-16 132 KV CHAKARBHATA - KOTA CKT No.I 08:08 11:41 3:33:00

16 5-May-16 160 MVA XMER No.II AT 220 KV S/S DOMA 08:30 15:35 7:05:00

17 5-May-16 40 MVA XMER No.II AT 132 KV S/S GUDHIYARI 09:15 15:25 6:10:00

18 5-May-16 220 KV URLA - KHEDAMARA CKT 09:02 12:38 3:36:00

19 5-May-16 132 KV KE - I/C No.II 12:10 15:49 3:39:00

20 5-May-16 132 KV CHAKARBHATA - KOTA CKT No.II 11:45 13:29 1:44:00

21 5-May-16 132 KV BISHRAMPUR - AMBIKAPUR CKT No.I 13:20 17:53 4:33:00

22 5-May-16 220 KV URLA - SILTARA CKT 13:22 17:10 3:48:00

23 6-May-16 40MVA Xmer NO. I AT 132KV S/S DOMA 08:30 11:08 2:38:00

24 6-May-16 40MVA Xmer NO. III AT 132KV S/S GUDHIYARI 10:37 13:55 3:18:00

25 6-May-16 40MVA 132/33KV Xmer NO. I AT 220KV S/S URLA 09:44 11:54 2:10:00

26 6-May-16 132KV GUDHIYARI - BIRGOAN CKT. 09:28 10:32 1:04:00

27 6-May-16 132KV SIMGA - BEMETARA CKT. 10:20 16:12 5:52:00

28 6-May-16 40MVA 132/33KV Xmer NO. II AT 220KV S/S DOMA 12:05 14:02 1:57:00

29 6-May-16 132KV SECTOR-C - BIRGAON CKT. 13:25 16:06 2:41:00

30 6-May-16 160MVA 220/132KV Xmer NO. II AT 220KV S/S PARASWANI 13:07 15:05 1:58:00

31 6-May-16 132KV DOMA - RAWANBHATA CKT NO. I 14:20 15:32 1:12:00

32 6-May-16 220KV KORBA(E) - CHHURI CKT. 05/05/2016 10:21 06/05/2016 14:50 28:29:00

33 6-May-16 132KV DOMA - RAWANBHATA CKT NO. II 15:34 16:32 0:58:00

34 6-May-16 220KV RAITA - GURUR CKT 05/05/2016 22:53 06/05/2016 17:48 18:55:00

35 7-May-16 132/33KV 40MVA Xmer NO. I AT 132KV S/S BORJHARA 09:05 13:20 4:15:00

36 7-May-16 132KV SUHELA - ULTRATECH CKT. 09:13 21:03 11:50:00

37 7-May-16 63MVA Xmer AT 132KV S/S SECTOR-A (HEERA POOLING) 09:05 15:10 6:05:00

38 7-May-16 160MVA Xmer NO. III AT 220KV S/S URLA 09:16 17:09 7:53:00

Monthly Report May16

HCL
Typewritten Text
17

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF MAY-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

39 7-May-16 132/33KV 40MVA Xmer NO. II AT 132KV S/S BORJHARA 13:25 15:45 2:20:00

40 7-May-16 400KV KHEDAMARA - SEONI CKT. 06/05/2016 9:02 07/05/2016 18:05 33:03:00

41 8-May-16 132 KV DOMA - PATAN CKT 08:00 11:25 3:25:00

42 8-May-16 63 MVA XMER No.II AT 132 KV S/S KACHNA 08:20 12:20 4:00:00

43 8-May-16 40 MVA XMER No.II AT 220 KV S/S DOMA 11:27 12:25 0:58:00

44 8-May-16 220 KV BHATAPARA - DOMA CKT 12:58 16:45 3:47:00

45 8-May-16 132 KV RLY TRACTION No.II AT 220 KV S/S URLA 13:16 15:45 2:29:00

46 8-May-16 132 KV URLA - KACHNA CKT No.I 13:29 16:45 3:16:00

47 9-May-16 132 KV MOPKA - SILPAHARI CKT 06:25 10:00 3:35:00

48 9-May-16 63 MVA XMER No.I AT 132 KV S/S KACHNA 06:57 11:20 4:23:00

49 9-May-16 40 MVA XMER No.I AT 132 KV S/S MANA 08:45 17:35 8:50:00

50 9-May-16 40 MVA XMER No.I AT 132 KV S/S AMBIKAPUR 08:45 15:00 6:15:00

51 9-May-16 40 MVA XMER No.II AT 132 KV S/S JAGDALPUR 09:04 12:45 3:41:00

52 9-May-16 132 KV MANA - DOMA CKT No.I 13:47 17:08 3:21:00

53 9-May-16 220 KV BHILAI - SILTARA CKT 10:12 14:08 3:56:00

54 9-May-16 132 KV SIMGA - CENTURY CKT 10:24 13:33 3:09:00

55 9-May-16 40 MVA XMER AT 132 KV S/S KACHNA 11:56 18:35 6:39:00

56 9-May-16 220 KV RAITA - SILTARA CKT 14:40 18:40 4:00:00

57 10-May-16 40 MVA XMER No.II AT 220 KV S/S AMBIKAPUR 08:20 16:15 7:55:00

58 10-May-16 40 MVA XMER No.II AT 132 KV S/S MANA 09:00 16:20 7:20:00

59 10-May-16 132 KV DOMA - MANA CKT NO. II 09:05 13:45 4:40:00

60 10-May-16 315 MVA ICT No.II AT 400 KV S/S RAITA 09:44 19:36 9:52:00

61 10-May-16 20MVA XMER AT 132KV S/S KIRANDUL 09:05 17:18 8:13:00

62 10-May-16 40MVA XMER NO-I AT 132KV S/S BIRGAON 09:50 12:24 2:34:00

63 10-May-16 220KV SILTARA-KORBA LINE 10:00 13:52 3:52:00

64 10-May-16 40MVA XMER NO-II AT 132KV S/S BIRGAON 12:32 16:05 3:33:00

65 10-May-16 220KV URLA -SILTARA LINE 14:31 18:36 4:05:00

66 10-May-16 132KV DHAMDHA-AZURE POWER LINE 15:10 15:35 0:25:00

67 10-May-16 40MVA XMER NO-I AT 132KV S/S RAJNANDGAON 11:04 13:35 2:31:00

68 11-May-16 63 MVA X-MER AT 132 KV S/S KUHERA 8:46 16:35 7:49:00

69 11-May-16 40 MVA X-MAR NO.III AT 132 KV S/S AMBIKAPUR 8:18 17:30 9:12:00

70 11-May-16 40 MVA XMER AT 220 KV S/S BANARI 09:15 14:20 5:05:00

71 11-May-16 220 KV KE - SILTARA CKT 10:23 19:05 8:42:00

72 11-May-16 40 MVA XMER No.II AT 220 KV S/S SILTARA 10:10 12:00 1:50:00

73 11-May-16 40 MVA XMER No.II AT 132 KV S/S RAJNANDGAON 11:32 17:18 5:46:00

74 11-May-16 132 KV KUHERA - RARASWANI CKT 13:00 17:35 4:35:00

75 11-May-16 63 MVA XMER AT 220 KV S/S SILTARA 12:05 13:15 1:10:00

76 11-May-16 40 MVA XMER No.II AT 220 KV S/S SILTARA 14:40 17:54 3:14:00

77 11-May-16 12.5 MVA XMER AT 132 KV S/S DALLIRAJHARA 14:03 15:22 1:19:00

78 12-May-16 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. I 08:20 14:30 6:10:00Monthly Report May16

HCL
Typewritten Text
18

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF MAY-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

79 12-May-16 160 MVA X-MER AT 220 KV S/S BANARI 09:26 14:20 4:54:00

80 12-May-16 132 KV SECTOR 'C' - URLA CKT 09:38 12:15 2:37:00

81 12-May-16 132 KV KUHERA - MANDIR HASAUD CKT 12/05/2016 13:00 14/05/2016 11:10 46:10:00

82 12-May-16 132 KV CHAMPA - JAIJAIPUR CKT 14:28 15:40 1:12:00

83 13-May-16 125 MVA X-MER NO. III AT 220 KV S/S BHILAI 03/05/2016 8:32 13/05/2016 15:35 247:03:00

84 13-May-16 220 KV RAIGARH - BUDHIPADAR CKT 06:07 19:19 13:12:00

85 13-May-16 40 MVA X-MER AT 132 KV S/S MANDIR HASAUD 09:10 13:10 4:00:00

86 13-May-16 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. II 08:40 15:21 6:41:00

87 13-May-16 132 KV MAHDIR HASAUD - MONNET CKT 13:22 17:15 3:53:00

88 14-May-16 40MVA XmerNO. I AT 132KV S/S MAHASAMUND 08:35 14:03 5:28:00

89 14-May-16 132KV KUHERA - PARASWANI CKT. 08:10 10:10 2:00:00

90 14-May-16 220KV BANARI - SUHELA CKT. 09:44 13:38 3:54:00

91 14-May-16 63MVA Xmer AT 220KV S/S URLA 09:54 16:18 6:24:00

92 14-May-16 160MVA Xmer NO. II AT 220KV S/S URLA 09:54 16:15 6:21:00

93 14-May-16 132KV PARASWANI - MAHASAMUND CKT. 10:18 12:21 2:03:00

94 14-May-16 220KV PGCIL-RAIPUR - KHEDAMARA CKT. 11:01 18:43 7:42:00

95 14-May-16 132KV KUHERA - MANDIRHASOD CKT. 12/05/2016 13:00 14/05/2016 11:10 46:10:00

96 15-May-16 132/33 KV 40MVA Xmer NO. II AT MAHASAMUND 08:10 11:09 2:59:00

97 15-May-16 132 KV MAHASAMUND - RAJIM CKT. 08:40 10:32 1:52:00

98 15-May-16 132 KV SUHELA - BALODABAZAR CKT. NO. I 10:41 15:06 4:25:00

99 15-May-16 132 KV SUHELA - BALODABAZAR CKT. NO. II 15:10 16:40 1:30:00

100 16-May-16 20 MVA XMER AT 132 KV S/S PARASWANI 08:54 12:20 3:26:00

101 16-May-16 220 KV MADWA - BANARI CKT No.I 09:10 13:40 4:30:00

102 16-May-16 132 KV BISHRAMPUR - I/C No.I 09:20 15:36 6:16:00

103 16-May-16 40 MVA XMER No.I AT 132 KV S/S BALODA BAZAR 09:50 12:40 2:50:00

104 16-May-16 40 MVA XMER No.II AT 132 KV S/S BALODA BAZAR 13:40 16:35 2:55:00

105 16-May-16 132 KV BHATAPARA - BALODA BAZAR CKT 14:48 16:36 1:48:00

106 16-May-16 132 KV BEMETARA - KAWARDHA CKT 10:10 16:01 5:51:00

107 16-May-16 220 KV KW - CHURI CKT No.I 17:14 18:45 1:31:00

108 17-May-16 220 KV MADWA - BANARI CKT No.II 09:10 20:12 11:02:00

109 17-May-16 132 KV BISHRAMPUR - I/C No.II 09:55 10:55 1:00:00

110 17-May-16 132 KV KUHERA - PARASWANI CKT 10:20 12:33 2:13:00

111 17-May-16 40 MVA XMER AT 220 KV S/S PARASWANI 08:50 14:52 6:02:00

112 17-May-16 160 MVA XMER AT 220 KV S/S SUHELA 10:35 17:06 6:31:00

113 17-May-16 132 KV PARASWANI - BAGBAHARA CKT 12:03 13:38 1:35:00

114 17-May-16 132 KV SILTARA - SKS CKT 10:13 16:18 6:05:00

115 18-May-16 3X40 MVA XMER AT 220 KV S/S BARSOOR 07:00 21:02 14:02:00

116 18-May-16 160 MVA XMER No.I AT 220 KV S/S PARASWANI 08:45 15:55 7:10:00

117 18-May-16 132 KV RLY TRACTION No.I AT 132 KV S/S BISHRAMPUR 09:50 17:35 7:45:00

118 18-May-16 132 KV KACHNA - MANDIR HASAUD CKT 09:25 15:12 5:47:00Monthly Report May16

HCL
Typewritten Text
19

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF MAY-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

119 18-May-16 20 MVA XMER AT 132 KV S/S AKALTARA 10:19 15:47 5:28:00

120 18-May-16 220 KV PARASWANI - SUHELA CKT No.I 10:16 13:51 3:35:00

121 18-May-16 220 KV KWB - CHHURI CKT NO. I 09:33 09:55 0:22:00

122 18-May-16 132 KV BHATAPARA - SIMGA CKT No.I 12:13 13:53 1:40:00

123 18-May-16 132 KV BHATAPARA - SIMGA CKT No.II 14:20 15:54 1:34:00

124 18-May-16 220 KV RAIGARH - GERWANI CKT 09:30 15:00 5:30:00

125 18-May-16 400 KV NTPC (KORBA) - KHEDAMARA CKT 18:42 19:43 1:01:00

126 19-May-16 160 MVA X-MER NO. II AT 220 KV S/S PARASWANI 08:51 14:00 5:09:00

127 19-May-16 40 MVA X-MER NO. II AT 220 KV S/S THELKADIH 08:58 13:08 4:10:00

128 19-May-16 220 KV RAIGARH - JPL CKT NO. I 09:15 13:21 4:06:00

129 19-May-16 315 MVA X-MER NO. I AT 400 KV S/S RAITA 09:09 18:57 9:48:00

130 19-May-16 132 KV BHATAPARA - MUNGELI CKT 11:50 13:54 2:04:00

131 19-May-16 132 KV BISHRAMPUR RLY TRACTION NO. II 10:00 16:30 6:30:00

132 19-May-16 220 KV RAIGARH - SARAIPALI CKT NO. II 11:48 19:30 7:42:00

133 19-May-16 132 KV BANARI - CHAMPA CKT 10:01 13:30 3:29:00

134 19-May-16 220 KV SUHELA - PARASWANI CKT NO. II 10:23 13:04 2:41:00

135 19-May-16 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. II 11:40 12:45 1:05:00

136 19-May-16 132 KV ARASMETA POOLING S/S - LAFARGE CKT 12:34 17:07 4:33:00

137 19-May-16 132 KV BHATAPARA - NAWAGARH CKT 13:59 15:52 1:53:00

138 19-May-16 132 KV BHATAPARA - BALODA BAZAR CKT 15:54 16:54 1:00:00

139 20-May-16 132 KV RENKI - MOPKA CKT 08:35 12:47 4:12:00

140 20-May-16 132 KV BANGO - BISHRAMPUR CKT 20/05/2016 8:50 21/05/2016 19:07 34:17:00

141 20-May-16 132 KV BISHRAMPUR - BAIKUNTHPUR CKT 20/05/2016 8:53 21/05/2016 20:23 35:30:00

142 20-May-16 40 MVA X-MER NO. I AT 132 KV S/S SARAIPALI 09:05 18:12 9:07:00

143 20-May-16 132 KV SARAIPALI - SARANGARH CKT 12:52 18:15 5:23:00

144 20-May-16 20 MVA X-MER NO. I AT 132 KV S/S BISHRAMPUR 20/05/2016 9:25 21/05/2016 19:57 34:32:00

145 20-May-16 40 MVA X-MER AT 132 KV S/S AKALTARA 10:20 14:50 4:30:00

146 21-May-16 40 MVA X-MER NO. II AT 220 KV S/S SARAIPALI 08:45 16:38 7:53:00

147 21-May-16 40 MVA X-MER NO. I AT 220 KV S/S URLA 09:42 11:55 2:13:00

148 21-May-16 132 KV BANARI - AKALTARA CKT 10:13 14:02 3:49:00

149 21-May-16 132 KV SARAIPALI - SANKARA CKT 10:05 13:05 3:00:00

150 21-May-16 220 KV KEB - BUDHIPADAR CKT NO. II 10:35 15:24 4:49:00

151 21-May-16 63 MVA X-MER AT 132 KV S/S SECTOR 'A' URLA 13:20 14:43 1:23:00

152 21-May-16 160 MVA X-MER NO. I AT 220 KV S/S URLA 14:05 17:49 3:44:00

153 21-May-16 132 KV SARAIPALI - JHALAP CKT 14:12 16:36 2:24:00

154 22-May-16 220 KV KORBA (E) - BUDHIPADHAR CKT No.III 08:15 13:37 5:22:00

155 22-May-16 40 MVA XMER No.III AT 220 KV S/S SARAIPALI 08:46 16:46 8:00:00

156 22-May-16 132 KV SARAIPALI - RAIGARH CKT 10:45 14:55 4:10:00

157 22-May-16 16 MVA XMER AT 132 KV S/S SIMGA 10:50 13:03 2:13:00

158 22-May-16 132 KV SIMAGA - BEMETARA - PATHARIYA CKT 13:16 14:27 1:11:00Monthly Report May16

HCL
Typewritten Text
20

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF MAY-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

159 23-May-16 160 MVA XMER No.I AT 220 KV S/S SARAIPALI 08:48 18:18 9:30:00

160 23-May-16 40 MVA XMER AT 132 KV S/S BISHRAMPUR 09:10 16:05 6:55:00

161 23-May-16 220 KV SUHELA - BEMETARA CKT No.I 10:04 13:08 3:04:00

162 23-May-16 132 KV ARASMETA - AKALTARA CKT 10:40 13:50 3:10:00

163 23-May-16 220 KV SARAIPALI - RAIGARH CKT No.I 11:23 16:40 5:17:00

164 23-May-16 220 KV SUHELA - BEMETARA CKT No.II 13:13 16:18 3:05:00

165 23-May-16 160 MVA X-MER NO. II AT 220 KV S/S RAIGARH 15:13 17:25 2:12:00

166 24-May-16 400/220 KV ICT No.III AT 400 KV S/S KHEDAMARA 23/05/2016 9:07 24/05/2016 1:10 16:03:00

167 24-May-16 160 MVA XMER No.II AT 220 KV S/S SARAIPALI 08:51 15:53 7:02:00

168 24-May-16 132 KV BANGO - BISHRAMPUR CKT 09:45 14:26 4:41:00

169 24-May-16 220 KV KE - CHHURI CKT 09:34 12:17 2:43:00

170 24-May-16 132 KV RLY TRACTION No.I AT 132 KV S/S AKALTARA 09:35 13:12 3:37:00

171 24-May-16 125 MVA XMER No.I AT 220 KV S/S BHILAI 09:20 CONTD. ---

172 24-May-16 220 KV SUHELA - BANARI CKT 10:17 15:16 4:59:00

173 24-May-16 132 KV BANGO - MANENDRAGARH CKT 12:46 14:21 1:35:00

174 24-May-16 400/220 KV ICT No.I AT 400 KV S/S KHEDAMARA 15:17 18:03 2:46:00

175 24-May-16 132 KV RLY TRACTION No.II AT 132 KV S/S AKALTARA 15:15 16:54 1:39:00

176 24-May-16 220 KV KW - KE I/C No.II 23/05/2016 14:04 24/05/2016 17:02 26:58:00

177 24-May-16 220 KV MAIN BUS No.II AT 400 KV S/S KHEDAMARA 12/01/2016 9:38 24/05/2016 23:23 3205:45:00

178 25-May-16 160 MVA XMER AT 220 KV S/S BARSOOR 08:05 16:45 8:40:00

179 25-May-16 40 MVA XMER No.I AT 132 KV S/S CHAMPA 08:10 12:05 3:55:00

180 25-May-16 132 KV MAIN BUS AT 220 KV S/S SILTARA 08:20 11:36 3:16:00

181 25-May-16 132 KV BISHRAMPUR - BAIKUNTHPUR CKT 08:46 16:56 8:10:00

182 25-May-16 40 MVA XMER No.I AT 132 KV S/S KURUD (BHILAI) 09:35 16:12 6:37:00

183 25-May-16 40 MVA XMER No.I AT 132 KV S/S SANKARA 09:36 17:56 8:20:00

184 25-May-16 220 KV BISHRAMPUR I/C No.I 09:54 14:03 4:09:00

185 25-May-16 132 KV MAIN BUS AT 132 KV S/S CHAPLE 10:37 12:25 1:48:00

186 25-May-16 20 MVA XMER AT 132 KV S/S DALLIRAJHARA 10:55 CONTD. ---

187 26-May-16 40 MVA XMER No.II AT 132 KV S/S CHAMPA 08:10 21:31 13:21:00

188 26-May-16 40 MVA XMER AT 132 KV S/S PULGAON 08:40 16:58 8:18:00

189 26-May-16 132 KV BIRGAON - HIRA POOLING CKT 10:09 16:44 6:35:00

190 26-May-16 132 KV URLA - BIRGAON CKT 10:39 16:25 5:46:00

191 26-May-16 132 KV BALODA BAZAR - SUHELA CKT No.I 10:30 12:56 2:26:00

192 26-May-16 132 KV BALODA BAZAR - EMAMI CEMENT CKT 10:55 19:05 8:10:00

193 26-May-16 132 KV SANKRA - JHALAP CKT 10:56 21:51 10:55:00

194 26-May-16 132 KV BALODA BAZAR - SUHELA CKT No.II 17:40 19:12 1:32:00

195 27-May-16 132 KV BANGO - MANENDRAGARH CKT 08:50 16:39 7:49:00

196 27-May-16 40 MVA X-MER NO. I AT 132 KV S/S JHALAP 09:30 14:00 4:30:00

197 27-May-16 132 KV JHALAP - PARASWANI CKT 10:12 13:09 2:57:00

198 27-May-16 132 KV JHALAP - BAGBAHARA CKT 10:13 13:11 2:58:00Monthly Report May16

HCL
Typewritten Text
21

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF MAY-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

199 27-May-16 132 KV AKALTARA - LAFARGE CKT 11:10 14:27 3:17:00

200 27-May-16 220 KV MAIN BUS NO. I AT 400 KV S/S KHEDAMARA 25/05/2016 13:15 27/05/2016 12:04 46:49:00

201 27-May-16 40 MVA X-MER AT 132 KV S/S SIMGA 12:02 17:00 4:58:00

202 27-May-16 132 SIMGA - BHATAPARA CKT NO. I 14:35 16:00 1:25:00

203 27-May-16 132 KV SIMGA - CHAKARBHATA CKT 15:45 16:12 0:27:00

204 27-May-16 132 KV SIMGA - BHATAPARA CKT NO. II 16:13 21:37 5:24:00

205 28-May-16 132 KV KOTMIKALA - MANENDRAGARH CKT NO. I 08:20 13:45 5:25:00

206 28-May-16 132 KV KACHNA - MANDIRHASAUD CKT 08:16 12:48 4:32:00

207 28-May-16 132 KV BISHRAMPUR - PRATAPPUR CKT 09:05 12:40 3:35:00

208 28-May-16 132 KV BHATAPARA - LAFARGE CKT 09:30 11:32 2:02:00

209 28-May-16 40 MVA X-MER AT 132 KV S/S JHALAP 09:40 16:40 7:00:00

210 28-May-16 132 KV JHALAP - SANKARA CKT 09:47 12:06 2:19:00

211 28-May-16 132 KV GHARGHODA - PATHALGAON CKT 11:19 16:50 5:31:00

212 28-May-16 132 KV JHALAP - SARAIPALI CKT 12:10 13:51 1:41:00

213 28-May-16 220 KV BHATAPARA - MOPKA CKT 12:05 13:39 1:34:00

214 28-May-16 220 KV BHATAPARA - SUHELA CKT 14:53 17:17 2:24:00

215 29-May-16 132 KV PARASWANI - MAHASAMUND CKT 09:08 12:19 3:11:00

216 29-May-16 160 MVA X-MER NO. I AT 220 KV S/S SILTARA 10:40 13:35 2:55:00

217 29-May-16 132 KV SILTARA - SEML CKT NO. II 14:25 15:39 1:14:00

218 30-May-16 220KV BHILAI - BARSOOR CKT. NO. II 08:11 10:59 2:48:00

219 30-May-16 132KV KOTMIKALA - MANENDRAGARH CKT. NO. II 08:25 14:49 6:24:00

220 30-May-16 132KV KORBA - CHAMPA CKT.NO. I 08:32 11:42 3:10:00

221 30-May-16 40MVA Xmer AT 132KV S/S BAGBAHRA 09:50 14:03 4:13:00

222 30-May-16 132KV PARASWANI - BAGBAHRA CKT. 10:07 12:10 2:03:00

223 30-May-16 132KV PATHALGAON - GHARGHODA CKT. 10:07 15:48 5:41:00

224 30-May-16 132KV JHALAP - BAGBAHRA CKT. 12:13 13:46 1:33:00

225 30-May-16 160MVA Xmer AT 220KV S/S BARSOOR 14:30 17:40 3:10:00

226 30-May-16 400KV BHILAI - BHATRAWATI CKT. 18:19 19:02 0:43:00

227 31-May-16 132KV CHAMPA - KORBA CKT. NO. II 08:25 17:42 9:17:00

228 31-May-16 220KV GURUR - BARSOOR CKT 08:11 11:11 3:00:00

229 31-May-16 132KV MANENDRAGARH - BAIKUNTHPUR CKT. 08:50 16:10 7:20:00

230 31-May-16 132KV RAJIM - PARASWANI CKT. 09:50 12:07 2:17:00

231 31-May-16 40MVA Xmer NO. II AT 132KV S/S KURUD(BHILAI) 09:55 14:50 4:55:00

232 31-May-16 (3X40)220/132KV Xmer AT220KV S/S BARSOOR 11:12 13:18 2:06:00

233 31-May-16 132KV GHARGHODA - PATHALGAON CKT. 11:22 14:26 3:04:00

234 31-May-16 315MVA Xmer NO. III AT 400KV S/S BHILAI 30/05/2016 9:24 31/05/2016 12:27 27:03:00

235 31-May-16 132KV MAHASAMUND - PARASWANI CKT. 12:17 14:09 1:52:00

236 31-May-16 40MVA Xmer NO. II AT 132KV S/S MANENDRAGARH 31/05/2016 15:22 01/06/2016 18:06 26:44:00

Monthly Report May16

HCL
Typewritten Text
22

10. LOAD SHEDDING DONE IN MAY-2016

DATE FROM TO GROUPAvg MW

ReliefDURATION

Equivalent Load

Relief in MU

1 15-May-16 15/05/2016 19:30 16/05/2016 0:12 INDUSTRIAL (PLAN ALL GROUP) 36 4:42:00 0.17

2 15-May-16 19:30 21:25 INDUSTRIALH/T GROUP - III 102.5 1:55:00 0.20

3 15-May-16 19:34 21:25 INDUSTRIAL H/T GROUP - IV 49.6 1:51:00 0.09

4 15-May-16 15/05/2016 22:16 16/05/2016 0:12 INDUSTRIAL H/T GROUP - I 114 1:56:00 0.22

5 15-May-16 15/05/2016 22:16 16/05/2016 0:12 INDUSTRIAL H/T GROUP - II 75 1:56:00 0.15

6 16-May-16 04:18 05:45 GROUP C 39 1:27:00 0.06

7 16-May-16 04:18 05:45 GROUP D 36.5 1:27:00 0.05

8 16-May-16 04:18 05:45 GROUP E 89 1:27:00 0.13

9 16-May-16 19:23 20:23 GROUP F 71.5 1:00:00 0.07

10 16-May-16 19:23 20:23 GROUP G 95 1:00:00 0.09

11 16-May-16 20:23 21:00 GROUP H 59 0:37:00 0.04

12 16-May-16 21:45 22:45 GROUP I 55.4 1:00:00 0.06

13 16-May-16 21:45 22:45 GROUP J 31 1:00:00 0.03

14 19-May-16 00:17 01:19 GROUP - A 51.5 1:02:00 0.05

15 19-May-16 19/05/2016 22:45 20/05/2016 0:01 IND. PLAN ( ALL GROUP ) 33.5 1:16:00 0.04

16 19-May-16 22:54 23:45 IND. H/T GROUP - III 106 0:51:00 0.09

17 19-May-16 22:54 23:45 IND. H/T GROUP - IV 50 0:51:00 0.04

18 31-May-16 19:22 20:20 GROUP-B 49 0:58:00 0.05

19 31-May-16 19:22 20:20 GROUP-C 52 0:58:00 0.05

20 31-May-16 20:19 21:10 GROUP-D 46 0:51:00 0.04

21 31-May-16 20:19 21:10 GROUP-E 91.5 0:51:00 0.08

63.48 28:56:00 1.79

Monthly Report May16

HCL
Typewritten Text
23

11. LOAD DURATIUON CURVE: MAY-2016

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

LOAD DURATION CURVE OF JAN-15[MAX DEMAND MET=3269 MW & MIN DEMAND MET=1959

% OF TIME

DEM

AN

D (

MW

)

LOAD DURATION CURVE OF MAY-2016

[MAX DEMAND MET= 3457 MW & MIN DEMAND MET= 1653 MW]