SSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service Center Planning data: Competition 2004, 1. Price Start of planning: November 2004 construction Phase 1: up to 2006 Constructional data: Built-up area: 7.670 m 2 Floor space: 7.750 m 2 Construction: Steel Construction construction Phase 2: up to 2008 Pictures: Paul Ott The building functions as an interface between road, rail and waterway transport. The delivery and outgoing goods sections embody the dynamism and efficiency of the company voestalpine SSC. Architecturally, the financial success of the enterprise is symbolised by the wide open access gates. The projecting roof structure intensifies this statement and directs attention towards the qualities inherent in the company’s signature material – steel. In the heterogeneous environment of the industrial zone with its company signs and logos, the building epitomises functionality and credibility. The concept reflects the market-economy demand for “corporate architecture” Text: Wolfgang Haas Edited by xarchitekten

Transcript of SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service...

Page 1: SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service

SSC voestalpine Stahl Service Center

Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service Center

Planning data: Competition 2004, 1. Price Start of planning: November 2004 construction Phase 1: up to 2006

Constructional data: Built-up area: 7.670 m2

Floor space: 7.750 m2

Construction: Steel Construction construction Phase 2: up to 2008

Pictures: Paul Ott

The building functions as an interface between road, rail and waterway transport. The delivery and outgoing goods sections embody the dynamism and efficiency of the company voestalpine SSC.

Architecturally, the financial success of the enterprise is symbolised by the wide open access gates. The projecting roof structure intensifies this statement and directs attention towards the qualities inherent in the company’s signature material – steel.

In the heterogeneous environment of the industrial zone with its company signs and logos, the building epitomises functionality and credibility. The concept reflects the market-economy demand for “corporate architecture”

Text: Wolfgang Haas Edited by xarchitekten

Page 2: SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service

SSC voestalpine Steel Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service Center Planning data: Constructional data: Competition 2004, 1. Price Built-up area: 7.670 m2 Start of planning: November 2004 Floor space: 7.750 m2

construction Phase 1: up to 2006 Construction: Steel Construction construction Phase 2: up to 2008 Pictures: Paul Ott Task: The company Stahl Service Center (SSC) has commissioned production and storage halls including a wharf for the loading and unloading of ships. The architectural implementation aims to integrate the company’s own products and showcase the scope for using steel as a design material. Location: This vibrant production site and shipping point is situated on a main artery of the industrial estate near the city centre. The following characteristics are important for choosing the location: an abundance of industrial buildings for manufacturing and office use, a high level of road traffic, the supply of goods by rail and road as well as the location by the docks. Concept: From a functional point of view, the building is an interface between road, rail and river traffic. The supply and dispatch of goods is a sign of the dynamics of SSC’s business. The economic success is visualised architecturally through wide open means of access. The protruding roof emphasises this message and focuses attention upon the different uses of steel as the companies’ main material. The building is a unique symbol of functionality and credibility in contrast to the generally heterogeneous surroundings of the other industrial estate buildings that rely on big company logos to make their mark. The concept complies with the market-economy demand for “Corporate Architecture”. Implementation: The extension of SSC’s production and storage halls takes place in two stages. The first stage involves a production hall and a storage area for raw materials as well as parking and shunting areas. During the second stage, an amenities building and a second production hall will be added to the existing hall. This stage also involves maintenance of the loading wharf by the docks. Text: Wolfgang Haas Revision: xarchitekten Translation: Anja Ganley

Page 3: SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service

Hafenbecken

Produktionshalle 1

Vormaterialhalle

Traf

o

IND

US

TRIE

ZEIL

E

IND

UST

RIE

ZEIL

E

Fahn

en

Fahn

en

Vordach

EinzŠunung BetriebsgelŠnde

Einzäunung Betriebsgelände Einzäunung Betriebsgelände

Schienenachse

Schienenachse

Schienenachse

Schienenachse

Schienenachse

Tor

Tor

NORD

EN

1. AUSBAUSTUFELAGEPLAN 1:500

Einzäunung Betriebsgelände

Tor

Tor

TorTor

Gebäude Bestand

1 2 3

Vordach

4 5 6 7 8 9 10 11

Par

ken

PK

W

Tor

Page 4: SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service

Hafenbecken

Produktionshalle 1

Vormaterialhalle

Traf

o

IND

US

TRIE

ZEIL

E

IND

UST

RIE

ZEIL

E

Fahn

en

Fahn

en

Vordach

EinzŠunung BetriebsgelŠnde

Einzäunung Betriebsgelände Einzäunung Betriebsgelände

Schienenachse

Schienenachse

Schienenachse

Schienenachse

Schienenachse

Tor

Tor

NORD

EN

1. AUSBAUSTUFELAGEPLAN 1:500

Einzäunung Betriebsgelände

Tor

Tor

TorTor

Gebäude Bestand

1 2 3

Vordach

4 5 6 7 8 9 10 11

Par

ken

PK

W

Tor

Page 5: SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service

+16,30

0,00

+8,40

+16,30

+2,50 OK Damm

+14,15

+16,30

0,00

+8,40

+16,30

+2,50 OK Damm

0,00

+16,30

+2,50 OK Damm

Betriebsinterne Strasse gerampt

+14,15

+8,85

Pilkington TRAFO

+16,30

+14,15

0,00

+8,40+8,85

PilkingtonTRAFO

PRODUKTIONSHALLE 1

+14,15

+8,85

PilkingtonTRAFO

Auskragung 15m

Kragträger = Fachwerkträger

Kranbahnhöhe +9,30

806 806 8061570

PfahlgrŸndung

StŸtzenfundament

Industriezeile Profilitverglasung

+16,30

+10,80

0,00

Kran 40 t

+13,30

Bodenplatte

Pfahlgründung

Fachwerkträger

Stützenfundament -4,00

Fachwerkstütze

Elementdach H=40cmNeigung 1,5 °

1330

300

VORMATERIALHALLE

SeitenverbandKranbahn

Leitschiene

+16,30

+8,40

+16,30

+2,50 OK Damm

Rampe

Kragträger = Fachwerkträger

Kranbahnhöhe +10,80

Profilitverglasung

Elementdach H=40cmNeigung 1,5 °

+10,80

+13,30

Stützwand STB

-4,00

Bodenplatte

Pfahlgründung

Stützenfundament

Kranbahn

VORMATERIALHALLE

806 806 806 806 753

Auskragung 6,30m

Längsschnitt 1:333

Ansicht Süd 1:333

Ansicht Nord 1:333

Ansicht West 1:333Ansicht Ost 1:333

Querschnitt 1:333

Page 6: SSC voestalpine Stahl Service Center - SKFANDRA · PDF fileSSC voestalpine Stahl Service Center Location: Industriezeile / Linz / Oberösterreich Client: Voestalpine Stahl Service

EinzŠunung BetriebsgelŠnde

+16,30

0,00

+8,40

+16,30

+2,50 OK Damm

+14,15

+16,30

0,00

+8,40

+16,30

+2,50 OK Damm

0,00

+16,30

+2,50 OK Damm

Betriebsinterne Strasse gerampt

+14,15

+8,85

Pilkington TRAFO

+16,30

+14,15

0,00

+8,40+8,85

PilkingtonTRAFO

PRODUKTIONSHALLE 1

+14,15

+8,85

PilkingtonTRAFO

Auskragung 15m

Kragträger = Fachwerkträger

Kranbahnhöhe +9,30

806 806 8061570

PfahlgrŸndung

StŸtzenfundament

Industriezeile Profilitverglasung

+16,30

+10,80

0,00

Kran 40 t

+13,30

Bodenplatte

Pfahlgründung

Fachwerkträger

Stützenfundament -4,00

Fachwerkstütze

Elementdach H=40cmNeigung 1,5 °

1330

300

VORMATERIALHALLE

SeitenverbandKranbahn

Leitschiene

+16,30

+8,40

+16,30

+2,50 OK Damm

Rampe

Kragträger = Fachwerkträger

Kranbahnhöhe +10,80

Profilitverglasung

Elementdach H=40cmNeigung 1,5 °

+10,80

+13,30

Stützwand STB

-4,00

Bodenplatte

Pfahlgründung

Stützenfundament

Kranbahn

VORMATERIALHALLE

806 806 806 806 753

Auskragung 6,30m

Längsschnitt 1:333

Ansicht Süd 1:333

Ansicht Nord 1:333

Ansicht West 1:333Ansicht Ost 1:333

Querschnitt 1:333