SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing...

13
DATEX II User Forum – Dublin – 13&14 September 2016 SRTI IMPLEMENTATION RIJKSWATERSTAAT A new obligation in an existing information provision

Transcript of SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing...

Page 1: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

SRTI IMPLEMENTATION RIJKSWATERSTAAT A new obligation in an existing information provision

Page 2: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

TIMELINE

2010 ITS Directive 2012 Ministry assigns RWS to do impact analysis SRTI in

NL Round table with experts of all stakeholders 2103 TISA list 2014 NAP and NB assigned

Roadnetwork determined

1-7-2015 Start operation SRTI NL 1-7-2016 First self assessment to National Body

Page 3: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

IMPACT ANALYSIS SITUATION 2012

Operational agreement Severe incidents: Travel and itinerary Disrupting incidents taffic alarm; + weatheralarm Crises: regular and direct Flagged DATEX messages Result commitment op own distribution media. Best effort on 3rd party media

Page 4: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

TISA LIST

51 DATEX II eventtypes

10 not applicable to NL (no avelanches on a pancake)

Added: 11 weather situations (storm conditions and heavy precipitation)

6 visibility (in relation to environmental issues (smoke, smog)

Accidents: protected or unprotected. They all are marked because:

Page 5: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

THE SELECTION OF THE ROADNETWORK

Page 6: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

IMPACT AT RWS

Lot of relevant information in unconnected systems

Freeze of system development until 2018

Exceptions for minor changes

Procedural changes: In the way RTCC inform VCNL (TIC)

Processing of information in VCNL

Page 7: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

START OPERATIONS

Service providers via push

Afnemers via open data (pull)

Datex 1Push

Verkeersincidenten HWN• RWS VC’s

• (politiemeldkamers)

Pech en ongevalsmeldingen• CMI centrale voor PA• CMV centrale voor VA

ONDALocatieverrijkingHerdistributie binnen RWS e.aPrivacy filterSRTI omvorming + filter

DATEX IIPush SRTI meldingen

pech en ongevallenDATEX II

Push

SRTI meldingenDATEX II push

Alle VCNL ADG incl SRTI vlagDATEX II push

D1-DII ConverterSRTI VlagSRTI filter

Alle ADG incl SRTI vlagDATEX II pushDATEX II pull

SRTI uit TOSDATEX II pushDATEX II pull

VCNL

WVLTOS

TOS

Mail DATEX II

Traffic Viewer

Mail

weerincidenten

Outlook

Spookrijdermeldingen112

SRTI uit ONDADATEX II pushDATEX II pull

NDWPer 1-7-2015distribueert

Page 8: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

AA

NTA

L BER

ICHT

EN

Total number of SRTI Messages in NL 2015-2016

Tijdelijk glad wegdek Obstakels etc op de weg Onbeveiligde ongevallen Kort durende werkzaamhedenVerminderd zicht Spookrijder Blokkades Uitzonderlijk weer

Page 9: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

5000 5082 4812 4686 4798 4912 4563 4679 4759 5011 5512 6395

2674 1669

2000 1914 1898 2366 2191 2727

2049 2576 2077 1945

2020

1872

445

82

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

AA

NTA

L BER

ICHT

EN

# obstacles on road and unprotected accidents

Obstakels etc op de weg Onbeveiligde ongevallen

Page 10: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

0

20

40

60

80

100

120

140

160

AA

NTA

L BER

ICHT

EN

#SRTI messages Slipery road, visibility and weather

Tijdelijk glad wegdek Verminderd zicht Uitzonderlijk weer

Page 11: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

0

20

40

60

80

100

120

140

160

AA

NTA

L BER

ICHT

EN

#SRTI messages other

Kort durende werkzaamheden Spookrijder Blokkades

Page 12: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

0

100

200

300

400

500

600

700

800

Obstacles on road without broken down vehicles

Obstakels op de wegVoorwerpen op de wegRommel op de weg

Page 13: SRTI IMPLEMENTATION RIJKSWATERSTAAT · RIJKSWATERSTAAT . A new obligation in an existing information provision . DATEX II User Forum – Dublin – 13&14 September 2016 . TIMELINE

DATEX II User Forum – Dublin – 13&14 September 2016

ASSESSMENT