SCHEDUL ITEM DESCRIPTION UNIT M L O/H A DEMOLITION WORK 1 Hack reinforced concrete structures of any sizes including removal of debris m3 B EXCAVATION 1 Excavation oversite not exceeding 150mm deep from ground level to reduced levels, contours, slopes, etc for building and road foundation, embankment and remove surplus material off site m2 2 Excavation from reduced level not exceeding 1.5m deep for Lift pit ground slab and hardcore/ m3 3 Excavation from reduced level not exceeding 1.5m deep for footings, pilecaps, beams, basemen including planking and strutting m3 4 Deep excavtion for under ground water tank m3 exceeding 3.0m. Including all design and relevant authority submission 7 Excavate trench for 300 x 300 RC Stumps not 500mm deep m 8 Excavate trench for 900 x 1000 RC stumps not exceeding 750 mm deep m B EXCAVATION (CONT'D) Filling, Removal & Hardcore

Transcript of SR

Page 1: SR

SCHEDULE OF RATES

ITEM DESCRIPTION UNIT M L O/H

A DEMOLITION WORK

1 Hack reinforced concrete structures of any sizes including removal of debris m3

B EXCAVATION

1 Excavation oversite not exceeding 150mmdeep from ground level to reduced levels, contours, slopes, etc for building and road foundation, embankment and remove surplusmaterial off site m2

2 Excavation from reduced level not exceeding 1.5mdeep for Lift pit ground slab and hardcore/lean concrete m3

3 Excavation from reduced level not exceeding 1.5mdeep for footings, pilecaps, beams, basement etc. including planking and strutting m3

4 Deep excavtion for under ground water tank not m3exceeding 3.0m. Including all design and relevant authority submission

7 Excavate trench for 300 x 300 RC Stumps not exceeding 500mm deep m

8 Excavate trench for 900 x 1000 RC stumps not exceeding750 mm deep m

B EXCAVATION (CONT'D)

Filling, Removal & Hardcore

9 Earth filling from selected excavated material deposited, spread, levelled and mechanically

rammed and consolidated in 300mm thick layers

Page 2: SR

under slab to make up levels. m3

10 Backfill around pilecaps, stumps, beams etc withapproved excavated materials to the requiredlevel and well compacted m3

11 Remove surplus excavated material off the siteto a dump to be provided by the Contractor m3

12 300mm consolidated thickness hardcore bedunder ground slab spread and levelled andblinded with sand to receive lean concrete. m2

Surface Treatment

13 Trimming sides of excavation to form slopes and embankment including consolidation m2

14 Provide anti-termite soil treatment as specified tounderneath of building structure; to be carriedout by an approved specialist including 5 yearswarranty m2

C CONCRETE WORKS

1 Lean concrete G15 of various thickness intrenches under bed, foundations, column bases,ground beams, basement slab, ground slab etc. m3

2 Vibrated reinforced concrete to pilecaps, columnstumps, ground beams, ground slabs, etc,including working around rebar or fabric meshreinforcement below ground floor level

i Grade 20 m3

ii Grade 25 m3

Page 3: SR

iii Grade 30 m3

iv Grade 35 m3

3 Vibrated reinforced concrete to suspended slabsbeams, columns, staircases, walls, ramps etcincluding working around rebar or fabric meshreinforcement above ground floor level

i Grade 20 m3

ii Grade 25 m3

i Grade 30 m3

ii Grade 35 m3

C CONCRETE WORKS (CONT'D)

4 Grade 30 with "Hydratite WR Liquid" integralwaterproofing admixture m3

5 Concrete in small quantities (all grades) notexceeding 1m3 m3

6 Patch up opening for pipes/conduits n.e 100mmdia. with waterproofed cement and sand mortar(1:3) in wall/floor n.e. 225mm thick includingmaking good to existing no

7 Mild steel rod and link reinforcement complyingwith SS 12 and 18 to pilecaps, slabs, beams,columns, walls, staircases, ramps etc in anylocation of structure

i Exceeding 25mm diameter kg

ii 16mm to 25mm diameter kg

iii Less than 16mm diameter kg

Page 4: SR

8 Deformed high tensile rod and link reinforcementcomplying with SS 12 and 18 to pilecaps, slabsbeams, columns, walls, staircases, ramps etcin any location of structure

i Exceeding 25mm diameter kg

ii 16mm to 25mm diameter kg

iii Less than 16mm diameter kg

9 Power floating surface of unset concrete m2

C CONCRETE WORKS (CONT'D)

10 BRC or other equal and approved fabric reinforcement well lapped at joints (measurednett)

i BRC A4 m2

ii BRC A5 m2

iii BRC A6 m2

iv BRC A7 m2

v BRC A8 m2

vi BRC A10 m2

vii BRC B6 m2

viii BRC B7 m2

ix BRC B8 m2

x BRC C6 m2

11 Sawn formwork to :-

a Vertical sides of pilecaps, footings, stumps,ground beams and the like m2

Page 5: SR

b Sides of columns m2

c Sides and soffit of suspended beams m2

C CONCRETE WORKS (CONT'D)

12 Sawn formwork to :-

d Soffit of suspended slabs m2

e Soffit of suspended slab over 3.5m and not exceeding 5m high m2

f Sloping soffit of staircases and ramps m2

g Sides and soffit of planter box m2

h Sides of plinth m2

i Sides of balustrade / parapet wall m2

j Edge of concrete not exceeding 100mm high m

k Edge of concrete exceeding 100mm high but not exceeding 200mm high m

l Risers formwork of various heights m

m Stringer sides of various heights m

n Fillet forming 20x20mm rebates or grooves onconcrete surfaces m

D BRICKWORKS AND BLOCKWORKS

Page 6: SR

Common brickwork / blockwork in cement and sand mortar (1:3)

1 115mm thick brickwall reinforced with "Exmet" or other equal and approved brick reinforcementat every fourth course m2

2 230mm thick brickwall reinforced with "Exmet" m2or other equal and approved brick reinforcementat every fourth course

3 75mm brick-on-edge wall reinforced with andincluding "Exmet" or other equal and approvedbrick reinforcement at every third course m2

D BRICKWORKS AND BLOCKWORKS (CONT'D)

4 100mm thick hollow block wall m2

5 200mm thick hollow block wall m2

6 Mild steel bonding tie 6mm diameter x 450mmlong; one end cast into concrete; the other endbuilt into brickwork no

7 50 x 3mm thick galvanised wrought iron holdfast225mm long, one end turned up twice drilled andscrewed no

8 100x100x80mm thick "WECK GLASS BLOCK"or other equal and approved glass blocks in 15mm wide white cement/sand mortar (1:4)including reinforcement at every course andpointed in neat flush joints as the work proceed m2

9 Horizontal damp proof course consisting of onelayer three-ply bituminous felt as specified :-

i 115mm wide m

ii 230mm wide m

E WATERPROOFING WORKS

Page 7: SR

1 Supply and apply 'Anti-Hydro-R' elastomericseamless waterproofing membrane or equivalent to slab m2

2 Supply and apply 'Anti-Hydro-R' waterproof screed30mm thick to slab including 300mm (min) upturn m2

E WATERPROOFING WORKS (CONT'D)

3 Supply and apply "Barralastic" or other equivalent waterproofing system all in accordance to manufacturer's instructions including providing 10-year warranty to the wet areas m2

4 50mm thick cement and sand screed protectionon waterproofing m2

F FLOOR FINISHES

1 Supply and lay 'NITOFLOR HARDTOP' or equivalentnon-metallic floor hardener on freshly placed concrete sprinkled by hand at a rate of 0.5kg/lin.m (5kg/m2) and power trowelled into concrete surface m2

2 Approved epoxy floor coating m2

3 25mm thick cement and sand (1:3) paving trowelled smooth m2

4 Power float to floor m2

5 Extra over for forming 150mm x 25mm deepscupper channel m

6 19mm thick screeded backing to top and sidesof 100x100mm high kerb m

7 25mm thick cement and sand (1:3) backing withapproved waterproof additive to floor m2

Page 8: SR

8 LAY ONLY homogeneous floor tiles in approvedpattern, bedded and jointed in cement grout andincluding cement and sand (1:3) screed to floor m2

F FLOOR FINISHES (CONT'D)

9 Ditto to 275mm wide tread m

10 Ditto to 175mm high riser m

11 Ditto to 100mm high drop or skirting m

12 Ditto to non-slip nosing tiles m

13 LAY ONLY polished ceramic floor slab in approvedpattern, bedded and jointed in cement grout andincluding cement and sand (1:3) screed to floor m2

14 Ditto to 100mm high drop or skirting m

15 Extra over for dressing into sides and bottomof 300mm wide x 38mm deep scupper drain m

16 Ditto to top and sides of 100x100mm high kerb m

17 38x6mm brass dividing strips bedded on edge atjunctions of different floor finishes m

18 Ditto stainless steel dividing strips ditto m

G WALL FINISHES

Plastering in cement and sand (1:4) plain face asspecified and finished smooth with a steel trowel-Internally

1 20mm thick to wall and column m2

2 Ditto but curved-on-plan m2

3 13mm thick to soffit of slab and sides and soffit

Page 9: SR

of beams m2

G WALL FINISHES (CONT'D)Plastering in cement and sand (1:4) plain face asspecified and finished smooth with a steel trowel-Internally

4 Ditto but over 3.5m and not exceeding 5m high m2

5 13mm thick to sloping soffit of staircase m2

Plastering in cement and sand (1:4) plain face gauged with mortar plasticiser as specified andfinished with a steel trowel - Externally

6 20mm thick to wall and column m2

7 Ditto but curved-on-plan m2

8 13mm thick to soffit of slab and sides and soffitof beam over 3.5m and not exceeding 5m high m2

9 Extra over for plastering to 5x18mm deep groove in wall m

Wall tiles

10 LAY ONLY homogeneous glazed wall tiles bedded andjointed with approved adhesive, on and includingcement and sand (1:4) backing screed to make uptotal thickness of 30mm to wall m2

11 LAY ONLY selected 20mm thick ceramic vanitytop 1300mm long x 60mm wide complete withback splash fascia slab, opening for taps andbasins etc no

H CEILING FINISHES

1 13mm thick cement and sand (1:3) plastering m2internally

Page 10: SR

2 Ditto, externally m2

H CEILING FINISHES (CONT'D)

3 13mm thick cement and sand (1:3) plastering tosloping soffit of staircase m2

4 Supply and install approved 12mm thick jointless gypsum fibrous plaster ceiling board including galvanised steel suspension framing and all necessary fixing devices. m2

5 Supply and install approved 19mm thick concealedgrid type Armstrong look I mineral fibre acousticceiling board including galvanised steel suspensionframing and all necessary fixing devices. m2

6 Supply and install 9mm thick water-resistent calcium silicate board ceiling complete with metal suspension system m2

7 supply and install approved decorative fibreglass moulded cornices to suspended ceiling above m

8 Extra over for forming access openings 600x600mm in all respective suspended ceilings no

I METAL ROOFING WORK

1

m2

2 50mm thick approved fibreglass wool insulation m2

3 'Parsec Thermo Brite' reflective foil m2

4 Wire mesh m2

5 Aluminium flashing to roof bent to required profile as shown on drawing and painted with

Supply and install 0.53mm thick BHP Lysaght 'Colorbond XRW Kiplok Hi-Ten' with zincalume coating profiled metal roofing sheet fixed to steel purlins, complete with ridge, capping and accessories

Page 11: SR

white enamel paint. m

I METAL ROOFING WORK (CONT'D)

UPVC rainwater downpipe to S.S 141 includingjunctions, bends, shoes, short lengths andfittings

6 100mm diameter m

7 150mm diameter m

8 300mm diameter m

UPVC roof outlets complete with screwed domical grating linting flange for finishes, settingin concrete slab and jointing to downpipe

9 100mm diameter no

10 150mm diameter no

11 300mm diameter no

J METAL WORKS

Structural Steel

1 Mild steel sections, joints, plates, clents etc instructural steel work regardless of height kg

Mild Steel

2 300mm wide hot dipped galvanised heavy dutymild steel gratings to surface drain m

K RAILING TO STAIRCASE

1 Stainless steel staircase railing 900mm high asper Architect's detail m

2 Mild steel railing ditto m

Page 12: SR

L DOORS

1

Solid timber door

a 45mm thick single-leaf m2

b Ditto, double-leaf m2

Louvred timber door

a 45mm thick single-leaf m2

b Ditto, double-leaf m2

Fire rated doors metal with frame

a 1/2-hour fire rated door with frame m2

b 1-hour fire rated door with frame m2

c 2-hour fire rated door with frame m2

2

m2

Supply and install hardwood timber door to design and details in single or double leaf with and including hardwood timber edging, framing, cover fillets, decorative architraves, including all necessary specified surface finish, etc. with colour and texture etc.all to Architect's approval

Supply and install powder coated aluminium louvred door to approved colour all to the approval of Architect

Page 13: SR

M WINDOWS, VENTS & FIXED PANELS

1

a Aluminium framed top hung windows m2

b Aluminium framed sliding windows m2

N PAINTING

1 Prepare and apply one coat alkali resisting primer, one undercoat and two finishing coats of"Nippon Vinyl Silk" emulsion paint on plastered wall and column internally m2

2 Ditto to plastered soffit and sides and soffit of beam do m2

3 Ditto to gypsum fibrous plasterboard ceiling do m2

4 Ditto to calcium silicate board ceiling do m2

5 Ditto to plastered wall and column externally m2

6 Ditto to plastered soffit and sides and soffit ofbeam do m2

7 Prepare and apply one coat aluminium woodprimer to back of frame on surfaces not exceeding 100mm girth m

8 Ditto exceeding 100mm and not exceeding 200mm girth m

Supply and install powder coated white colour aluminium windows, vents and fixed light panel with and including frames, glazing with 6mm thick clear glass, complete with mullion, transomes, fittings, fixing lugs, bedding frames in waterproofed cement and sand (1:3) and pointing both sides with approved mastic and gaskets etc all as specified and shown in the Architect's drawings

Page 14: SR

N PAINTING (CONT'D)9 Prepare, knot, stop, stain and apply two coats of

polyurethene based varnishing to approval ongeneral surfaces of timber doors and frames m2

10 Ditto on timber surfaces not exceeding 100mmgirth m

11 Ditto exceeding 100mm and not exceeding 200mm girth m

12 Prepare, knot, stop and apply one coat aluminium wood primer, two undercoats and onefinishing coat of synthetic enamel painting ongeneral surfaces of woodwork m2

13 Ditto on woodwork surfaces not exceeding 100mm girth m

14 Ditto exceeding 100mm and not exceeding 200mm girth m

Page 15: SR
Page 16: SR

SCHEDULE OF RATES

RATE

Page 17: SR
Page 18: SR
Page 19: SR
Page 20: SR
Page 21: SR
Page 22: SR
Page 23: SR
Page 24: SR
Page 25: SR
Page 26: SR
Page 27: SR
Page 28: SR
Page 29: SR
Page 30: SR