SR232 Project Closedown Actual Effort Hours 3.0
-
Upload
prabhakar-krishnan -
Category
Documents
-
view
213 -
download
0
Transcript of SR232 Project Closedown Actual Effort Hours 3.0
-
8/22/2019 SR232 Project Closedown Actual Effort Hours 3.0
1/6
Instructions
Template Version: 2.1
Field Name Description/Instruction
SR Number The assigned SR number for the project
Project Name Short Description of the Project/SR
Project Start Date Actual Project Start Date
Project End Date Actual Project End Date
Project Manager Assigned Project Manager(s) for the Project
Total Estimated Effort
Hours
This should be pulled from the latest reviewed and approved project estimate.
Resource NameThis column should be filled in with all of the HP Resources that were engaged on your project/
regardless of how much effort they spent.
Resource Role
For every resource name listed enter the role that the resource played on the project/SR. The
description entered should be an exact match to the roles called out in the TOPS Account High
Estimate Template.
Comments - brief
explanation of whatresource did
Provide an additional information that provides more clarification on hours tracked by a resourc
where applicable. Call out at a high level what the resource did for their hours logged - for exacompleted technical design, requirements determination, reviews, etc.
Week of mm/ddStarting with the first week the project/SR was active up to the last week of the project provid
cumulative weekly hours for every resource listed.
Field Name Description/Instruction
Project/SR Summary A brief summary of what the SR/Project. This can be copied directly from the SR
Actual Hours The total Actual Hours for the SR/Project (from the Actual Project Hours Tab)
Estimated Hours The total Estimated Hours for the SR/Project (from the Estimate worksheet on the SR)
Percent Variance The percentage difference of the estimated hours versus actual hours
Estimate Cost Estimated Cost (to be completed by account team)
Actual Cost Actual Cost (to be completed by account team)
Explanation of Variance
If the Percent Variance is greater than or less than 15% then an explanation of the variance inor cost is needed.
Instructions for Use
To Complete the Actual Project Hours Tab
To Complete the Summary Tab
163012210.xlsx.ms_office
-
8/22/2019 SR232 Project Closedown Actual Effort Hours 3.0
2/6
TOPS MARKETS
Sankaran Karthikeyan On
Project Start Date:
SR Number:
Project End Date:
-
8/22/2019 SR232 Project Closedown Actual Effort Hours 3.0
3/6
-
8/22/2019 SR232 Project Closedown Actual Effort Hours 3.0
4/6
-
8/22/2019 SR232 Project Closedown Actual Effort Hours 3.0
5/6
Project/SR Summary
Estimated Hours
Actual Hours
Estimate Percent Variance
Estimated Cost
Actual Cost
Cost Percent Variance
Explanation of Variance (only if Percent Variance is + or - 15% )
The scope of the project involved,
- Retrofitting the code changes that were made in Ahold environment in 2009.
- Testing & Implementation of code changes.
- Making changes as part of change control CC01 to drop more tags (Bonuscard and Non BC) from
the TAG files that are sent to In Store Marketing based on requirements received from Pricing team.
- Making changes as part of change control CC02 to drop more tags (Bonuscard and Non BC) fromthe TAG files that are sent to In Store Marketing for Bulk Items (using a PARM Card)
-
8/22/2019 SR232 Project Closedown Actual Effort Hours 3.0
6/6
78
78
0.00%
#DIV/0!