Arizona Department of Transportation andFederal Highway Administration
Study UpdateSeptember 18th, 2015
ADOT Project No.: 189 SC 000 H8045 01LFederal Aid No.: 189-A(201)T
![Page 2: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/2.jpg)
Study Deliverables
• Alternative Screening Report (Jan 2015)
• Recommended Corridor Concept
• Evaluated numerous I-19 Interchange Options
• Design Concept Report (Draft Dec 2015)
• Environmental Assessment (Draft Spring 2016)
![Page 3: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/3.jpg)
Design Concept Report (DCR)
• 30% design of the preferred Build Alternative
• Implementation Plan
• Discuss major design features of the preferred Build Alternative
• Estimate of probable cost
![Page 4: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/4.jpg)
Environmental Assessment (EA)
• The EA will describe the following: Project’s purpose and need The anticipated impacts that the project activities would have on:
• Natural, cultural, recreational, historic resources• Planned growth and land use for the area• As well as socioeconomic impacts, among others
Project alternatives considered, and Recommended Plan Public, Agency & Stakeholder input Measures that can mitigate impacts
![Page 5: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/5.jpg)
SR 189 and I-19 Traffic Interchange Concept
![Page 6: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/6.jpg)
Option D - Diamond with Inside Flyover & Grade Separation TI
Multi-directional ramps (NB & SB access)
NB/SB ramps bridge over Frank Reed Rd.
Est. Cost $130-$140M (ramps only)
![Page 7: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/7.jpg)
SR 189 Design Concept
![Page 8: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/8.jpg)
SR 189 Design Concept
Multi-directional ramps (NB & SB access)NB/SB ramps
Bridge over Frank Reed Rd.
![Page 9: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/9.jpg)
State Route 189 Design Concept
![Page 10: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/10.jpg)
Study Level Cost Estimates
• Corridor Improvements ($20M - $50M)
![Page 11: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/11.jpg)
Study Level Cost Estimates
• Corridor Improvements ($20M - $50M)
• Interchange Improvements ($100M- $150M)
![Page 12: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/12.jpg)
Funding
• Total Cost (Preferred Ultimate Plan)
• $120M - $200M
• Anticipated Funding to Date (Development Plan)
• $64M (FY2021)
• Funding Shortfall (Local Partnerships)
• $60M - $140M
![Page 13: SR189 Design Concept Report and Environmental …aztransportationboard.gov/downloads/Presentations/2015-091815-SR...Design Concept Report (DCR) • 30% design of the preferred Build](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aacab437f8b9aa06a8d57e8/html5/thumbnails/13.jpg)
Next Steps
• Complete Design Concept Report (Draft Dec 2015)
• 30% Design of Preferred Ultimate Plan
• Implementation Scenarios
• Environmental Assessment (Draft Spring 2016)
• No Build Alternative & Preferred
• Public Hearings
• Funding Options