Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway...

13
Sr. No. Name of the party Subjet Date of submission in division Status/Remarks 1 M/s. Aawas Group 997 - Usarali - NOC for proposed layout scheme on S. No. 1 to 93 at village - Usarali, Tal - PaNVL, Dist - Raigad. 03-08-2012 Feasibility report yet to be received from ADEN (M) PNVL / Sr. DCM/Sr. DEE(TD)/ Sr. DSTE CSTM. 2 M/s Sunny Housing India Pvt. Ltd. 991 - PNVL- NOC for proposed construction at Plot No. 5 at Sector no. 15, New Panvel (East) 27-12-2012 Letter sent to party on 20.10.2014 for attestation of documents. 3 M/s Impact Design Group 978-LTT- Redevelopement of building for LIG & MIG tenements on land bearing CTS No. 47 (Pt) at Tilak Nagar, Chembur, Mumbai. 07-11-2012 Proposal is pending with DEN (HQ) CSTM for reply of queries. 4 M/s Spaceage consultant 973-Kon- NOC for proposed STP on plot bearing No. 85/A to 91/5, village -Kon, Thal Panvel. 27-09-2012 This is post facto NOC case. There are no guidelines for issue of post facto NOC. 5 M/s. G. J. Panjwani 970-Mamdapur(Neral)- NOC for construction of building on Plot bearing No. 35, Hissa No.1 (pt) at village Mamadapur(Neral) 23-08-2012 Structural Stability Certificate is not submitted by party. Letter sent to party on 09.11.2013, 01.09.2014, 05.09.2014 & 20.10.2014. 6 M/s. Vinay Relators 957-SNPD - NOC for proposed Res. Bldg. on CTS No.23, Sector No. 04 at Sanpada, Navi Mumbai. 16-06-2012 File sent to Sr. DEE (TD) KYN on 20.10.2014 for Singnature in OPT. 7 M/s MCGM 926 - KJRD- Proposed plan for New Transport Garage in lieu of Kurla garage on plot beaing CTS No. 108/C at Village Hariyali near Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR on 20.10.2014 for submission of updated land plan as per Railway Reservation of Land. 8 M/s. Khandekar Arch. 895- SNPD- NOC for proposed development on plot bearing No. 22, in sector -4 at Sanpada , Navi Mumbai. 01-06-2011 File sent to Sr. DEE (TD) on 20.10.2014 for signature in OPT. 9 M/s. Sameer S. Ketkar 880 - BUD : NOC for proposed construction of Bldg. on plot bearing No. 325 at village - Kulgaon, Badlapur. 02-12-2010 Construction feasibility has not been received due to non finalization of 3rd line alignment on Kalyan- Karjat section Building NOC cases of BB division pending as on 27.10.2014 .

Transcript of Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway...

Page 1: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

Sr.

No.

Name of the

party

Subjet Date of

submission in

division

Status/Remarks

1 M/s. Aawas

Group

997 - Usarali - NOC for

proposed layout scheme on

S. No. 1 to 93 at village -

Usarali, Tal - PaNVL, Dist -

Raigad.

03-08-2012 Feasibility report yet to be received from

ADEN (M) PNVL / Sr. DCM/Sr. DEE(TD)/ Sr.

DSTE CSTM.

2 M/s Sunny

Housing India

Pvt. Ltd.

991 - PNVL- NOC for

proposed construction at Plot

No. 5 at Sector no. 15, New

Panvel (East)

27-12-2012 Letter sent to party on 20.10.2014 for

attestation of documents.

3 M/s Impact

Design Group

978-LTT- Redevelopement of

building for LIG & MIG

tenements on land bearing

CTS No. 47 (Pt) at Tilak

Nagar, Chembur, Mumbai.

07-11-2012 Proposal is pending with DEN (HQ) CSTM for

reply of queries.

4 M/s Spaceage

consultant

973-Kon- NOC for proposed

STP on plot bearing No. 85/A

to 91/5, village -Kon, Thal

Panvel.

27-09-2012 This is post facto NOC case. There are no

guidelines for issue of post facto NOC.

5 M/s. G. J.

Panjwani

970-Mamdapur(Neral)- NOC

for construction of building

on Plot bearing No. 35, Hissa

No.1 (pt) at village

Mamadapur(Neral)

23-08-2012 Structural Stability Certificate is not

submitted by party. Letter sent to party on

09.11.2013, 01.09.2014, 05.09.2014 &

20.10.2014.

6 M/s. Vinay

Relators

957-SNPD - NOC for

proposed Res. Bldg. on CTS

No.23, Sector No. 04 at

Sanpada, Navi Mumbai.

16-06-2012 File sent to Sr. DEE (TD) KYN on 20.10.2014 for

Singnature in OPT.

7 M/s MCGM 926 - KJRD- Proposed plan

for New Transport Garage in

lieu of Kurla garage on plot

beaing CTS No. 108/C at

Village Hariyali near

Kanjurmarg station (BMC)

23-11-2012 Railway Land boundary is not tallying with

approved land plan. Letter has been sent to

TILR on 20.10.2014 for submission of

updated land plan as per Railway

Reservation of Land.

8 M/s.

Khandekar

Arch.

895- SNPD- NOC for

proposed development on

plot bearing No. 22, in sector

-4 at Sanpada , Navi

Mumbai.

01-06-2011 File sent to Sr. DEE (TD) on 20.10.2014 for

signature in OPT.

9 M/s. Sameer

S. Ketkar

880 - BUD : NOC for

proposed construction of

Bldg. on plot bearing No. 325

at village - Kulgaon,

Badlapur.

02-12-2010 Construction feasibility has not been

received due to non finalization of 3rd line

alignment on Kalyan- Karjat section

Building NOC cases of BB division pending as on 27.10.2014.

Page 2: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

10 M/s. Rajguru

developers

857 - MLND : NOC for

proposed construction of SRA

Scheme on plot bearing CTS

No. 1464 to 1473 of village -

Nahur,Mulund, situated at P.

J. N. Road, & Ghoshala Road

Mulund (West).

08-04-2010 Details of Land acquired in this location has been

asked from Dy.CE (C) vide Letter dt. 20.10.2014 .

11 Smt.

Shakuntala

Hingmire

815 - Bhisegaon (KJT) : NOC

for proposed residential and

commercial Bldg. on CTS

NO. 576 to 586 at village -

Bhisegaon, Karjat.

27-12-2010 Land boundary under dispute. The matter is on

Court.

12 M/s.

Bramhman

Society

753 - TNA : NOC for

extension of existing Bldg.

on PB S. No. 151/4, CS No.

748 at Brahman Society at

Naupada, Thane.

10-07-2007 Feasibility report yet to be received from Sr.

DEE (G) CSTM & Construction Organization.

13 M/s. Spaceage

Consultant

1071 - Parsik : NOC for

proposed Bldg. on property

bearing CTS No. 185 & Gut

No. 181 at village - Parsik,

Tal & Dist - Thane.

08-01-2014 Feasibility report awaited from MRVC.

14 M/s. Dream

Realtor

1027 - Atgaon : NOC for

proposed development of

Bldg. on Old Survey No.

168/2 (new Survey No.

226/2) at Atgaon, Dist -

Thane.

08-07-2013 As per Dy. C. E. ( C ) GC's letter No.:

CE/C/GC/117/IV. dtd. 24.03.2014 Feasibility

report can not be given without finalization

of proposed alignment for 3rd line.

Reminder given on 21.10.2014 to Dy. C. E.

( C ) to give feasibility.

15 Architectural

Consultant

968 : DR-MTN : NOC for

redevelopment on plot

bearing CTS NO. 69/10 of

Matunga division situated at

Lakhasmi Napoo Road,

Dadar (E), Mumbai.

04-05-2012 ADEN (T) BY's Feasibility report is yet to be

received. Reminder -III sent on

01.07.2014. Reminder- IV sent on

20.10.2014.

16 M/s.Sun City

Construction

1066 - Chinchvali : NOC for

proposed residential building

on survey No. 14, Gut No.

3/C at village - Chinchvali,

Tal - Khalapur, Dist - Raigad.

27-03-2014 Feasibility checking by ADEN (N) LNL is in

process.

17 M/s. Mehta

Enterprises

1061: MTN-KCE - NOC for

redevelopment of Bldg. on C.

S. No. 500-C/10, Plot No.

8/A-2 at K. A.

Subramaniyam road,

Matunga-19.

06-05-2014 Office Note prepared & put up to Branch

Officers for signature in OPT.

18 M/s. Aesthetic

Planner (Mr.

Arshad Amir

Porbanderwala

)

1055 : Khandala - NOC for

proposed construction of

building on Survey No. 113

at Khandala, Tal - Maval,

Dist - Pune.

06-02-2014 Feasibility checking is in process.

Page 3: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

19 Shri - Shekhar

Parab

1049 - Badlapur (Kulgaon) -

NOC for proposed Bldg. on S.

No.13, H. No. 1 / 4 at village

- Kulgaon, Badlapur, Tal -

Ambernath, Dist - Thane.

17-10-2013 Feasibility report yet to be recd. From

ADEN (T) KYN & Sr. DCM & Sr. DSTE CSTM.

20 Mr. Hasan

Asgar Ali

Choudhary

1047: Badlapur ( Belavali) -

NOC for proposed Bldg. on

plot No.4, S.No.83,Hissa

No.4 (Pt) at village -

Belavali, Badlapur (West),

Tal- Ambernath, Dist -

Thane.

28-05-2013 This is post facto NOC case. There are no

guidelines for issue of post facto NOC.

21 Smt. Darshana

A. Damle

1040 : Badlapur ( Belwali) -

NOC for proposed

construction of Bldg. on S.

No. 77, Hissa No. 1,2 & 3 at

village - Belwali, Tal -

Ambernath, Dist - Thane.

02-09-2013 Feasibility report yet to be recd. from Sr.

DSTE & Construction Organization

Reminder - II sent on 18.08.2014. Reminder-

III sent on 21.10.2014.

22 Mr. Manohar

V. Choudhary

1031 : Kanchgaon - NOC for

proposed Bldg. on S. No. 71

(New), H. No. 2,3 etc at

village - Kanchgaon, Tal -

KYN, Dist - Thane.

23-08-2013 Feasibility report yet to be Recd. from ADEN

(Wks) KYN & Br. Officers. Rerminder - III

Sent on 18.08.2014. Reminder-IV sent on

21.10.2014.

23 M/s.

Destination

1016 : Shelu (Banshivali) -

NOC for development of

proposed Bldg. on CTS No.

37/1, 37/3, 38 & 39/2 at

village - Bandhivali, Shelu,

Tal- KJT, Dist - Rigad.

06-05-2013 3rd and 4th line is passing through this

area. The alignment of the same is under

finalisation. The case will be processed after

finalisation of alignment.

24 M/s. Jay Ambe

Builders &

Developers

1032: Kharbav (Malodi) -

NOC for proposed

development of Residential

Building on plot bearing

S.No. 67 & 37 at village -

Malodi, Kharbav, Tal -

Bhiwandi, Dist - Thane.

13-08-2013 Feasibility Report yet to be recd. from

ADEN (NE) KYN & Sr. DCM CSTM. Reminder -

IV sent on 18.08.2014. Reminder-V sent on

20.10.2014.

25 M/s. Krupa

Sindhu Builder

& Developers

1038 - Karjat : NOC for

proposed Residential Building

on land bearing Survey No.

2/3 at village - Kosane,

Karjat, Tal - Karjat, Dist -

Raigad.

20-09-2013 Feasibility report yet to be recd. from

ADEN(T) KYN & Const Org. Remidner - V

sent on 18.08.2014. Reminder-VI sent on

20.10.2014.

26 M/s. DOT

Architects

1028 - KJRD - NOC for

proposed development of

Slum Rehabilitation on CTS

No. 122 at village - Hariyali,

Karve Nagar, Kanjurmarg

(East), Mumbai.

17-07-2013 Feasibility report yet to be recd. From

Constn. Organization. Reminder- IV sent on

18.08.2014. Reminder-V sent on

20.10.2014.

27 M/s. G. N.

Gandhe

(Architect()

1026 - Usarali (Khurd) - NOC

for proposed development of

Bldg. on Plot bearing Survey

No. 07, Hissa No. 02 at

village - Khurd, Usrali, Tal -

29-01-2013 The feasibility has been received from all

BOs. Preparation of OPT is under

finalisation.

Page 4: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

28 Mr. N. M.

Mahale

(Architect)

1021 - Kurla - NOC for

proposed redevelopment

Scheme on plot bearing CTS

NO. 9/A & 10/1A at S. G.

Barve Marg, L-ward, Kurla.

21-05-2009 Party not submitted the structural stability

Certficate & Floorwsie plan attested by

Architect. Party has been asked to submit

the documents on 20.10.2014.

29 M/s Anand V.

Dhoke

1086 - CMBR(Deonar)- NOC

for proposed redevelopement

of building on land bearing

CTS No. 74-A/3-A, 74-A/01

& 75 at village - Deonar,

Chembur, Mumbai

14.07.2014 Feasibility report yet to be received from

ADEN (M) MNKD & all Branch Officers.

30 M/s. Omkar

Developers

980-CHF- NOC for proposecd

construction of building plot

bearing no. 570/to 570/72 of

village Kurla for Co. Housing

society Ltd at Sainath Nagar.

Party has

approch on

12-12-2012

with

incomplete

document

and left out .

And again

submitted on

21.07.2014.

Feasibility report yet to be received from all

Branch Officers.

31 M/s. H. S.

Thakker &

Associates

716 - Sion – Matunga : NOC

for proposed construction of

Commercial Building on plot

bearing C.S No. 411/6, plot

No. 11 of Sion-Matunga

Estate, Sion (West) Mumbai.

10.09.2007 1)  Structural Certificate, 2)  Methodology

certificate has not submitted by party.

Party has been asked to submit the

documents on 20.10.2014.

32 Shri Sadashiv

Shankar

Chande

572 - Asangaon – NOC for

proposed construction of

Building (Type - “A & B”) on

plot bearing S. No. 107,

Hissa No. 2 at Village –

Asangaon, Tal – Shahapur,

Dist – Thane.

23.11.2004 Structural Certificate not submitted by

party. Party has been asked to submit the

document on 20.10.2014.

33 Shri P. N.

Sanghadia

(Architect)

845 - CRD - NOC for

Redevelopment (Irani

Chawl) on plot bearing C. S.

No.94 of Lower Parel

Division, Delise Road ( N. M.

JoshiMarg)Currey Road,

Mumbai.

19.01.2010 1)  Structural Certificate, 2)  Methodology

certificate not submitted by party. Party

has been asked to submit the documents on

20.10.2014.

34 M/s. AIMS

Consultants

870 - Chembur - NOC for

Redevelopment Scheme on

plot bearing C.T. S. No.

811/ 01 to 11 at N. G.

Achraya Marg, M-Ward,

Chembur, Mumbai.

18.08.2010 1)   Structural Certificate, 2) Municipal

Authority / Grampanchayat letter not

submitted by party. Party has been asked to

submit the documents on 20.10.2014.

Page 5: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

35 M/s. Smita

Conductors

Ltd.

950. - Vithalwadi – NOC for

proposed construction of

building on Plot bearing

C.T.S. No. 164, 165, 168,

169 & 170 at Vithalwadi,

Tal – Ulhasnagar, Dist –

Thane.

14.09.2011 Municipal Authority / Grampanchayat letter

not submitted by party. Party has been

asked to submit the documents on

20.10.2014.

36 Shri Harish

D. Shetty

825 - Dombivli – NOC for

proposed construction of

building on plot bearing

Survey No. 34 (Pt), CTS No.

4022 to 4034 at Dombivli

(West), Tal – Kalyan, Dist –

Thane.

09.10.2009 1) Municipal Authority / Grampanchayat

letter, 2)  Owners letter for NOC. 3)  

Documents regarding ownership of land not

submitted by party. Party has been asked

to submit the documents on 20.10.2014.

37 M/s. Sidharth

Developers

993 - Badlapur ( Belavli) –

NOC for proposed building on

land bearing Survey No. 82,

Hissa No. 2 & Survey No. 83,

Hissa No. 1(Pt) at village –

Belavali, Badlapur, Tal-

Ambernath, Dist – Thane.

29.10.2012

(Recd. On

05.11.2012)

Feasibility report yet to be received from

ADEN (T) KYN and Dy. C E. ( C ) Survey.

38 M/s. Suyog

Associates

1072 - Ulhasnagar – NOC for

proposed building on Plot

No. 161 (Pt),Unit No. 67 to

81, Sheet No. 29, on CTS

No. 30285 at village –

Ulhasnagar -03.

28.03.2014 Feasibility report yet to be recd. From ADEN

(T) KYN & Sr. DEE (G) CSTM, Sr. DCM

CSTM.

39 Mr. Dattatraya

B. Awate. M/s.

Aarini Dream

build Pvt. Ltd.,

1039 - Karjat (Halivali) –

NOC for development of

proposed building on plot

bearing Survey No. 36/3/A,

37/1 at village – Hariyali, Tal-

Karjat, Dist - Raigad.

Recd. On

16.07.2013

Feasibility report yet to be received from

ADEN (T) KYN.

40 Mr.

Upendrabhai

Patel.

1054 - Karjat – NOC for

proposed Residential building

on property survey No.

2/8/A/1 & 2/8/A/2 at village

– Diksal, Karjat, Tal – Karjat,

Dist – Raigad.

19.12.2013 Feasibility report yet to be received from

ADEN (T ) KYN & Sr. DSTE, Sr. DOM, Sr.

DCM & Construction Orgnization.

41 Mr. Ulhas H.

Ambvane.

1037 - Badlapur – NOC for

proposed building on Land

bearing survey No.70/1,70/2

at village – Kasgaon,

Badlapur, Tal – Ambernath,

Dist – Thane.

11.06.2013. Feasibility report yet to be received from ADEN (T)

KYN & Constructon Organization. Intially letter

circulated to all branch officers on 17.10.2013.

42 Mr. Shripad S.

Apte.

947 - Neral : NOC for proposed

Residential Building on land

bearing Survey No. 72 at Neral,

Tal - Karjat, Dist - Raigad.

27.02.2012 Feasibility report yet to be received from Sr. DCM,

Sr. DSTE & Construction Organization.

Page 6: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

43 M/s. Hitendra M.

Patel.

1057 - Shelu (Karjat) – NOC

for development of proposed

building on plot Bearing

Survey No. 23 & 46, Hissa

No. 3/A at village –

Bandhivali, Karjat, Shelu, Tal

– Karjat, Dist – Raigad.

26.08.2013. Feasibility report yet to be received from Sr. DSTE,

Sr. DEE (G), Sr. DCM & Construction Organization.

44 M/s. Rachana

Relators.

941 - Badlapur (Belavali)–

NOC for proposed building

on Land bearing survey

No.78, Hissa No. 3 (Pt), Plot

No. 05 at village – Belavali,

Badlapur (West).

04.01.2012. Feasibility report yet to be received from

Construction Organization.

45 M/s. Darshana

Damle.

1035 - Badlapur ( Belavli) –

NOC for proposed building on

land bearing Survey No. 166

at village – Chikhaloli,

Badlapur (East), Tal –

Ambernath,

13.08.2013. Feasibility report yet to be received from

Construction Organization and ADEN (T) KYN

46 Mr. Pritesh B.

Ghorpade.

995 - Badlapur (Belavali) –

NOC for proposed building

on land bearing Survey No.

53, Hissa No. 2 at village –

Belavali, Badlapur (East),

27.12.2012. Requirement of land for 3rd line to construction

department - required distance from Railway is

33.10 and which morethan provided distance 23.0

m. Hence NOC can not be granted.

47 M/s. Prakash

Sharma

994 - Badlapur ( Belavli) –

NOC for proposed building on

land bearing Survey No. 49,

Hissa No. 02 (Pt) at village –

Belavli, Badlapur (East), Tal

– Ambernath, Dist – Thane.

12.03.2013. As per Construction organization's letter dated

22.07.2013, the proposed 3rd line alignment of

Kalyan- Karjat sections not finlized, will take few

month hence feasibility report can not be given

till date. Reminder to Dy. C. E. ( C ) on 20.10.2014.

for submitting feasibility report as early as

possible.

48 M/s. Infinity

Group.

1029 - Shelu – NOC for

proposed building on land

bearing Survey No. 55/1,

55/2-A, 55/3, 55/4, 55/5,

54/2 at village –Damat,

Shelu, Tal- Karjat,

17.05.2013. As per Construction organization's letter dated

22.07.2013, the proposed 3rd line alignment of

Kalyan- Karjat section is not finlized hence

feasibility report can not be given till date.

Construction has been asked to finalise the

alignment at the earliest.

49 Mrs. Ila Ravi Patil 1084 - Diwa (Mhatardi) –

NOC for proposed

construction of building On

survey No. 74, Hissa No. 9/B

at village – Mhatardi,

Diwa,Tal- TNA, Dist - TNA.

07.05.2014 Drawing under Preparation.

50 Mrs. Ila Ravi Patil 1085 - Diwa (Mhatardi) –

NOC for proposed

construction of building On

survey No. 94,at village –

Mhatardi, Diwa,Tal- TNA,

Dist - TNA.

07.05.2014 Drawing under Preparation.

Page 7: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

51 Mr. Prakash

Sharma

1093 - Badlapur : NOC for

proposed construction of

Building on land bearing

Survy No. 34 & 33 (Pt) at

village - Belavali, Tal- ABH,

Dist - Thane.

30.05.2013 Letter written to party on 22.10.2014 for

submitting the Stability Certificate,

Floorwise plan etc attested by Architect.

52 M/s. Aman

Developers

1088 - Lonavla - NOC for

proposed construction of

buildsing on land bearing CTS

No. 186/26, 188, 189 /A at Old

Khandala Road, "H"-Ward,

Lonavla.

21.07.2014 Letter written to party on 22.10.2014 for

submitting all the documents with attestation by

Architects.

53

M/s Shri Sharad Mahajan

(690) Sub: KJRD-NOC for

proposed rehabilation scheme

under R&R for PAPs on lnd

bearing CTS No. 119(pt) S ward

at Vuillage hariyali, KJRD (East)

01-03-2007 This is post facto NOC case. There are no

guidelines for issue of post facto NOC.

54

M/s.

Vardhamad

Developers

986 - GC- NOC for proposed

construction of residential

building on plot bearing No.

871 to 881 at vilage Kirol,

GC, Mumbai

19-12-2012

This is post facto NOC case. There are no

guidelines for issue of post facto NOC.

55

M/s. Sumedha

Gore

984 - MTN - NOC for

proposed redevelopment of

existing Bldg. ( Uma Niwas)

on plot bearing No. 8 B/ 4,

C. S. No. 500 G /10 of DR-

MTN Estate Scheme on K. A.

Subramaniam road,

Matunga, Mumbai -19

18-10-2012Incomplete proposal. Party has been

advised accordingly.

56M/s. Rajan

Kulkarni &

Associates

916- GV - NOC for

temporary RMC Plant on plot

bearing CTS No. 74 to 83 at

Govandi, Mumbai

13-06-2011Feasibility report yet to be received from

ADEN(M) MNKD & MRVC.

57

M/s. Pappu

Developers

908-KYN (E) - NOC for

proposed Bldg. on ploty

bearing S. No. 220 (Pt),

221/1,2 (Pt), 222, 223 (Pt) ,

224 (Pt) at Lokgram , Kalyan

(East).

11-07-2011Remark awaited from ADEN (T) KYN .

Reminder sent on 31.10.2013

58

M/s. Alfa Mana

Realtors Pvt.

Ltd.

911- MZN - NOC for

proposed Redevelopment of

Building on property bearing

CTS No. 110 of Mazgaon

Division, "E"-ward, at

Mazgaon, Mumbai.

11-07-2011Querries raised by HQ. Party not submitted

some documents till date.

Page 8: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

Building NOC cases of NGP division pending as on 27.10.2014.

Sr. No.

Name of Party Subject Date of submission in

Div.

Status / Remarks

1 Smt. Rama Jaiprakash Chourasia.

Issue of NOC for constn. of bldg. on Plot No. 6, Kh. No.55, 56, 57/1, Mouza- Mankapur.

17.01.2011 Structural stability certificate is awaited from party in proper format.

2 Smt. Manjiri Pravin Naik.

Issue of NOC for constn. of bldg. on Plot No. 19, Kh. No.111/2, 112/2, Mouza- Somalwada.

11.10.2011 Structural stability certificate is awaited from party in proper format.

3 Shri Moreshwar Mahadevrao Halbe.

Issue of NOC for constn. of bldg. on Plot No. 30, Kh. No.102/1, 157, Mouza- Somalwada.

31.07.2013 Approval of Branch Officers is under process.

4 Shri Milind Jagannath Kapure, POAH of Shri Arun Fattuji Lokhande.

Issue of NOC for constn. of bldg. on Plot No. 114, Kh. No.71, Mouza- Zingabai Takli.

17.12.2013 Drg. is under preparation.

5 Smt. Yogini S. Dhote

Issue of NOC for constn. of bldg. on Plot No. 30, Kh. No.102/1, 157, Mouza- Somalwada.

06.12.2013 Revised drg. & structural stability certificate is awaited from the party.

6 Smt. Manda Dilipsingh Tomar

Issue of NOC for constn. of bldg. on Plot No. 114, Kh. No.71, Mouza- Zingabai Takli.

31.12.2013. Revised drg. & structural stability certificate is awaited from the party & drg. is under preparation.

7 Shri Shyamkumar Lalaramji Jaiswal.

Issue of NOC for constn. of bldg. on Plot No. 36, Kh. No.57/2, Mouza- Somalwada.

17.02.2014 Approval of Sr. DSTE is awaited. B.P. copy of drg. Submitted on 07.07.2014.

8 Shri Praful Bhaurao Wahadude.

Issue of NOC for constn. of bldg. on Plot No. 48, 49, 50, Kh. No.158/1, Mouza- Somalwada.

26.03.2014 Feasibility report awaited from ADEN (S).

9 Shri Narayan Govindrao Joshi.

Issue of NOC for constn. of bldg. on Plot No. 4, Kh. No.97/1, Mouza- Zingabai Takli.

23.01.2012 Letter dtd. 5.9.2014 sent to party for submission of revised set of drg. & structural stability certificate. Party has not submitted the above details till date.

10 Shri Lalit Vasudeo Mahajan

Issue of NOC for constn. of bldg. on Plot No. 36, Kh. No.111, 112/1, Mouza- Somalwada.

05.06.2014 OPT drg. handed over to party for sign. of Architect & party. OPT drg. Awaited duly signed by Architect & Party.

11 Shri Tushar Vasudeo Mahajan.

Issue of NOC for constn. of bldg. on Plot No. 9, Kh. No.100/2, 103/2, Mouza- Somalwada.

05.06.2014 OPT drg. handed over to party for sign. of Architect & party. OPT drg. awaited duly signed by Architect & Party.

12 Smt. Pornima Haridas Dhongde.

Issue of NOC for constn. of bldg. on Plot No. 36, Kh. No.158/1, Mouza- Somalwada.

06.06.2014 Drg. is under preparation.

Page 9: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

13 Shri. Shekhar Chintaman Gondane

Issue of N.O.C. for construction of building on plot No. 22-A,Khasra No. 158/1, Mouza- Somalwada.

9/11/2011 Drg. is under preparation.

14 Shri, I.S. Pathan P. No. 141, Z. Takli 7/10/2011 Drg. is under signature of Branch Officers.

15 Shri. Mod. Jamil, Mod. Yunus

P.No.46,47 20/04/2009 Site report not signed by ADEN (N). Letter to ADEN (N) on 02.09.2014 for signing feasibility report.

16 Shri. Gondhali Padma

P.No. 62 Z.Takali 20/03/2013 Letter dtd. 8.9.2014 sent to party for submission of revised set of drg. & structural stability certificate. Party has not submitted the above details till date.

17 Smt. Vina Kirar P.No. 44-A Z. Takali 29/05/2012 Letter to ADEN (N) for submission of feasibility report dtd. 02.09.2014.

18 Shri. Kiran Kumar Ghiya, C/o Shri. M. Mulik

P.No. 37 Dhantoli 18/01/2013 Letter dtd. 8.9.2014 sent to party for submission of revised set of drg. & structural stability certificate. Party has not submitted the above details till date.

19 Smt. Rekha Sudharrao Bhasme

P.No. 1 Somalwada 28/08/2012 Approval of Sr. DSTE is awaited . B.P. copy of drg. Submitted on 24.09.2014

20 Shri Dnyaneshwar Chandrabhanji Bagde.

Issue of N.O.C. for construction of building on plot No. 35, Khasra No. 99, Mouza- Zingabai Takli.

07/08/2014

Letter sent to ADEN (N) for submission of feasibility report.

21 Shri Dhananjay

Nemichand Jain.

Issue of N.O.C. for construction of building on plot No.23, Khasra No. 100/2, 103/2, Mouza- Somalwada.

30/06/2014

Drg. is under preparation.

22 Shri Mohnish

Manoj Kothari.

Issue of N.O.C. for construction of building on plot No. 12, Khasra No. 100/2, 103/2, Mouza- Somalwada.

30/06/2014

Drg. is under preparation.

23 Smt. Nirmala Vijay Nagmote.

Issue of N.O.C. for construction of building on plot No. 7, Khasra No. 54/2, Mouza- Somalwada.

11/09/2014

Feasibility report awaited from ADEN (HQ).

24 Shri Azizur Rehman Rafique.

Issue of N.O.C. for construction of building on plot No. 10, Khasra No. 75, Mouza- Zingabai Takli.

11/09/2014

Feasibility report awaited from ADEN (N).

Page 10: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

Building NOC cases of BSL division pending as on 27.10.2014.

Sr. No

Name of the

party

Subject Date of submission in division

Status / Remarks

1 Shri. G. J.

Rane

To issue NOC for construction of

house by Shri. Ganesh Janardan Rane, of Jalgaon on his own private

land on Plot No. 15 in Gat No. 171/2 between Jalgaon Sirsoli section at Km

416/25-27 adjoining to railway land.

03-06-2012 Proposal submitted to HQ on

2-09-2014. Proposal returned by HQ on 11-9-2014 for

compliance of queries. Proposal re-submitted to HQ

on 19-09-2014 & returned by

HQ on 1-10-2014 for

compliance.. Party has been advised accordingly

2 Smt.

Meenal Tushar

Bafna

To issue NOC permission for

construction of private building on your own private land at Survey No.

8/1 & 8/2 at village Vihitgaon, Tal.

Dist. Nasik.

25-07-2012 Structural Stability certificate

and Municipal Corporation’s letter is not submitted. Letter

given to the applicant for

submission of certificates on dated 24-07-2014.

3 Shri Dadawadi

Sansthan

Trust

To issue NOC for construction of Temple building on their own private

land, bearing plot No. 5/6 of Nazul

sheet No. 65 in Mouje Peth Amravati, Pragane – Badnera, Tal. & Dist.

Amravati, total admeasuring area 1416.06 Sq. M.

25-06-2014 Feasibility received from ADEN/E/AK on dated 14-07-

2014, Drawing is under

process.

4 Smt.

Sushma B. Kabra

To issue NOC for the construction of

private building of Smt. Sushma B. Kabra, NKRD on own private land of

sheet No. 44/16+3A/1+3B/1A/2 between Railway Kms. 189/27-

190/01, NKRD.

30-10-2012 Drawing prepared and sent to

BO’s on dated 05-09-2014

5 Shri. P. Sonawala

A.A.N.P.T.

To issue NOC for the construction of Anant Arogya Nidhi Public Trust’s

building, 184/23-25 in survey No.

17/7 B+9, area measuring 3900Sq. M. at Vihitgaon, Devlali Tal. Dist.

Nasik in between IGP-BSL section

30-01-2014 Drawing prepared and sent to BO’s on dated 22-08-2014

6 Shri. Md.

R. U.

Meman

To issue NOC to Shri. Mohmmad

Rizwan Usman Memon of Nasik Road,

for construction of residential building on his own private land on plot No. 2

of survey No. 245/1 at Devlali Dist. Nasik measuring 700 Sq. M, adjoining

to Railway land.

20-01-2013 Drawing prepared and sent to

BO’s on dated 05-09-2014

7 Shri A. P. Ghurade

To issue NOC for construction of house on own private land on survey

No. 22/1, plot No. 14B, measuring

area 1615 Sq. Ft. in Patel Nagar at Mouje – Akoli, Tal. & Dist. Amravati

between Railway Kms. 667.007 to 668.195 on BD-NRKR section,

adjoining to Railway land.

26-11-2013 Proposal submitted to HQ on 3.6.2014. Queries raised by

HQ on 10.6.14 were replied &

case sent to HQ’s on dated 24-07-2014. Proposal returned by

HQ for compliance of queries regarding verification of land

with original land plan.

Page 11: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

8 Shri.

Nagesh G. Patil

To issue NOC to Shri. Nagesh

Gangadhar Patil, of Jalgaon for construction of residential building on

his own private land near Km 421/21-

23 area measuring 189.00sq. m. at Jalgaon, Tal. & Dist. Jalgaon,

adjoining Railway land.

24-02-2014 Proposal submitted to HQ on

4.9.2014.Queries raised on 12.9.14 were replied & sent to

HQ’s on dated 19-09-2014. .

Proposal returned by HQ for compliance of queries on 1-

10-2014. Case will be re- submitted to HQ shortly.

9 Shri A. S.

Patil

To issue NOC for construction of

private building adjoining Railway land boundary from Survey No. 281,

CTS No. 8218 & Plot No. 1, at Km 418/18-20 of Shri. Ananda Sada Patil.

05-12-2007.

(Proposal closed on

15.9.2010 due to non-

compliance of

queries. Case reopened on

applicant’s request &

resubmitted on 25-02-

2014)

Re-submitted the case on

30.9.2014 after compliance of querries raised by HQ on

3.7.2014 and 18.7.2014. Case is under scrutiny at HQ.

10 Shri. J. S. Thakur

To issuing NOC for construction of residential building on his private own

land on Plot No. 148 of Gat No. 44

CTS No. 7850 area measuring 137.37 sq. m. at Pimprala shivar Dist.

Jalgaon, adjoining Railway land.

10-10-2013 The height of proposed building was more than

Railway’s guide lines and site

check report. (Letter given to applicant on dated 25-07-

2014.) Applicant submited the revised drawing on dated 30-

09-2014.

11 Shri. U. A. Shitole

To issue NOC for the construction of private house of Shri. Umesh Ajabrao

Shitole, on gat No. 28 area 0.41 Hector at Mouje Kherda Bu. Dist.

Washim, between Railway Kms.

642/1-3 on down side of MZR-YTL Narrow gauge section.

25-10-2013 Proposed building plan is not submitted by applicant and Rs.

2000 is also not remitted by applicant. (Letter given to the

applicant on dated 25-07-

2014)

12 Shri. B. J.

Dabore

NOC for the construction of proposed

building on city survey No. 2211/49 at railway Km 420/18-20 on MMR-BSL

section belongs to Shri. Bansi Jagan Dabore.

18-01-2010.

(Proposal closed on

15.9.2010 due to non-

compliance of queries. Case

reopened on

applicant request Dt.

31.12.13)

Proposal submitted to HQ on

4.4.2014, returned by HQ for

compliance of queries.. Party has been advised accordingly.

13 Smt. S. R. Nadiyana

To issue NOC for construction of house on own private land, on plot

No. 21/A in survey N o. 22/1 near railway Km 669/19 on Badnera

Narkhed section Mouje- Akoli, Tal. &i Dist. Amravati.

28-02-2014 Drawing prepared and sent to BOs on dated 08-08-2014

Page 12: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

Building NOC cases of PA division pending as on 27.10.2014. Sr.No.

Name of party

Subject Date of submission in Div.

Status / Remarks

1 Dinesh m. Korgaonkar

Issue of NOC for construction of building on CTS No. 523 at kms. 46/7-8 on MRJ-KOP section near Kolhapur.

8.2.2011 Proposal submitted to HQ on 25.7.12 and returned by HQ on 29.8.12 for compliance of queries regarding ownership of land. Reply sent on 13.9.12 & on 11.6.2014. Proposal under scrutiny in HQ.

2 Vaishnavi associates

Issue of NOC for construction of building on survey No. 252/1,2,3,4 & 5/1- 5, CTS No. 4493 at kms. 176/3-5 (Up side) on PA-LNL section at Chinchwad, Pune

4.1.2011 Proposal submitted to HQ on 10.3.2012. It is returned by HQ for compliance of queries. Party has been advised to submit proper structural stability certificate, municipality certificate and plan showing drainage arrangement etc.

3 Mrs. V.D. Jamdade

Proposed construction of building at survey no 122 at Barmati.

1.3.2013 Proposal submitted to HQ on 12.2.2014 and returned by HQ on 23.7.2014 for compliance of queries regarding Railway land width. Letter sent to party on 1.9.14 for joint survey with revenue dept. & Railway.

4 R.G.Chaudhari, URI-YT

Issue of NOC for construction of building at Rly. Kms. 232/500-700 between YT-URI stations on PA-DD section

17.4.2014 Case is Under DRM’s approval.

5 Shri.P.M. Jain and others

on Survey No. 63/2+3+4, 65/4 1 B, 63/5A/6A, 64/A/2-A and 64/A (Part), 2388, 2381 and 2179 (Part) at Rly. Kms. 183/13-15 DN Road

27.4.2013 Proposal submitted to HQ on 1.9.2014 and returned by HQ on 16.9.2014 for compliance of queries. Party has been advised accordingly.

6 Shri. Subhash Mohan Kadam.

Issue of NOC for construction of building on Survey No. 9/11-4 at Rly. Kms. 44/0-1 on MRJ-KOP section

17.7.2013 Proposal submitted to HQ on 4.9.2014 and returned by HQ on 16.9.2014 for compliance of queries. Party has been advised accordingly

Page 13: Sr. Name of the Subjet Date of Status/Remarks€¦ · Kanjurmarg station (BMC) 23-11-2012 Railway Land boundary is not tallying with approved land plan. Letter has been sent to TILR

Building NOC case of SUR division pending as on 27.10.2014. 1 Manisha

balasaheb

jadhav

To obtain construction permission

in Daund C.T.S. No. 2561 N.A.

Plot No. 98/99

29/08/20

13 Case is Under process.