N The contract packages shown below represent the work that is necessary to construct the SR 99 tunnel and remove the Alaskan Way Viaduct’s central waterfront section. Contract type: Design-build Major scope items: Manufactures tunneling machine. Builds bored tunnel (9,270 ft.) and interior stacked roadway with two lanes in each direction. Builds cut-and-cover tunnel (1,700 ft.) at north and south portals. Installs fire, life and safety systems. Builds tunnel operations buildings at tunnel’s north and south ends. Installs traffic management systems, overhead signage and electronic tolling equipment. SR 99 Tunnel Contract type: Design-build Major scope items: Demolishes the viaduct. Restores roadway. Viaduct Removal Contract type: Design-bid-build Major scope items: Removes soot and asbestos. Disconnects power, water and drainage lines. Relocates utilities that run through the tunnel. Fills tunnel with suitable material and seals portals. Battery Street Tunnel Decommissioning SR 99 Tunnel Contract type: Design-bid-build Major scope items: Built connections between the tunnel’s north portal and Aurora Avenue North. Built SR 99 on- and off-ramps. Extended Sixth Avenue North. between Harrison and Mercer streets. Installed stormwater control and signage. Relocated utilities. North Access Project North Access Project Contract type: Design-bid-build Major scope items: Reconnects John and Thomas streets across SR 99 and rebuilds a small section of Denny Way and Wall Street. Improves Aurora Avenue North between Denny Way and Harrison Street. Restores drainage, landscaping and sidewalks. North Surface Street Connections North Surface Street Connections Alaskan Way Viaduct REPLACEMENT PROGRAM February 2017 SR 99 Tunnel - Project Delivery Contract type: Design-bid-build Major scope items: Connects the South Holgate Street to South King Street project with the tunnel. Builds SR 99 on- and off-ramps connecting the tunnel’s south portal to city streets. Removes SR 99 construction bypass. Installs landscaping, sidewalks, signage and stormwater control. South Access Project (SR 99 connections) Contract type: Design-bid-build Major scope items: Connects surface streets between South Atlantic Street and South King Street. Builds south operations building parking facility. Installs landscaping and pedestrian plazas. Reconstructs First Avenue. Contract type: Design-bid-build Major scope elements: Builds off-ramp bridge from northbound SR 99 to South Dearborn Street. South Access Project (S. Dearborn Street Off-Ramp Bridge) South Access Project (Surface street connections) Contract type: Design-bid-build Major scope items: Built foundations for off-ramp bridge from northbound SR 99 to South Dearborn Street. South Access Project (Drilled shafts)

Transcript of SR 99 Tunnel - Project Delivery€¦ · SR 99 Tunnel - Project Delivery Contract type:...

Page 1: SR 99 Tunnel - Project Delivery€¦ · SR 99 Tunnel - Project Delivery Contract type: Design-bid-build Major scope items: • Connects the South Holgate Street to South King Street

S H

OL

GA

TE

ST

RE

ET

S WA L K E R S T R E E T

C e n t u r y L i n k Fi e l d

N

The contract packages shown below represent the work that is necessary to construct the SR 99 tunnel and remove the Alaskan Way Viaduct’s central waterfront section.

Contract type: Design-build

Major scope items:• Manufactures tunneling machine.• Builds bored tunnel (9,270 ft.) and interior stacked

roadway with two lanes in each direction.• Builds cut-and-cover tunnel (1,700 ft.) at north and south

portals.• Installs fire, life and safety systems.• Builds tunnel operations buildings at tunnel’s north and

south ends.• Installs traffic management systems, overhead signage

and electronic tolling equipment.

SR 99 Tunnel Contract type: Design-build Major scope items:• Demolishes the viaduct.• Restores roadway.

Viaduct Removal

Contract type: Design-bid-build Major scope items:• Removes soot and asbestos.• Disconnects power, water and drainage lines.• Relocates utilities that run through the tunnel.• Fills tunnel with suitable material and seals portals.

Battery Street Tunnel Decommissioning

SR 99 Tunnel

Contract type: Design-bid-build Major scope items:• Built connections between the tunnel’s north portal and Aurora

Avenue North. • Built SR 99 on- and off-ramps. • Extended Sixth Avenue North. between Harrison and Mercer

streets.• Installed stormwater control and signage. • Relocated utilities.

North Access Project

North Access Project

Contract type: Design-bid-build Major scope items:• Reconnects John and Thomas streets across SR 99 and

rebuilds a small section of Denny Way and Wall Street.• Improves Aurora Avenue North between Denny Way and

Harrison Street.• Restores drainage, landscaping and sidewalks.

North Surface Street Connections

North Surface Street Connections

Alaskan Way Viaduct REPLACEMENT

PROGRAM

February 2017

SR 99 Tunnel - Project Delivery

Contract type: Design-bid-build

Major scope items:• Connects the South Holgate Street to South King Street

project with the tunnel.• Builds SR 99 on- and off-ramps connecting the tunnel’s

south portal to city streets.• Removes SR 99 construction bypass.• Installs landscaping, sidewalks, signage and stormwater

control.

South Access Project (SR 99 connections) Contract type: Design-bid-buildMajor scope items:• Connects surface streets between South

Atlantic Street and South King Street.• Builds south operations building parking facility.• Installs landscaping and pedestrian plazas.• Reconstructs First Avenue.

Contract type: Design-bid-build

Major scope elements:• Builds off-ramp bridge from northbound SR 99 to South

Dearborn Street.

South Access Project (S. Dearborn Street Off-Ramp Bridge)

South Access Project (Surface street connections)

Contract type: Design-bid-build

Major scope items:• Built foundations for off-ramp bridge from northbound

SR 99 to South Dearborn Street.

South Access Project (Drilled shafts)

Page 2: SR 99 Tunnel - Project Delivery€¦ · SR 99 Tunnel - Project Delivery Contract type: Design-bid-build Major scope items: • Connects the South Holgate Street to South King Street

These contract packages represent the work that was necessary to replace the south end of the Alaskan Way Viaduct between South Holgate Street and South King Street.The stages of work shown here include a temporary bypass between South Royal Brougham Way and South King Street that connects the new SR 99 roadway to the existing viaduct along the waterfront. A connection between the new roadway and the SR 99 tunnel will be built as part of the tunnel’s South Access Project.

Alaskan Way Viaduct REPLACEMENT

PROGRAM

February 2017

S. Holgate Street to S. King Street Viaduct Replacement - Project Delivery

99

99

Contract type: Design-bid-build

Major scope items:• Rebuilt and relocated utilities.• Prepared the area for road and bridge construction.

Contract type: Design-bid-build

Major scope items:• Replaced SR 99 between South Holgate and South King

streets.• Relocated railroad track.• Improved surface streets.• Built new bicycle/pedestrian facilities.

Contract type: Design-bid-build Major scope items:• Built overpass of railroad track at South Atlantic Street.• Finished building the shared bicycle/pedestrian path on

east side of Alaskan Way South.• Built future connection between Alaskan Way South and

East Marginal Way South.

Stage 1 (Utility relocation) Stage 2 (SR 99 road and bridge construction) Stage 3 (S. Atlantic Street overpass)

Stage 1 (Utility relocations)

SR 99 detour

S K

ING

ST

S R

OYA

L B

RO

UG

HA

M W

AY

S M

ASS

AC

HU

SETT

S ST

S AT

LAN

TIC

ST

UTAH AVE S

TERMINAL 46

COLORADO AVE S

ALASKAN WAY S

S H

OLG

ATE

ST

S W

ALK

ER S

T

EAST MARGINAL WAY S

1ST AVE S RAILROAD WAY S